portfolio

Page 1

Robert L. Thompson Professional+Academic Portfolio


Resume

Personal Data

Name: Robert L. Thompson Address: Danziger strasse 157 D-10407 Berlin Germany mobile: +49 163 768 5226. Email : thompsonrl@gmail.com Web: thompson-rl.blogspot.com

Educational History 10.07-6.09

08.01-06-04

MASTERS OF ARCHITECTURE Anhalt University of Applied Sciences Germany BACHELOR OF ARTS IN ARCHITECTURE STUDIES(Hons) University Of Technology Jamaica

Professional Experience 09.12 - Present

ANOTHER ARCHITECT STUDIO Berlin

08.09 - 11.09

NEW DIALOGUE AG Switzerland

11.05-10-08

JENIFER SMITH ARCHITECTS TRINIDAD & TOBAGO

10.04-09-05

POSITION: Architectural Assistant POSITION: Architectural Intern POSITION: Architectural designer

COSMO WHYTE ARCHITECTS JAMAICA

Software Proficiencies • • • • • • • • •

POSITION: Architectural designer

Adobe Creative Suite Autodesk Maya(with fair knowledge of Mel and Python scripting) Rhinoceros 3d v4( with fair Knowledge of Rhinoscript,Grasshopper and vb.net scripting) Autodesk 3d Studio Max 9( Intermediate knowledge of Max Script) Processing Ecotec Auto Cad 2009 Archicad v10 Microsoft Office


Academic WORK


PROJECT TITLE: PROJECT STATUS: PROJECT TEAM: PROJECT SIZE:

LAS DAVOS DESIGNED KEVIN BARDEN,ROBERT THOMPSON 4000M2

PROJECT SUMMARY: THE PROJECT IS LOCATED IN DAVOS A DORF(VILLAGE) IN THE SWISS ALPS FAMOUS FOR ITS AMAZING SKIING SLOPES. THE PROJECT AIM WAS TO PROPOSE A INTERVENTION THAT WOULD HELP THE CITY OF DAVOS REORGANIZE ITS FOCUS FROM A PURLEY WINTER LOCATION TO AN ALL YEAR ROUND LOCATION FOR VISITORS. THE MAIN IDEA BEHIND THIS PROJECT IS ‘REDLIGHT DISTRICTS’, ‘SEX TOURISM’ THE REDLIGHT DISTRICT IS OBSERVED AS AN URBAN SPACE AND THIS PROJECT INVESTIGATES WHAT IT WOULD BE LIKE TO COMPRESS THIS URBAN ENTITY WITHIN A SINGLE STRUCTURE.


possible acces point/center point

gather green/play

gather

N

Design Models

open airgreen space for play

exising edge condition

possible building mass orientation(single block)

dual interconectivity_ i.e sublevel circulation between east zone+west zone

existing east/west connection


access

access

c

c

d

c

access

d

c

basment plan 1:200

d a

b

a

d

a

b

access

access

elev1

access

c

c d

a

b

d

elevation

d

c

d

d

d

c 1:200 second floor plan

c

d

d

b

a

c

c

DN

c

b

a

basment plan 1:200

a

b

b

a

elevation

a

b

a

basment plan 1:200

elev1

access

c

c

c

d

d

elev2

access

access

a

b

elev1

c d

a

b

d

c

DN

c

third floor plan 1:200

basment plan 1:200 d

exotic dance lounge

retail spaces

b

a

second floor plan 1:200

b

elevation

multi level bar+lounge

a

elevation

gaming lounge

b

a

d

c

c

d

d

multi level bar+lounge

exotic dance lounge

retail spaces

a

b

elevation

gaming lounge

elev2

b

a

elev1

c

to train station

d

c

bus zone d

to train station

bus zone

elevation

b

a

third floor plan 1:200

parking

parking

+16.00_RoofLevel

+12..00_ThirdFloorLevel

multi level bar and lounge

wc’s

exotic dance lounge

+8.00_SecondLevel

+16.00_RoofLevel

gaming lounge

balcony

+4.00_FirstFloorLevel

retail space

+12..00_ThirdFloorLevel

+8.00_SecondLevel

gaming lounge

wc’s

exotic dance lounge

-4.00_ParkingLevel

balcony

+4.00_FirstFloorLevel

retail space

retail space

walkway

0.00_GroundFloorLevel

parking -4.00_ParkingLevel

retail space

walkway

0.00_GroundFloorLevel

multi level bar and lounge

parking

undressing room



Institution: Chur Institute of Architecture| Tutor: Vital Streiff| Team: Robert Thompson, Kevin Barden


ALGORITHMIC SURFACE MODULATION DESIGNED PROJECT TEAM: IRINA BOGDAN, ROBERT THOMPSON PROJECT SIZE: -- PROJECT SUMMARY: The objective of this project was to design an Olympic stadium for the 2012 London Olympics. Field behaviors were explored as a design/form generator. We tried to redefine the idea of an Olympic stadium being an ephemeral entity and tried to make it an everyday place of being. PROJECT TITLE:

PROJECT STATUS:

TORTILINI STADIUM

THE


deformation

points

paths




Institution: Dessau Institute of Architecture| Tutor: Christos Passas| Team: Irina Bogdan, Robert Thompson


Professional WORK


HEALTH ECONOMICS UNIT BUILT DESIGN TEAM: JENIFER SMITH, ROBERT THOMPSON PROJECT SIZE: 2500 M2 PROJECT SUMMARY: This new building functions primarily as the administrative and training centre for the recently established Health Economic Unit of the University of the West Indies. It includes a conference centre/multipurpose hall, which seats approximately 250 people and smaller meeting rooms as well as training facilities and research spaces. PROJECT TITLE:

PROJECT STATUS:

The building is arranged in an L shape with separate entrances to the conference facility and to the communal lobby for the offices that are arranged on three floors. The building is constructed in reinforced concrete with lightweight steel roof structures. The design incorporates overhangs and external shading devices to lower the heat loading from the exterior and to improve the efficiency of the internal air conditioning systems. PROJECT ROLE: DESIGN TEAM COORDINATION, DESIGN AND WORKING DRAWINGS PREPARATION

