Page 182

LION

Landing Points • Terre Rouge (Mauritius) • Toamasina (Madagascar)

LOWER INDIAN OCEAN NETWORK • Sainte Marie (Reunion Island)

RFS Year EOS Year System Cost (USD) Length (km) Initial Capacity (Tbps) Design Capacity (Tbps) Fiber Pairs Wavelengths per Fiber Pair Capacity per Wavelength  (Gbps) Owners System Installer Region

2009 2034 $30,000,000 1,091 0.02 1.28 2 64 10 France Telecom, Orange  Madagascar FCR, Orange Marine Indian Ocean Pan‐East Asian

Page 182 of 293 pages

Profile for Submarine Telelecoms Forum

Submarine Cable Almanac Issue 24  

Since the last issue, we have updated every single system with a substantive change and added 10 new systems.   As part of our continuing co...

Submarine Cable Almanac Issue 24  

Since the last issue, we have updated every single system with a substantive change and added 10 new systems.   As part of our continuing co...