Issuu on Google+

TRIBUTO BUILDING @ The Tribu Campus


A+Building


First Floor


5.55

8.25

8.25

.55

Lobby


Second Floor


Third Floor


Roof Top


The Building 9,684 m2 of construction space. Anti-seismic construction with pre-stressed concrete. Compliance with NFPA international standards. More than 200 parking spaces. Conveniently situated in Lindora.


The Building

• Multiuse space for Yoga, Aerobics and other recreational activities. • Health Care Center (Nutritionist, Company Doctor and others) • Organic Food Kiosk • Britt Coffee Kiosk • Subway Kiosk


Materials: Roof covering and glass facades with thermal insulation properties, that reduce the consumption of air conditioning and thereby reduce electricity bills compared to decks and conventional glass facades. It also has an air conditioning system which has a core team of 200 ton high efficiency chillers, where all the components are of variable speed, meeting the demand for cold air optimized with energy use. This Chiller is the only one of its kind installed in Central America and, compared with conventional equipment of the same capacity, is up to 25% more efficient, thus reducing the carbon footprint of the project.


Tributo


Internet and connectivity:

• Monomode fiber optic connectivity • 3 available Internet service providers (ICE, Racsa, Tigo) • Symmetric / Asymmetric speeds • Internet speeds from 1mbs to 150mpbs per line • E1 availability • Copper land lines availability • VoIP availability with hard lines on North America, Europa and Central America • Redundancy (Multi-mode fiber optics between Tributo and Tribu building) • Triple Play availability • Digital TV availability • Hosting availability • Colocation services facilities availability


Security: HID access card technology CCTV IP base system Security officer on site 7x24x365


Power Supply

• 1250kVA PowerCo generator system • Generator has day tanks with four 5,000L tank system with redundant pumping system • Fuel tanks carry four hours of fuel at full load with fuel delivery within two hours • Generator system accepts load within 15 seconds of activation


Bosz Digital

• Working Spaces for 550 people, with all the technological facilities. • 3 large meeting rooms and 2 conference rooms, with video conference, projector and TV high definition screens. • Training Center • 4 lounges for informal meetings • 2 Recreational areas • 90 parking spaces for vehicles • Bicycle racks


Design and Working Space Herman Miller Canvas Collection for 520 working spaces.


First Floor


Second Floor


Third Floor


Entrance - Vertical Garden


Inside 3D


Inside 3D


Inside 3D


Outdoor Deck


TRIBUTO BUILDING The Tribu Campus


Tributo Building