Rosemont Copper Mine Conservation and Mitigation Requirement Project Tracking and Scheduling Table

Page 1

Condition or Mitigation Measure

Summary

Resource Area: B = Bio, C = Cult, E= Earth, Water L = Land Use

Restoration Plan

Preconstruction (planning, design, and inventory/survey)

Construction (pre-mining; resource monitoring)

PostConstruction (Operations and Monitoring; removal and reclamation)

Utility ROW Mgmt. (T, W, & R)

Location (Mine = M, Water pipeline ROW = W, Transmission Corridor = T, Utility Maint. Road = R)

Crossreference to other project document/s

Note: * = stipulation refers to specifics in secondary document/s AFEIS Chapter 2: Alternatives, including the Proposed Action

p. 16, 20-22

lines Transmission line construction specs (Core 10) V

W, T

p. 18, lines Water supply pipeline E, B, V,    W, T 10-23 construction/soil specs L p. 21-22 Stormwater specs E ?  M p. 22-23 Utility Maintenance Road E, B, V,    R construction specs L p. 28-29 Reclamation components E, B, V   M, T, W, R, p. 66, lines Details of mitigation  34-36 measures found in Appendix E, B, V, M, T, W, R,  B can be found in Chapter 3 L other resource sections p. 67, lines Base mitigation plan on  35-40 “available and reasonably E, B, V, M, T, W, R, foreseeable information” in  ? L other cases where NEPA in completed p. 69, lines 2- Biological Monitor  M, T, W, R, 4 responsibilities outlined in B    ? other BO conservation measures* p. 69, lines Post-closure reclamation  12-13 success monitoring to occur B, V, E  ? M, T, W, R at least twice/year p. 69, lines Groundwater monitoring per ? E  ? M, other 16-17 ADEQ closure reqs p. 69, lines Surface water monitoring ? 17-20 per Arizona Pollutant M, T?, W?, R?, E ? Discharge Elimination other System permit* Chapter 2: Alternatives, including the Proposed Action: Management Area 16 Management Prescriptions (pp. 88-89) Dispersed Minerals exploration access L, V     M, T, W, R, Recreation and public use excluded other from mine; evaluation of

TEP NEPA; AFEIS Ch. 3: Visual: p. 63 Huss, 2009

BO, p. 300


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Rosemont Copper Mine Conservation and Mitigation Requirement Project Tracking and Scheduling Table by Matthew Bossler - Issuu