Issuu on Google+

WEEKLY BULLETIN www.marinba.org ◆ mba@marinba.org

April 15, 2014 Vol. 58, Issue #15

IT’S HERE!

Marin Home Magazine’s Spring 2014 Design Issue The digital edition of Marin Home Magazine’s Spring 2014 Design Issue is now available featuring incredible work, design expertise and fine craftsmanship by our members! Visit us online at marinhomemagazine.com to view the full Spring 2014 Design Issue. Also, look out for your hardcopy in the mail and if you’re interested in requesting additional copies for your storefront please call the MBA at 415.462.1220.

www.marinhomemagazine.com


www.marinba.org ◆ mba@marinba.org

2014 MBA SCHOLARSHIP APPLICATION

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 2


www.marinba.org ◆ mba@marinba.org

2014 MBA SCHOLARSHIP APPLICATION

CLICK HERE TO DOWNLOAD APPLICATION OR GO TO http://marinba.org/scholarship/Scholarship_Application_2014.pdf

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 3


North Bay NARI

north bay C h a p t er When May 6, 2014 5:30-8:30pm 5:30-6:15 pm Networking 6:15-8:30 pm Dinner and Presentation Location Stone Tree Golf Club 9 Stone Tree Lane Novato, CA

Red Tagged! What Every Remodeler Should Know About Building Codes Come Hear from Our Panel of Local Building Inspectors Knowledge is power. This dynamic and interactive presentation features a panel of three Marin County building inspectors. They will discuss the latest and most important code changes in their districts (County of Marin, San Rafael, and Novato), as well as provide key information on obtaining permits and other local regulations that affect your remodeling projects. Do you wish you knew what your inspector really wanted? Come and learn the most important things you can do to ensure a smooth permitting and inspection process. After you attend this presentation, you will know: •

Cost $45 NARI members/ $55 non-members Registration will be available at the door.

• • • •

Top reasons why you need a permit, and when New code changes for 2014 Specific local codes Title 24 and what it means What WUI is and how it affects you And much more!

Register and prepay online by May 2, and receive a $5 discount. About our Panelists:

Proper attire required. North Bay NARI PO Box 1313 Novato, CA 94948 Email membership@ northbaynari.org Website For information on how to become a member: www.northbaynari.org

Bill Kelley has served as a Marin County Building Official since 2007. Bill brings 40 years of practical construction experience to bear on the challenges of local governance in pursuit of healthy, safe, and sustainable communities. Bill holds numerous professional certifications, and has served as President of the County Building Officials Association of California.

Thomas Ahrens has been Chief Building Official for the City of San Rafael for over 8 years, and has also served as San Rafael Fire Marshal. He began his construction-related career on the other side of the counter, beginning as a carpenter before obtaining his GC license.

Fred Lustenberger has been Chief Building Official for the Town of Tiburon since 2010, and also works as a Certified Access Specialist. He has worked as a Building Official for the city of San Carlos, as well as Mariposa County and Sonoma County. He was a general contractor for 9 years.

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 4


www.marinba.org ◆ mba@marinba.org

PROJECT OF THE WEEK Notice inviting bids for

JUVENILE SERVICES BUILDING INTERIOR RENOVATION PROJECT Friday, April 25th, 2014 @ 11:00 AM Non Mandatory Pre Bid Conference: Thursday, April 17th @ 10 AM at 4 Jeanette Prandi Way, San Rafael, CA

IN THIS ISSUE ________________________ VOL.58 ISSUE#15 IT’S HERE! MARIN HOME SPRING 2014 ...........1

Description: Div_02-selective structure demolition; Div_03-cast-in-place concrete; Div_05-structural steel framing, metal fabrications, decorative formed metal; Div_06-rough carpentry, sheathing, exterior finish carpentry, interior arch woodwork; Div_07-bldg insulation, flexible membrane flashing, joint sealants; Div_08-hollow metal doors & frames, access doors & frames, security doors & frames, aluminum framed entrances & storefronts, security windows, unit skylights, door hardware, glazing; Div_09-finish schedule, portland cement plastering, gypsum, board, tiling, linear wood ceilings, resilient base & accessories, resilient sheet flooring, painting; Div_10-identification devices, toilet & bath accessories, fire protection cabinets, fire extinguishers; Div_11miscellaneous owner-furnished, contractor-installed equipment; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical; Div_28-intrusion detection system, video surveillance system.

Bidders who have questions regarding the project should contact County of Marin @ 415.473.7877.

2014 Scholarship Application Project of the Week

...........2

........................5

The Capitol Connection

.................10

5 Things YOU Need to Know

.........11

Phil Vermeulen ..................................12 SAFETY: Be a Safety Coach Part 2 ....15 Permits

..............................................20

Tax Liens & Completions ..................24 Project Bid Schedule

.......................29

Classifieds ..........................................43 __________________________

Plans and specifications may be viewed online by subscribers to the MBA Online Plan Service.

CONTACT MBA 660 Las Gallinas Avenue San Rafael, CA 94903 ◆ Office: 415-462-1220 Fax: 415-462-1225

www.marinba.org mba@marinba.org 415.472.3434

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 5


www.marinba.org◆ ◆mba@marinba.org mba@marinba.org www.marinba.org

SAVE THE DATES

04.18.14

2014 events

SCHOLARSHIP APPLICATIONS DUE @ 5:00PM

06.10.14

SCHOLARSHIP AWARDS RECEPTION @ Jason’s Time TBA

09.22.14

ANNUAL GOLF TOURNAMENT @ Marin Country Club Time TBA

FOR MORE EVENT DETAILS & UPDATES VISIT OUR CALENDAR ONLINE AT

http://members.marinba.org/events/calendar/

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 6


www.marinba.org ◆ mba@marinba.org

2013-2014 MBA DIRECTORS & OFFICERS President jim Schalich - Schalich Bros. Construction Vice President Tyler Doherty - Cal-West Rentals, Inc. Chief Financial Officer Tom Barr - Ghilotti Bros., Inc. MBA MEMBER

SECRETARY John Busick - Bob Kunst Painting Past President Jeff Mertel - Mertel Carpets Chief Executive Officer Rick Wells

ADVERTISE HERE! Free classifieds space for MBA members

Oliver Dibble - Dibble & Company Keith Dotto - Dotto Glass, Inc. Aimi Dutra - The Dutra Group Clayton Fraser - West Bay Builders Dave Garbarino - Marin Sanitary Service, Inc Jeff Grady - California Mortgage Advisors Diane Henderson - DMH Land Use Planning Dan McLennon - McLennon Law Corporation Rob Scerri - Golden State Lumber Dave Trahan - Patriot Mechanical Michelle Whiteside - Whiteside Construction STAFF Paula Krause - Office Manager Barbara Jones - Membership Manager Kellie Buono - Administrative Assistant/Reception CONSULTANTS Casey Mazzoni - Legislative Analyst Terrence Knoles - Publications The weekly bulletin is owned by MBA. Archive available at www.marinba.org 660 Las Gallinas Avenue, San Rafael, CA 94903 Publisher: Marin Builders Association

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 7


www.marinba.org ◆ mba@marinba.org

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 8


www.marinba.org◆ ◆mba@marinba.org mba@marinba.org www.marinba.org

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 9


www.marinba.org◆ ◆mba@marinba.org mba@marinba.org www.marinba.org

The Capitol Connection Q&A for Contractors By Shauna Krause, Capitol Services, Inc.

Despite attempts to make government more

A: Unfortunately there is not much a contractor

this for you and pick it up when it’s ready, or

accessible, understandable and open to

can do regarding a public agency class

you can fill out the form, which is available on

citizens there always seems to be one more

determination on one of their projects. Unless

the CSLB’s website, and mail it in.

‘hoop’ to jump through to get where you

it’s wildly ‘off base’ a local government agency

want to go as our first question shows. We

can pretty much decide which classification

Yes, it is true that you as a consumer are not

also offer a new take on the old Latin phrase,

they will accept. Both public agency and federal

required to pay a contractor who is not properly

“caveat emptor” or buyer beware…

projects have their own unique processes and

licensed during the entire length of the project.

requirements that don’t always align with those

If the individual’s license goes ‘Suspended’ even

in the private commercial marketplace.

for just one day as the result of non-compliance

Q: First of all, I want to say thank you for your recent efforts/help with our various licenses!

(such as an expired Worker’s Comp policy or an

I’d like some clarification on our asbestos

You can always appeal to the governing board of

expired License bond) they are not entitled to be

certification though. On our license it shows

the public agency, however that usually doesn’t

paid for the entire project by law. A crucial point

the asbestos certification and says “for bidding

go anywhere because it creates the need to re-

for contractors to know and understand because

purposes only”. That implies that we cannot

advertise the bid but it’s one thing you can try.

many consumers now do know they can easily

actually perform the service. We are registered

research the law and licensing online. “Contra

with DOSH as an asbestos contractor. Do we

Q: I am not a contractor but I came across your

cave” in Latin or in any language, contractors

need to provide the CSLB with our DOSH

website when I was doing research on what I

beware!

certificate?

should do about an issue that I’m having with a contractor that is doing work on my home. I

A: Yes, if you are performing asbestos

am not happy with his work at all and I checked

abatement work then you should provide the

out his license and found that it’s currently

While knowledge is power, knowing where to go for the answers

CSLB with your DOSH certificate. Once that

suspended! I called the CSLB to see what the

is half the battle. Get expert assistance immediately when you call

is provided, the CSLB will remove the “for

date of Suspension was and they said that they

bidding purposes only” notation from your

were not able to give me that information. Is

license.

there a way that you can find out when the

866-443-0657, email info@cutredtape.com, or write us at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

license went ‘suspended’? And is it true that I Q: Is there anything a contractor can do to

don’t have to pay him for the project because his

influence how a public agency classifies work

license is suspended?

for a project? The General Contractor on our current project said the project is 90% General

A: In order to find out when the license was

and 10% Electrical, but the City wants to give

suspended you will want to request a “certified

the contract to a “C-10” Electrical contractor.

license history” from the CSLB. We can request

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 10


www.marinba.org ◆ mba@marinba.org

BY CASEY MAZZONI MARIN BUILDERS ASSOCIATION LEGISLATIVE ANALYST casey@marinba.org

5 things you need to know Marin Builders Association working for YOU!

1

. CITY OF NOVATO REVEALS A $32.7 MILLION DOLLAR BUDGET http://www.marinij.com/novato/ci_25533504/proposed-32-7-million-budgetunveiled-novato

“To make democracy work, we must be

2

. RATE INCREASE FOR MARIN CLEAN ENERGY CUSTOMERS. http://www.marinij.com/marinnews/ci_25525441/marin-clean-energy-authorityraises-rates-7-percent

a notion of participants, not simply

3

. MARIN CLIMATE ACTION PLAN MEETING – APRIL 29TH http://www.marincounty.org/depts/cd/divisions/planning/sustainability/climateand-adaptation?p=1

observers. One who does not vote has no right to complain.”

4

. NOVATO MAYOR ERIC LUCAN’S WEEKLY BLOG http://novato.patch.com/groups/eric-lucans-blog/p/mayors-weekly-mar-31--apr-6

5

. MARC LEVINE SENDS A MAILER ASKING FOR A FRACKING MORATORIUM http://www.watchsonomacounty.com/2014/04/sacramento/ marc-levine-mailer-calls-for-fracking-moratorium/

― Louis L’Amour

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 11


www.marinba.org◆ ◆mba@marinba.org mba@marinba.org www.marinba.org

MBA’s Sponsored Bill Passes First Hurdle! by Phil Vermeulen, MBA Legislative Advocate Also In This Update

Bills Set for Week of April 21st

subcontractor, or surety may deposit the full

Bills Set For Week of April 21st

While the Legislature enjoys its annual spring

amount of the assessment or notice with the

Need Extra Time to File Taxes?

break next week, I will be preparing for the

Department of Industrial Relations in the form of

LA Building Inspector Convicted of

following week’s onslaught of hearings that will

cash or a bond acceptable to the Director of the

Bribe Keeps Pension

contain dozens of bills in each committee! As

Department of Industrial Relations.

you may recall, the deadline for bills to pass

AB 2355 (Levine) – Local Requirements

out of their house of origin’s policy committee

AB 1803 (Skinner) - Lead-related

for RAP/RAS on Roads – I am happy to be

is May 2nd for bills with a fiscal impact to the

construction registration program - This bill

the first to inform you that MBA’s sponsored

state and May 9th for all others. Since that

would establish a registration program that would

bill, AB 2355 (Levine) was heard yesterday in

means each policy committee will only have

require employers and contractors who perform

the Assembly Local Government Committee

2 or 3 hearings prior to the deadlines, dozens

lead-related construction work to register with

and passed out 9-0. Traveling up from Marin

of bills will be heard at each hearing. ‘Good

the Division of Occupational Safety and Health

were Casey Mazzoni and Nik Minton of Marin

government’ at work!

before commencing work. The bill would require

Resource Recovery Center. Nik provided the

payment of an application fee for registration

superb testimony that helped convince the

AB 1741 (Frazier) - Public works: prevailing

in an amount determined by the division as

committee that this is an important bill! It will

wage rates: wage and penalty assessments

prescribed and would require annual renewal of

next be heard in the Assembly Transportation

- Existing law provides that, after 60 days

the registration with the payment of a renewal fee

Committee.

following the service of a civil wage and penalty

established by the division. Under the bill, those

assessment or notice, the affected contractor,

fees would be deposited into the Lead Contractor

If signed by the governor (which I don’t see why

subcontractor, and surety on a bond issued to

Registration Fund, which the bill would create,

it won’t) would encourage local governments to

secure the payment of wages become liable for

with the moneys in the fund to be used, upon

adopt Cal Trans’ forthcoming specification to

liquidated damages in an amount equal to the

appropriation, for the purpose of investigating,

use at least 40% reclaimed asphalt pavement in

amount of unpaid wages. Existing law authorizes

registering, and renewing registrations for lead-

their hot asphalt roadway mix. Also included in

a contractor, subcontractor, or surety to deposit

related construction work.

this proposed standard will be a mixture of up

the full amount of the assessment or notice,

to 30% by weight of the use of recycled asphalt

including penalties, with the Department of

AB 1897 (Roger Hernández) - Labor

shingles. All local governments will be required

Industrial Relations to hold in escrow pending

contracting: client liability – Existing law

to adopt Cal Trans’ standards by January of 2017

administrative or judicial review and to be

prohibits a person or entity from entering into a

or conduct a public hearing to explain why.

distributed.

contract for labor or services with a construction,

This bill would specify that a contractor,

farm labor, garment, janitorial, security guard, or warehouse contractor, if the person or entity

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 12


www.marinba.org◆ ◆mba@marinba.org mba@marinba.org www.marinba.org

knows or should know that the contract or

AB 1918 (Williams) – Central heating and

Qualified heavy equipment is mobile if the

agreement does not include sufficient funds for

air cooling equipment - This bill would require

qualified heavy equipment is not intended to

the contractor to comply with laws or regulations

the State Energy Resources Conservation and

be permanently affixed to real property for the

governing the labor or services to be provided.