HEU_


Wire Fence

1

2

3

4,800

4 Currogated alu-zinc roof sheeting

4,800

5

4,800

6

4,800

4,800

7

4,800

see detail sheet no# d/01/05

25mm thk ply-wood sheeting

+12.4m Roof Apex

203mm deep Z purlins@1200 o/c see engineers details

10deg slope

10deg slope

850

X

X

X

100mm dia pvc pipe below grade

21.18

X

Drain

X

6

21.3 R1,200

21.09

21.24 20.95

150 21.45 450

21.53

21.14 20.88 20.95

WARNER STREET

Figure ground, Sections,Elevations

150

4,309

2,800

2,907

150

635

800

3,700

1,765

2,750

10,406

1,850 85 150 250

856 2,706

3,700

550

125

X X X

2,224

1

R500

R500

21.43 17,300

X

X

Drain

21.63

X

29

3

2

21.59

21.67

150

Wire Fence X

X

21.75

2,800

900

21.98

23,736

3,700

900

3,700

1,485 1,180

2,444

setting out for junction J7 of grid

22.07

22.02

21.5 X 7 5 21.27 21.6

21.15 Exposed

Pipeline

2,224

800

300

250

800

2,800

1,916

445

2,951

1,035

3,700

675 150 2,875

2,850

2,750

2,355

1,044

150 885

350250

891 2,159

2,450

150 250

425 250

516

Admin offices

900

Research office

+3.7m Top of Slab

637 150

1,765

2,850

900

150

150

Lobby

Ceiling Void

1,391

Ceiling Void

Meeting Room

Concrete block work wall rendered and painted

44

10,307

Research office

Ceiling Void

Research office

Ceiling Void

Research office

Sick bay

2,913

rendered painted blockwork wall

3,700

600x600mm ceiling tiles

2,159

2,875

2,875 150

150mm high painted mdf skirting

Wall mounted wash basin Reinf. concrete apron to eng. details ±0.0m Top of Slab

125

125

5,575

21.75

21.27

21.19

21.07

rendered painted blockwork wall

Ceiling Void

150mm high painted mdf skirting

21.89

4

X

Ceiling Void

Part of telescopic seating system

7

722.0

21.83 21.51

+7.4m Top of Slab

Ceiling Void

UWI Offices 600x600mm ceiling tiles

200

Ceiling Void

2,159

21,000 6

5

nd 21.73 Undergrou Pipeline 21.62

21.75

solar shading device see detail

Ceiling Void

-0.60m Grade

4

concrete catch pit(see eng. details)

Ceiling Void

see detail sheet no# d/01/05

14,050

22.10

Line of setback from boundary

5,500

150mm high painted mdf skirting

1,044

I

Auditorium

450

21.64

R1,200

22.04

J

28 6,300

21.97

TD

425

X

TD

21.69

Concrete block work wall rendered and painted

rendered painted blockwork wall

3,550

31

+10.2m Beam Base

UWI Offices

Gypsum Bulk head.

Ceiling Void

8,277

ne

6,732

eli

2,784

Pip

400

d

see detail sheet no# d/01/05

Ceiling Void

Ceiling Void

21.68 21.29 21.19

21.16

X 21.82

A

Nail fd.

B

C

4,800

4,800

D

E

4,800

6,400

F

7,000

G

6,400

H

6,400

I

6,400

J

2,650

21.70

Drain

21.29

21.32

21.89

nd

Undergrou

49,650

21.88

X 21.67

Section B-B Sc. 1:75

21.38

+12.4m Roof Apex

22.02

+10.2m Beam Base

+8.9m Top of parapet

115.00° 400

21.66

750

21.48

1,765

305 305 1,680 900

2,360

1,680 900

3,700

see detail sheet no#d/01/05

6,484

un

21.7 line delineates site area available to the contractor

X 21.38 21.04 20.98

2,360

1,765 2,665 900

5,666

1,765

2,665

900

External Block work wall rendered and painted

10deg slope

Ceiling Void

3,300

ro

30

21.25

21.06

1,765

305 2,360

X X 39' 67.03

06° X X

10deg slope

203mm deep Z purlins see engineers details

100mm rock wool roll insulation

150mm dia pvc down pipes painted RAL 9005

X

erg

700 150

Ceiling Void

see detail sheet no# d/01/05

25mm thk ply-wood sheeting

22.12 21.82

21.88

21.59 21.87

+7.4m Top of Floor Slab

+3.7m Top of Floor Slab

+3.7m Top of Floor Slab

21.77

WILSON STR EET

Figure Ground Plan sc. 1:150

Un d 21.65

Bestcrete Grass Pavers

100mm dia pvc pipe below grade

21.54

21.05

32

+12.4m Roof Apex

Currogated alu-zinc roof sheeting TD

Valve

21.33

Currogated alu-zinc Roof Sheeting

2,650

850

100 mm thk. block work upstand wall

H

21.37

21.32

J

25mm ply-board sheeting 6,400

2,224

20.77

20.86 20.70

I

6,400

2,800

20.94

H

6,400

±0.0m Top of Floor Slab

3,700

20.69

G

7,000

3,700

21.31

21.15

F 49,650

6,400

989

X

23

27

Soakaway Cover (4'x4')

21.36

E

4,800

Asphalt with gravel topping

1,159

X

33

5,500

21.36

Wire Fence

D

4,800

600

Drain

C

4,800

2,165

X

B

22.16

1,415

21.11 21.17

A

22.16

5,656

21.11

A=Ir.fd. in conc.

22.13

3,700

X 20.68

22

26

72,470

21.59

34

25

21.43 21.32

concrete catch pit(see eng. details)

±0.0m Top of Floor Slab

G

22.20

21.85

X

Drain

1,212

21.39

existing slipper drain

21.48

+3.7m Top of Floor Slab

-0.60m Grade

Wire Fence

3,660

21.59

21

24

guard booth existing

Septic Tank

21.27

21.09

21.59

R600

450

35

21.80

+7.4m Top of Floor Slab

356mmx171mm steel rafters

R600

21.46

450

4

450

21.01

1 4,800

South Elevation Sc. 1:75

HD

5

20

±0.0m Top of Floor Slab

356x171 steel rafters see engineers details

21.40

21.31

21.17

20.73

21.53 21.71

Paved Area

R600

1/2" pvc water line

21.23

21.06

Drain

5,500

X

21.11

21.04

21.53

21.35

3

21.45 21.44

R632

21.63

4" pvc waste line

2

21.58

21.49

R600

21.15

21.43

1

2 4,800

X

ne

eli

6,300

Wire Fence

X

existing slipper drain to be diverted around new car park (see eng. details)

