83 Metro Street Gurgaon

Page 1

83 Metro Gurgaon Street


Welcome to the place that gives you the elevated business feels- 83 metro Street Gurgaon. SVH (SV Housing Pvt. Ltd.) has paid their deliberate attention in making the higher level of the commercial project. Breaking all the records of the other premium commercial projects in the area and setting the level of what exquisiteness is known as. The builder is in the legacy of work for 40 years and has covered lacks square feet of the ground with amazing work.

2


Welcome to the place that gives you the elevated business feels- 83 metro Street Gurgaon. ▪ ▪

Hello !

▪ ▪ ▪

Ground Floor: Retail shops, ATM’s, and an Anchor Store (80K square feet) First Floor: Retail outlets, ATM’s and an Anchor Store (55K square feet) Second Floor: 5 screen Multiplex with a Food Court for a yummy tummy Third Floor: 7 aesthetically designed Restaurant space From the Fourth floor and till the eighteenth floor, they are dedicated to office space holding Director Suites, Doctors Floor, and Independent Professional Floor etc.

3


The concept of creating a mini city can be obtained in this housing. Some of the points to note in this project are:

● The project is 100% Approved by all concerned Authorities ● It is RERA registered and RERA Number is 337 of 2017 ● Majestic front part of 640 feet; beautiful and enthralling view ● Shops having Double Height of 19.5 feet ● 3 floors of Car parking in the Basement, ample of space for parking ● High street retail emporium; the ideal choice for business opportunities ● Shoppers Paradise for the luxury and convenience of shopping ● High definition entertainment with the 5 screen multiplexes ● Unlimited gaming for the kid’s fun 4


“ Lock in your capital and boost it up with this high- end commercial project.

5


Retail Highlights ▪

High Street retail units with 19.5 ft height.

Multiple ATM accessibility

Convenience store

Coffee shops

Medical & Pharmacy

Gymnasium and Spa

Anchor stores

6


Key Feature - At a Glance

▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪

Food Court Fine Dining restaurants Dedicated drop-off-zones Grand central atrium 640 ft frontage facing Dwarka Expressway Triple height reception lobby Dedicated corporate suites and Office spaces with common reception Gaming arcade 5 screen multiplex Ample parking space Exclusive business lounge 24*7 power back up High-speed elevators Wi-Fi enabled building Security with electronic surveillance


PAYMEN T PLAN ● Possession Linked Payment Plan ● Time Linked Plan ● SVH - Mega Saver Plan ● SVH -Super Saver Plan ● Construction Linked Payment Plan

8


Possession Linked Payment Plan On Booking

10% of BSP

Within 30 Days of Booking

15% of BSP

Within 60 Days of Booking

10% of BSP + 100% of EDC/IDC

On Completion of SuperStructure

35% of BSP + 100% of PLC

On Offer of Possession +

30% of BSP +100% (Stamp Duty Registration Charges + IFMS + Right to use car parking + All other additional charges)

9


Time Linked Plan On Booking Within 60 Days of Booking

10% of BSP 40% Of BSP + 100% of EDC/IDC

After 1 year of Booking

25% of BSP + 100% of PLC

After 2 years of Booking

20% of BSP + 100% Right to use car park

On Offer of possession Registration

5% of BSP + 100% (Stamp Duty + Charges + IFMS + All other additional charges)

SVH - Mega Saver Plan On Booking

10% of BSP

Within 60 Days Of booking PLC

85% of BSP + 100% of EDC/IDC + 100% of

On Offer of possession Registration

5% of BSP + 100% (Stamp Duty + Charges + IFMS + Right to use car parking + All other additional charges) 10


SVH -Super Saver Plan On Booking

10% of BSP

Within 60 days of Booking

40% of BSP

On Commencement of 4th Floor Slab 7.5% of BSP + 50% EDC & IDC On Commencement of 7th Floor Slab 7.5% of BSP + 50% PLC On Commencement of 13th Floor Slab

7.5% of BSP + 50% PLC

On Commencement of Top Floor Slab 7.5% of BSP + 50% Right to use Car Parking On Commencement of Faรงade work Parking

7.5% of BSP + 50% Right to use Car

On Commencement of Flooring work 7.5% of BSP On Offer of possession Registration

5% of BSP +100% (Stamp Duty + Charges + IFMS + All other additional charges) 11


Construction Linked Payment Plan On Booking

10% of BSP

Within 45 days of Booking

15% of BSP

On Commencement of Excavation Work

10% of BSP

On Commencement of Excavation Work

10% of BSP

On Commencement of First Basement Slab

10% of BSP + 50% EDC & IDC

On Commencement of 1st Floor Slab

7.5% of BSP + 50% EDC & IDC

On Commencement of 4th Floor Slab

7.5% of BSP + 50% PLC

On Commencement of 7th Floor Slab

7.5% of BSP + 50% PLC

On Commencement of 13th Floor Slab Car Parking

7.5% of BSP+ 50% Right to use

On Commencement of Top Floor Slab Car Parking

7.5% of BSP + 50% Right to use

On Commencement of Faรงade work On Commencement of Flooring work On Offer of possession Registration

7.5% of BSP 5% of BSP 5% of BSP + 100% (Stamp Duty + Charges + IFMS + All other additional charges)

12


Location Connectivit y

13


5 MINS Hyatt Regency 700 Acre Township ISBT (Proposed) Metro Hub 10 MINS Vedanta Hotel KR Mangalam University IFFCO Chowk HSIIDC Huda City Centre Metro Station Medanta 15 MINS Hotel Raddison ITM University AeroCity Oberoi Hotel IGI Airport/ T3 Ambience Mall Hotel Leela

14


Locatio n Map

15


Site Plan

16


Thank you very much for your time

Any Website questions?

www.83metrostreet.ind.in Contact No. +91 9811 999 666

17


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.