Power Plant Substation Construction Maintenance

Office : PTC Pulogadung Blok 8B No. 36 Jakarta 13920 Phone : 46832932, 70207590 Warehouse : Jl. Raya Cakung Cilincing Km 6.3 Jakarta Utara Phone : 4403932

www. trifika-engineering.com


About PT Trifika Bina Engineering 01 Our Company Business Building with Quality and Achievement for Better World PT Trifika Bina Engineering established from 2005 is National Private Company specializing in Mechanical, Electrical, Construction and Maintenance Service. Name of : PT. TRIFIKA BINA ENGINEERING Company Type of Company : Private Company DR. M. M. RIDWAN INDRA R.A. SH. Notaris ACT : Spn. MM. MKn NPWP : 02 . 313 . 190 . 7 – 004 . 000 TDP : 09. 04 . 1 . 51 . 27750 SIUP : 861 / 13 - 1. 824 . 51 SIUJK : 1 . 604095 . 3171 . 00682 JAMSOSTEK NO : 0600000001001 KADIN : 20203 . 83785 - 4 / 27 - 02 - 2006 GAPENSI : 09 . 71. 10 . 1297 . 06 . 12635 SKT ( MIGAS ) : 599 / SKT / Daf / DMT / 2006 SKT ( : 2394/30DJB/2011 PERTAMBANGAN) SKA APEI (ELEKTRIKAL)

: 1.4.100.2.28.09.079380

ACCOUNT BANK :

MANDIRI BANK, PERMATA BANK and BANK RAKYAT INDONESIA


02

Vision and Mision

We are PT Trifika Bina Engineering had vision to become National Private Company specializing service Installation Power Plant, Substation, Construction and Maintenance. With best skill, knowledge and experience we moving forward to service our customer to got best result and on time in target schedule project. With Mission our Motto : Quality and Reality, we always challenges our company to become innovative, efficient, effective, integrity and commitment to our client. We keep satisfaction our customer to become our priority.


03

Company Asset

A. Machine Equipment 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Machine Pipe Threading Rigid Machine Pipe Threading Electrical Compressor Electrical Grinder Electrical Drill Electrical Hammer Drill Magnetic Base Drill Stand Electrical Cutting Pipe Bender Gun Ramset Jig Saw Gun Ramset Bending Roll Plate Hydraulic Punch

16. Welding Arc 400 A Tick & Mig ( Miller) 17. Cutting Torch & Regulator 18. Machine Roll Alum 19. Vacuum Cleaner 20. Portable Air Blower 20” 21. Chisel 22. Hot Jet (PVC) 23. Generator Set 20 Kva ( Silent Type) 24. Generator Set 50 Kva 25. Torque Moment 500 – 800 N 26. Drilling Portable Machine 27. Container Office 28. Welding Transformer 400 A

B. Heavy Lift/ Lifting Equipment 1. 2. 3. 4. 5. 6. 7. 8. 9.

Different Chain Block Rope Fuller Universal Pulling Lifting Cable Jack 25 T Rachet and Lowering Level Block Chain Block Hydraulic Jack 15 T Enerpac Jack 25 T

10. Hand Pallet 2.5 T 11. Sling Nylon 3 T 12. Forklift 3 T 13. Electric Pump 4 Channel (1 pcs) Hypo see 900 Bar 14. Electric Pump Sun Ran Two Channel 700 Bar 15. Jack Vertical 50 T ( 4 pcs) 16. Jack Horizontal 32 T (4 pcs) 17. Jack Pad 5 T (2 pcs) 18. Roll Tank Capacity 30 T (4 pcs)


04 Structure Organization President Director H. CHAERUL ANWAR

General Manager Ir. SULTONI ARSYAD

Marketing Engineering

Project Mechanical, Electrical & Construction

Project Maintenance & Service

QA / QC

HSE

SESEP H.A, S.T

Project Manager CHAMDI D.S.

Mechanical Engineer DWI MARGIANTO

SOLEH SOBARI

UJANG RAHMAT

SIMON TANUTAMA

Site Manager YAKOBUS PATTI

Electrical Engineer ABDUL HARRIS

Finance Procurement

Finance Manager TASMONO

FIRDA NINGSIH

BETY ANNA VONNY D.

HRD

DONNY SUTARNO


05 Structure Organization Project Maintenance & Service DWI MARGIANTO

Spv Electrical Abdul Haris

Staff Elect Ari Adrian

Admin Sugiyanto

Staff Elect Joko Susilo

Spv Mechanical Hery Iskandar

Staff Mech Martin

Staff Mech Ahmad Hardi


06 No.

Personnel KeyKeyPersonel CLASIFICATIONS

PERSONEL

1

Constructions Manager

1

2

Constructions Mechanical Manager

1

3

Constructions Electrical Manager

1

4

Maintenance & Service Engine

3

5

Project Supervisor Mechanical

4

6

Project Supervisor Electrical

4

7

Estimator Engineer

2

8

Process Engineer

2

9

Instrument Engineer

1

10 Marketing Department

2

11 Draftmen

2

12 Quality Control

2

13 Project Administration

4

14 Project Finance

2

15 Computer Operator

4

16 General Staff

5

Best Regards, PT. TRIFIKA BINA ENGINEERING

H. CHAERUL ANWAR DIRECTOR


07

Completed Projects PT Bukit Muria Jaya

Area : Karawang West Java Modification and Installation Bale Conveyor Work : Installation, Erection Work , Alignments Work,