12

21.50

17400

21.28

21.20

line of set back from boundary

11

R600

21.28

21.09

20.91

100 21.77 2,400

2,400

10

36

Valve

21.67

Drain

+3.7m Top of Floor Slab

X

Pip

X

20.92

2,400

21.61

Proposed Building

37

21.70

1,292

Bestcrete Grass Pavers

21.17 Drain 21.08

21.26

F

entrance stairs2

R1,225

R1,225

21.69

90.00°

100

21.34 21.34

21.28

21.33

21.13

21.09

9

n

21.28

21.28

2,400

Foundatio

22.26

nd

ou

gr

er

car park set out parallel to exisitng building

100

8 21.52

21.33

2000

450

2,400

3 4,800

600

22.55

21.99

21.88 21.84

21.68

Drain

21.27

21.01

100

7

5,500

21.27

6

21.07

21.14 21.28 21.11

21.34

2,400

100 21.38

3 21.5100

22.70

22.04

line delineates site area available to teh contractor

21.81

21.59 21.68

1000

X

2400

22.29 22.10

21.71

21.58

21.67

Drain

21.57

21.4190.00°

21.32

21.36

21.19

21.57

1,552

X

d PV C

21.74

Walkway

21.66

21.56

21.79

22.70

22.24

21.96

21.48

Existing Building

21.58

Drain roun

21.14

4 4,800

+8.9m Roof Apex

22.41

6 22.20 22.3 22.67 22.67

22.09

22.10

21.46

X 21.12 21.15 Un derg

5 4,800

E

22.20

X

21.81

21.82

d Un

03° 49' 65.90 X

21.62 21.30

21.39

6

+10.2m Beam Base

22.31 22.49

19

21.98

Paved Area

21.82

21.63 21.81

22.70m

11,350

Drain

Walkway

18

22.23

X

21.71 21.81

22.07

17

22.26

63,463

21.82 21.83

21.66

16

22.11 21.97 22.04

Drain

21.99

22.10

21.67 21.77

21.68

21.79 21.18

7

5,247

21.49 21.61

21.66

21.21

Section A-A scale 1:75

ramp up

21.61

Walkway

15

1

in

Drain

21.54

Drain 21.64

21.82

13 21.9 14

21.80 21.70

Dra

X

21.85 21.82

21.68

21.82

Drain

21.86 21.80

21.94

21.96

22.12

Walkway

22.06

22.03

22.01

21.84

21.86 21.82

21.41

21.52

-0.60m Grade

+12.4m Roof Apex

22.07

22.03

21.90

Walkway

Walkway

X

21.99

21.47

21.40

Reinf. concrete apron to eng. details

rendered painted blockwork wall 150mm high painted mdf skirting

28,800

ramp up

Walkway

Cesspit

21.20

wc 31

4,800

21.99 22.00

21.64

559x254 duct refer to dwg no. mkeheu-ac-01

Meeting room

D

21.86

21.88 21.83

610x356 ducts refer to dwg no. mke-heu-ac-01

Research Area

C

UP

X

21.75

21.45

21.45

wc 31

HD

22.70m

21.89

21.48

21.27

125mm thk reinf. concrete floor slab

22.55

21.72

21.47

22.42

+3.7m Top of Slab

559x254 duct refer to dwg no. mke-heu-ac-01 600x600mm ceiling tiles

±0.0m Top of Slab

22.1

Stand

21.46

22.37

ramp up

22.09

Tank

21.30

TD

22.23

22.10

HEU Training Offices

150mm high painted mdf skirting

2,159

21.82

Drain

X

21.40

Walkway

4,911

21.93

Drain

21.76

21.97

21.85

21.85

22.08

Walkway

solar shading device see detail

559x254 duct refer to dwg no. mke-heuac-01

610x356 ducts refer to dwg no. mke-heu-ac-01

Research Office

1,044

21.82

22.02

21.82

Drain

21.91

21.70

22.06

22.12

21.96

22.03

21.83 21.79

22.50

21.74 21.63

Drain

38,049

22.04

22.04

21.75

21.82

21.75

Walkway

Walkway

X 21.34

Foundatio

21.81

Cesspit 21.74

150mm thk reinf. concrete floor slab

85

B

+7.4m Top of Slab

559x254 duct refer to dwg no. mke-heu-ac-01 600x600mm ceiling tiles

rendered painted blockwork wall

Wire Fence

X

n

21.71

18,019

Aluminium Shading device (see sheet no. d/01/01-02)

100mm thk Cantilevered R/C concrete slab

22.69

DBZ

TD

+10.2m Beam Base

610x356 ducts refer to dwg no. mke-heu-ac-01

UWI Offices

Line of setback from boundary

F

TD

Recessed Fire Hose Reel

rendered painted blockwork wall 150mm high painted mdf skirting

788

22.44

TD

TD

F

600x600mm ceiling tiles

2,762

22.29

TD

100 mm thk. block work upstand wall

see detail sheet no# d/01/05

External Block work wall rendered and painted

150

A

TD

c/l

22.38

22.35

22.06

X

4,189

HD

22.25

N

1,765

X 7 22.50

900

X 6

39,439

22.25

22.11

22.55

5 22.36

1,765

21.99

22.06

22.05

22.55 22.55

22.4

X

X

4

900

22.04

22.4

X

3

22.25 22.24

22.35

electrical kiosk

22.37522.06

22.4

X

X 2

22.13

X

21.99

21.92

21.61

21.50

X

X

22.00

Drain

21.37 21.41 21.42

X

X

1

21.82

21.33 Line of setback from boundary

X

22.01

Walkway

X

21.45

21.40

X Wire Fence

X

21.94

9 21.653,101

22.60 setting out for junction A7 of grid

X

X

X

X

X

X

Line of setback from boundary 21.42

100mm rock wool roll insulation

Wire Fence

X

X

22.36

setting out for junction J7 of grid

X 21.48 21.54

22.16

3,567

X

X

96° 18' 96.73

ramp up

22.07

Wire Fence

800

356x171 steel rafters see engineers details

21.45

±0.0m Top of Floor Slab

-0.60m Grade

West Elevation Sc. 1:75


Elec Panel room SV-01-04 0.6 m2

22.35

121

150 600

22.55

900 900

22.55

1,212

900 1,538

F

F

4,800

Drain 110

1,755

2

elevation 2

4,800

3

350

100

XX

100

9,450 350 22.67 22.67

2,387

39,439

1,542

Wall Sect. 3

1,879

7,200

7,200

4

18,850

183 350

1,188

Water Tanks

4,800

4,450

100

elevator car 1100x1348

1,800

16,116

HE-D13

CF-D02

350

350

5

5,075

Meeting room-1 CF-01-01 23.8 m2

5,075

350

9,550

9,587

150mm dia pvc down pipes

CF-D01

100

HE-D22

100

200 4,450

1,757 1,757 22.70 Lobby coir matting set in painted mild steel frame. top toHE-01-01 align with tiled floor finish 22.7 m2

