1 minute read

Trail System

Trail System

A number of new and improved sidewalks surrounding the site will provide access to the new community park campus. The trail system consists of a primary loop path approximately half a mile in length. This connects to a secondary trail system that connects numerous site amenities, such as the playground, sprayground, skate park, dog park, bike skills area, and wetland. Through the wetland, this path transitions to an elevated boardwalk, providing an immersive nature experience. The sidewalks and trails will provide approximately 2.2 miles of circulation pathways throughout the site. A potential future connection to the Chehalis Western Trail has been identified on the south boundary of the park property.

1410'

760'

Sidewalks 700'

580'

900'

620' 410'

350' Primary Loop Path

3000' 320' 920'

340'

Wetland Boardwalk Secondary Trails

460'

1180'

N