PT Indo Matra Power

Area : Pesanggaran Bali Installation Mechanical and Electrical Diesel Engine Sulzer 16VZA40SA 3 Unit x 10.5 MW

PT Sumatera Prima Fiber

Area : Tanjung Seteko – Palembang Modification and Instalation Hate Exchanger Unit

PT Trakindo Utama Singapore

Area : Republic of Timor Leste Installation Diesel Engine CAT 3616 1 X 4.2 MW


08

Completed Projects

PT Trakindo Utama

PT Yamaha Indonesia

Area : Kuala Kencana , Timika Papua Installation Exhaust Gas System

Area : Karawang West Java Dismantling, Unwiring Melting Furnace LC.21

PT Wartsila Indonesia

PT Inco Sarowako

Area : Bukit Asam, South Sumatera Dismantling Engine 12 ZVA40 6.3 MW

Area : Sarowako, Makasar South Sulawesi Installation Diesel Engine CAT 3515 X 32 Unit


09 Completed Projects PT Iradat Aman

Area : PLTD Tello Makasar Project BOO 80 MW Work : Installation and Leveling Engine Sulzer 16ZAV40s x 8 Unit

PT Daya Esa Mandiri

Area : Kawasan Industri Jababeka II CikarangWest Java Work : Installation of Expansion Joint & Booster For Turbine Gas 1 x 60 MW

PT Freeport Indonesia

Area : Tanjung Seteko – Palembang Modification and Instalation Hate Exchanger Unit

PT Phak-phak Bumi Energy

Area : Sulutenggo, Silae – Palu Work : Installation of Mechanical Electrical 3 x 6,5MW Deutz & 1 x 10,5 MW Sulzer


10

Completed Projects Vpower HK

Area : PLTG, Teluk Lembu – Riu Work : Installation of Mechanical Electrical Gas Engine 12 MW

PT. AREVA T & D

Area : Ranca Kasumba West Java Work : KE 3 LOT 3 Gardu Induk 150 KV

Mingken Engineering

Area : Tallasa – Makasar Work : Installation of Mechanical Electrical 4 x 6,5 MW Deutz 16 BV 640

PT. ABB

Area : Pesanggaran – Bali Work : Gardu Induk 150 KV


11

Completed Projects

PT. Daya Esa Mandiri Project

Area : Kawasan Industri Jababeka 1 Cikarang, West Java

CV. Putri Salju

Area : PLTD PLN (PERSERO)Hative Kecil Ambon Work : Stork Warsila 9TM410

CV. Putri Salju

Area : PLTD PLN (PERSERO) Hative Kecil Ambon Work : Stork Warsila 9TM410

PT. Sri Rejeki

Area : Jatisari,Karawang – West Java Work : Installation for N-Line Continous Dryer


12

Certificate


13

Certificate


14

Certificate


15

Certificate


16

Certificate


17

Certificate


18 Year

Project History

Milestone

Power plant 2012

Installation of Mechanical & Electrical diesel engine deutz 16 BV 640 capacity 4 x 6,5 Mw , Tallasa, Makassar Client: Mingken Engineering Co Ltd

Year 2009

Installation of Mechanical & Electrical Diesel Engine Sulzer 16 ZAV 40 S, Capacity 3 x 10,5 Mw , Likupang, Manado Client : PT. Humbahas Bumi Energi Installation of Mechanical and Electrical Gas Engine MTU BR 4000 Capacty 12 x 1600 Kw, PLTD PLN(Persero) Teluk Lembu, Pekanbaru, Riau Client : PT. Hutan Alam 2011

2006

Installation Of Mechanical Diesel Engine Wartsila 18 V 32, Capacity 1 x 10 Mw, Cikupa, Tanggerang, Banten Client : PT.Nikomas Gemilang

Installation Of Mechanical Electrical Engine Sulzer 16 ZA V 40 s ,Capacity 3 x 10,5 Mw. PLTD PT. PLN (Persero) Pesanggaran Bali Client : PT. Sri Rejeki Power/ PT. Indo Matra Power Installation and Allignment Diesel Enginee Sulzer 16 ZA V 40 s, Capacity 8 X 10,5 Mw, PT. PLN(Persero)Tello, Makassar Client : PT. Assindo Perniagaan Internasional

Modification System Mfonisasi Engine SWD Capacity 4 x 1,2 Mw PLTD PLN(Persero) Meulaboh, Senabouh NAD Client : PT. Tandon Citra Murti/ Wartsilla Modification System Mfonisasi Engine SWD Capacity 3 x 3,2 Mw, PLTD PLN(Persero) Pulo Pisang, Sigli NAD Client: PT. Tandon Citra Murti/ Wartsilla Installation of Diesel Engine Container CAT D 3516 B,Capacity 32 x 1200Kw. PT. Inco Sorowako, Sulawesi Selatan, Client: PT. Trakindo Utama Installatiom of Mechanical Electrical Diesel Engine CAT 3616, Capacity 1 x 4,2 Mw. Power Plant Comoro Dilli Republik Timor Leste Client: TUSSPL Singapore