2,650

lights

1,500

951

100 1,260

4

2,832

875

HE-D25

600mm square tile with 4mm joints between.refer to finishes specifications

storage

Administration Area 1 HE-01-04 11.7 m2

3,675

Research Area 2 HE-01-04 31.7 m2

Research Office HE-01-13 11.1 m2

Research Office HE-01-12 11.1 m2

3,575 Research Office HE-01-11 11.1 m2

Research Office HE-01-10 11.1 m2

HE-W10

Sick Bay HE-01-09 9.3 m2

3,575

2,100

2,700

100

150

1,150

HE-D19

FB

FB

FB

FB

1,200

950

4,800

4,450

100

100

7,100

TD

1,893

TD

TD

Research Area 1 HE-01-05 23.7 m2

HE-D11

7,100

880

HE-D20

FD

HE-D24

Shower+W.c HE-01-15 4.2 m2

882

Female. W.C HE-01-15 7.5 m2

3,500

Fire Exit FE-01-01 13.4 m2

6

590

1,408

989

CF-D16

100

HE-D12

1,392 SV-W15

HD

FD

HE-D04

863

100

600

HD

FD

TD

TD

TD

TD

TD

TD

TD

1,577

250

DBZ

Disabled W.C CF-01-10 A: 4.4 m2

2,200

7

200

Janitors closet CF-01-13 1.9 m2

2,200

150

wc 31

150 350

100

22.55

ramp up

950

750

142 200

200

150

7

100

1,126

1,356

964

150

Lv Room SV-01-03 3.6 m2

Comms Room SV-01-02 7.2 m2 1,455 2,909

SV-W09

2,984 2,027

2,598

3,575

3,675

Staff Area HE-01-08 29.3 m2

2,102

HE-W09

2,100

2,700

1,411

Asst. Co-ordinator HE-01-07 11.1 m2

3,575

3,375

Meeting Room HE-01-06 22.5 m2

2,269

Directors Office HE-01-05 15.7 m2 3,575

3,025

4,900

Documentation Center HE-01-02 42.4 m2

4,450

4,900

1,032

Air handler SV-01-01 7.2 m2

1,455

750

150

2,540

Male W.C CF-01-11 A: 12.1 m2

4,800 5,164

4,200

CF-01-12 A: 19.9 m2

456

340

150

4,550

Female W.C

c/l

CF W09

CP-D11

Lobby CF-01-14 4.9 m2

CF-D12

1,560

wc 31

1,810

W.C Foyer CF-01-10 13.3 m2

364

250 100 18

250

350

100

FB 113

1,275 100 FB

FB

FB

6

21,000

150

111 365

FD

3,641

Observation room CF-01-09 9.4 m2

Circulation CF-01-11 34.8 m2

Information HE-01-03 32.5 m2

22.70

4,450

HE-W02

Administration Area 2 HE-01-16 34.0 m2

Circulation CF-01-11 107.3 m2

fire hose reel 1,292 Recessed Fire Hose Reel 4,450

9,500

1,275

FE-D03

5

Aluminium Shading device (see sheet no.d/01/01-02) 7,679 14,650 7,073

23,736

nd

HD

750

950

150

1,542 150

100

746

150 200

Auditorium CF-01-08 272.0 m2

FE-D04

150mm dia pvc down pipes

4,800 4,935

150mm dia pvc down pipes

Line of setback from boundary

3

Sect. f Meeting room-2 CF-01-02 16.7 m2

4,450

CF-W13

1,542 4,800

Wall Sect. 1

150mm dia pvc down pipes

300mm high block work curb wall

1,608

1,464

1,586

1,494

150mm dia pvc down pipes

4,450

1,879

1,608 4,800

1,879

CF-D05

1,812

matt well w/ coir matting

22.70m

Conference Lobby CF-01-04 29.6 m2

CF-D06

5,023

Kchn dtl 3

1,608

1,307

1,461

150

9,675

350

150mm dia pvc down pipes 22.55

Recessed Fire Hose Reel

CF-D06

2,075

22.70m

Food preparation area CF-01-06 23.0 m2

Equipment Storage CF-01-07 27.8 m2

Fire Exit FE-01-02 15.1 m2

100

Pump Room CF-01-07 2.5 m2

CF-D04

Reception/Dining CF-01-05 34.8 m2

planter detail n

4,650

CF-W12

4,950 bench 4,430

1,755 4,800

Sect. l

Aluminium Shading device (see sheet no.d/01/01-02)

elevation 4

Undergrou Pipeline

4,189

A

Line of setback from boundary

B 150mm dia pvc down pipes

Sect. d

C 150mm dia pvc down pipes painted RAL 9005

D 150mm dia pvc down pipes painted RAL 9005

150mm high concrete block curbwall

Sect. n E 150mm dia pvc down pipes

Sect. e

F

150mm dia pvc down pipes

elevation 3

150mm dia pvc down pipes

Sect. A

G

H

I

Aluminium Shading device (see sheet no.d/ 01/01-02)

J

150mm dia pvc down pipes

5,575

Sect. d

1

Sect.h

Ktchn Dtl 1

Sect. n

planter detail n

Sect. e

elevation 1

Sect. A

Sect. d

Ktchn Dtl 1

Sect. n

175

1,375 1,200

150mm dia pvc down pipes

planter detail n

Sect. e

150mm dia pvc down pipes

elevation 1

Sect. A

1

1

DN 150

4,800

planter detail n

4,800

4,800

2,248

Tech Office CF-02-01 13.6 m2

150mm dia pvc down pipes

1,077

2

2

2

150mm dia pvc down pipes

planter detail n

150

150mm dia pvc down pipes

900

CF-W07

960 206

1,375

Fire Exit FE-02-01 2.9 m2

FE-D06

Hallway FE-02-02 8.7 m2

150

3,325

3,593

4,800

Kchn dtl 3

±7.4m

150

Kchn dtl 3

4,450

3

elevation 2

4,450

150

2,900

826

1,675

1,676

1,526

1,320

4 29,150

150

4

1,353

31,570

100

150

150

100 100 370 750

4

31,570

29,150

390 ac diffuser

18,850

949

350

960

1,251

Training Room HEU-02-03 528.4 m2

1,826

1,764

2,082

2,650

6,526

2,651

2,650

2,650 6,526

2,650

4,800

200

4,800

800

1,125

964

FE-D07

83

1,150

350

350

50

100

200

5

350

950

5,747

4,800

14,450

4,800

3,500

150

6

150

6

200

507

100 401 100

150

150

9,450

100

350

slope 10deg

slope 10deg

5,000

4,800

1,300

2,909

LV Room SV-03-01 3.5 m2

4,800 5,000

150

slope 10deg

UW-W34

1,530

100

964 119

SV-D10

SV-W01

1,760

2,099

100

339

696

100

100

600

998

150

2,909

7

150

150

100 350

eq

3,140

2,159

1,420

2,061

SV-W10

Air Handler SV-03-03 7.2 m2

TD

TD

TD

TD

eq

Air handler SV-02-04 14.5 m2

150mm high concrete block curbwall

2,201

Disabled wc's HEU-02-05 4.4 m2

150

LV Room SV-02-03 3.5 m2

Janitors closet UW-02-04 2.0 m2

Research Office 2 HEU-02-02 528.4 m2

4,900

854

150

150 150

150

1,426 100 1,126

Research Office 3 HEU-02-02 528.4 m2

2,100 2,700

4,975

UW-W05

store HEU-02-02 528.4 m2

2,909

Comms Room SV-03-02 2.8 m2

5,050

2,100

UW-W37

4,800

600

2,205

CF-W02

Air handler SV-02-01 6.9 m2 150mm high concrete block curbwall

Comms Room SV-02-02 6.1 m2

4,725

Secretariat HEU-02-02 528.4 m2

Administrator Office HEU-02-02 528.4 m2

Photocopy centre HEU-02-02 528.4 m2

150

Circulation HEU-02-02 528.4 m2

1,591

1,524 1,149

SV-W02

Research Office 1 HEU-02-02 528.4 m2

Roof Detail D1

1,591

Visitor Male wc's HEU-02-06 5.4 m2

Visitor Female wc's HEU-02-06 12.9 m2

UW-D16

100

446

UW-D06

1,205

150 618

150

9,950

WC/24

1,425

Research Area HEU-02-02 528.4 m2

4,450

600

Reception/Waiting HEU-02-02 528.4 m2

Circulation HEU02-02 528.4 m2

±7.4m 150mm thk R/C roof

FE/01

6

WC/24

+10.6m

16,450

4,800

Female wc's UW-03-04 7.6 m2

Male wc's UW-03-03 7.6 m2

4,450

3,500

Fire Exit FE-03-01 12.9 m2

17,190

4,800

Uwi Offices UW-03-02 425.0 m2

150mm high concrete block curbwall

150

WC/24

150mm thk R/C roof

11,541

150 950

4,750

Recessed Fire Hose Reel

77

Training Room HEU-02-02 528.4 m2

Traing Room HEU 02-02 528.4 m2

HD

Male wc's HEU-02-03 7.8 m2

Female wc's HEU-02-03 7.4 m2

16,450 3,500 4,525 17,190

4,525

4,450

Fire Exit FE-02-02 13.4 m2

4,649

Recessed Fire Hose Reel

2,600

c/line of ceiling tile to align with mid point between grid lines 4 & 5 as indicated

