01 03
J
FOREWORDS
02 04 05 06 07
INTRODUCTION
RECONSTRUCTION IMPLEMENTATION COMMISSION FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO
08 09 10 11 12
Pri zren
13
HOW THE RIC WORKS
Holy Archangels Monastery
14 15 17 18 19 20 21 22 23 24 25 26 27
20 05 20 06 20 07 20 08 20 09 20 10
DAMAG E ASSESSMENT
New monastery completely burnt down in March 2004: destroyed roofs and services, badly damaged walls, ceilings and floors. Workshop burnt down and totally destroyed. The rest of the archaeological site was undamaged. New guest house built by the Church over the foundation of the old workshop during 2004 – after the March riots.
PR OTEC TIVE 33No interventions carried out. I N T ERVENTIO NS 33No consensus reached.
RESTORED SITES
20 04
FURTHER 33No interventions carried out. I N T ERVENTIO NS FURTHER 33No interventions carried out. I N T ERVENTIO NS FURTHER 33No interventions carried out. I N T ERVENTIO NS FURTHER 33No interventions carried out. I N T ERVENTIO NS
FURTHER INFORMATION
16
FURTHER 33Reconstruction of the guest house. I N T ERVENTIO NS 33Reconstruction of the perimeter wall. NEED ED 33Landscaping.
28 29 30
APPENDICES
31 32 33 34 35
D Library of this project
Return to thumbnails : : Return to list
Page 29