Development Commission to develop a system to

purpose of using the qualified heavy equipment

This bill would require a client employer, as

track central heating and air cooling equipment

for its intended use. Qualified heavy equipment

defined, to share with a labor contractor all legal

sales and installations in the state.

is mobile if it is intended to be moved among worksites as needed.

responsibility and liability for the payment of wages, the failure to report and pay all required

AB 2114 (Pan) - Taxation: qualified heavy

employer contributions, worker contributions,

equipment - This measure would levy a .75%

AB 2376 (Weber) - State construction

and personal income tax withholdings, and the

state tax on persons leasing or renting heavy

projects: insurance - Existing law authorizes

failure to obtain valid workers’ compensation

equipment in lieu of the local personal property

the Director of General Services to establish a

coverage. The bill would define a client employer

tax that is currently paid by the owner of the

master builders’ risk insurance program for all

as an individual or entity that receives workers

equipment.

state construction projects during construction. Existing law requires a deductible from a

to perform labor or services within the usual course of business of the individual or entity

The amended bill effectively shifts a tax

contractor of at least $25,000 for a master policy

from a labor contractor. The bill would define

burden from the owners of heavy construction

issued under the master builders’ risk insurance

a labor contractor as an individual or entity that

equipment to the construction contractors who

program.

supplies workers, by contract or otherwise, to

lease or rent it. Currently, the costs of personal

This bill would instead require the contractor’s

perform labor or services within the usual course

property taxes paid by the heavy equipment

deductible under a master policy to be at least

of business for a client employer. The bill would

owner are embedded in the rental charge.

$10,000

specify that it does not prohibit client employers

Depending on the competitiveness of the local

and labor contractors from mutually contracting

market, those taxes may be wholly passed along

AB 2416 ( Stone) Liens: laborers and

for remedies, including indemnification, for

to the person renting the equipment or partially

employees - This bill would authorize an

violations of its provisions by the other party.

absorbed by the equipment owner. The practical

employee to

The bill would require a client employer or labor

effect of this bill would be to allocate the entire

record and enforce a wage lien upon real and

contractor to provide to a requesting agency or

incidence of the tax to those persons, mostly

personal property of an employer, or a property

department, and make available for copying,

licensed contractors, who frequently lease or rent

owner for wages, other compensation, and related

information required to verify compliance with

heavy equipment.

penalties and damages owed the employee. The bill would prescribe requirements relating

applicable state laws. The bill would authorize the Labor Commissioner and the Division

Qualified heavy equipment” means construction,

to the recording and enforcement of the wage

of Occupational Safety and Health to adopt

earthmoving, or industrial equipment that is

lien and for its cancellation and removal. The bill

necessary regulations and rules to administer

mobile, including attachments for the equipment,

would require a notice of lien on real property to

and enforce the bill’s provisions. The bill would

including, but not limited to, all of the following:

be executed under penalty of perjury.

provide that waiver of its provisions is contrary to

self-propelled vehicle that is not designed to

public policy, void, and unenforceable.

be driven on the highway; Industrial electrical

AB 2728 (Perea) - Vehicle weight fees:

generation equipment; Industrial lift equipment;

transportation bond debt service - This bill,

Industrial material equipment; Equipment used

notwithstanding other provisions or any other

in shoring, shielding, and ground trenching.

law, until January 1, 2019, would prohibit weight

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 13


www.marinba.org◆ ◆mba@marinba.org mba@marinba.org www.marinba.org

fee revenue from being transferred from the

By properly filing this form, a taxpayer will

unlike the State of California, does not prevent

State Highway Account to the Transportation

avoid the late-filing penalty, normally five

convicted employees guilty of felonies from

Debt Service Fund or to the Transportation

percent per month based on the unpaid balance,

collecting certain retirement benefits as no such

Bond Direct Payment Account for the purpose

that applies to returns filed after the deadline. In

provision exists within the city’s charter.

of payment of the debt service on transportation

addition, any payment made with an extension

general obligation bonds, and would also prohibit

request will reduce or eliminate interest and

In’s case is not setting well with LA City

loans of weight fee revenue to the General Fund.

late-payment penalties that apply to payments

Councilman Mitchell Englander, who told the

The Great Recession is over. The state is

made after April 15. The interest rate is currently

Los Angeles Times that he would support city

showing billions of dollars in revenue above the

three percent per year, compounded daily, and

legislation that would prevent such incidences in

budget. So Central Valley Assemblyman Henry

the late-payment penalty is normally 0.5 percent

the future.

Perea, D-Fresno, says it’s time the weight fees

per month.

paid by truckers are put back where they were

Besides Free File, taxpayers can choose to

“If you are convicted of a felony and were

intended: into fixing the roads. “Redirecting

request an extension through a paid tax preparer,

utilizing your position [at a government agency],

truck weights fees back to their intended purpose

using tax-preparation software or by filing a

you should have to forfeit the entire thing,”

will help California invest in our state highways

paper Form 4868, available on IRS.gov. Of the

remarked Englander.

and create about 18,000 good jobs,” says Mr.

more than 12 million extension forms received

Perea. “These fees would provide funding for

by the IRS last year, over 7 million were filed

In’s attorney, Harold Greenberg, disagrees and

projects leading to a beneficial multiplier effect

electronically.

believes his client is entitled to his pension given the collective worth of his 37 years of public

in the state economy, through the vital creation of new jobs and overdue investment in our

L.A. Building Inspector Convicted in Bribery

service. “He did a lot of good in the community,

transportation infrastructure.”

Will Keep City Pension

not only for the department but for civic groups,”

A 37-year veteran of the LA Department of

said Greenberg.

Get Extra Time to File Taxes

Building and Safety will continue to collect his

The IRS has received almost 100 million tax

annual pension of more than $72,000 despite

returns so far this year and expects to receive

being sentenced last month to prison in an FBI

about 35 million more by the April 15 filing

corruption case.

deadline. However, about 12 million taxpayers will have requested extensions by the filing

Samuel In pleaded guilty in 2013 to accepting

deadline, giving them an extra 6 months to file.

more than $30,000 worth in bribes will working

The fastest and easiest way to get the extra time

as a senior inspector for the department. He was

is through the Free File link on IRS.gov. In a

accused of taking advantage of Korean-speaking

matter of minutes, anyone, regardless of income,

business owners and was sentenced last month to

can use this free service to electronically request

two and a half years in prison.

an automatic tax-filing extension on Form 4868.

Two years ago Governor Jerry Brown signed

Filing this form gives taxpayers until Oct. 15

into a law a measure coercing public employees

to file a return. To get the extension, taxpayers

who have been convicted of a felony to forfeit

must estimate their tax liability on this form and

their benefits that were accumulated during the

should also pay any amount due.

time the crime was committed. Los Angeles,

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 14


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

SAFETY

Be a Safety Coach (Part 2) - Observing As part of a series on the role of the Safety Coach, this article focuses on observing work practices in the context of a behavior-based safety approach. Simply put, behavior-based safety (BBS) is a systematic way to promote safety in the workplace. Typically it involves creating a process that clearly defines a set of safe behaviors and work practices that reduce employees’ risks for injuries. Behavior Based Safety: •

The behavior-based process provides a methodology to identify and reinforce safe work practices consistently and on a regular basis so these behaviors occur more frequently than at-risk behaviors.

Ideally, in an effective BBS program, at-risk behaviors are reduced to a near-zero level. Using this approach, supervisors and co-workers conduct observations on the practices within their own work units in order to create and implement a coaching strategy that is customized to their organization’s needs.

Making observations is critical in a BBS system. Observations provide the objective data that make behavioral coaching uniquely effective.

Observing behavior: •

Observations can be built around a checklist or Job Hazard Analysis (JHA) completed for a task or position. (These observations can come directly from one of the applications in Risk Management Center.)

These documents ensure that important safety practices are considered.

Use of these documents also helps the coach to be objective, specific and positive when discussing observations with the employees being observed.

Points to keep in mind when developing an observation checklist or Job Hazard Analysis: The checklist: Take into consideration that checklists can have a variety of formats; the goal is to develop a format that is reliable and user-friendly. Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 15


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

SAFETY

Be a Safety Coach (Part 2) - Observing Determining critical safe behaviors and practices: Deciding which employee practices to include on the checklist or JHA is a balance between including those essential to maintaining a safe workplace and creating a simple and easy-to-use tool. This is fairly straight forward for those organizations that use tools like JHAs. Identifying practices: Practices included on the checklist or JHA must be described in such a way as to allow coaches to reliably record their observations. Each item must be detailed enough that the checklists or JHA of two independent observers, observing the same employee at the same time, will substantially be the same. Trying out the checklist/JHA: •

Designing a valid, reliable, and above all else, practical checklist or JHA requires taking them out into the work place.

Members of the work team can test the drafts of the JHA in their work areas.

Ideally, the observation and recording of observations takes no more than fifteen minutes for each observation period.

Observations should be performed during all aspects of the work that is done during the day, not only done for specified time periods.

Observations on a regular basis can fine tune behaviors and provide the data a safety coach needs to make improvements in their organization.

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 16


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

SAFETY

Conviértase en un instructor de seguridad (parte 2) - Observar Como parte de una serie sobre el papel del Instructor de seguridad, este artículo se centra en la observación de las prácticas de trabajo en el contexto de un enfoque de seguridad basado en el comportamiento. En pocas palabras, la seguridad basada en el comportamiento (BBS, por sus siglas en inglés) es una forma sistemática de promover la seguridad en el lugar de trabajo. Normalmente se trata de crear un proceso que defina claramente un conjunto de comportamientos y prácticas seguros de trabajo que reduzcan los riesgos de lesiones de los empleados. Seguridad basada en el comportamiento: •

El proceso basado en el comportamiento proporciona una metodología para identificar y reforzar las prácticas seguras de trabajo en forma regular y sistemática, a fin de que estos comportamientos sean más frecuentes que los comportamientos de riesgo.

Lo ideal sería que, en un programa eficaz de BBS, los comportamientos de riesgo se redujeran a un nivel cercano a cero. Con este enfoque, los supervisores y compañeros de trabajo realizan observaciones sobre las prácticas dentro de sus propias unidades de trabajo a fin de crear e implementar una estrategia de instrucción personalizada para las necesidades de su organización.

Las observaciones son fundamentales en un sistema BBS. Las observaciones proporcionan los datos objetivos que hacen que el entrenamiento de comportamiento sea singularmente eficaz.

Observar el comportamiento: •

Las observaciones pueden hacerse en torno a una lista de verificación o a un Análisis de riesgos de trabajo (JHA) completado para una tarea o posición. (Estas observaciones pueden provenir directamente de una de las aplicaciones en el Centro de gestión de riesgos.)

Dichos documentos garantizan que se tengan en cuenta las prácticas de seguridad importantes.

El uso de estos documentos también ayuda a que el instructor sea objetivo, concreto y positivo al comunicar las observaciones a los empleados que están siendo observados.

Puntos a tener en cuenta al elaborar una lista de verificación o un Análisis de riesgos de trabajo para la observación: La lista de verificación: Tome en cuenta que las listas de verificación pueden tener distintos formatos; el objetivo consiste en desarrollar un formato que sea fiable y fácil de usar.

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 17


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

SAFETY

Conviértase en un instructor de seguridad (parte 2) - Observar Determinar las conductas y prácticas seguras críticas: Para decidir qué prácticas de los empleados se incluirán en la lista de verificación o JHA, es preciso un equilibrio que incluya a las personas esenciales para mantener el lugar de trabajo seguro y la creación de una herramienta simple y fácil de utilizar. Para aquellas organizaciones que utilizan herramientas como JHA, esto es bastante sencillo. Identificar las prácticas: Las prácticas incluidas en la lista de verificación o JHA deben ser descritas de tal manera que permita a los instructores registrar sus observaciones de forma fiable. Cada elemento debe ser lo suficientemente detallado como para que las listas de verificación o JHA de dos observadores independientes que observaran al mismo empleado al mismo tiempo, sean sustancialmente iguales. Probar la lista de verificación/JHA: •

Para diseñar una lista de verificación o JHA válido, fiable y, sobre todo, práctico, es preciso llevarlos al lugar de trabajo.

Los miembros del equipo de trabajo pueden probar los bosquejos del JHA en sus áreas de trabajo.

Lo ideal es que la observación y el registro no tomen más de quince minutos para cada período de observación.

Las

observaciones deben tomar en cuenta todas las partes del turno de trabajo, y no solo un horario determinado.

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 18


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

SAFETY

Be a Safety Coach (Part 2) - Observing This form documents that the training specified above was presented to the listed participants. By signing below, each participant acknowledges receiving this training. Organization: Trainer:

Trainer’s Signature:

Class Participants: Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Name:

Signature:

Date:

Remember to load your completed trainings into the Risk Management Center. Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 19


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

PERMITS

COUNTY OF MARIN PERMITS ISSUED

Owner Contractor Kayer Louise Trust FAIRWAY DESIGN & CONSTR. Buetzow Mark R & Linda TRAVIS BUILDERS INC Schnugg Family Partners L GEORGE T. FLYNN CONSTRUCT Bella Carol A OWNER/BUILDER Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Spirit Rock Meditation Ce CAMELLO INC Chiarappa Nicla /Tr/ Etal OWNER Lecale Investments Inc DUCHARME CONSTR. Vogt Mark G & Kristin OWNER/BUILDER Rowett Kent M & OWNER Kalmanoff Alan PUMP-A-TURD PLUMBING Brand Christopher C & HEAVEN’S EARTH CO INC Greenery Apts Etal REGENCY GENERAL CONTRACTO Greenery Apts Etal REGENCY GENERAL CONTRACTO Greenery Apts Etal REGENCY GENERAL CONTRACTO Hussain, Iftikhar & Jill CLOUGH, JAMES S ENTERPRIS Zirker-Smith Kathleen /Tr CHRISTENSEN CONSTRUCTION Honig Lorraine R /Tr/ BALDWIN, JOHN ROOFING INC Trick Patricia A LINSCOTT ENG. CONTR Johnson Real Estate Llc OWNER Primestar Lending Llc OWNER/BUILDER Hurtado Nancy /Tr/ ROSENBACH CONSTR. INC.

