Stormwater Annual Report

Page 47

5.0

EVALUATION OF THE STORMWATER PROGRAM

The 2010 MS4 Permit requires the City to provide an evaluation of the progress and success of the City’s stormwater management program, including an assessment of the effectiveness of stormwater management practices in reducing the discharge of pollutants to and from the City’s MS4 in the Annual Report. 5.1 PROGRAM PROGRESS The City has drafted the following standard operating procedures addressing the requirements provided in the 2010 MS4 Permit. The most current date of these procedures is also provided. •

Commercial & Industrial Facility Inspection Standard Operating Procedures (September 2011)

Environmental Code Violation Standard Operating Procedures (September 2011)

Environmental Program Training Standard Operating Procedures (February 2012)

Standard Operating Procedures for City Facility Compliance Assessments (February 2012)

Standard Operating Procedures for City Field Operations Activities (September 2011)

Standard Operating Procedures for City Stormwater Infrastructure Operations Activities (March 2011)

Standard Operating Procedures for Construction Activities of City Projects (March 2011)

Standard Operating Procedures for Construction Activities of Private Projects (September 2011)

Standard Operating Procedures for Stormwater Monitoring (currently in draft)

Wet-Weather Stormwater Sampling & Analysis Plan (April 2011)

Standard Operating Procedures for Stormwater Monitoring (October 2012)

Many of these procedures incorporate other City requirements established under the Mesa City Code that are not specific to the City’s stormwater program.

City of Mesa, Storm Water Annual Report

Page 5-1


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.