to make necessary remodels and repairs to The Makonde Christian Hospital
Phase 4 - $2.20M - 12 months
Repairs and Maintanance Work to Wards, Hospital Central Services, Theatre, Radiology Department, Corridors, Mortuary, and Intergration of Paediatric Ward
Advertisement
Maternity Ward
Currently, the hospital conducts about 120 deliveries per month, and there is inadequate space. The unit is using two labour beds and a four bedded pre-and post-natal room. Hence the need for an independent unit to cater to these clients. We aim to build a maternity ward with a total of 40 beds broken down as follows: Pre Labour (eight beds), Labour Ward (four beds), Delivery Room (four beds ), PostDelivery (10 beds), C/S and Post Surgical (10 beds), and Pre-term & Resuscitation room for monitoring (four beds).
Mortuary
The current Hospital Mortuary has cracked and rusted walls. The cold room lock is broken and is currently being held together with wires. Lastly, the mortuary roof is sagging. ZACH plans to repair the mortuary, making it better than new.
Wards and Corridors
The hospital wards and corridors currently have heavily cracked floors and ceilings. Electrical updates are imperative in the Labour Ward and major updates to the bathrooms are needed.