Multimodal Level of Service Guide for King County

Page 32

4.0 multimodal level of service models

32

HCM Application: Transit EX: Transit No-Build

EX: Transit Build

Transit LOS Score = 6.0 – 1.50 * 1.95 + 0.15 * 3.85 = 3.65

(D)

Transit LOS Score = 6.0 – 1.50 * 2.79 + 0.15 * 3.50 = 2.34

(B)

Findings: Improving service frequency has the most significant impact on the overall score.

Example 2: Evaluating Trade-offs The following example was included in a presentation from Kittelson and Associates, Inc. pertaining to the multimodal analysis methods in the HCM 2010 (Parks, 2011). The following tables and designs illustrate the LOS outputs based on different roadway design alternatives. This example is intended to demonstrate the comparative abilities of the multimodal LOS framework in looking at designs and the trade-offs to each mode. Cross-section Option 1: No Build Street

Score

LOS

Auto

N/A

F

Transit

3.68

D

Bike

4.75

E

Ped

3.15

C

Change

Cross-section Option 1: Increased Right of Way Street

Score

LOS

Change

Auto

N/A

F

=

Transit

3.66

D

+

Bike

4.75

E

=

Ped

2.99

C

+

Cross-section Option 2: Removal of Bicycle Lanes Street

Score

LOS

Change

Auto

N/A

F

=

Transit

3.67

D

+

Bike

5.22

F

-

Ped

3.05

C

+

multimodal level of service in king county

Made possible by funding from the Department of Health and Human Services and Public Health – Seattle & King County


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.