Page 47

A L O T O F G L AS S I S I N C O R PORATE D I NTO THE P ROJE CT’S DE SI GN S O T H AT PEOPL E I N S I DE T H E HOSP I TA L—WHE THE R PATI E NTS OR STA F F — C A N L OOK OU T S I DE A ND SE E THE P HY SI CA L BE A U TY TH ERE It was a great fit right out of the gate. “Penn Medicine has been just a fantastic partner,” Duncan told us. “They’ve invested the capital, helped us recruit additional doctors and nurses, and at the same time, they’ve recognized that Chester County Hospital has a unique and very special culture. They’ve gone out of their way to acknowledge that culture, and to let the local management team maintain that feel of how we treat one another here. I was impressed when Penn leadership—from our very first meeting—mentioned that our culture here was something that they wanted to be protected.” With the partnership established and the capital secured, ground was broken in May of 2017 for this ambitious project, and things seem to be on target for completion of it by the target date of December 2019—“It’s our Christmas present to the community,” Duncan said. “At this point, we’re very optimistic that we’re going to be right on schedule. The most important thing we needed to get done has gotten done: the new tower is enclosed. So snow or bad weather won’t impede us at this point—all the work has moved indoors.”

Speaking of the indoors, even the architectural firm selected for the job was a good fit. As it happened, the same firm, Ballinger, which has worked with CCH for over 20 years, also does business with Penn Medicine. “So when we wanted to do this expansion,” Duncan said, “we already had somebody who understood what’s important to us doing the design.” A couple of the concepts considered in the design were not only the history of Chester County, but the geography of it. So it was not only important to maintain the hospital’s architectural elements, but a lot of glass is incorporated into the project’s design so that people inside the hospital—whether patients or staff—can look outside and see the physical beauty there. “Right now, if you walk into an operating room for your eight- or 10- or 12-hour shift, you won’t see the outdoors again until you get in your car to go home,” Duncan told us. “In the new structure, there’s glass right next to the operating room, so between cases, a nurse or doctor or tech can step out into a quiet space and look out onto the beauty of Chester County.” There will

also be several interior courtyards with trees, and a huge green roof on top of the operating rooms. In addition to creating these physically beautiful spaces, a lot of work has gone into creating quiet spaces where a doctor and a patient or a patient and family can find spaces for conversation. “We’re creating a calm, quiet environment for everyone here. Even the floors in our new neonatal intensive care unit are sound absorbent. It’s unbelievably quiet, which helps the babies.” With the renovation completed by the end of next year, move in will commence in January of 2020, and it’s expected that everything will be operational (no pun intended) by the early part of April. The project—like many renovations—is both exciting and demanding, and Duncan says the CCH management team is working hard—really hard. “We’re doing two full time jobs right now,” he said. “We’re successfully running the hospital that we’ve got, and at the same time, we’re building the hospital that we want: a hospital for the future.”

JANUARY 2019 THEWCPRESS.COM

47

The WC Press Development Issue - January 2019  

Voice of the Borough

The WC Press Development Issue - January 2019  

Voice of the Borough