MARLBOROUGH HOSPITAL CANCER PAVILION

Tocci Building Companies 660 Main Street Woburn, MA 01801

c

o

o

l

c a l m constructed


Marlborough Hospital Cancer Pavilion Marlborough, MA

The Marlborough Hospital Cancer Pavilion (MHCP) is a 14,538 square-foot project with a new cancer treatment wing and a 2,000 square-foot renovation. The project centers on a state of the art Linear Accelerator for radiation oncology, a CT Simulator for diagnostic imaging, and ten chairs for infusion oncology. Tocci, The S/L/A/M Collaborative, and Marlborough Hospital, along with key consultants and subcontractors, delivered the project under a full IPD contract.


Aspirations of Marlborough Hospital Cancer Pavilion A cancer diagnosis is traumatic. Coping with that reality

cancer care by providing:

alone is daunting. For those who go through treatment, as

ƒƒ

well as their families and loved ones, there is much more to

chemotherapy infusion bays and two private infusion

deal with than being ill. It is the stress of rearranging busy lives for lengthy chemotherapy treatments or frequent visits for

A spacious medical oncology area with eight open rooms

ƒƒ

The most sophisticated linear accelerator technology

radiation. Long drives in traffic, parking hassles, waiting as

available with

the treatment is prepared and given, and an exhausting drive

Varian TrueBeam

home. This is what takes over the life of an individual with

radiation and CT

cancer.

Simulation for optimal radiation

No more.

treatments ƒƒ

Access to UMass

In 2013, a new Malborough Hospital Cancer Pavilion

Memorial/UMass

opened. The state-of-the-art facility is part of the UMass

Medical School

Memorial Health Care Cancer Center of Excellence and

clinical trials

combines the skills and knowledge of multidisciplinary teams

ƒƒ

of cancer specialist and an accredited cancer program – all

exam rooms and

in one location. A nearly14,000 square-foot addition on the north side of the

Comfortable offices

ƒƒ

An oncology

hospital will house cancer care services including medical

center where

oncology, radiation oncology, exam space and a healing

experts share

garden. Currently, medical oncology is located on the

their knowledge

second floor of the hospital’s 1952 building while radiation

for the best

oncology is only available off site. The new pavilion will bring all cancer services together under one roof with dedicated

possible treatments and outcomes for patients ƒƒ

patient entrance and parking.

consultation by all medical team members ƒƒ

The new Cancer Pavilion makes possible a team approach to

4

Electronic medical records for efficient, shared Open educational spaces where clinical experts discuss and present advanced prevention, care, research, and

Tocci Building Companies


ƒƒ

ƒƒ

treatment options to their colleagues and community

The new Cancer Pavilion brings the most advanced

Compassionate and highly skilled oncologists, oncology

technology available to cancer care. This includes TrueBeam

nurses, pharmacists, and support staff to care for patients

radiation therapy, a fully integrated system that coordinates

and support family members

imaging, patient positioning, motion management and

A healing garden to reduce stress on patients, families,

treatment to:

and caregivers by providing an area for respite and

ƒƒ

Provide more precise dosages

meditation

ƒƒ

Increase patient safety and comfort

ƒƒ

Tackle the most complex treatments, including

Designed to be constructed and maintained with environmentally friendly materials, the new Cancer Pavilion

radiosurgery and moving tumors ƒƒ

will be built according to the LEED-certification process (Leadership in Energy and Environmental Design).

Produce high quality/4D images with a 25 percent lower radiation dose

ƒƒ

Cut treatment time in half or more

Linear Accelerator

c

o

o

l

c a l m constructed

5


LINAC The project centers on the state of the art LINAC. Tocci’s approach to the LINAC and vault is detailed on the following pages.

Code Clearance Tocci added installation, maintenance and code clearance to objects ranging from VAV’s to windows -- facilitating construction and operations.


Clash Detection The hospital, Tocci, SLAM and key subcontractors are reaping the benefits of clash detection, BIM’s low hanging fruit.

SDC-E4.0

GROUND FLOOR CABLE TRAY

DN

1

Laser Scan 2 8' - 11 1/2"

9' - 4 1/2"

Tocci used a laser scan of the building to coordinate new and relocated utilities.

19' - 2 1/2" 10' - 2 1/2"

10' - 9 1/2" 10' - 8 1/2"

8' - 9 1/2" DN

3

Cable Tray Schedule Family Length Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings IN STOCK: 4 Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings Cable Tray with Fittings NEW: 13 Grand total: 17

11' - 5 1/2"

9' - 3 1/2"

8' - 9 1/2"

10' - 9 1/2"

25' - 0" 18' - 0" 19' - 0" 32' - 0" 94' - 0" 24' - 3" 28' - 3" 9' - 1 1/2" 19' - 7" 17' - 7" 18' - 4" 15' - 5" 8' - 9" 39' - 6" 14' - 5" 10' - 8" 5' - 1 1/2" 4' - 9" 215' - 9" 309' - 9"

IN STOCK? IN STOCK IN STOCK IN STOCK IN STOCK NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW NEW

REVISIONS NO DATE

DESC

6' - 9 5/16"

8' - 9 1/2"

8' - 9 1/2"

07/02/12

ISSUED

JW

JG

JC

Checker

SUPER

PRJ MGR

PROJECT NO

157 UNION STREET MARLBOROUGH, MA

UP

9' - 2 1/2"

BIM LEAD

DN

CANCER PAVILION

8' - 9 1/2"

Using the BIM, Tocci and the electrictian verified cable tray requirements against the owner’s stock, reducing the new tray purchase by a third.

n Street MA 01801 35.5500 35.1888

9' - 9 1/2"

1' - 1 5/8"7' - 10 3/8"

QAQC

Verification 10' - 5 1/2"


Linear Accelerator The project will provide new additional exam rooms, but the program centers on a state of the art Linear Accelerator (LINAC) for radiation oncology, a CT simulation for diagnostic imaging and 10 chairs for infusion oncology. Tocci, S/L/A/M, and key subcontractors modeled the LINAC, it’s vault, and mechanical systems extensively.

8

Tocci Building Companies


LINAC Vault

Immediately before forming the 745 CY concrete LINAC

The above photo shows the “blank slate” of the LINAC, before

vault, Tocci and S/L/A/M reviewed and finalized layout

all of the equipment arrives. The sub-slab, 5’ below grade,

of access panels and pull boxes. While explaining conduit

supported the staging needed while the roof cured and will

sweep radii to the Architect, Tocci pulled in the Electrician

provide a clean smooth surface for underground installation.

and HVAC foreman for their input on the layout. The team was able to use the model to optimize an item being built a few feet away.

c

o

o

l

c a l m constructed

9


LINAC Installation

Tocci modeled the LINAC installation path to better

S/L/A/M designed the LINAC space with healing in mind.

understand how to sequence casework and finishes, as well

Murals and all visualizations being an element of nature,

as to conform the overall geometry of the corridors.

balanced by light wood and clean colors.

10

Tocci Building Companies


c

o

o

l

c a l m constructed

11


TO CCI

660 Main Street Woburn, MA 01801 t 781.935.5500 f 781.935.1888 www.tocci.com

Marlborough Hospital Cancer Pavillion - Tocci Building Companies  

A new 14,000 SF, $12.7 million cancer treatment wing for Marlborough Hospital. Tocci, SLAM, and Marlborough Hospital worked together under a...