Testing

Page 3

Rexel invests in the solar market Rexel continues to build its capability in the Grid Connect Solar market. With dedicated resources assigned to the development of this key renewable energy initiative. Rexel is developing an industry leading portfolio of solar energy products and services to support the industrial and domestic solar energy markets. Ranging from the domestic 1.5kw system to large scale commercial projects. Rexel is positioned to offer installers a quality kit that is inclusive of all required components to fulfil a domestic installation. These kits have been matched by the manufacturer for reliability and efficiency to ensure the homeowner gets the maximum return on their investment and the installer can maximise the number of installations per day. This market is developing rapidly due to the various government incentives offered at both a state and national level, currently demand outstrips supply with the availability of the inverter coming under pressure. However Rexel is well positioned to supply your requirements in the coming months. The market is continuing to grow due to further state government initiatives, such as the recently announced West Australian government feed in tariff that will come into effect on the 1st of August. Rexel encourages accredited installers to register with your local branch to keep up to date on new offers, market trends and training & information sessions. It is advisable for installers to closely monitor the time it takes to install a solar kit as all kits are not equal, read on to see some key aspects of the installation that should be noted and taken into consideration when quoting a solar installation.

When quoting for solar panels installation: Q How many Photo Voltaic panels are required? A As many as 15 panels and as little as 7 panels for a 1.5kw kit. More panels = more mounting hardware = more time to install. Is there is enough space on the roof for the kit? Q How heavy are the Photo Voltaic panels? A Panels range from 13-25kg. Larger panels will require two people to lift, position and install the panel. Q What connectors are used for the panels? A Are the connectors readily available? How much do they cost? Are they an industry standard? Q How much cable is needed to run to the inverter? A The bigger the house the longer the run. How many strings does your inverter require? Q Do you have the right inverter? A Is your inverter suitable for the environment you are installing it in? Does it need extra protection? Q Do you have a suitable mounting kit? A Is it for tin or tile, etc‌? Does your kit enable fast and efficient installation? Does your kit include rails, brackets and cable management? Q What is the Renewable Energy Certificate (REC) price this week? A Will you be trading in them?

rexel electrical supplies | phone: 1300 my rexel | web: www.rexel.com.au

3


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.