Page 121

C.2. Tectonic Elements

4

1

The panels are connected to the secondary structure at specific angle to ensure the different wind directions could hit on the panel efficiently. Thus, energy produced could be optimised.

2

The primary structures which run horizontally and vertically are conencted by prefabricated socket thourgh welding.

3

The panels and piezo patches are bolted to the secondary structure.

4

The secondary structure is screwed onto the horizontal primary structure.

5

The primary structure is anchored to the ground slab through bolting.

117

Tan yeeyin 560654 journal final submission  

final journal studio air