5

elevation 2

5

FE/01

500

+13.04m

top of lift shaft

500

slope 10deg

slope 10deg

slope 10deg

2,200

DN

100

150

1,100

2,000

1,800

150mm dia pvc down pipes

2,500

200

200

UW-W28

Lobby UW-03-01 36.5 m2

3,575

150

1,699 5,050

2,100

UW-W27

4,430

4,800

2,200

1,800

150mm dia pvc down pipes

200

4,450

CF-W05

2,900

6,526

2,650

2,650

Lobby UW-02-01 32.0 m2

2,600

slope 10deg 950

7

175

7

150

100

1,395 1,220

100 370 1,320

750

1,220

1,395

150

150

850

850

950

950

370

4,800

WC/24

Sect.f

elevation 4

elevation 2

4,800 24,150

150mm dia pvc down pipes

150

150

150mm dia pvc down pipes

Wall Sect. 1

150mm dia pvc down pipes

Wall Sect. 3

150mm dia pvc down pipes

elevation 4

4,800

CF-W04

150mm dia pvc down pipes 29,150

column paint to match auditorium 4,430 wall paint, Shagreen (sw6422)

2,100 2,744

centre line of conference hall aligns with mid point between grid lines B&C

plastered painted gypsum board. paint is Dover White (sw6385).

UW-W31

mid point between grid lines b&c

150mm dia pvc down pipes

350

19,400

3

WC/24

5,751

2,692

900

5,000

1,226

FE-D05

964 213

1,699 1,399

12,907

4,800

24,000

Wall Sect. 1

Wall Sect. 3

3

WC/24

150mm thk R/C roof

14,400

±3.7m

150mm thk R/C roof

4,800

150mm dia pvc down pipes

Kchn dtl 3

12,724

4,800

150mm dia pvc down pipes

8,300

HID recessed downlight 150mm dia pvc down pipes

150

475 475

350

Training Room HEU-02-03 528.4 m2

Back Projection Room CF-02-02 15.6 m2

2,900

Translation Booths CF-02-03 5.0 m2

4,650

14,400

6,802 15,150

2,100

UW-W32

13,324

12,724

150mm dia pvc down pipes

2,655

planter detail n

2,100

UW-W34

3,689

CF-D21

964

CF-D20

1,375

671

150

100

148

1,423 150

1 Henderson 290/ss tracks for sliding door. see dwg ga/01/06 for details.

150

987

110

1,440

480

5,500

2 concrete catch pit(see eng. details)

150

UP

134

22.4

step down 200mm along this line

3,600

T+Tec Hv room SV-01-04 12.2 m2

1,879 EK/D/02

22.35

1,805

step down 200mm along this line 4,911

100

ramp up

22.1

22.55

22.10

1

450

750

1

292

209

175

600

600

Roof Detail D4

4,901

Break Out HEU-02-02 528.4 m2

3,575

Kitchenette HEU-02-02 528.4 m2

2,100 2,700

5,050

3,675 UW-W17

UP

133

1,879

Sect. d

3 # risers up to apron level

Ktchn Dtl 1

planter

track located on beam for folding door

22.10

150mm dia pvc down pipes

150mm dia pvc down pipes

planter detail n Sect. n

Sect. e

elevation 1

R500

150mm dia pvc down pipes

Wall Sect. 1

150mm dia pvc down pipes

Wall Sect. 3

1,251 951

SV-W02

A

B

C

Sect. d

D

E

Sect. n

F

Sect. e

Sect.h

elevation 3

G Sect. A

H

Sect.f

I

J 150 dia pvc downpipes

Corrugated alu-zinc roof sheeting fixed to purlins( to eng. specs.)

A

B

2nd flr rcp

J

J

150mm dia pvc down pipes

I

H

Sect. A

G

150mm dia pvc down pipes

elevation 3

F

150mm dia pvc down pipes

Sect. e

150mm dia pvc down pipes

E

Sect. n

150mm dia pvc down pipes

D

C

150mm dia pvc down pipes

Sect. d

B

150mm dia pvc down pipes

A

150mm dia pvc down pipes

I

H

Sect. A

G

elevation 3

150mm dia pvc down pipes

F

150mm dia pvc down pipes

Sect. e

E

150mm dia pvc down pipes

Sect. n

D

150mm dia pvc down pipes

150mm dia pvc down pipes

C

Sect. d

150mm dia pvc down pipes

Roof Plan Sc. 1:75 Second Floor Plan Sc. 1:75

DN

4,800 4,800 6,400 7,000 6,400 6,400

52,440

14,893 22,850

1,070 18,332

6,400

6,400 7,000

2,916 150 150

150

2,650

1,395 4,800 4,800 4,800

29,020 812 2,774 5,419 614 503 703 100 2,922 6,400 2,700

499 2,700 501 6,400 21,397 2,700 499 2,700 501 6,400 2,700 2,975 2,650 100 100 550 570 750 1,395 570

Sect. A

6,300

17,300

Recessed Fire Hose Reel

Sect. d

Ktchn Dtl 1

Sect. n

150mm dia pvc down pipes

planter detail n

Sect. e

elevation 1

Sect. A

150

950

100 950

Floor Plans

50,647

545

100 1,220 5,294

SV-W03 UW-W25 UW-W26 UW-W12 UW-W10 UW-W06 UW-W13

UW-W11

5,224

Sect. f 370

First Floor Plan Sc. 1:75

UW-D09

2,041 549

655 SV-W05

SV-D13

8,890

4,000 150 1,243 150

5,710 150 659

139 965 330

397

1,351 1,108

100

884 350 1,905

100

UW-D10

2,566

964 3,351 30,125 100 2,470 546 946 150 2,500

BF-D02

8,907 100 1,741

SV-D11 UW-D15

150

100

625 100

1,395 4,800 4,800 4,800

UW-D08

175 161 508 1,333 100 887 150

812 812 2,773

150 1,211 27,797 125

12,076

29,020 6,400 7,000 52,440 50,647

1,889 1,644 1,838 662 100 503 703 100 3,222 2,922 6,400 2,100 2,700 1,099 499 2,100 2,700 1,101 501 6,400 2,100 2,700 1,099 499 2,100 2,700 1,101 501 6,400 2,100 2,700 3,275 2,975 2,650

