Condition or Mitigation Measure
Summary
Resource Area: B = Bio, C = Cult, E= Earth, Water L = Land Use
Restoration Plan
Preconstruction (planning, design, and inventory/survey)
Construction (pre-mining; resource monitoring)
PostConstruction (Operations and Monitoring; removal and reclamation)
Utility ROW Mgmt. (T, W, & R)
Location (Mine = M, Water pipeline ROW = W, Transmission Corridor = T, Utility Maint. Road = R)
Crossreference to other project document/s
Note: * = stipulation refers to specifics in secondary document/s AFEIS Chapter 2: Alternatives, including the Proposed Action
p. 16, 20-22
lines Transmission line construction specs (Core 10) V
W, T
p. 18, lines Water supply pipeline E, B, V, W, T 10-23 construction/soil specs L p. 21-22 Stormwater specs E ? M p. 22-23 Utility Maintenance Road E, B, V, R construction specs L p. 28-29 Reclamation components E, B, V M, T, W, R, p. 66, lines Details of mitigation 34-36 measures found in Appendix E, B, V, M, T, W, R, B can be found in Chapter 3 L other resource sections p. 67, lines Base mitigation plan on 35-40 “available and reasonably E, B, V, M, T, W, R, foreseeable information” in ? L other cases where NEPA in completed p. 69, lines 2- Biological Monitor M, T, W, R, 4 responsibilities outlined in B ? other BO conservation measures* p. 69, lines Post-closure reclamation 12-13 success monitoring to occur B, V, E ? M, T, W, R at least twice/year p. 69, lines Groundwater monitoring per ? E ? M, other 16-17 ADEQ closure reqs p. 69, lines Surface water monitoring ? 17-20 per Arizona Pollutant M, T?, W?, R?, E ? Discharge Elimination other System permit* Chapter 2: Alternatives, including the Proposed Action: Management Area 16 Management Prescriptions (pp. 88-89) Dispersed Minerals exploration access L, V M, T, W, R, Recreation and public use excluded other from mine; evaluation of
TEP NEPA; AFEIS Ch. 3: Visual: p. 63 Huss, 2009
BO, p. 300