Page 106

CONSTRUCTION FLOW

FROM FOOTING TO PIEZO INSTALLATION

Pile footing is used to anchor the sculpture deep into ground so that this high sculpture can stay firmly on the site.

Concrete slab is poured according to the base area shaped by the primary structure with reinforcement.

Primary steel structure is bolted Second to th ground slab, to ensure they would primar no move when resisting the storngand wind su bracin structu

102

Tan yeeyin 560654 journal final submission  

final journal studio air

Advertisement