703 21,397 750

100 550 750 1,395 100

SV-W14

150 3,415

100

902 310

eq

100 4,952

1,193 eq eq 1,193

SV-D12

HE-D03 UW-D05

0 1,536

100 964 111 974

UW-D04

eq 100

150 1,211

59 879

SV-D08

BF-D01

964 255 629 780

397

150 2,466

886 440 1,910

eq 2,459 100 SV-W11 UW-W16 UW-W15 UW-W24

SV-D02 SV-D14

3,740 100

525 UW-D06

UW-W23 UW-W20 UW-W21 UW-W22

650 150

100 2,470 546 945

Sect. b Sect. b

slope 10deg

elevation 4

150

Sect. m

4,752

slope 10deg

slope 10deg 150mm dia pvc down pipes

2,850

UW-D11

Ktchn DtL 2

Sect. m Wall Sect. 2

slope 10deg 150 6,250

Sect. m 200 1700 200 6,911

2,736 1,879 2,736

Sect. b Sect. b

14,789

UW-D12 1,127 863

863

5,444

UW-D14 1,158

UW-D13 1,433 150

1,318

Sect. m Sect. m 150 200

slope 10deg 2,736 1,879 1,443

Wall Sect. 2 1,669 3,050 1,681 1,669 3,050 1,681

1,292

Roof Detail D2 1,217 864 100 1,019 862 1,382

UW-D18 UW-D17

1,382 1,118

200 1,200 250 1,200

1700

Sect. m

350

20,233 1,467

Wall Sect. 2

150

Roof Detail D5

Sect. l 6,750 1,748 5,052 22,700

Sect. l

Sect. l

Sect. f Sect. f 514 964 2,225 2,500 150 397

slope 10deg 3,949 953 344

SV-D06 2,013

Sect. b 950 100 100 1,150

Sect. b

4,752

slope 10deg UW-W08 494 2,100 1,181

UW-W18 UW-W03 UW-W19

2,700 581

2,100 1,099

2,700 499

2,100 1,101

2,700 501

2,100 1,099

UW-W02 UW-W39 UW-W30

2,700 499

2,100 1,101

2,700 501

2,100 2,975

2,700

3,275 100 550 100 570

750

Sect. l

1,748

Sect. f Sect. f

UW-W36 200

1,698 200

1,123

3,263 UW-W14 UW-W29

1,748

150 3,799

Roof Detail D3

570 UW-W04

1,181

150 6,175 100 6,300 100 9,025

UW-W09 UW-W38 UW-W07 UW-W01

1,898 4,902 494 581

2,100

2,100

150 953 194 2,700 2,700

499

2,100

1,099 2,700

750 100

Roof Detail D1

Sect. l 29,500

501 2,632

21,950 2,100

1,101 683

1,101

2,100

1,099 2,584 501

2,100 3,275

2,700 2,975 750 570

1,675 3,050

14,400 6,750 1,898

547 2,042

slope 10deg

Sect.z

UW-D05 UW-D04 UW-D03

545 662 351 644 545 3,258 352 1,095

547

slope 10deg

1,675

FF

ramp up CF-D03

Sect. c 150 2,097 2,678

CF-D15

Ktchn Dtl 4 Ktchn DtL 2 Ktchn Dtl 4 CF-D19

1,124

UW-D02

150 2,459

Sect.z

Wall Sect. 4 Sect. c Sect. c Wall Sect. 4

Sect. c Sect. c 1,997 100 1,413 300 964

CF-D18

1,663 2,002 100 150 887 1,211

4,800 4,800 6,400 7,000

CF-D11

23,048

1,220 21,150 29,370 1,898 5,102 1,220 350

slope 10deg

CF-W10

100

3,210 1,540 912 9,638

4,922

100 4,700

CF-W09

100

CF-D14

Ktchn DtL 2

100 812 3,000 888 CF-W01c

3,000 999 1,517

964 300 3,435 100

Ktchn Dtl 4

1,517

3,222 3,245

100 4,775

150 6,250

CF-W01b CF-W01a

Roof Detail D6

964 316 701 964 3,435

29,370 8,894 3,363

3,567 2,100 2,700 1,099 499 2,100 2,700 1,101 501 2,100 2,700 1,099 499 2,100 2,700

6,400 6,400 6,400 2,650

863 244 1,879 3,012 14,235 5,013 3,225 703 1,018

508

2,92263,463

5 105 963

100

8,675

1,169 875 1,502

2,811 FE-D01 SV-W12

SV-D01

1,233 HE-W11 HE-W05 HE-W06

slope 10deg

Sect. l

4,752

Sect. f

23,045 24,268

1,905 3,131 1,905 14,747

100

Wall Sect. 4

4,800 4,800 4,800

CF-W02 CF-W11 UW-W33 UW-W35

7,751 2,100 7,000 1,302

2,100

14,747 6,400 600

3,538 6,225 2,248

X

Ground Floor Plan sc. 1:75

100

HE-W01 HE-W07 HE-W08

3,886

1,224 SV-D09

BF-D04

CF-D17

1,201 eq eq 150 92 887 232 150

100 1,158 100 2,566

476 863 2,788 1,325 100

SV-D03

225

75 3,885 815

1,301 5,825

HE-D01

3,679 450 2,496 1,825 HE-D07 HE-D09 HE-D10

7,000 5,064 964 393 964 5,447 988

2,000 1,046 2,000

HE-D23

547 947

1,954

100 5,825

1,101 501 2,100 2,700 3,275 2,975 750

3,828 1,200 200 150 250

7,350 ramp up

727

1,400

1,100

2,736 1,879 2,736

14,050 200

HE-D08

CF-D09

Sect. b sect/06

275 4,775 1,350 350 1700

200

4,752 350 251 964 4,070 18,850 964 402 964

HE-D14 HE-D15 HE-D16 HE-D17 HE-D18

4,037 421 964 350 1,471 52 964 1,118 1,182

Wall Sect. 2

200 5,700

1,150 6,175 100 3,100 100 3,100 100 3,100 100 3,100 100 2,625

sect/06

Sect. b

963 329

150

Sect. m

Sect. m

matt well w/ coir matting

150 HE-W14 HE-W13 HE-W16

1,879

2,700 581 2,700 499 2,700 501 2,700 499 2,700 501 2,700

HE-W15 HE-W12 HE-W17

2,536

7,144 3,030 2,100

1,181

2,100

1,099

2,100

1,101

2,100

1,099

2,100

1,101

1,208

14,525 6,475

3,104

100 6,471 100 12,074 150 874

4,700

Sect. l

2,100

3,275 750

Sect. f

600

Ktchn Dtl 4

EK-D-03

Sect. c Wall Sect. 4 Sect. c

FE-D02 SV-D07

2,124 254

2,032 100 3,000 100 2,345 579 1,899 965 169

SV-W13

CF-D07

100 519 507 CF-W03

ramp up

Ktchn DtL 2 150

100 965 202 1,005


4

203mm deep Z purlins see engineers details 24 guage Currogated alu-zinc roof sheeting

350

800

25mm thk ply-wood sheets 356x171 steel rafters see engineers details

Aluminium shading device ( see sheet no#d/01/01-02) 3,562

1,800

150

424

374

950

850

3,100

E

150mm thk reinf. concrete roof slab w/ asphalt and gravel topping

500

150mm thk reinforce concrete floor slab (see eng. details)

250150

2,043 2,191

1,800

150 150

Carpet laid on screed 125mm thk reinforce concrete floor slab (see eng. details)

500

150mm high mdf skirting

499

Carpet laid on screed

+3.7m Roof Level

874

750

250 162

150mm thk reinforce concrete floor slab (to eng. details)

+3.7m Finish Floor Level

150mm thk reinf. concrete roof slab w/ asphalt and gravel topping

400 250

989

150mm high mdf skirting

727 877

reinforced concrete cantilever box as window shading ( see eng. details)

3,550

3,550

3,700

356x171 steel rafters see engineers details

150mm thk blockwork wall with 12mm render on both sides

600

600x600 ceiling tiles

1,800

600x600 ceiling tiles

+7.4m Roof Level

150

650

150mm thk reinforce concrete floor slab (to eng. details)

