01 FOREWORDS
02 03 04 05 07
J
RECONSTRUCTION IMPLEMENTATION COMMISSION FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
INTRODUCTION
06 08 09 10 11
15 16
20 04
DAMAG E ASSESSMENT
Older church: Interior damaged, internal surfaces, wall paintings, floor and wooden doors and windows affected by fire. Exterior in good condition. Newer church walls: soiled by smoke, unstable upper sections, doors and windows affected by fire, bell tower in an unstable condition.
17 18 19
20 05
PR OTEC TIVE 33Cleaning. I N T ERVENTIO NS 33Repair of the wall tops to the newer church and cleaning of stonework. 33Replacement of damaged timber doors and metallic windows. 33Construction of a new fence and gates. 33New roof construction and metallic covering to the belfry.
20 06 20 07 20 08
FURTHER I N T ERVENTIO NS
33No interventions carried out.
FURTHER I N T ERVENTIO NS
33No interventions carried out.
FURTHER I N T ERVENTIO NS
33No interventions carried out. 33UNESCO programme.
20 21 22 23 24
25 26 27 28 29 30
20 09 20 10
For further information, please contact : Siniša Šešum UNESCO Venice Office – BRESCE, Marsala Tita 48, UN House, Sarajevo, BOSNIA AND HERZEGOVINA Tel:+387 33 222 796/Fax:+387 33 222 795/E-mail: s.sesum@unesco.org
FURTHER I N T ERVENTIO NS
33No interventions carried out.
FURTHER I N T ERVENTIO NS NEED ED
33Repairing of the newer church walls and the bell tower. 33Perimeter wall (fence). 33New iconostasis. 33Furniture in the church.
APPENDICES
31 32 33 34 35
D Library of this project
Return to thumbnails : : Return to list
RESTORED SITES
Church of the Holy Saviour
14
FURTHER INFORMATION
Pri zren
13
HOW THE RIC WORKS
12
Page 45