Address 7 Sea View Dr San Rafael 24 Montego Key Novato 216 SEAdrift Rd Stinson Beach 412 Donahue St Sausalito 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 5000 Sir Francis Drake Blvd Sa 404 Viewpark Ct Mill Valley 30 Eagle Rock Rd Mill Valley 3193 Paradise Dr Tiburon 28 La Cuesta Dr Greenbrae 10 Main Dock Sausalito 293 Morning Sun Ave Mill Valle 10 Greenwood Cove Dr (10-18)- 19 Greenwood Cove Dr (19-30)- 31 Greenwood Cove Dr - Bldg 12 170 Nadina Way Greenbrae 369 Dolan Ave Mill Valley 62 Drakes Summit Rd Inverness 300 Richardson Way Mill Valley 53 Labrea Way San Rafael 61 N Knoll Rd Mill Valley 1091 W California Ave Mill Val

Parcel # 014-111-34 157-202-07 195-331-06 052-431-10 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 172-350-35 200-281-45 034-082-26 058-091-14 070-121-29 901-030-10 050-211-17 055-061-28 055-061-28 055-061-28 070-171-06 050-141-39 114-310-25 049-161-45 180-064-12 034-072-48 048-202-47

Construction Value (62) Demolish Fir $50,000 (23) Bathroom Rem $21,000 (56) Siding Repla $45,000 (58) Replace 13 W $10,982 (11) Retaining Wa $20,000 (11) Retaining Wa $20,000 (11) Retaining Wa $20,000 (11) Retaining Wa $20,000 (11) Retaining Wa $20,000 (30) Community Me $3,073,769 (30)Administrativ $936,712 (30) Multi-Purpos $47,111 (30) Village Comm $230,013 (20-1/1) Staff Ho $87,230 (20-1/1) Staff Ho $87,230 (20-1/1) Staff Ho $100,480 (30) Multi-Purpos $73,612 (20-1/1) Staff Ho $100,480 (20-1/1) Visitor $91,830 (20-1/1) Visitor $91,830 (20-1/1) Visitor $91,830 (20-1/1) Visitor $91,830 (21)(23) Remodel $95,000 (23)(21)(12)Remod $360,000 (23, 52) Remodel $45,000 (93) Voluntary Fo $14,875 (23) Rmdl Ba - Ex $12,000 (22) Struct Rmdl $30,000 (23, 92) Interio $420,000 (23, 92) Interio $460,000 (23, 92) Interio $379,000 (13, 50, 58) Add $45,500 (23,58) Rmdl Kit, $80,000 (53) Reroof $12,365 (11) Emergency Re $187,000 (23)(58) Kitchen $48,950 (23) (54) (92) Rm $32,000 (51,92) Repl Bric $10,000

COUNTY OF MARIN PERMITS RECEIVED Address 608 Eastwood Way Mill Valley 5 Fairway Dr San Rafael 34 Greenwood Bay Dr Tiburon 201 Laurel Grove Ave Kentfield 127 Oak Manor Dr Fairfax 800 Redwood Hwy Frontage Rd - Ste 610 Mi 800 Redwood Hwy Frontage Rd - Ste 619 Mi 213 Seadrift Rd Stinson Beach 250 Stuyvesant Dr San Anselmo 10 Turnagain Rd Kentfield 6 Valleystone Dr San Rafael 6 Valleystone Dr San Rafael

Owner Work Mimeles Stephanie A (24) Convert Storage To Liv Sp Gershengorn 2003 Revocable Trust Etal (60) Rf Mtd P V Sys 5.63 K W - Brant Robert (13) Deck Friedman, Mark (50) Electrical For Fence Mc Kibbin James R (21, 58, 92) Bath/Laundry Addi Strawberry Village Retail Tenant Improvement, Suite 610 Strawberry Village Retail Tenant Improvement, Suite 619 Lockwood-De Zela Living Trust Etal (20--1/3,12,13) New S F D W/At Culhane Patrick G Trust-2000 (23) Int Rmdl - Express Bober Chris & Leanne (21,22,59) Add, Rmdl, Move & A Clawson Cindy /Tr/ (10) New Pool Clawson Cindy /Tr/ (11) Ret Walls - I Permit Per

Value $30,000 $14,000 $35,000 $21,500 $30,000 $75,000 $17,000 $400,000 $54,000 $85,000 $55,000 $15,000

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 20


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

PERMITS

COUNTY OF MARIN PERMITS RECEIVED (continued)

Address 76 Almenar Dr Greenbrae 56 Bay Vista Dr Mill Valley 50 Belvedere Dr Mill Valley 100 Brighton Ave Bolinas 61 Calypso Shores Novato 11 Charles Van Damm Sausalito 17 Charles Van Damm Sausalito 65 Crescente Ave Bolinas 43 De Silva Island Dr Mill Valley 28 La Cuesta Dr Greenbrae 10 Main Dock Sausalito 530 Fawn Dr San Anselmo 369 Dolan Ave Mill Valley

Owner Work Prowell Ian M & Cheryl L (21, 22, 13, 54) Substantial R Greene Frank C & (22,23)Rmdl Upstairs; Rmdl Dow Strawberry Village Retail (13) Add New Ada Ramp & Sidewa Amjt Capital (92) Rot Repair To Window Head Dubru Michel O (13) Repl Deck Finn, Maria (21-0/0)(22)(13) Berardi, Penny (27-1/3) (13) Atalaya Llc (22,12)Increase Scope Of 13896 Larsen Living Trust (23,51) Repl Interior Stair An Rowett Kent M & (93) Voluntary Found Repair & Kalmanoff Alan (23) Rmdl Ba - Express Hougen James R (60) Rf Mtd P V Sys 7.56 K W - Zirker-Smith Kathleen /Tr/ Etal (23,58) Rmdl Kit, Repl Wndws &

Value $420,000 $45,000 $30,000 $10,000 $15,000 $105,000 $120,000 $500,000 $50,000 $14,875 $12,000 $20,000 $80,000

CITY & TOWN PERMITS ISSUED City/Town

Issue Date

Owner

Site Address

Type

Valuation

Mill Valley

3/3/2014

Mochalshi Cheryl L

8 BYRON CIR

Kitchen & bath remodel w/1 new bath

$90,000

Mill Valley

3/4/2014

Holland Christopher B &

58 SHELLEY DR

Replacement of 10 windows, like for like with no change in s

$10,000

Mill Valley

3/4/2014

Aroyan Harry J Marital Trust

6021 SHELTER BAY AVE

split system ducted heat pump

$10,792

Mill Valley

3/4/2014

Howard Nurse

6042 SHELTER BAY AVE

install a split system ducted heat pump

$10,889

Mill Valley

3/4/2014

Zamudio-Ramirez Pavel &

258 SYCAMORE AVE

OTC 1.5 KW Roof Mounted Photovoltaic System.

$20,000

Mill Valley

3/4/2014

Clahan Kevin B &

118 LA GOMA ST

OTC 3.7 KW Roof Mounter Photovoltaic System.

$30,000

Mill Valley

3/5/2014

Riner, Robert

307 OAKDALE AVE

OTC - Kitchen Remodel.

$17,500

Mill Valley

3/6/2014

Goodman Richard

154 ETHEL AVE

Re-roof, no re-sheet with comp shinlges. All work shall meet

$13,000

Mill Valley

3/6/2014

Steve Jones

800 EDGEWOOD AVE

OTC Conversion of existing space to Bath with steam room and

$50,000

Mill Valley

3/6/2014

Brater Brian

347 LOVELL AVE

OTC Remodel of 3 Bathrooms + Kitchen.

$60,000

Mill Valley

3/6/2014

Glasgow William J /Tr/

880 EDGEWOOD AVE

OTC Kitchen Remodel.

$60,000

Mill Valley

3/6/2014

Erik Larson

200 AMICITA AVE

Remodel of existing SFD

$125,000

Mill Valley

3/7/2014

Clemons Leland & Kristin Liv

200 MOLINO AVE

OTC Kitchen and Bath Remodel.

$175,000

Mill Valley

3/7/2014

Domingo Roberto S &

355 VISTA LINDA DR

Demo + Construct SFR w/Attached Garage/2nd

$1,650,000

Mill Valley

3/11/2014

GRAHAM WILLIAM W JR &

41 PRESIDIO AVE

Replacement of 5 windows, like for like with no framing chan

$10,000

Mill Valley

3/11/2014

Waltz Laura

30 MESA AVE

OTC 7kw Roof Mounted Photovoltaic System.

$15,000

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 21


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

PERMITS City/Town

Issue Date

Owner

Site Address

Type

Valuation

Mill Valley

3/11/2014

Kristin and John Bomben

70 RALSTON AVE

OTC Remodel of Kitchen & 2 Baths.

$60,000

Mill Valley

3/11/2014

Lee/Lum Lp

35 THROCKMORTON AVE

(aka 41 Throckmorton) Repair and remodel of upper level.

$75,000

Mill Valley

3/11/2014

Garrett Koehn

119 MARGUERITE AVE

Construct New 2nd Unit under (E) Garage.

$175,000

Mill Valley

3/13/2014

BRIGHAM WILLIAM E /TR/&

143 SYCAMORE AVE

OTC Remodel 2 Baths & relocation of sub panel.

$50,000

Mill Valley

3/17

Satake Robert

6060 SHELTER BAY AVE

Installation of Fujitsu heating and air conditioning system.

$10,592

Mill Valley

3/17/2014

Capra Richard

6017 SHELTER BAY AVE

Installation of Fujitsu heating and air conditioning system.

$11,377

Mill Valley

3/17/2014

Kristin and John Bomben

70 RALSTON AVE

Replace five windows and four doors

$11,500

Mill Valley

3/17/2014

Cotter Family Trust Etal

130 CASCADE DR

OTC Bathroom Remodel and alteration.

$30,000

Mill Valley

3/17/2014

Taska Robert & Elizabeth Revoc

177 OAKDALE AVE

Bath and Laundry room remodel.

$179,000

Mill Valley

3/17/2014

Lee/Lum Lp

65 THROCKMORTON AVE

Create 4 Live/Work Units

$1,456,873

Mill Valley

3/18

Sage Equity, LLC

55 LOVELL AVE

OTC Construct Detached Accessory Structure.

$21,000

Mill Valley

3/18

Powell Family Trust

15 MIDDLE CT

OTC Remodel of Kitchen and Baths, + Misc

$170,000

Mill Valley

3/18/2014

Diamond Philip R /Tr/ &

5 ETON WAY

Residential addition remodel and addition

$234,570

Mill Valley

3/20

Scafidi Joseph A /Tr &

11 MIDHILL DR

Re-Roof.

$15,810

Mill Valley

3/20/2014

Clifford, Michael and Lucie

23 NELSON AVE

Addition and remodel

$185,000

Mill Valley

3/24

Goldman Robert A /Tr/

6039 SHELTER BAY AVE

Installation of new Fujitsu heating and air system including

$10,592

Mill Valley

3/24

Gellert Fred

6025 SHELTER BAY AVE

Installation of new Fujitsu heating and air system including

$10,888

Mill Valley

3/24

Alex Roy Aal Qualified Persona

6038 SHELTER BAY AVE

Installation of new Fujitsu heating and air system including

$12,659

Mill Valley

3/24/2014

Mathiowetz-Price Trust Etal

55 SHELLEY DR

Widening of driveway.

$45,000

Mill Valley

3/24/2014

Wener Ryan

377 VISTA LINDA DR

Residential Remodel

$300,000

Mill Valley

3/24/2014

106 Locust LLC

106 LOCUST AVE

2797 sq ft Remodel

$550,000

Mill Valley

3/25

Boon Rolston

19 THOREAU CIR

Replacement of 6 windows and 3 Patio doors. All like for lik

$10,522

Mill Valley

3/25

BERRY CARL G TR &

Repair of existing deck, includes new guardrail and handrail

$14,000

Mill Valley

3/25

John and Susie Cecchi

5 Roque Moraes Dr.

OTC Replace Water Proofing on Deck and Rebuild Guardrail.

$21,000

Mill Valley

3/25

Brian Lurie and

166 ELINOR AVE

OTC 4.5 KW Roof Mounted Photovoltaic System

$27,000

Mill Valley

3/26/2014

Gri Alto Center Llc

741 E BLITHEDALE AVE 775B

TI know as Starbucks

$233,600

Mill Valley

3/26/2014

Collins Craig B

215 ROQUE MORAES DR

Minor addition and new deck.

$275,000

Mill Valley

3/27

Herzog Herbert D /Tr/ &

45 E MANOR DR

OTC Deck Repair.

$14,000

Mill Valley

3/31

Lin Martin &

711 E BLITHEDALE AVE

furnace replacement

$10,875

Mill Valley

3/31/2014

Roark Van Dien

180 CASCADE DR

Addition and Remodel

$425,000

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 22


www.marinba.org ◆ mba@marinba.org

Permit lists subject to change, please check with Association.

PERMITS City/Town

Issue Date

Owner

Site Address

Type

Valuation

Mill Valley

03/31/2014

Norris Gregory & Melinda Trust

110 E BLITHEDALE AVE

Substantial remodel of mixed use building

$476,000

Novato

4/7/14

Henry Roofing Inc

6 Estrella Ct

Reroof

$13,600

Novato

4/7/14

Larry Smith Construction, Inc

800 Mcclay Rd

Accessory Dwelling

$170,000

Novato

4/7/14

Del Mar Pacific Acquisition Co

1285 Redwood Blvd A,B,C,D,E&F

Construction

$656,260

Novato

4/8/14

Lic.Contract.Hired By Owner

145 Pebble Beach Dr

Minor Construction

$20,000

Novato

4/9/14

California Window & Exteriors

509 Malobar Dr

Window

$11,000

Novato

4/9/14

Moore Heating & Air Conditioni

35 Partridge Dr

Hvac

$17,564

Novato

4/9/14

Solarcity

70 Pacheco Creek Dr

Solar

$41,000

Novato

4/9/14

E. K. Construction Co

3 Farvue Rd

Construction

$71,000

Novato

4/10/14

Whitcomb Construction

1089 Rosalia Dr

Minor Construction

$12,500

Novato

4/10/14

Lic.Contract.Hired By Owner

1 Vineyard Ct

Minor Construction

$19,000

Novato

4/10/14

Gia Power Management

7514 Redwood Blvd

Tenant Improvement

$22,000

Novato

4/10/14

National Sign & Marketing

35 Rowland Way

Sign

$23,000

Novato

4/10/14

Owner-Builder

481 Ignacio Blvd

Construction

$29,985

Novato

4/10/14

Devcon Construction Inc.