150 thk Concrete blockwork parapet wall

499

250 162

Carpet laid on screed

511

150mm high mdf skirting

989

+7.4m Finish Floor Level

2,900

988

150mm thk blockwork wall with 12mm render on both sides

1,752

3,550

600x600 ceiling tiles

150

Wall Section #3 sc.1:25

Details

125mm thk reinforce concrete floor slab (see eng. details)

125mm thk reinforce concrete apron (see eng. details)

448

125mm thk reinforce concrete apron (see eng. details) 150mm high mdf skirting Carpet laid on screed 125mm thk reinforce concrete floor slab (see eng. details)

Wall Section #4 sc.1:25

562 450 150

±0.0m Finish Floor Level

150mm thk blockwork wall with 12mm render on both sides 125mm thk reinforce concrete apron (see eng. details) 150mm high mdf skirting Carpet laid on screed

600

989

2,900

3,475

1,800

600x600 ceiling tiles

±0.0m Finish Floor Level


office: Jenifer Smith Architects | Location: Trinidad and Tobago | Team: Jenifer Smith, Robert Thompson


18 MARY AVENUE UNDER CONSTRUCTION PROJECT TEAM: KORRY BARNETT, ROBERT THOMPSON PROJECT SIZE: 800 M2 PROJECT SUMMARY: This is a single-family house designed to take full advantage of the views available from the site, the site is a very steep lot in a housing development complex on the western tip of the island of Trinidad and Tobago. The client wanted a dwelling suitable for family, entertaining AND embraces a Caribic – minimalist style. PROJECT ROLE: Design phase A-E, Working drawings and tender document preparation PROJECT TITLE:

PROJECT STATUS:

18 MA


b

a

N 1

C

17,496 8,515

3,161

1,800

1,800

4,365

5,514

5,590

MA-D01

5,590

5,590 MA-D09

124

124

168

124 124

1,473

124

fall 1:80

3,889

124 +117.90

1,564

5,476

5,352

typical bathroom details 5,000

124

study

100mm thk reinforced concrete cantilevering slab (see eng details)

1,112

master bath

3,089

b

1,409

bath

813

MA-W17

1,664

2,500

124

1,524

1,678

1,512

124

124

852

150

timber louvered sunscreen(see details)

1,473

833

4,162

1

MA-W15

1,800

289

B3,285

1,800

C 3

1,496

8,515

3,161

1,658 sloping roof element to be defined by engineer 150mm thk concrete blcokwork parapet wall rendered and painted

17,496 7,496

124

10,000

4,000

fall 1:80

6,000

5,876

fall 1:80

2,402

3,764

3,602

outliine of walls below

fall 1:80

24 gauge currogated allu-zinc sheeting primed and painted to finish laid on steel framing (see eng details)

150mm thk roof slab

1 fall 1:80

2,681

1,319

12,000

11,041

slope 30 deg

1,496

slope 30 deg

slope 30 deg

slope 30 deg fall 1:80 5,514

B

1,224

a

fall 1:80 fall 1:80

1,971

3,161

11,314

7,496

fall 1:80

slope 30 deg

slope 30 deg

fall 1:80

slope 30 deg

C

124 1,658

fall 1:80

3 1

124

3,000

3,000

3,000

3,000

N

3

1,496

1,502 5,064

08'

17

Ir.fd.

b

timber framed bi-folding glazed window(see schedules)

Ir.fd.

25

,18

2

DR AI N

300mmx300mm reinforced concrete column(see eng. details)

119°

site se

1

11,925

2

+112.75

3

80.48

b

06'

R

R 1,5

00

1,172

ack setb

+112.47

site

1,172

119°

1

06'

4

wood

en

way

57,260

D

LP

4

Ir.fd. 54,43

2

0 11

40,902

er

SMHSew le Manho

Ir.fd. R 77

0

6.00

3,821 AI N

9,694

6 11

100

A Ir.fd.

ROAD

55.86

2° 26'

04'

99

102

4

102°

3

10

b

117

55.86m

10

109

118

116

102°04'

98

ck

101

106

108

111

2 shed

45,149

110

112

114

113

site setback

107

109

111

99

119

59.2

11,438

11 3 112

4 11

1 12

122

32'

1,812

2

N

Site Plan, Floor Plans

6,500

00

12.50

9 11

124

123

3,250

3,126

,695

STA.1

,5

15

45

97

2

a

site setba

8 11

3

166°

4,821

+111.97

Ir.fd.

R 1,2

shed

7 11

1,671

pool deck+walk

5,756

site plan sc.1:100

2.68

100

124

96

27° 30' 8.68

105

DR

6 40.9

1,496

A

58,61

18

124

O

fence

propo

+112.22

a

drive 75.48

g

11,091

1,172

tback

uildin

+113.00

1,172

100mm thk concrete blockwork wall with 12mm render on bothside painted to finish

+113.25

timber framed door and window unit(see schedule)

1,172

150mm thk reinforced concrete cantievered slab

+113.50

16,216

3,345

1,172

roof plan sc.1:50

7.90

5,514

168°

5,476

900

4,000

sed b

+113.75

1,172

11,190

Ir.fd.

162

124

1,496

+114.20

+114.10

1,496

1,496

+114.00

2,341

fall 1:80

124

5,390

5,476

slope 30 deg

124

200

MA-D18

3,875

494

124

1,800

MA-W24

2

11,314

6,449

4

3

162

3

162

700

N

fall 1:80

183

MA-D02

MA-W10

MA-W12

2

2

2,852

1,200

2,476

cl

A

a

1,597

1,225

2,765 800 775

1,533

2,852

MA-D12

124 2,728

689

1,076

reinforced concrete staircase (see stair details)

