Cedarbrook Country Club As-Built

Page 1

NEW SHORT GAME AREA COMPLEX LIMIT OF DISTURBANCE

GRAVEL SUMP 4" SOLID HDPE

2" PVC

PE

ID HD

4" SOL

4" PE

RF H

CLEANOUT

DPE

ERF

4" P PE

HD PE

4"

F ER

HD

P

WIRES TO CONTROLLER

12" DRAIN BASIN NEW GATE VALVE EXISTING SPRINKLER HEADS

EXISTING CONTROLLER

EXISTING SHORT GAME COMPLEX

CEDARBROOK COUNTRY CLUB 180 Penllyn Pike, Blue Bell, PA 19422 SUMMER 2016 NOTES:

Total Turf Golf Services

1965 Byberry Road, Huntingdon Valley, PA 19006 office: 215.366.7155 fax: 215.366.7156 drawn by KL

NEW GREEN AREA: 2,800 SF; BUNKER AREA: left greenside - 640 SF; right greenside - 730 SF *Fill imported from offsite to build up new green complex *New Toro 835 Heads installed around green complex, including new output cards/boards at controller

SHORT GAME AREA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Cedarbrook Country Club As-Built by Total Turf Golf Services - Issuu