9 Hamilton Landing

Construction

$45,000

San Rafael

4/1/2014

Dolan Francis J

26 Village Cir

Alter-Condo

$10,000

San Rafael

4/1/2014

Senno Louis M &

57 Bay Way

Alter-Sfd

$29,000

San Rafael

4/1/2014

Vance Bradley J &

1544 3Rd St

Alter-Sfd

$40,000

San Rafael

4/1/2014

Alioto Franklin & Eta

39 Lochinvar Rd

Alter-Sfd

$56,000

San Rafael

4/1/2014

Urban Matthew L

22 Billou St

Alter-Sfd

$80,000

San Rafael

4/1/2014

Hinsvark Amber F Eta

515 3rd St

Alter-Commercial

$1,800,000

San Rafael

4/2/2014

Brown Roxanne H &

995 Belle Ave

Alter-Sfd

$35,000

San Rafael

4/2/2014

Sr Corporate Center

790 Lindaro St

Alter-Commercial

$900,000

San Rafael

4/3/2014

Pierce Stephen T &

390 Holly Dr

Alter-Sfd

$12,852

San Rafael

4/3/2014

686 Barberry Lane Llc

686 Barberry Ln

Alter-Sfd

$13,850

San Rafael

4/3/2014

Shuman Kenneth M &

737 Montecillo Rd

Alter-Sfd

$14,500

San Rafael

4/3/2014

Mac Donald Robert

47 Longwood Dr

Alter-Sfd

$30,000

San Rafael

4/3/2014

Ogden Emilie M &

408 Biscayne Dr

Alter-Sfd

$49,000

San Rafael

4/3/2014

Clifford Charles H /Tr

3 K St

Alter-Duplex

$96,000

San Rafael

4/3/2014

Regency Center

100 Smith Ranch Rd 2Nd Fl

Alter-Commercial

$390,000

San Rafael

4/7/2014

Moreno Arnulfo

1845 2Nd St

Alter-Sfd

$10,000

San Rafael

4/7/2014

San Rafael Manor Inc

1012 Los Gamos Rd

Alter-Apartments

$27,980

San Rafael

4/7/2014

Probst Ingrid & Tony

647 Francisco Blvd E

Alter-Commercial

$150,000

San Rafael

4/8/2014

Kral Lubos T &

271 Fairhills Dr

Alter-Sfd

$20,000

San Rafael

4/8/2014

Carle Leslie E 2011 Tru

543 Woodbine Dr

Alter-Sfd

$33,000

San Rafael

4/8/2014

Burns Family Trust 19

38 Moody Ct

Alter-Sfd

$35,000

Tiburon

7-Apr

Essex Property Trust

25 Red Hill Circle #A

Remodel Kitchen and Bath

$19,000

Tiburon

4/7/2014

Betsy & Nathan Wright

139 Gilmartin Drive

Replacement

$27,000

Tiburon

4/8/2014

Stephen Kim

71 Via Los Altos

Re-roof

$11,800

Tiburon

4/8/2014

Margot Plant

407 Hilary Drive

Solar

$28,000

Tiburon

4/9/2014

Joe & Debbie Hanssen

114 Howard Drive

Remodel Bathroom

$13,700

Tiburon

4/9/2014

Paul Mussche

2431 Spanish Trail Road

New roof

$32,000

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 23


www.marinba.org ◆ mba@marinba.org

TAX LIENS & COMPLETIONS COMPLETIONS Recording Date

Grantors/Grantees

Grantees/Grantors

Title

Document Number

4/8

CENTRAL MARIN SANITATION AGENCY (I)

(none)

COMPLETION

2014-0012971

4/8

GSE CONSTRUCTION CO INC (I)

(none)

COMPLETION

2014-0012971

4/9

MARIN MUNICIPAL WATER DISTRICT (I)

(none)

COMPLETION

2014-0013204

4/9

PIAZZA CONSTRUCTION (I)

(none)

COMPLETION

2014-0013204

4/10

COUNTY OF MARIN (I)

(none)

COMPLETION

2014-0013401

4/10

MARIN COUNTY (I)

(none)

COMPLETION

2014-0013401

4/10

TEAM GHILOTTI INC (I)

(none)

COMPLETION

2014-0013401

4/12

BLOCKA CONSTRUCTION INC (I)

(none)

COMPLETION

2014-0013754

4/12

CAMINO RAMON ASSOCIATES LLC (I)

(none)

COMPLETION

2014-0013598

4/12

GOLDEN GATE BRIDGE HIGHWAY & TRANSPORTATION DISTRICT (I)

(none)

COMPLETION

2014-0013753

4/12

GOLDEN GATE BRIDGE HIGHWAY & TRANSPORTATION DISTRICT (I)

(none)

COMPLETION

2014-0013754

4/12

SHIMMICK OBAYASHI JOINT VENTURE (I)

(none)

COMPLETION

2014-0013753

Grantors/Grantees

Grantees/Grantors

Title

Document Number

LIENS Recording Date 4/8

CASA MARINWOOD ASSOCIATION (E)

OPPENHEIMER PAULETTE E (O)

LIEN

2014-0012909

4/9

ARANA RESIDENTIAL & COMMERCIAL PAINTING (E)

ORNISH DEAN M (O)

LIEN

2014-0013165

4/9

PARKHAVEN HOMEOWNERS ASSOCIATION (E)

JPMORGAN CHASE BANK (O)

LIEN

2014-0013168

4/10

CITY ELECTRIC SUPPLY-SAN RAFAEL (E)

ORNISH DEAN M (O)

LIEN

2014-0013404

4/11

CAPTAINS LANDING (E)

CAMICCIA WILLIAM (O)

LIEN

2014-0013522

4/11

HAWKEN CONSTRUCTION (E)

UNKNOWN OWNER (O)

LIEN

2014-0013509

4/11

INDEPENDENT ELECTRIC SUPPLY INC (E)

PEACOCK GAP GOLF COURSE (O)

LIEN

2014-0013484

4/11

VILLAGE WEST HOME OWNERS ASSOCIATION INC (E)

HALL CATHERINE ANN (O)

LIEN

2014-0013521

RELEASE OF LIENS Recording Date

Grantors/Grantees

Grantees/Grantors

Title

Document Number

4/8

AIMCO MADERA VISTA LLC (E)

CLOSETMAID CORPORATION (O)

RELEASE OF LIEN

2014-0012722

4/8

EASLEY WESLEY (E)

SOLANO COUNTY DEPARTMENT OF RELEASE OF LIEN CHILD SUPPORT SERVICES (O)

2014-0012974

4/8

PEACOCK GAP HOLDINGS LLC (E)

GREAT WESTERN BUILDING MATERIALS (O)

RELEASE OF LIEN

2014-0012907

4/9

ENGELS ROLAND T (E)

MARIN COUNTY DEPARTMENT OF CHILD SUPPORT SERVICES (O)

RELEASE OF LIEN

2014-0013112

4/9

ENGELS ROLAND TREVOR (E)

SAN MATEO COUNTY DEPARTMENT RELEASE OF LIEN OF CHILD SUPPORT SERVICES (O)

2014-0013113

4/9

ENGELS ROLAND TREVOR (E)

SAN MATEO COUNTY DEPARTMENT RELEASE OF LIEN OF CHILD SUPPORT SERVICES (O)

2014-0013114

4/9

ORLICK SHANE (E)

CAL-STEAM INC (O)

RELEASE OF LIEN

2014-0013065

4/9

ORLICK SHANE (E)

CLEAN CRAWLSPACE INC (O)

RELEASE OF LIEN

2014-0013066

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 24


www.marinba.org ◆ mba@marinba.org

TAX LIENS & COMPLETIONS RELEASE OF LIENS (continued) Recording Date

Grantors/Grantees

Grantees/Grantors

Title

Document Number

4/11

ESTRADA ROGER (E)

NEVADA COUNTY DEPARTMENT OF CHILD SUPPORT SERVICES (O)

RELEASE OF LIEN

2014-0013511

4/11

ESTRADA ROGER (E)

NEVADA COUNTY DEPARTMENT OF CHILD SUPPORT SERVICES (O)

RELEASE OF LIEN

2014-0013512

4/12

BACCIOCCO JASON D (E)

CHEDA KNOLLS TOWNHOME (O)

RELEASE OF LIEN

2014-0013738

4/12

FARRELL MOLLY E (E)

DISCOVER BANK (O)

RELEASE OF LIEN

2014-0013760

4/12

LUSHTAK ALEX (E)

SAN FRANCISCO COUNTY DEPARTMENT OF CHILD SUPPORT SERVICES (O)

RELEASE OF LIEN

2014-0013838

Grantors/Grantees

Grantees/Grantors

Title

Document Number

TAX LIENS Recording Date 4/8

FRANCHISE TAX BOARD (E)

CRABTREE KENNETH M (O)

TAX LIEN

2014-0012750

4/8

FRANCHISE TAX BOARD (E)

PORTEOUS FLOYD (O)

TAX LIEN

2014-0012838

4/8

FRANCHISE TAX BOARD (E)

LOS CERROS PROPERTY (O)

TAX LIEN

2014-0012930

4/8

FRANCHISE TAX BOARD (E)

MGAS INC (O)

TAX LIEN

2014-0012931

4/8

FRANCHISE TAX BOARD (E)

CLEAN LOOK INC (O)

TAX LIEN

2014-0012932

4/8

FRANCHISE TAX BOARD (E)

TUGBOAT CREW ENTERTAINMENT LLC (O)

TAX LIEN

2014-0012933

4/8

FRANCHISE TAX BOARD (E)

SCOTTS VALLEY CAR WASH INC (O) TAX LIEN

2014-0012934

4/8

FRANCHISE TAX BOARD (E)

SIGHT DESIGN LLC (O)

TAX LIEN

2014-0012935

4/8

FRANCHISE TAX BOARD (E)

PEAK STATE PERFORMANCE (O)

TAX LIEN

2014-0012936

4/8

FRANCHISE TAX BOARD (E)

VL & ASSOCIATES INC (O)

TAX LIEN

2014-0012937

4/8

FRANCHISE TAX BOARD (E)

ANTON POINTE INC (O)

TAX LIEN

2014-0012938

4/8

INTERNAL REVENUE SERVICE (E)

BIRRELL JAMES V (O)

TAX LIEN

2014-0012869

4/8

INTERNAL REVENUE SERVICE (E)

DIPSEA CAFE (O)

TAX LIEN

2014-0012870

4/8

INTERNAL REVENUE SERVICE (E)

SIOTOS JOHN A (O)

TAX LIEN

2014-0012870

4/8

INTERNAL REVENUE SERVICE (E)

FERN BILLIE L (O)

TAX LIEN

2014-0012871

4/8

INTERNAL REVENUE SERVICE (E)

SALAS JOSE A (O)

TAX LIEN

2014-0012872

4/8

INTERNAL REVENUE SERVICE (E)

HAMEL RUSSELL C JR (O)

TAX LIEN

2014-0012873

4/8

INTERNAL REVENUE SERVICE (E)

HAMEL CAROL L (O)

TAX LIEN

2014-0012874

4/8

INTERNAL REVENUE SERVICE (E)

HAMEL RUSSELL C JR (O)

TAX LIEN

2014-0012874

4/8

INTERNAL REVENUE SERVICE (E)

MENDEZ JESUS (O)

TAX LIEN

2014-0012875

4/8

INTERNAL REVENUE SERVICE (E)

TUSCANY COUNTY GRILL (O)

TAX LIEN

2014-0012875

4/8

INTERNAL REVENUE SERVICE (E)

DARLING SUSAN C (O)

TAX LIEN

2014-0012876

4/8

INTERNAL REVENUE SERVICE (E)

ORT BRENT C (O)

TAX LIEN

2014-0012876

4/8

INTERNAL REVENUE SERVICE (E)

ORT BRENT C (O)

TAX LIEN

2014-0012877

4/8

INTERNAL REVENUE SERVICE (E)

FRAZIER CHIKI FLEISCHMAN (O)

TAX LIEN

2014-0012878

4/8

INTERNAL REVENUE SERVICE (E)

TGT INC (O)

TAX LIEN

2014-0012960

4/8

INTERNAL REVENUE SERVICE (E)

TGT II INC (O)

TAX LIEN

2014-0012961

4/8

INTERNAL REVENUE SERVICE (E)

TMPM INC (O)

TAX LIEN

2014-0012962

4/8

INTERNAL REVENUE SERVICE (E)

TMTM INC (O)

TAX LIEN

2014-0012963

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 25


www.marinba.org ◆ mba@marinba.org

 

     

MBA  Group  Legal  Plan   Provided  by  McLennon  Law  Corporation  (“MLC”)   Designed  to  prevent  legal  problems  before  they  become  a  problem!  This  group  program   provides:   •  Initial  Consultation   •  Access  for  free  monthly  phone  consultations   •  Reduced  hourly  rates   •  Special  contingency  fee  rates   •  Reduced  flat  fee  rates  for  specific  services    

For  more  information  on  this  valuable  benefit     contact  Paula  at  415-­‐462-­‐1220  or  by  email  at  paula@marinba.org.      

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 26


www.marinba.org ◆ mba@marinba.org

TAX LIENS & COMPLETIONS TAX LIENS (continued) Recording Date

Grantors/Grantees

Grantees/Grantors

Title

Document Number

4/8

INTERNAL REVENUE SERVICE (E)

CORTE MADERA TOWING INC (O)

TAX LIEN

2014-0012964

4/8

INTERNAL REVENUE SERVICE (E)

LEIGON LARRY A (O)

TAX LIEN

2014-0012965

4/8

INTERNAL REVENUE SERVICE (E)

JOHNSON SUSAN L (O)

TAX LIEN

2014-0012966

4/10

FRANCHISE TAX BOARD (E)

MILLER JOY (O)

TAX LIEN

2014-0013367

4/10

FRANCHISE TAX BOARD (E)

KUHL CONSTANCE (O)

TAX LIEN

2014-0013368

4/10

FRANCHISE TAX BOARD (E)

BELL DERRICK L (O)

TAX LIEN

2014-0013369

4/11

FRANCHISE TAX BOARD (E)

MUD WORLDWIDE LLC (O)

TAX LIEN

2014-0013519

4/11

FRANCHISE TAX BOARD (E)

A TRUST (O)

TAX LIEN

2014-0013541

4/12

FRANCHISE TAX BOARD (E)

BAUM JULIAN M (O)

TAX LIEN

2014-0013696

NEW MBA Workers’ Compensation & Commercial Insurance Program We are excited to announce that George Petersen Insurance Agency has developed a new workers’ compensation & commmercial insurance program for the Marin Builders Association. With a 76-year history of insuring local contractors, George Petersen Insurance Agency has the experience and expertise to protect your business.