600

3,764

316 MA-W06

286

3,237 900

124

8,338

750 720

MA-D04

4,279

MA-W16

124 3,627 124

1,128

F

outline for slab above

124

wic

2,356

balcony

4,279

MA-D08

124

+117.90

3,293

17,496

8,515

600

100mm thk reinforced concrete slab on grade

332 374

124

124 800 2,827

124 750

MA-D06

720 124

124

124

4,428

1,971

1,800

MA-W14

947

MA-D07

124 124

1,800

2,033

MA-W18

1,127

124 646 700

MA-W11

700 700

MA-W13

124

14,916

1,800

MA-W09

124

1,384

124

1,800

+114.30

228

100mm thk cantilevered reinforced concete step up

apron#1

124

MA-W23

2,099

+114.45

1,850

324

2,945

3,045

4,454

1,900

124

11,752

124

MA-D15

fall 1:80

5,326

124

Living Room

494

325

3,161 fall 1:80

150

601

324

124 1,800

+114.30

3,485

fall 1:80

covered patio

627 4,826

124

+117.90

5,390

MA-W21

1,800

2,402

4,000

b

124 MA-D14

entry foyer up

800

1,800

MA-W05

MA-W25

774

1,528

124

324

635

bedroom#2

first floor plan sc.1:50

124

MA-W19

11,066

5,352

500

cantilevered timber shelving

2,082

+114.10

2,602

4,501

124

3,689

3,889

dining area

89

1,607

cantilevered timber framed eating counter

MA-W20

1,800

124

124

MA-D03

A

3,976 planter bed

1,899

800

800

255

833 124

927

cl

1

+117.90

master bedroom

800 MA-D11

5,752

2,674

1,626

laundry

MA-D21

hallway#1

bath

1,533

MA-W01

124

700

2,700

cl

124

bedroom#3

2,099

124

419 750

bath

800

124

826

MA-D19

2,576

900

162

428

MA-D16

124

699

MA-D20

3,075

800 61

Kitchen

1,366

fall 1:80

2,500

1,065

2,726 124

124

1,404

1,870 124

2,028

124

153

MA-D22

628

3,565

3,724

800

124

wash room

200

724

600

guest bedroom

3,045

1,800

MA-W26

124

3,627

700 MA-W02

124

124

124

794 124

848

2,795

4,559

1,620 MA-W04

MA-D05

MA-W08

3,312

324

MA-W03

3,751

1,600

14,916

947

bath

124 124 646 700

11,165

4,162

ramp up

4,000

3,876 MA-D17

3,876

+114.45

900

1,800 MA-W22

+117.90

4

bi-folding flush door 883

3,796

1,800

3,602

hallway #2

+117.90

bedroom#1

750

1,800

timber framed fixed glazing

down

5,752

MA-D10

2,526

2,278

124

car port

2,976 1,128

124

1,900

5,752

4,552

150mm high concrete block work parapet wall

124

fall 1:80MA-W07

124

900 124

4

apron#2

fall 1:80

fall 1:80

1,658

7,496

4,076

4,202

3,876

MA-D13

124

124

2,500

1,200

9,965

1,200

10,000

3,751

a

b

B

4,162

900 900 124

ground floor plan sc.1:50

A

a


C

B

A

150mm thk concrete flor slab w/ 600mmx600mm tile finish

50mm dia brushed aluminium hand rail 124mm thk concrete block work wall

11,676

24 gauge currogated allu-zinc sheeting primed and painted to finish laid on steel framing (see eng details)

100mm thk timber framed gypsum raling painted to match stair finish colour

3,161

8,515

reinforced concrete stair (see eng details)

22

3,700

2,100

living/dining

250

575

125mm thk cantilevered floor slab on grade(see eng dwgs) +114.45

reinforced concrete retaining wal(see eng details)

150 2,350

6,250

300

150mm thk floor slab on grade(see eng dwgs)

150

+117.90

stair section b-b sc:1:25

1,350

stair section a-a sc:1:25

bathroom

wall slit as closet entry

timber framed bifolding glazed window(see schedules)

12mm thk continuous plaster board with recesses to take fluorescent fixtures

kitchen

garage 3,300

stair plan sc:1:25

801

8,900

3,980

425

75

1,000

1,500

157

627

157

850

bedroom

575

75 reiniforce concrete stair slab with finish matching main floor

1,872

3,450

157

266

ient

4,782

266

grad

cantilevered timber framed eating counter

125mm thk floor slab on grade(see eng dwgs)

100mm thk concrete blockwork wall with 12mm render on bothside painted to finish

1,050 150

266

deg

2,100

266

hallway

1,662

266

ient

grad

450

1,200

266

4,782

266

3,930

deg

150mm thk concrete blcokwork parapet wall rendered and painted

master bedroom

775

266

balcony

ient

1,500

266

157

50

+120.95

30

grad

2,100

266

1,575

266

157

100

900

38

38

100

up

deg

30

150

1

ient

grad

450

2

deg

2,850

3

30

30

150mm thk roof slab

157

4

150

5

157

6

2,725

7

157

8

157

9

157

10

800

11

100mm thk timber framed gybsum wall painted to match stair finish colour

157

390

2,278

1,990

2,190

157

800

50mm dia brushed aluminium tubular handrail

2,050

21

124

20

176

19

1,949

18

3,050

17

1,000

16

157

15

939

14

146 157 157 168

13

1,000

100

12

157

50

50

reinforced concrete beam(see eng details)

100

+114.20

steel guard rail painted to finish

800

125mm thk reniforced concrete slab with 600mmx600mm terra cotta tile finish

section a-a sc.1:50

+111.98

existing grade level

1

2

3

3

10,990

2

150

10,990 5,476

5,514

1 14,916

2,576

1,200

5,514

5,476

2,350

2,050

24 gauge currogated allu-zinc sheeting primed and painted to finish laid on steel framing (see eng details)

2,600

9,000

1,500

450 2,100

1,500

3,000

3,471

1,350

1,950

124

8,550 1,950

100 100 800 3,973

section b-b sc.1:50

Sections, Elevations, Stair Details East Elevation sc.1:50

reinforced concrete ramp 79

1,025

250 100

+114.45

150

bath

1,500

kitchen

150mm thk reinforced concrete cantilevered bench

750

2,862 125mm thk floor slab on grade(see eng dwgs)

12mm thk continuous plaster board with recesses to take fluorescent fixtures

laundry

+117.90

100

+114.45

150

125mm thk cantilevered floor slab (see eng dwgs) existing grade level

12 426

3,300

stairwell

reinforced concrete stair(to eng details)

bath

150

1,000 450

+117.90

bedroom

bedroom

150 thk floor slab w/ 300mmx300mm tile finish(see eng dwgs)

1,000

2,100

metal stud framed plasterboard railing painted to finish

800

1,500

timber flush door(see door schedule)

2,126

2,626

4,800

timber framed bi-folding glazed window(see schedules)

4,800

124

+120.95

timber louver suncreen(see details)

100

150mm thk concrete blcokwork parapet wall rendered and painted

975

150mm thk roof slab


124

75

24

25

EQ

EQ

EQ

5,000

EQ

EQ

EQ

25

25

50

50

25 50mmx124mm timber frame 25mmx75mm timber subframe

C

timber louver

72275

275

50mm x75mm steel angle

steel rafters (see eng details)

15

precast concrete coping reiniforced concrete parapet wall

+120.95 +120.70

194

50

approved concrete roof finish

176

791

154

516

25 50

50mm thk approved roof finish

steel Z-purlins @900mm centers(see eng details) 24 guage alu-zinc sheet flashing

124

2,626

24 guage alu-zinc flashing 24 guage alu-zinc roof sheeting

2,526

2,476 2,626

A

1,950

reinforced concrete lintel(see eng details)

timber louver details sc: 1:25

steel handrail 150mmx150mm tile finish

+117.90 reinforced concrete beam(see eng details)

24 guage alu-zinc sheet as roof gutter

559

+117.90

41

800

1,044

50mm x75mm steel angle approved concrete roof finish

750

24 guage alu-zinc rof sheeting

150mm thj layered rock wool roofing insultion or approved other steel Z-purlins (see eng details) 173

steel rafter(see eng details)

133

50mmx75mm steel C-channel welded to rafter @900mm c/c 12mm thk continous plaster boader or approved other allow 20mm gap at wall

20

2,100

20

100mm thk cocncrete block work wall with 12mm render on bothsides 124

steel floated finished concrete floor

detail @valley sc:1:10

150mm thk cantilevering floor slab w/ brushed conrete finish

+114.45 250

+114.45

+114.20

wall section A sc 1:25

Details

wall section B sc 1:25


Location: Trinidad and Tobago | Team: Korry Barnett , Robert Thompson


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.