BBG
BAY OF BENGAL GATEWAY System Details
Landing Points
RFS Year
2016
• Penang (Malaysia)
• Mumbai (India)
EOS Year
2041
• Chennai (India)
• Fujairah (United Arab Emirates)
Est. System Cost (USD)
$250,000,000
• Barka (Oman)
• Mt. Lavinia (Sri Lanka)
Length (km)
8,040
Initial Capacity (Tbps)
6.4
Design Capacity (Tbps)
55
Fiber Pairs
3
Capacity per Wavelength (Gbps)
100
Owners
Bay of Bengal Consortium
Region
Indian Ocean Pan-East Asian
View industry news related to this cable system
Page 57