By partnering with George Petersen Insurance Agency, you’ll receive preferred pricing on your workers’ compensation rates. In addition, you can benefit from working closely with one of George Petersen’s construction-industry professionals. With over 50 years of combined experience, George Petersen’s specialized construction agents have a deep understanding of the industry, allowing them to assess the unique characteristics of your business, its exposures and its evolving needs. Support the MBA and protect your business by contacting one of our construction specialists today: Bruce Okrepkie 707.360.4117 bokrepkie@gpins.com

Daniel Walters 707.525.4168 dwalters@gpins.com

Sean Parsons 707.525.2715 sparsons@gpins.com

George Petersen Insurance Agency License #0603247

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 27


BUILDING THE FUTURE

www.marinba.org ◆ mba@marinba.org

SUMMER INTERNS AVAILABLE ROP CONSTRUCTION TECHNOLOGY

“Construction Education is where education Meets the Real World” CONTACT: TOM ELLER INSTRUCTOR 415 488-9865 Office 415 606-1955 Cell

For the last nineteen years students all over Marin County have had the opportunity to learn hands-on skills of the construction trade. The class is eighteen weeks and is offered every Spring Semester on Wednesday evenings at Redwood High School, Larkspur. Our Assistant Instructors take groups of five students each and build a shed from the ground up. It is a memorable experience and the students and instructors look forward to every Wednesday. Students also have the opportunity to be hired for a six week Summer Internship with local contractors. They will be completely qualified to use power tools during the internship. Please support us by hiring a student for an internship. Students who interview are recommended by all Instructors to insure they are ready to work for you! You will not be disappointed. It’s a WIN, WIN, WIN for you and the students! THANKS FOR YOUR SUPPORT

the4const@aol.com Sponsored By: Marin County Office of Education Regional Occupational Program Marin Builders Association National Assoc. of Remodeling Industry

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 28


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/10/2014

2:00 PM

Bus Stop Pavement Improvements FY13

San Jose

E680B/0 Santa Clara Valley 05C Transportation Authority

4/10/2014

2:00 PM

Cattle Fencing at Santa Teresa County Park

San Jose

E682B

4/10/2014

3:00 PM

7243-Century Area Phase II Sanitary Sewer Replacement

San Jose

ONLINE San Jose, City Of

4/10/2014

2:00 PM

City-Wide Park Shade Improvement Project

Brentwood

ONLINE Brentwood, City Of

4/10/2014

3:00 PM

7572-2014 Remove & Replace Asphalt Concrete Pavement

San Jose

ONLINE San Jose, City of

4/10/2014

9:00 AM

Bridge Rehabilitation - Pt Sur State Historic Park

Monterey

ONLINE Natural Resources Agency

4/10/2014

2:00 PM

Intake Counter Reconfiguration at the Martinez Detention Facility Martinez

ONLINE Contra Costa, County of

4/10/2014

2:00 PM

Mechanical Design & Construction-SMUD

Sacramento

ONLINE Sacramento Municipal Utility District

4/10/2014

11:00 AM

ADA Improvements Phase 3-Downtown Parking Lots

Lodi

ONLINE Lodi, City of

4/10/2014

2:00 PM

2014 On-Call Material Testing & Inspection Services

Citrus Heights

ONLINE Citrus Heights, City of

4/10/2014

2:00 PM

Green Valley Road Utilities Locating Project

Freedom

ONLINE Santa Cruz, County of

4/10/2014

2:00 PM

Tuxedo Avenue Sewer Rehabilitation Project

Stockton

ONLINE Stockton, City of

4/10/2014

2:00 PM

Shell Station-Emeryville

Emeryville

ONLINE

4/10/2014

11:00 AM

Independence High School Buildings B & C Modernization

Diamond Springs

ONLINE Anova Nexus Architects

4/10/2014

1:30 PM

Concrete Work at Christian Penke Park & District Corporation Yard

Hayward

ONLINE Hayward Area Recreation & Park District

4/10/2014

3:00 PM

Texas Cabin Rehabilitation-Gilroy Hot Springs

Morgan Hill

ONLINE Department of Parks & Recreation

4/10/2014

2:00 PM

Wilson Way Adaptive Traffic Control System

Stockton

ONLINE Stockton, City of

4/10/2014

2:00 PM

Ohlone Elementary School Moving Services

Hercules

ONLINE West Contra Costa Unified School District

4/10/2014

3:00 PM

6470-Lower Guadalupe River Trail Tasman Undercrossing Project

San Jose

ONLINE San Jose, City Of

4/10/2014

1:00 PM

Crosswalk Improvements at Amador Valley Blvd

Dublin

ONLINE Dublin, city of

4/10/2014

2:00 PM

Sprouts Market TI

Daly City

ONLINE

4/10/2014

2:00 PM

Phase II:Sanitary Sewer Design

Belvedere Tiburon

ONLINE San Francisco State University

4/10/2014

12:00 PM

7592-Miscellaneous Sanitary Sewer Repairs FY 2013-2014 (Package III)

San Jose

ONLINE San Jose, City Of

4/10/2014

11:00 AM

Petersen Road North Soundwall

Suisun City

ONLINE Suisun City, City of

4/10/2014

2:00 PM

RFP-Transit Bus Rehabilitation

Elk Grove

ONLINE Elk Grove, City of

4/10/2014

2:00 PM

JCPenney Store #0389 Escalator Replacement

Pleasanton

ONLINE

4/10/2014

11:00 AM

Hutchins Street Square South Entrance ADA

Lodi

ONLINE Lodi, City of

4/10/2014

2:00 PM

Grit Rag & Scum Hauling & Disposal

San Mateo

ONLINE San Mateo, City of

4/10/2014

2:00 PM

NARS Tipping Building Pavement Rehabilitation

Sacramento

ONLINE Sacramento, County Of

Santa Clara, County of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 29


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/10/2014

2:00 PM

Cupertino Middle School Modernization

Sunnyvale

ONLINE Cupertino Union School District

4/10/2014

12:00 PM

Durant Mini Park Improvements

West Oakland

ONLINE Oakland, City of

4/10/2014

2:00 PM

Wintergreen Landscaping Improvements Project

Citrus Heights

ONLINE Citrus Heights, City of

4/10/2014

11:00 AM

RFP-Airport Security Systems Maintenance/Repair & Video Surveillance System Upgrade

Oakland

ONLINE Port Of Oakland

4/10/2014

2:00 PM

Dianne Drive Realignment

Turlock

ONLINE Turlock, City of

4/10/2014

1:00 PM

Public Storage-Santa Clara

Santa Clara

ONLINE

4/10/2014

2:00 PM

Interior Hallway & Common Area Re-Painting

Alameda

ONLINE Alameda Housing Authority

4/10/2014

2:30 PM

2014 Overlay Project

Walnut Creek

ONLINE Walnut Creek, city of

4/10/2014

1:30 PM

Eight Mile Rd Bridge No. 29C-114 (Across Bishop Cut) & Bacon Stockton Island Road Bridge No. 29C-108 (Across Middle River) Approach Rehabilitation

Online

4/10/2014

2:00 PM

RWCF Weeding & Grubbing

Stockton

ONLINE Stockton, City of

4/10/2014

3:30 PM

Devlin Road Transfer Station Pavement Rehabilitation - Phase 1

American Canyon

ONLINE Napa-Vallejo Waste Management Authority

4/10/2014

2:00 PM

Hacienda Staging Area Improvements & Restroom Facility at Almaden Quicksilver Co. Park

San Jose

R026

4/11/2014

2:00 PM

Pest Management Services For VTA Facilities & Buses

San Jose

E679B/0 Santa Clara Valley 88C Transportation Authority

4/11/2014

3:00 PM

North Richmond Multifamily & Senior Center

Richmond

ONLINE Community Housing Development Corporation

4/11/2014

2:00 PM

EMCS Replacement Phase 1

Oakland/San Leandro/Pleasanton

ONLINE Alameda, County of

4/11/2014

2:00 PM

RFQ-Clean Dust from Interior of Solids Conditioning Building

Martinez

ONLINE Central Contra Costa Sanitary District

4/11/2014

11:00 AM

RFP-Airport Parking Revenue Control System Consulting Services

Oakland

ONLINE Port Of Oakland

4/11/2014

2:00 PM

White Hill Middle School Asphaltic Concrete Paving

Fairfax

ONLINE Ross Valley School District

4/11/2014

2:00 PM

Westfield Park Picnic Area

West Sacramento

ONLINE West Sacramento, City of

4/11/2014

1:00 PM

MVCS Shops S-1 & Jr Major S1 & S2

Turlock

ONLINE

4/11/2014

2:00 PM

Shade Structure at O.W. Erlewine Elementary School

Sacramento

ONLINE Sacramento City Unified School District

4/11/2014

2:30 PM

Demolition of Single Family Residence (1860 E. Anita St)

Stockton

ONLINE San Joaquin, County of

4/11/2014

2:00 PM

Application of Chip Seal on Unpaved Parking Lot & Related Site Santa Cruz Work

ONLINE Santa Cruz Metropolitan Transit District

4/11/2014

2:00 PM

Newark Overflow Parking

Newark

ONLINE Ohlone Community College District

4/11/2014

12:00 PM

636 El Camino Real, South San Francisco - Tenant Improvements

South San Francisco ONLINE

4/11/2014

2:00 PM

Noodles & Company Tenant Improvements

San Francisco

ONLINE

4/11/2014

4:00 PM

RFQ-Construction Support Services for Moscone Expansion Project

San Francisco

ONLINE San Francisco, City & County of

4/11/2014

1:30 PM

As-Needed Environmental Remediation Services

San Francisco

ONLINE San Francisco International Airport

San Joaquin, County of

Santa Clara, County Of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 30


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/11/2014

2:00 PM

RFQ-Power Prime Heavy Duty Trash & Sewage Pump

San Jose

ONLINE San Jose, City of

4/11/2014

2:00 PM

Graham Middle School Modernization Phase 1

Mountain View

ONLINE

4/11/2014

5:00 PM

RFQ-On-Call Geotechnical Engineering, Materials Testing & Inspection Services & Other Miscellaneous Engineering Services

Napa

ONLINE Napa, County of

4/11/2014

2:00 PM

EMCS Replacement Phase 1 Project

San R014 Leandro,Dublin,Oakla nd

4/14/2014

5:00 PM

Arbor View Estates Lot 2 Foundation

Lafayette

096C

4/14/2014

2:00 PM

CDBG Curb Ramp

*Pittsburg

E692B/0 Pittsburg, city of 61C

4/14/2014

2:00 PM

RFP-Breuner Marsh Restoration & Public Access Project

Richmond

ONLINE East Bay Regional Park District

4/14/2014

2:00 PM

Stormwater Pump & Motor Maintenance Services

Mill Valley/Tiburon/San Rafael

ONLINE Marin, county of

4/14/2014

3:00 PM

Cosumnes Mine Road at North Fork Cosumnes River Bridge Maintenance Materials

El Dorado Co.

ONLINE El Dorado, County of

4/14/2014

3:00 PM

RFP-Baggage Handling System Services at Mineta San Jose International Airport

San Jose

ONLINE San Jose, City of

4/14/2014

2:00 PM

Chualar Monitoring Well Replacement

Salinas

Online

Monterey, County of

4/14/2014

2:00 PM

Chualar Sanitary Sewer Rehabilitation

Salinas

Online

Monterey, City of

4/14/2014

3:00 PM

Job Order Contract No. 1273

San Francisco

ONLINE San Francisco, City & County of

4/14/2014

5:00 PM

VoIP System-Superior Court of Tehama

Red Bluff

ONLINE Superior Court of California

4/14/2014

4:00 PM

HVAC Maintenance

Yolo County

ONLINE Department of California Highway Patrol

4/14/2014

4:00 PM

Overhead Door Maintenance

Yolo County

Online Onl

4/15/2014

2:00 PM

Construction of East Contra Costa Bart Extension Project Trackwork, System, and Facility Finishes

Contra Costa County 009C/B6 San Francisco Bay Area Rapid Transit 66 District

4/15/2014

2:00 PM

Wayside Fence Refurbishment, R-Line

Contra Costa County 022C

4/15/2014

2:00 PM

Asphalt Rubber Street Sealing on Approximately 1.70 Miles Various Roadways in Unincorporated Areas

Alameda Co.

093C/E6 Alameda, County of 94B

4/15/2014

2:00 PM

North Coach Division BRT Improvement Project

Mountain View

E693B/0 Santa Clara Valley 19C Transportation Authority

4/15/2014

3:00 PM

Palo Alto Municipal Golf Course Reconfiguration Project

Palo Alto

ONLINE Palo Alto, City of

4/15/2014

2:30 PM

Elevator Electrical Controls Modifications

Oakland

ONLINE Department of Motor Vehicles

4/15/2014

2:00 PM

South/East Utility & ADA Improvments Project

Chico

ONLINE California State University-Chico

4/15/2014

10:00 AM

2013-2014 Annual Sidewalk Safety Repair Program & Curb Ramp Installation

Dublin

ONLINE Dublin, city of

4/15/2014

2:00 PM

Vargas Road Improvements Between Route 680 & Morrison Canyon Road

Fremont

ONLINE Fremont, City of

4/15/2014

2:00 PM

Sheldon Road & Grant Line Road Traffic Signal Installation Project

Elk Grove

ONLINE Elk Grove, City of

4/15/2014

1:00 PM

Jo-Ann Fabrics

Salinas

ONLINE

4/15/2014

2:30 PM

Heather Farm Park Community Center Exterior Painting

Walnut Creek

Online

Alameda, County of

Department of California Highway Patrol

Bay Area Rapid Trnsit District

Walnut Creek, city of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 31


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

4/15/2014

2:00 PM

RFQ-Fire System Testing

Contra Costa County ONLINE Mt Diablo Unified School District

BIN # Plan Issuer

4/15/2014

1:00 PM

Variable Frequency Drive Replacement

Palo Alto

ONLINE

4/15/2014

2:00 PM

Library Roof Renovation Project

Hayward

ONLINE California State University East Bay

4/15/2014

3:00 PM

RFP-Emissions Testing of Sewage Sludge Incinerators

Palo Alto

ONLINE Palo Alto, City of

4/15/2014

2:00 PM

Pinole MS Soccer & Football Fields

Pinole

ONLINE West Contra Costa Unified School District

4/15/2014

2:00 PM

Swanson-Centennial Dog Park

Turlock

ONLINE Turlock, City of

4/15/2014

2:00 PM

Tiburon Pavement Rehabilitation 2013-2014

Tiburon

ONLINE Tiburon, town of

4/15/2014

10:00 AM

Building 22 Fire Alarm Upgrade

Fremont

ONLINE Ohlone Community College District

4/15/2014

2:00 PM

Boiler Replacement at 651 Pine Street

Martinez

ONLINE Contra Costa, County of

4/15/2014

2:00 PM

Vactor Receiving Station

Pleasanton

ONLINE Dublin San Ramon Services District

4/15/2014

3:00 PM

Butte County Hall of Records (Prequalified Generals Only)

Oroville

ONLINE Butte, County of

4/15/2014

2:00 PM

Dos Coyotes Bike Trail

Folsom

Online

4/15/2014

2:00 PM

Hilltop Regional & Pocket Parks 15 & 16 Construction Project

San Francisco

ONLINE Lennar Urban

4/15/2014

1:00 PM

San Martin/Gwinn & PA Walsh Network Cabling & Equipment

San Martin

ONLINE Morgan Hill Unified School District

4/15/2014

2:00 PM

Meadow Lane Effluent Storage Facilities Pond "C" Repair

Santa Rosa

ONLINE Santa Rosa, City of

4/15/2014

1:00 PM

Ripon High School Stadium Synthetic Track Surfacing

Ripon

ONLINE

4/15/2014

2:00 PM

Soccer Pro-Gilman District (Specs on Plans)

Berkeley

ONLINE

4/15/2014

2:00 PM

Meyerholz Elementary School Modernization & Seismic Upgrades

San Jose

ONLINE WLC Architects

4/15/2014

3:00 PM

14” Water Main Installation in N. Willow Ave. Between Teague Fresno & Yeargin Ave. & in E. Shepherd Ave. between Winery & Willow Ave.

Online

Fresno, City of

4/15/2014

2:55 PM

Fresno-Clovis Regional Wastewater Reclamation Facility Jensen Avenue Entrance Improvements

Fresno

Online

Fresno, City of

4/15/2014

2:00 PM

RFP-Asphalt/Street Materials

Antioch

ONLINE Antioch, City of

4/15/2014

2:00 PM

Improvements of Maud Avenue From Kelly Street to D St-A Safe Route to School Project

Eden Township

R008

Alameda, County of

4/15/2014

2:00 PM

Page Mill Bicycle Detection

Los Altos

R028

Santa Clara, County Of

4/15/2014

3:00 PM

California Boulevard Widening Pueblo Avenue to Permanente Way

Napa*

R029/01 7C

4/16/2014

1:30 PM

MWWTP Dewatering Building Sludge Well Access Improvement Oakland

E685B

4/16/2014

2:00 PM

Irwin St Sewer Improvements Between Woodland Ave & Lynn CtSan Rafael*

E688B/0 67C

4/16/2014

1:30 PM

Mokelumne Aqueducts Cathodic Protection Improvements

Calaveras

E689B

4/16/2014

2:00 PM

Camino Aguajito/Tenth Street Pedestrian Improvements

Monterey

ONLINE Monterey, City of

4/16/2014

3:00 PM

ATC Boiler Replacement, De Anza College

Los Alto

ONLINE Foothill-De Anza Community College District

Folsom, city of

East Bay Municipal Utility District

East Bay Municipal Utility District

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 32


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE

Bid Date Bid Time Project Name

City

4/16/2014

2:00 PM

DAF Tanks Renovation

Contra Costa County ONLINE Central Contra Costa Sanitary District

BIN # Plan Issuer

4/16/2014

3:00 PM

Asphalt Patch Paving

Placerville

ONLINE El Dorado Irrigation District

4/16/2014

4:00 PM

CHP -Office of the Academy-Weapons Range Maintenance & Lead Removal Services

Sacramento

ONLINE Department of California Highway Patrol

4/16/2014

2:00 PM

Emeryville Center of Community Life Bid Group 03

Emeryville

ONLINE

4/16/2014

2:00 PM

Chinese Education Center Elementary School-Security Improvements

San Francisco

ONLINE San Francisco Unified School Dist

4/16/2014

2:00 PM

Conlin Youth Sports Complex-Vehicle Access Gate

Sacramento

ONLINE Sacramento, City of

4/16/2014

2:00 PM

North Bay Operations & Maintenance Facility Waterside Construction Phase & Passenger Float Project

Vallejo

ONLINE Water Emergency Transportation Authority

4/16/2014

2:00 PM

Leasing Suite Improvement (Specs On Plans)

Walnut Creek

ONLINE

4/16/2014

2:30 PM

Carl Larsen Playground Renovation

San Francisco

ONLINE San Francisco, City & County of

4/16/2014

2:30 PM

San Francisco Public Library Teen & Literacy Center Renovation Work

San Francisco

ONLINE San Francisco, City & County of

4/16/2014

2:00 PM

6th St & Wilson St Sewer & Water Improvements

Santa Rosa

ONLINE Santa Rosa, City of

4/16/2014

3:00 PM

LED Runway Edge /Threshold Light Fixtures & Isolation Transformers

San Jose

ONLINE San Jose, City of

4/16/2014

2:30 PM

Traminer & Meritage Balcony Replacement

Rohnert Park

ONLINE Sonoma State University

4/16/2014

4:00 PM

Nika's Place

Oakland

ONLINE

4/16/2014

2:30 PM

Great Highway Restrooms Renovation

San Francisco

ONLINE San Francisco, City & County of

4/16/2014

11:00 AM

2013/2014 Street Resurfacing Project-Surface Seals

Portola Valley

ONLINE Town of Portola Valley

4/16/2014

2:00 PM

Window and Sliding Glass Door Replacement

Alameda

Online Onl

Alameda Housing Authority

4/16/2014

1:30 PM

Main Wastewater Treatment Plant Engineers Road Widening

Oakland

S001

East Bay Municipal Utility District

4/16/2014

1:30 PM

South Reservoir Demolition

Hayward

S452/01 East Bay Municipal 5C Utility District

4/17/2014

2:00 PM

Instrumentation & Backup Power Systems Improvements THIS PROJECT WILL NOT BE SCANNED

San Francisco*

176C

4/17/2014

2:00 PM

San Francisco Groundwater Supply Pipeline - THIS PROJECT San Francisco* WILL NOT BE SCANNED

177C

4/17/2014

3:30 PM

650 Imperial Way Building Window Replacement & Exterior Painting

Napa*

E686B/0 66C

4/17/2014

2:00 PM

AC Overlay Projects 2014

Sacramento

E700B/0 Sacramento County 97C Municipal Services Agency

4/17/2014

2:30 PM

2014 Crack Fill Contract

Lafayette

ONLINE Lafayette, City Of

4/17/2014

2:00 PM

RFP-Landscape Maintenance for Health, Housing & Community Berkeley Services

ONLINE Berkeley, City of

4/17/2014

2:00 PM

Project Management Support Services for South Field Tenant Relocations

San Francisco

ONLINE San Francisco International Airport

4/17/2014

2:00 PM

Wastewater Storage & Disposal Expansion

Pope Valley

ONLINE Lake Beryessa Resort Improvement District

4/17/2014

2:00 PM

Smart Classroom Project-Holt/Shima

Stockton

ONLINE San Joaquin Delta Community College District

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 33


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/17/2014

2:00 PM

Purchase of Hot-Mix Asphalt

Stockton

ONLINE Stockton, City of

4/17/2014

2:00 PM

Olinda Elementary School & Shannon Elementary School Fire Alarm Replacement

Richmond/Pinole

ONLINE West Contra Costa Unified School District

4/17/2014

2:00 PM

Sonora High School Measure J Improvements Track and Field

Sonora

ONLINE

4/17/2014

3:00 PM

3336-Fire Station No. 21 (Prequaified Generals Only)

San Jose

ONLINE San Jose, City Of

4/17/2014

2:00 PM

Fair Avenue Sewer Lining

Santa Cruz

ONLINE

4/17/2014

2:00 PM

Casa Grande Parking Lot Repair

Sonoma

ONLINE State of California

4/17/2014

4:00 PM

RFP-Conditions Assessment & Structural Evaluation of Concrete Tanks

Santa Cruz

ONLINE Santa Cruz, City of

4/17/2014

2:00 PM

RFQ-Engineering Services for the Basin 52 Stormwater Master Sacramento Plan Update

ONLINE Sacramento, City Of

4/17/2014

2:00 PM

Sullivan Well Equipping 2014

Daly City

ONLINE Daly City, City Of

4/17/2014

1:30 PM

2014 Sidewalk Repair Program (Various Locations in Country Club and Lincoln Village)

Stockton

Online

4/17/2014

1:00 PM

Live Oak Network Cabling & Equipment

Morgan Hill

ONLINE Morgan Hill Unified School District

4/17/2014

2:00 PM

Traffic Signal Modernization Project

Oakley

ONLINE Oakley, City of

4/17/2014

4:00 PM

RFQ-Professional Planning Services

Sonoma

ONLINE Sonoma, county of

4/17/2014

2:00 PM

RFP-Petersen Road Fence Repair Project

Suisun City

ONLINE Suisun City, City of

4/17/2014

3:00 PM

7474-RWF Street Treatment Phase III

San Jose

ONLINE San Jose, City Of

4/17/2014

2:00 PM

State Route 99/Central Galt Interchange Landscape Improvements-Phase 1

Galt

Online

Galt, city of

4/17/2014

1:30 PM

Thornton Road Improvements (Peltier Road to Walnut Grove Road)

Stockton

Online

San Joaquin, County of

4/17/2014

2:00 PM

Morrison Hall Roof Replacement

Berkeley

ONLINE Berkeley, UC

4/17/2014

2:00 PM

Green Parking Lot Demonstration Project

Citrus Heights

ONLINE Citrus Heights, City of

4/17/2014

2:00 PM

Davis Road Class II Bikeway

Salinas

ONLINE Monterey, County of

4/17/2014

3:00 PM

Hillside Boulevard Improvements Project

Colma

ONLINE Colma, Town Of

4/17/2014

3:00 PM

7493-Sanitary Sewer Condition Assessment 2013-2014 Willow San Jose Glen Basin

ONLINE San Jose, City Of

4/17/2014

2:00 PM

Line A-5 Offline Detention Basin, Phase II

Hayward

R023

4/18/2014

2:00 PM

Lead Abatement & Painting at Sonoma State Historic Park

Sonoma

ONLINE State of California

4/18/2014

2:00 PM

Cleophus Quealy Beer Company (No GC Openings)

San Leandro

ONLINE

4/18/2014

2:30 PM

Demolition of Single Family Residence (103 S. Thelma Ave)

Stockton

ONLINE San Joaquin, County of

4/18/2014

2:00 PM

Demolition of Single Family Residence (219 N. Oro Ave)

Stockton

ONLINE San Joaquin, County of

4/18/2014

12:00 PM

El Pollo Loco

Sacramento

ONLINE

4/18/2014

2:00 PM

RFQ-Repair Furnace # 1 Refractory

Martinez

ONLINE Central Contra Costa Sanitary District

4/18/2014

2:00 PM

Airport Janitorial Services

Visalia

ONLINE Visalia, City Of

San Joaquin, County of

Alameda, County of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 34


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/18/2014

2:00 PM

Emergency Generators

Davis

ONLINE Davis, city of

4/21/2014

2:00 PM

Hunter's Point Shipyard Phase 1, Block 49-Shoring

San Francisco

ONLINE

4/21/2014

3:00 PM

TG10.3 Heating, Ventilating & Air Conditioning Construction Services

San Francisco

ONLINE

4/21/2014

2:00 PM

Marina Middle School Replacement of Lockers

San Francisco

ONLINE San Francisco Unified School District

4/21/2014

2:00 PM

RFP-Architectural Services & Contract Administration Fire Station # 3

Alameda

ONLINE Alameda, City of

4/21/2014

2:00 PM

RFP-Criminal Justice Master Plan 2014 Update

Sonoma

ONLINE Sonoma, county of

4/22/2014

2:00 PM

Ayala Cove Paving

Belvedere Tiburon

062C

4/22/2014

1:30 PM

Office Management Services for VTA Facilities Year 2014-2019 San Jose

072C/E6 Santa Clara Valley 90B Transportation Authority

4/22/2014

2:00 PM

Sidewalk Rehabilitation & Wheelchair Ramps FY 2014

Hayward

E696B/0 Hayward, city of 21C

4/22/2014

2:00 PM

Hacienda Avenue Green Street Improvement 08-04B

Campbell

ONLINE Campbell, city of

4/22/2014

10:00 AM

Positano Hills Park Playground

Dublin

ONLINE Dublin, city of

4/22/2014

2:00 PM

Parking Lots I, J, K & N Pavement Repair

Aptos

ONLINE Cabrillo Community College District

4/22/2014

2:30 PM

Washington Elementary School Interim Housing

Oakland

ONLINE

4/22/2014

2:00 PM

Farm Burger Upgrades

Berkeley

ONLINE

4/22/2014

3:00 PM

SF Community School ADA Site Improvements of Play Yard

San Francisco

ONLINE San Francisco Unified School District

4/22/2014

2:00 PM

FY 2014 Measure M (LID) Projects

Berkeley

ONLINE Berkeley, City of Public Works

4/22/2014

2:00 PM

Electric Vehicle Charging Station Construction

Sacramento

ONLINE Sacramento Municipal Utility District

4/22/2014

2:00 PM

Franklin High School Kitchen Food Court Building

Stockton

ONLINE

4/22/2014

2:00 PM

Concrete Pumping Services Inmate Ward Labor Program at CTF & SVSP

Soledad

ONLINE California Dept of Corrections & Rehabilitation

4/22/2014

2:00 PM

AveVista 460 Grand (No GC Openings)

Oakland

ONLINE

4/22/2014

2:00 PM

Leak Remediation for Laney College Buildings A, B, C, D, E & G Oakland

ONLINE Peralta Community College District

4/22/2014

10:00 AM

Gold River K-8 Portable Relocation

Rancho Cordova

ONLINE San Juan Unified School District

4/22/2014

10:00 AM

Hoover High School Exterior Painting, Roosevelt High School Exterior Painting,Sunnyside High School Exterior Painting

Fresno

Online

4/22/2014

2:00 PM

2014 Cape, Slurry & Crack Seal Project

Fremont

ONLINE Fremont, City of

4/22/2014

2:00 PM

Noodles & Co - Roseville, CA

Roseville

Online

4/22/2014

2:00 PM

RFP-Elevator Maintenance

Berkeley

ONLINE Berkeley, City of

4/22/2014

2:00 PM

South Hayward BART Development Confirmation

Hayward

ONLINE

4/22/2014

4:00 PM

RFQ-Elmwood Correctional Facility Trench Drain

Milpitas

ONLINE Santa Clara, County Of

4/22/2014

2:00 PM

Thickener Control Building Improvements

Union City

ONLINE Union Sanitary District

State of California

Fresno Unified School District

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 35


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/22/2014

2:00 PM

Drying Bed Improvements

Redwood City

ONLINE South Bayside System Authority

4/22/2014

2:00 PM

Wood Pole Reinforcement 2014-2015

Sacramento

ONLINE Sacramento Municipal Utility District

4/22/2014

3:00 PM

Embarcadero Road Satellite Parking Lot

Palo Alto

ONLINE Palo Alto, City of

4/22/2014

2:00 PM

Geneva Avenue Utilities Undergrounding District 18-Phase 1 Street Light Installation

Daly City

ONLINE Daly City, City Of

4/22/2014

2:00 PM

ESC-Kings Sacramento Downtown Plaza Improvements & Selective Demolition

Sacramento

ONLINE Turner Construction

4/22/2014

2:00 PM

Science Building Roofing Replacement Project

Hayward

ONLINE California State University East Bay

4/22/2014

3:00 PM

RFP-MSC Fuel Station Demolition & Site Improvement

Palo Alto

ONLINE Palo Alto, City of

4/22/2014

2:00 PM

Glenn Dyer Detention Facility (GDDF) Water Conservation

Oakland

R015/07 Alameda, County of 9C

4/22/2014

2:00 PM

Madison Middle School Interim Housing

Oakland*

R037/00 4C

4/23/2014

2:00 PM

Pantoll Ranger Station

Mill Valley

064C

State of California

4/23/2014

2:00 PM

Firehouse Lead Abatement

Tiburon

065C

State of California

4/23/2014

2:00 PM

2nd Avenue, 36th Avenue & Occidental Avenue Street Reconstruction Project

San Mateo

E698B/0 San Mateo, City of 28C

4/23/2014

2:00 PM

N. Idaho Street, Cary Avenue & 7th Avenue Street Reconstruction Project

San Mateo

E699B/0 San Mateo, City of 26C

4/23/2014

2:30 PM

Bartlett Streetscape Improvements

San Francisco

ONLINE San Francisco, City & County of

4/23/2014

2:00 PM

48-Inch Force Main Reliability Improvement Project - Unit 3 Inner Bair Island to Monte Vista Drive

San Mateo County

ONLINE South Bayside System Authority

4/23/2014

3:00 PM

Kings County Jail-Transfer Tunnel

Hanford

ONLINE Kings, County Of

4/23/2014

2:00 PM

ADA Improvements 2014-Rancho Solano Subdivision

Fairfield

ONLINE Fairfield, City Of

4/23/2014

2:00 PM

Fire Station No. 11 Standby Generator

Sacramento

ONLINE Sacramento, City of

4/23/2014

2:00 PM

Dover Elementary School Parking & Site Improvements-Phase 2 San Pablo

ONLINE West Contra Costa Unified School District

4/23/2014

12:00 PM

Jacobs Hall (Prequalified Generals Only)

Berkeley

ONLINE Berkeley, UC

4/23/2014

2:00 PM

RFP-Clock & Public Address System Replacement

Newark

ONLINE Newark Unified School Dist

4/23/2014

2:00 PM

Burbank Heights Community Building Addition & Remodel

Sebastopol

ONLINE

4/23/2014

3:30 PM

Water & Sewer Main Replacement & Rehabilitation 2013/2014

Petaluma

ONLINE Petaluma, City of

4/23/2014

2:30 PM

Elmhurst Middle School Paving Replacement

Oakland

ONLINE

4/23/2014

10:00 AM

RFP-Testing & Inspection Services Utility Infrastructure Uprade Fremont Ohlone College Fremont

ONLINE Ohlone Community College District

4/23/2014

2:00 PM

Whittier Elementary School Portables Installation Phase II

Oakland

ONLINE

4/23/2014

2:00 PM

Guy West Bridge Painting & Rehabilitation Project

Sacramento

ONLINE Sacramento, city of

4/23/2014

2:00 PM

Galt WWTP Upgrade Project

Galt

ONLINE Galt, city of

4/23/2014

2:00 PM

RFP-Sewer Mains Video Inspection & Cleaning Phase 7

Alameda

ONLINE Alameda, City of

4/23/2014

2:00 PM

Theater Rigging Beam Repair & Rigging System Replacement- Hayward The Main Campus Theater

ONLINE California State University East Bay

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 36


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/23/2014

10:00 AM

RFP-Project Inspector Services Utility Infrastructure Upgrade Ohlone College

Fremont

ONLINE Ohlone Community College District

4/23/2014

2:00 PM

GA Classroom Renewals FY 13-14 (Prequalification)

Berkeley

ONLINE Berkeley, UC

4/23/2014

1:00 PM

Crystal Springs/El Cerrito Phase II Sewer Improvements Project Hillsburough

R027/01 Hillsborough, Town of 0C

4/23/2014

2:00 PM

Rossi Storm Water Pump Station Rehabilitation

R032/02 San Rafael, city of 7C

4/23/2014

2:00 PM

State Route 12 Corridor Improvement Project Phase II, Stage 2 Sonoma*

S902

4/24/2014

2:00 PM

Laguna Drainage Improvements

Burlingame

E697B

4/24/2014

2:00 PM

Christmas Hill Park Copper Wire Theft Repairs Project

Gilroy

ONLINE Gilroy, city of

4/24/2014

2:00 PM

Smith Canal Pump Station Well Rehabilitation & Miscellaneous Stockton Site Improvements

ONLINE Stockton, City of

4/24/2014

2:00 PM

Bothe-Napa Three Roof Replacement Project

Calistoga

Online

State of California

4/24/2014

1:30 PM

Lower Sacramento Road Resurfacing ( Woodbridge Road to Jahant Road )

Stockton

Online

San Joaquin, County of

4/24/2014

1:30 PM

Wilson Way Improvements ( 500' north of the Stockton Diverting Stockton Canal )

Online

San Joaquin, County of

4/24/2014

2:00 PM

Verde Elementary School Circulation & Parking Improvements

Richmond

ONLINE West Contra Costa Unified School District

4/24/2014

2:00 PM

Novato Fire Protection Dist-Station 64 Project (Pre-Qualified Generals Only)

Novato

ONLINE

4/24/2014

12:00 PM

RFP-Multi-Use AG Barn

Modesto

ONLINE Modesto City Schools

4/24/2014

10:00 AM

RFQ-DSA Certified Project Inspectors for Oakland Unified School Dist

Oakland

ONLINE Oakland Unified School District

4/24/2014

2:00 PM

Fremont Police Department Interior Painting

Fremont

ONLINE Fremont, City of

4/24/2014

3:00 PM

7121-Police Administration Building Security Card Access System Project

San Jose

ONLINE San Jose, City Of

4/24/2014

2:00 PM

2014 Pavement Project

Piedmont

ONLINE Piedmont, City of

4/24/2014

3:00 PM

7135-Roadway Sign Replacement & Upgrades Package 3

San Jose

ONLINE San Jose, City Of

4/24/2014

2:00 PM

Ohlone Community College Dist Temporary RelocatablesConnections Package Increment 1

Fremont/Newark

ONLINE Ohlone Community College District

4/24/2014

2:00 PM

Boyce Road Lift Station Project Phase 2

Fremont

ONLINE Union Sanitary District

4/24/2014

2:00 PM

2014 Three Step Chip Seal Project on Old River Rd & Hensley Creek Rd

Mendocino Co.

ONLINE Mendocino, County of

4/24/2014

2:00 PM

Golf Club Road Bridge Replacement Project

Pleasant Hill

ONLINE Pleasant Hill, City of

4/24/2014

1:30 PM

Elmwood Avenue and Oxford Way Resurfacing (Mission Road to Pershing Avenue)

Stockton

Online

4/24/2014

2:00 PM

RFQ-North Natomas Aquatic Complex & Community Center Feasibility Study

Sacramento

ONLINE Sacramento, city of

4/24/2014

3:00 PM

6394-Minnesota Avenue Sanitary Sewer Improvement

San Jose

ONLINE San Jose, City Of

4/24/2014

2:30 PM

2014 Chip Seal Project on Various County Maintained Roads

Mendocino Co.

ONLINE Mendocino, County of

4/24/2014

2:00 PM

Sonora Elementary School Buildings D & E-Fire Damage Repair Sonora

ONLINE California Design West Architects

4/24/2014

2:00 PM

Willow Pass Road Trunk Sewer Upgrade

ONLINE Concord, City of

4/24/2014

2:00 PM

RFP-Turlock Regional Transit Center Phase 2 Design & Master Turlock Plan

San Rafael

Concord

San Joaquin, County of

ONLINE Turlock, City of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 37


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/24/2014

4:00 PM

RFQ-On-Call Material Sampling & Testing Services

Sacramento

ONLINE Sacramento, city of

4/24/2014

1:00 PM

Flora Street Project (Informal Bid )

Crockett

ONLINE Crockett Community Services District

4/24/2014

3:00 PM

Centre Concord Movable Walls & Coverings

Concord

ONLINE Concord, City of

4/24/2014

2:00 PM

Sunnyside High School Track and Field Improvements

Fresno

Online

4/24/2014

2:00 PM

RFP-Hazardous Vegetation Reduction Services (Proposals will Berkeley not be Opened & Read Publicly)

ONLINE Berkeley, City of

4/24/2014

2:00 PM

AST Installation and Parking Lot Resurfacing - San Jose Area Office #340

San Jose

ONLINE Department of General Services

4/24/2014

2:00 PM

2013 Sanitary Sewer Rehabilitation Project

Stockton

ONLINE Stockton, City of

4/24/2014

2:00 PM

Mendocino Hall Fire Alarm Upgrade 2014

Sacramento

ONLINE California State University Sacramento

4/25/2014

3:00 PM

Fremont Gurdwara Sahib

Fremont

ONLINE

4/25/2014

2:00 PM

Shields Reid Park

Richmond

ONLINE Richmond, City of

4/25/2014

2:00 PM

District Residence & Workspace Remodel

Sausalito

ONLINE Sausalito-Marin City Sanitary District

4/25/2014

3:00 PM

Sierra Vista Open Space Presewrve Vehicle/Equestrian Staging San Jose Area

ONLINE Open Space Authority Santa Clara Valley

4/25/2014

3:00 PM

Annual Overlay/Rehabilitation 2013-14

San Leandro

ONLINE San Leandro, city of

4/25/2014

3:00 PM

Camp 2 Bridge Replacement Project

El Dorado Co.

ONLINE El Dorado Irrigation District

4/25/2014

4:00 PM

RFP-As Needed Municipal Engineering, Design & Construction Millbrae Mgmt Services

ONLINE Millbrae, city of

4/25/2014

11:00 AM

Juvenile Services Building Interior Renovation Project

San Rafael

R041/02 Marin, county of 9C

4/29/2014

2:00 PM

Slurry Seal Resurfacing of Portions of Various Roadways

Alameda Co.

E691B/0 Alameda, County of 82C

4/29/2014

2:00 PM

Installation of Pedestrian Ramps at Various Locations in Unincorporated Areas of San Lorenzo & Castro Valley

San Lorenzo/Castro Valley

E692B/0 Alameda, County of 81C

4/29/2014

2:30 PM

Safe Routes to School

Livermore

E695B/0 94C

4/29/2014

1:00 PM

Prop 39-Exterior Lighting Installation

Stockton

ONLINE San Joaquin Delta Community College District

4/29/2014

3:00 PM

Downtown Garage Parking Sign

San Leandro

ONLINE San Leandro, city of

4/29/2014

2:00 PM

CTCNC Welding Training Center

Fairfield

ONLINE

4/29/2014

2:00 PM

2014 Slurry Seal Project

Martinez/Walnut Creek

ONLINE Contra Costa, County of

4/29/2014

2:00 PM

Merced Regional Airport/MacReady Field Apron Pavement Maintenance Project

Merced

ONLINE Merced, County of

4/29/2014

2:00 PM

Pump Station Security Upgrades

Martinez

ONLINE Central Contra Costa Sanitary District

4/29/2014

10:00 AM

RFQ-Asbestos Abatement Services at Various MDUSD Sites

Concord

ONLINE Mt Diablo Unified School District

4/29/2014

2:00 PM

Bessie Avenue Building Demolition

Tracy

ONLINE Tracy, City of

4/29/2014

2:00 PM

2013-2014 Street Repair Project

Millbrae

ONLINE Millbrae, city of

4/29/2014

11:30 PM

Gunn High School Buildings E & K Modernization

Palo Alto

ONLINE Palo Alto Unified School District

Fresno Unified School District

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 38


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/29/2014

2:00 PM

Hacienda Avenue Green Street Improvement (Federal Project) Campbell 08-04A

ONLINE Campbell, city of

4/29/2014

2:00 PM

Water Pollution Control Facility Aeration System Retrofit

Woodland

ONLINE

4/29/2014

2:00 PM

Central Park Sand Volleyball Conversion to Multi-Use Sports Courts

Fremont

ONLINE Fremont, City of

4/29/2014

10:00 AM

Highway 1 Trail Improvements

Half Moon Bay

ONLINE Half Moon Bay

4/29/2014

3:00 PM

Willard & Rosa Parks Slurry

Berkeley

ONLINE Berkeley Unified School District

4/29/2014

2:30 PM

RFP-Design & Environmental Services for the Islais Creek Bridge Rehabilitation Project

San Francisco

ONLINE San Francisco, City & County of

4/29/2014

2:00 PM

Healdsburg 2014 Pavement Rehabilitation

Healdsburg

ONLINE Healdsburg, City Of

4/29/2014

2:00 PM

Apartment Turnover Services for University Management

San Francisco

ONLINE San Francisco State University

4/29/2014

2:00 PM

Upper Hetch Hetchy Corridor Sanitary Sewer Rehabilitation Project

Fremont/Newark

ONLINE Union Sanitary District

4/29/2014

5:00 PM

H-Complex Maintenance & Repair

Petaluma

ONLINE

4/29/2014

2:00 PM

Clearland Drive Curb Ramp Project

Contra Costa County ONLINE Contra Costa, County of

4/29/2014

10:00 AM

Bay Point Sewer Repairs

Antioch

ONLINE Delta Diablo Sanitation District

4/29/2014

2:00 PM

Mirabel Fish Screen and Fish Ladder Replacement

Forestville

S903/02 Sonoma County Water 1C Agency

4/29/2014

2:00 PM

Fire Station No. 7 & Firehouse Clinic

Hayward

S904/01 Hayward, city of 6C

4/30/2014

12:00 PM

2014 Citywide Slurry Seal Project

San Mateo

E703B/0 San Mateo, City of 14C

4/30/2014

2:00 PM

Security Camera for the Cashier's Office-The Main Campus Theater

Hayward

ONLINE California State University East Bay

4/30/2014

3:00 PM

Boys & Girls Club at Shoreline Middle School

Santa Cruz

ONLINE

4/30/2014

3:00 PM

City Hall South End Roof Replacement

San Leandro

ONLINE San Leandro, city of

4/30/2014

12:00 PM

Fabric Patching Program-Asphaltic Emulsion

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

3:00 PM

Aggregate Materials for Maintenance & Repairs

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

2:00 PM

2013-14 Concrete Sidewalk & Curb Repairs & Installation of ADA Curb Ramps, Phase VII

Mountain View

4/30/2014

12:00 PM

High Performance Cold Mix Asphalt Concrete Packaged

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

2:00 PM

Little Pocket & Tahoe Parkwater Main Replacement Project

Sacramento

4/30/2014

12:00 PM

Bulk Aggregate for County's 2014 Chip Seal Program

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

12:00 PM

PWD Rd Maintenance Surface Treatment Program

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

2:00 PM

Doyle Swimming Pool Deck & Skimmer Replacement & Updated Equipment

Sacramento

4/30/2014

12:00 PM

Asphalt Concrete for Road Maintenance

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

4:00 PM

RFP-Cleaning & Maintenance of Park Street, Webster Street & Alameda Marina Village

ONLINE Alameda, City of

4/30/2014

2:00 PM

Mare Island Strait Outfall Installation Project

ONLINE Vallejo Sanitation and Flood Control District

Vallejo

ONLINE Mountain View, city of

ONLINE Sacramento, City Of

ONLINE Sacramento, City of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 39


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

4/30/2014

2:00 PM

Edison High School Administration/Cafeteria/Kitchen Building (Lease-Leaseback Project)

Stockton

ONLINE Roebbelen Contracting, Inc.

4/30/2014

2:00 PM

Conant Place Patio Fence Replacement

Modesto

ONLINE Stanislaus, County of

4/30/2014

2:00 PM

Fire Sprinkler Upgrade at 2531 Land Avenue

Sacramento

ONLINE Sacramento Regional Transit District

4/30/2014

12:00 PM

Rock Slope Protection

Contra Costa County ONLINE Contra Costa, County of

4/30/2014

1:30 PM

Bayview Gateway & Tulare Park Project

San Francisco

ONLINE Port Of San Francisco

5/1/2014

2:00 PM

Joint Trunk Sewer Replacement

Gilroy

ONLINE Gilroy, city of

5/1/2014

2:00 PM

Ohlone Elementary School FF&E

Hercules

ONLINE West Contra Costa Unified School District

5/1/2014

2:00 PM

RFP-Project Management, Environmental Clearance & Design Berkeley Development for the Hearst Avenue Complete Streets Projects

ONLINE Berkeley, City of

5/1/2014

11:00 AM

Chemical Storage Room Rehabilitation Project (Construction)

San Rafael

ONLINE Central Marin Sanitation Agency

5/1/2014

2:00 PM

West Contra Costa Family Justice Center Bldg Remodel & Tenant Improvement

Richmond

ONLINE

5/1/2014

12:00 PM

Mariposa Road Resurfacing (Dodds Road to Escalon-Bellota Road)

Stockton

Online

5/1/2014

2:30 PM

2014 Slurry Seal Project

Walnut Creek

ONLINE Walnut Creek, city of

5/1/2014

4:00 PM

RFP-Program Management & Construction Management Services for Monterey Conference Center Renovation

Monterey

ONLINE Monterey, City of

5/1/2014

2:30 PM

2014 Road Rehabilitation Project

Lafayette

ONLINE Lafayette, city of

5/1/2014

2:00 PM

Menlo Park Public Library Boiler Replacement Project

Menlo Park

ONLINE Menlo Park, City of

5/1/2014

2:00 PM

Job Order Contract CSU Sacramento

Sacramento

ONLINE California State University Sacramento

5/1/2014

2:00 PM

RFP-Project Management, Environmental Clearance & Design Berkeley Development for Shattuck Reconfiguration & Pedestrian Safety Project

ONLINE Berkeley, City of

5/2/2014

2:00 PM

AC Transit Line 51 C.D.R.D. (Corridor Delay Reduction & Sustainability Project)

Oakland

ONLINE AC Transit District

5/2/2014

5:00 PM

RFQ-Emerald Glen Recreation & Aquatic Center Project

Dublin

ONLINE Dublin, city of

5/5/2014

11:00 AM

Paradise Cay 2014 Maintenance Dredging

Tiburon

E701B/0 Marin, county of 31C

5/5/2014

12:00 PM

Tractor Supply Company Store Tenant Improvement

Lodi

ONLINE

5/5/2014

10:00 AM

Felt St & 17th Ave Sewer Replacement Project

Santa Cruz

ONLINE Santa Cruz, County of

5/5/2014

2:00 PM

Prequalification of Interested General Contractors for the City of Alameda Alameda's Relocation of Two Existing Sewer Mains (Lagoon Seawall & Clinton Extension)

ONLINE Alameda, City of

5/6/2014

2:00 PM

Residential Street Resurfacing Project FY 2013-2014

Foster City

E705B

5/6/2014

2:00 PM

2014 On-Call Trucking Services Contract for Aggregate Stockpiling

Contra Costa County ONLINE Contra Costa, County of

5/6/2014

11:00 AM

Briggsmore Avenue Rehabilitation Project

Modesto

ONLINE Modesto, City of

5/6/2014

2:00 PM

Environmental Health & Safety Office & Hazardous Materials Facility Re-Roof

Sacramento

ONLINE California State University Sacramento

5/6/2014

2:00 PM

Fort Ross State Historic Park Repair Stockade Wall

Jenner

ONLINE State of California

5/6/2014

2:00 PM

Modernization of Rooms 3, 25, 26 & Library (Buildings 200, 400 Cupertino & 800)

San Joaquin, County of

Foster City, City of

ONLINE Cupertino Union School District

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 40


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

5/6/2014

2:00 PM

Camino Tassajara Shoulder Widening

Contra Costa County ONLINE Contra Costa, County of

BIN # Plan Issuer

5/6/2014

2:00 PM

Los Cerritos Community Park Picnic Areas

Fremont

ONLINE Fremont, City of

5/6/2014

2:00 PM

UST Removal and AST Installation Merced Area Office

Atwater

ONLINE Department of General Services

5/7/2014

2:00 PM

Lower Silver Creek Flood Protection & Creek Restoration Project, Moss Point Drive To Cunningham Ave (Reach 6B)

San Jose

ONLINE Santa Clara Valley Water District

5/7/2014

2:00 PM

Mission Bay Block 7E-Family House

San Francisco

ONLINE

5/7/2014

2:00 PM

C-526 Gym Annex Elevator

San Pablo

ONLINE Contra Costa Community College District

5/7/2014

2:00 PM

Northeast Corridor Fiber Optic Installation Phase 2

Sacramento

ONLINE Sacramento Regional Transit District

5/7/2014

1:00 PM

Central Kitchen Storage Renovation

San Lorenzo

R042

San Lorenzo Unified School Dist

5/8/2014

2:00 PM

CCTV at Various Locations

San Jose

E704B

Santa Clara Valley Transportation Authority

5/8/2014

10:00 AM

Air Base Line Pipeline Replacement Project

San Rafael

ONLINE Marin Municipal Water District

5/8/2014

2:30 PM

2011 Storm Damage Repairs on Comptche Ukiah Road, CR 223, at M.P. 8.25

Ukiah

ONLINE Mendocino, County of

5/8/2014

2:00 PM

2011 Storm Damage Repairs on Comptche Ukiah Road, CR 223, at M.P. 8.50

Ukiah

ONLINE Mendocino, County of

5/8/2014

2:00 PM

Browns Valley Road Sewer Improvement Project-McCormick Lane to Larkin Way

Napa

ONLINE Napa Sanitation District

5/8/2014

2:00 PM

Phase I Wastewater Treatment Improvement Project

Biggs

ONLINE Biggs, city of

5/8/2014

2:00 PM

Hunters View-Phase 2-Buildings Blocks 7 & 11

San Francisco

ONLINE Cahill Contractors, Inc.

5/8/2014

2:00 PM

Soltrans Curtola Park & Ride Hub Project

Vallejo

ONLINE Solano County Transit

5/8/2014

2:00 PM

Oliver Road Park & Ride Improvement Project

Fairfield

ONLINE Fairfield, City Of

5/9/2014

2:00 PM

Re-Roofing the Tamien Early Educational Center

San Jose

E702B/0 Santa Clara Valley 71C Transportation Authority

5/9/2014

2:00 PM

Tennis Facilities Expansion & Improvements Phase 3 Resurfacing

Vallejo

E706B

Greater Vallejo Recreation District

5/9/2014

2:00 PM

Tennis Facilities Expansion & Improvements Phase 4 Fencing

Vallejo

E707

Greater Vallejo Recreation District

5/9/2014

2:00 PM

RFQ-Butte Regional Transit Operations Center Construction

Chico

ONLINE

5/9/2014

11:00 AM

Improve Emergency Sustainment Capabilities, Building 50

Palo Alto

ONLINE

5/13/2014

3:00 PM

RFP-Program Management Services for RWQCP

Palo Alto

ONLINE Palo Alto, City of

5/13/2014

2:00 PM

Marsh Creek Road Safety Improvements-1 Mile East of Russelmann Park Rd

Martinez

ONLINE Contra Costa, County of

5/14/2014

2:00 PM

McClymonds High School Fire & Intrusion Alarm Replacement

Oakland*

R038/02 3C

5/15/2014

2:00 PM

8-Inch Ductile Iron Water Main Installation on Alabama & 25th Streets

San Francisco

ONLINE San Francisco, City & County of

5/15/2014

2:00 PM

Shoreline Drive, Westline Drive Bikeway Improvements

Alameda

ONLINE Alameda, City of

5/15/2014

2:00 PM

South Sewer Main Replacement (Grant Rd)

Los Altos

ONLINE Los Altos, City of

5/16/2014

2:00 PM

Main Library Restrooms ADA Improvements

Richmond

Online

Richmond, City of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 41


www.marinba.org ◆ mba@marinba.org

Bid list subject to change prior to bid date, please check with Association.

PROJECT BID SCHEDULE Bid Date Bid Time Project Name

City

BIN # Plan Issuer

5/20/2014

10:00 AM

RFQ-Architectural Services to the Oakland Unified School Dist

Oakland

ONLINE Oakland Unified School District

5/20/2014

3:00 PM

Site Lease of Parking Structures for Renewable Electric Power Palo Alto

ONLINE Palo Alto, City of

5/21/2014

3:00 PM

Parking & Circulation Phase 3-Lot 1 Stairs

Los Altos

ONLINE Foothill-De Anza Community College District

5/22/2014

2:00 PM

TG10.4 Electrical, Communicatins, Security & Integrated Networks

San Francisco

ONLINE

6/30/2014

5:00 PM

Various Public Works Projects

Rohnert Park

ONLINE Sonoma State University

6/30/2014

1:00 PM

Inclusion Letter for Licensed Contractors, City of Richmond, Re- Richmond Issue

ONLINE Richmond, City of

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 42


www.marinba.org ◆ mba@marinba.org

CLASSIFIED ADS SEEKING ESTIMATOR FOR CONCRETE CONTRACTOR Concrete company seeks an experienced Estimator for residential/ commercial projects. Must have experience in estimating concrete to apply. Be able to prepare complete estimates for assigned project by doing a thorough and complete takeoff of the scope and quantities of work. Review proposal specifications, drawings, attend pre-bid meetings, etc. to determine scope of work and required contents of estimate. Prepare subcontracts, materials list once job is awarded.. Prepare, RFI’s, change orders and all other construction related documentation. Interface with owners, vendors, subcontractors and lower tier employees. Must have clean DMV and pass drug test. Qualified applicants may reply with a resume, cover letter and salary requirements to Trisha@Sonomarin.com

SEEKING ESTIMATOR FOR RESIDENTIAL CONSTRUCTION Seeking Estimator/Project Manager for a Marin based Residential General Contractor. Requirements: • Minimum 10 years experience in Residential Construction. Field experience desired. • Offering Benefits • Salary DOE Please reply to the email below with your resume if you are interested. Lee Bonilla - Fontana Construction Inc. 1945 E. Francisco Blvd. Suite N., San Rafael ,CA 94901 415-457-1290 P | 415-457-1294 F | Fontanaleeb@aol.com

Classified ads are provided free to MBA members & staff. Please advise if position is filled or commodity is sold. paula@marinba.org

SEEKING EXPERIENCED ACCOUNTING PROFESSIONAL WITH EXTENSIVE OFFICE MANAGEMENT SKILLS Must be highly motivated and organized with strong human resource skills. The primary duties of the position include: • Direct and manage all accounting functions • Produce all monthly and yearend financial reports • Responsible for all human resource functions • Responsible for all payroll related activities including state and federal tax filings and reporting • Assist with all insurance activities, including auto, liability, personal property and workers compensation Experience – minimum of five years experience in increasingly complex accounting positions with a similar level of managerial responsibility. Experience with computers and accounting software is required, construction accounting and software experience a plus. Qualified applicants may reply with a resume, cover letter and salary requirements to Trisha@Sonomarin.com

SEEKING FULL-TIME FOREMAN FOR SAN RAFAEL BASED CO. Residential remodeling company, Crescent Builders, Inc. seeks bi-lingual (Span./Eng.) foreman for full time position. Health care benefits available after 90 days. Pay based on experience. Qualifications Include: • • • • • • • • • • •

Working knowledge of building trades Can effectively manage personnel Clean driving record Fluent in both Spanish and English Can read plans well and assemble materials lists 10+ years in residential construction industry Strong organizational and interpersonal skills Willingness to interface with clients as well as staff Strong communication skills and clean/neat appearance Familiarity with Marin County Report time cards Please forward resume and salaray requirements to: Lindsay@buildwithcrescent.com

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 43


www.marinba.org ◆ mba@marinba.org

CLASSIFIED ADS

Classified ads are provided free to MBA members & staff. Please advise if position is filled or commodity is sold. paula@marinba.org

PLUMBER/SERVICE TECHNICIAN (NOVATO) Family owned Novato based plumbing company seeking full time Plumber/Service Technician experienced in residential/ commercial plumbing and drain cleaning. We will train the right candidate who meets the following criteria: • Clean DMV, CA Driver’s License • Clean and neat appearance, drug-free • Self-motivated, attention to detail • Able to take direction, willing to learn, team player • Strong communication skills On-call work required. Compensation based on experience. We offer medical benefits, and vacation. Call 415.898.2700 for more information.

PART-TIME BID RUNNER GHILOTTI BROS. CONTRACTORS

SEEKING ESTIMATOR IN COMMERCIAL ROOFING Wedge Roofing, Inc. is currently looking for an Estimator in the Commercial Roofing Market for the San Francisco Bay Area. Experienced Estimator who is capable of performing hard bid and conceptual estimates in both private and public work markets. They must be able to manage multiple estimates at one time along with some minor project management.

This person will need to have the ability to work with plans & drawings, clients, consultants, subcontractors and municipalities. This position will be expected to work in both a team atmosphere and function autonomously at various times. Local market estimating experience is also preferred. Commercial Estimator position works from Petaluma office facility.

Desired Skills & Experience 1.

Familiarity with all major roofing systems.

An established, family–owned, San Rafael based construction company is seeking an experienced Part–Time Bid Runner. Flexible hours range from 5-10 hours per week. Responsible for delivering bid documents. Must be dependable, punctual, and have excellent penmanship. The ability to listen and write quickly and accurately under pressure is crucial. This person must have the confidence to meet strict time deadlines. Receives bid pricing and subcontractor information over the telephone. Clean driving record. This position is not eligible for benefits. Salary is DOE. If you would like more information about our company, please visit www.ghilottibros.com.

2. 3. 4.

Local Bay Area experience. Strong client interaction skills. Strong plan & bid take off skills.

FOR MORE INFORMATION CALL 707-763-5475 Company Description Since 1976, San Francisco Bay Area’s most trusted roofing contractor, Wedge Roofing provides quality and dependable roofing solutions for residential, commercial, industrial and public work clients throughout San Francisco, Marin County, Sonoma County, Napa County and the East Bay. Lic # 416737 C-2, C39, C-43, & B General

GBI is committed to being an equal opportunity employer.

Marin Builders Association ◆ WEEKLY BULLETIN ◆ Page 44


MBA Weekly Bulletin vol. 58 issue#15