Installation of Mechanical Electrical Enginee Deutz 16 BV 640 and Sulzer 18 V ZAV 40 s Capacity 3 X 6,5 Mw And 1 x 10,5 Mw , Silae, Palu Sulutenggo. Clien: PT. Phakpak Bumi Energi 2010

Milestone

Installation and Modification Exhaust Duct Silencer and Tank Modular Urea Services tank for Diesel Engine CAT 3616, PLTD Koala Kencana, Freeport Timika,Papua Client : PT. Trakindo Utama 2005

Installation of Expantion Joint & Below Turbin Gas 1 x 60 Mw, Kawasan Industri Jababeka I, Cikarang-West Java Client: PT. Cikarang Listrindo Installation of Diesel Generator(Genset) CAT 250 Kva, PT. PLN(Persero) Kediri, East Java Client: PT. Samapta Nusantara


Project History

19 Year

Milestone

Substation 150 KV 2010 Installation and Treatment oil Transformer Capacity 70 Mva,PLTD PLN(Persero) Pesanggaran Bali, Client : PT. ABB 2008

Installation and Erection Switchyard 150Kv Line Bay Trafo I,PT. PLN(Persero) Gardu Induk , Dawuan. Cikampek Client: PT. Areva T & D

Year 2011

2006

2005

2005

Supply and Installation of Heat Exchanger and piping system Thermal oil, Manufacture fiberboard, Indralaya KM, 32 South Of Sumatera Client: PT. Sumatera Prima Fiberboard Installation of Mechanical Equipment Proces Papermill II, PT. Bukit Muria Jaya Karawang Barat Client: PT. Bina Rasano Engineering Shutdown & Reinstallation Krofta Tank, papermill II PT. Bukit Muria Jaya Karawang Barat Client: PT. Bina Rasano Engineering

Installation and Fabrication Condensate pipe Injection Hook Up Line, AW 5 Geothermal Chevron Darajat 12 Garut-West Java Client : PT. Bina Rasano Engineering Installation and Fabrication Condensate Pipe and Welding Services , AW 2 Power Plant Geothermal ,Magma Nusantara Limited Pengalengan, West Java Client : Magma Nusantara Limited

Supply and Fabrication Dismantling, Reinstall and Moulding Melting Furnance LC. 20.PT. Yamaha KIIC Karawang Barat Client: PT. Andika Mitra Teknik

Supply Engineering Supervisi Mechanical & Electrical Diesel Enginee 3 x 4,2 Mw Gosowong Mining Halmahera Utara. Client : PT. Trakindo Utama

Pipe Line Gas

Installation and Erection Switchyard 150 Kv Line Bay Trafo III,PT. PLN(Persero) Gardu Induk , Rancakusumba. Bandung Selatan Client: PT. Areva T & D

2008

Milestone

Testing and Commissioning 2013 Trouble shooting and Services Engine CAT 3616 Capacity 4,2 Mw PT. PLN (Persero) Kayu Merah Maluku Utara Client: CV. Putri Salju 2012

Commissioning Diesel Enginee Sulzer 1 x 16 ZAV 40 s. PLTD PLN(Persero) Silae- Palu, Sulutenggo. Client : PT. Phakpak Bumi Energi


Project History

20 Year

Milestone

Services and OverHaul 2012 Major Overhaul Engine GMT unit #3 PLTD PT. PLN(Persero), Pokka Ambon Client : CV. Putri Salju 2012

Major Overhaul Engine SWD 410, unit #1 PLTD PT. PLN(Persero) Hative Kecil, Ambon Client : CV. Putri Salju

2011

Major Overhaul Engine SWD 410 unit #2, PLTD Hative Kecil, Ambon Client : CV. Putri Salju Major Overhaul Engine SWD 410 unit #3, PLTD Hative Kecil, Ambon Client : CV. Putri Salju

Year

Milestone


21

Year 2012

2011

Completed Project Map

Location Ambon , Maluku Palu, Center of Sulawesi Pekanbaru, Riau Makasar , South of Sulawesi Manado, North of Sulawesi Ambon, Maluku Tangerang , Banten

2010

Halmahera Utara, Maluku Utara Karawang, West of Java Pesanggaran, Bali Makasar, South of Sulawesi

2009

Sigli, Nangroe Aceh Darusalam

2008

Rancakusumba, Dawuan, West of Java Karawang, West of Java Darajad, West of Java

Year

Location

2007

Sorowako, South of Sulawesi

2006

Hative Ambon, Maluku Comoro, Republic of Timor Leste Timika, Papua Darajad, West of Java

2005

Cikarang, West of Java Kediri , East of Java Inderalaya, South of Sumatera Karawang, West of Java