An inspection of this nature is necessary in order to file a Notice of Termination (NOT) to end coverage under the CGP. 3.8.3 Summary of Corrective and Enforcement Actions For private construction projects, a certificate of occupancy will not be issued until such a time that the developer provides a third party inspection of post-construction stormwater controls for projects requiring such an inspection. The City files a NOT to end coverage under the CGP for each project that disturbed one or more acres of land based on the results of the final stability inspection. Where final stabilization has not been achieved, coverage under the CGP is maintained. This may occur in instances where one general contractor’s scope of work did not include final stabilization (e.g. application of ground cover) but that this would be achieved under another project phase, either by City personnel or another general contractor. 3.9 DRY-WEATHER SCREENING The 2010 MS4 Permit requires the City to report the status of the following in the Annual Report as it pertains to the dry-weather screening requirements: 1. 2. 3. 4.

Staff training. Outfall and field screening point inventory. Inspection tracking system. Inspection and screening procedures and significant findings.

3.9.1 Staff Training The 2010 MS4 Permit requires the existing employees directly involved with stormwater management activities, including dry-weather screening and associated investigations, be trained at least once every two (2) years and to provide an opportunity for new employee training at least one (1) time per year. As such, all City staff who conducts these types of operations must meet the following requirements: •

Review the procedures detailed in the Environmental Code Violation Standard Operating Procedures;

City of Mesa, Storm Water Annual Report

Page 3-26