PR OTEC TIVE 33Clearance of the yard. I N T ERVENTIO NS 33Re-roofing with new lead. 33Repair or substitution of damaged stones and bricks. 33New door and windows with glazing. 33Replacement of broken floor stone slabs. 33New iron fence. 33Temporary hoardings to the site.
20 06 20 07 20 08 20 09 20 10
FUR THER 33No interventions carried out. I N T ERVENTIO NS
22 24 25 26 27 28 29 30
Lead roof removed, stone work partly damaged by hammering, perimeter fence partially lost. Windows destroyed. Interior badly damaged by fire and vandalised, marble pavement and wall paintings affected by fire.
20 05
21 23
DAMAG E ASSESSMENT
R E CO NSTRUC TIO N 33Internal repairs. W O R KS 33Electrical installation.
FURTHER INFORMATION
16
RESTORED SITES
15
HOW THE RIC WORKS
Church of St Nicholas (Tutić’s church)
14
R E CO NSTRUC TIO N 33Project works continued from 2007. W O R KS FUR THER 33No works carried out. I N T ERVENTIO NS FUR THER 33Wall paintings restoration. I N T ERVENTIO NS 33Landscaping and drainage. NEED ED