1 minute read

Locker room lockout

IZAIAH CERRATOS STAFF REPORTER

The Riverside City College football team has been forced to abandon its stadium locker room for offseason training.

Advertisement

The Board of Trustees granted a $7.7 million dollar budget for the renovations of Wheelock Stadium’s football field, stands and track. Two separate projects were announced in the plan.

One project is designated to renovate the track and turf field. The other project is referred to as the “Wheelock Grandstand Seating Repair Project.”

The football team locker room was left out of the budget and is set to remain the same despite renovations to the majority of the stadium happening this summer. Funds to refurbish the stands on both sides of the stadium were included to improve the bleacher’s safety for staff and fans.

The college fields a competitive team each year but has not supplied it with proper resources.

“We’ve asked (the administration) for a place to meet and for classroom space,” head coach Tom Craft said. “They’ve searched and there is no availability.”

As construction continues to occupy the inside of Wheelock Stadium, many players have audibled to a different locker room or changed their daily routine when gearing up for the 2023 offseason training program.

Some have opted to come prepared and just drive into the parking lot ready to hit the field. Other players have switched to the locker room in the gymnasium.

“For right now it’s easier to change in the gym,” freshman Xavier Harvey said. “It’s right outside our practice field. (It’s) less of a walk for me and the guys.”

The renovations of the football track and field broke ground in early May and are set to be finished in time for the 2023 Fall semester. The idea of improving the facilities have been in talks

See LOCKERS on page 3

This article is from: