Sylvia Kim
GAEP Homeless center
14 15
massing
During the Schematic Design stage of the Project, initial massing studies were done with the site. With North Calhoun Road being the street front where urban activity can occur, the emphasis was placed on giving the street front that any city deserves. Concurrently, many massing studies were accomplished in reference with the existing A.J. Whittenberg Elementary School. With the overhanging structure conversing directly with our site, the consideration of the surrounding architecture was crucial in the form of the homeless center. As the auditorium will be an anchoring program that serves as the connector for the community, the form of the auditorium will be crucial in the overall design of the homeless center.