Page 64

Benchmarks

Regulation 714/2009/EC239

239

50 11.06.2017 the law of Ukraine On Electricity markets was enacted, one of its requirements if to carry out joint (coordinated) auctions for 2019 with at least the neighboring system operators of ENTSO-E area. In August and September Ukrenergo drafted and sent to the NEURC the draft documents: Methodology for determining the available throughput capacity of interstate power networks of the UES of Ukraine; Limit Management Rules and Procedure for conducting distribution of the throughput capacity of interstate crossings; Model agreement on access to interstate crossings;

Adoption of the REGULATORY ACT to determine the conditions for access to electricity networks (in particular, the Electricity Codes), concerning the conditions of electricity export / import (in particular, the Rules for conducting electronic auctions for the distribution of capacity of interstate networks).

Energy Reforms: December 2017 review  

The project “Enhancing impact of civil society in monitoring and policy dialogue on energy and related sectors’ reforms in line with the Ass...

Energy Reforms: December 2017 review  

The project “Enhancing impact of civil society in monitoring and policy dialogue on energy and related sectors’ reforms in line with the Ass...

Advertisement