Page 1

StructureTone Introduction


“


“ We wanted to create a space that would leave a lasting impact on visitors and provide staff with a space they wanted to work in. The team have worked hard to achieve this and we believe the refurbishment has completely lifted the building and blown new life into it. “

John Robinson | EMEA Head of Design and Construction | J.P. Morgan


INTRODUCTIONS DEAN MANNING MANAGING DIRECTOR

RICHARD BRANDON MISSION CRITICAL DIRECTOR

MIKE BURKE PRECONSTRUCTION & DESIGN DIRECTOR

TEL: +44 (0)20 7204 7017 EMAIL: dean.manning@ structuretone.co.uk

TEL: +44 (0)20 7204 7048 EMAIL: richard.brandon@ structuretone.co.uk

TEL: +44 (0)20 7204 7030 EMAIL: michael.burke@ structuretone.co.uk


ALAN FORD OPERATIONS DIRECTOR

RUSSELL WHITE COMMERCIAL DIRECTOR

JONATHAN ROSS BUSINESS DEVELOPMENT DIRECTOR

TEL: +44 (0)20 7204 7051 EMAIL: alan.ford@ structuretone.co.uk

TEL: +44 (0)20 7204 7064 EMAIL: russell.white@ structuretone.co.uk

TEL: +44 (0)20 7204 7029 +44 (0)75 9510 6124 EMAIL: jonathan.ross@ structuretone.co.uk


ABOUT US OVERVIEW DUBLIN

LONDON

Warrington House, 1st Fl. Mount Street Crescent Dublin 2, Ireland

77 Gracechurch Street London EC3V 0AS United Kingdom

NEWYORK StructureTone Inc. 770 Broadway, 9th Floor, New York, NY 10003, USA

OTHER OFFICES BOSTON 711 Atlantic Avenue, Boston, MA 02111 USA

PHILADELPHIA 1500 Walnut Street, Suite 1410, Philadelphia, PA 19102 USA

WASHINGTON DC 2300 Clarendon Boulevard, Suite 900, Arlington, VA 22201 USA

DALLAS 3333 Welborn Street, Suite 200 Dallas, TX 75219 USA

SAN ANTONIO

WOODBRIDGE 10 Woodbridge Center, Drive, Woodbridge, NJ 07095 USA

HOUSTON 4550 Post Oak Place Drive, Suite 335 Houston, TX 77027 USA

10100 Reunion Place, Suite 333, San Antonio, TX 78216 USA


MANAGEMENT STRUCTURE STRUCTURETONE ORGANISATION

STRUCTURETONE International Limited London

Dean Manning Managing Director

MISSION CRITICAL

UK OPERATIONS

IRELAND OPERATIONS

Richard Brandon

Alan Ford

James Reidy

STRUCTURE TONE ORGANISATION Structure Tone is a Global Organisation, with offices across the United States, United Kingdom and Ireland.

With a global turnover of over $4 billion, we consistently look after our clients to the highest standard across any office.

StructureTone employ 1,400 people worldwide and work across multiple sectors offering full construction services.


ABOUT US FORWARD INTRODUCTION STRUCTURETONE IS ONE OF THE UK’S LEADING CONSTRUCTION COMPANIES, WITH VAST EXPERIENCE IN THE COMMERCIAL OFFICE FITOUT, REFURBISHMENT AND DATA CENTRE SECTORS. We have a long impressive history of delivering high quality work and included in this brochure are examples of some of our recent projects. To consistently achieve the demands of Quality, Time and Budget, it is a requirement that we understand our clients market and therefore how they work. We have made it our business to understand these as part of a vision not only to meet client expectations, but also to exceed them.


CAPABILITIES

CONSTRUCTION MANAGEMENT

COST MANAGEMENT

BIM & VIRTUAL CONSTRUCTION

DESIGN MANAGEMENT

HEALTH SAFETY MANAGEMENT

ENVIRONMENTAL MANAGEMENT

RISK MANAGEMENT

SUPPLY CHAIN MANAGEMENT


OUR FINANCIALS FINANCIAL STRENGTH Worldwide StructureTone now employs in excess of 1400 construction professionals and has put in place projects worth over $4bn annually. Our investment in the European marketplace began over 28 years ago and has the financial strength and commitment to support projects of any size. Since incorporation we have: • Maintained cash reserves with no external borrowing • Maintained a comprehensive local insurance programme We have a 2A1 rating with Dunn & Brad Street and maintain average cash of £2m.


INTRODUCTION TO BIM VC BIM & VIRTUAL CONSTRUCTION Throughout 2015, we have been developing our BIMVC programme in-house, across all disciplines and have successfully completed 3 projects utilising Autodesk Revit, 3ds Max and Navisworks software with full virtual and augmented reality tools. In 2016 it is our goal to implement Level 2 BIM specifics and Virtual Construction on all projects. Unlike other contractors we will continue to develop this in-house to offer our clients a market leading service.


COLLABORATION

PERFORMANCE

VISUALISATION

DELIVERY


INTRODUCTION TO BIM VC

CLASH DETECTION SERVICES Clash Detection is carried out as standard on all projects utilising 3D modelling, regardless of the projects BIM Level requirement. We will facilitate the Clash Detection sessions and resolve any issues early, resulting in a clash free design, reducing unforeseen costs and wastage.


VIRTUAL CONSTRUCTION Helping clients to visualise the construction process, highlight junction and interface issues and demonstrate StructureTone’s understanding. Virtual Construction is StructrureTone’s in-house CGI project visualisation team. They utilise the following skills on every project; Using Photo realistic images, Diagrammatical presentations, Full construction animations, immersive Full 360 Images/animations, Augmented and Virtual Reality.


MAINTAINING QUALITY TOTAL QUALITY Structure -Tone is committed to the philosophy and application of Total Quality in all of our activities to achieve business excellence. These principles are adopted for managing an organisation in a way which enables it to meet stakeholder needs and expectations efficiently and effectively, without compromising ethical values. In an effort to reduce costs, some organisations have forgotten that it is the quality of the complete services delivered that counts. Providing a low cost services whist ignoring quality management will not lead to satisfied customers. At StructureTone we deliver a ‘business excellence’ culture in our projects by the application of handson management by high calibre technically qualified people and the implementation of a Project Management strategy. Client interviews have shown us to have an industry leading 86% satisfaction.


CLIENT SATISFACTION

100%

86% 75%

EXCELLENT

50%

GOOD

25%

POOR

O V

ER

A LL

ER O V D

N A H

D

IS

RU

AV

PT

IO

U

IO N

R

E M TI H

IV EL D

BE

Y

ER

ED

BA CK

DISRUPTION PREVENTION

90% %

80 94%%

80

TY LI

ST A SU

FE

A BI IN

SA &

EA H

QUALITY OF SERVICE

FE

LU VA LT H

M CO

%

80

86%

TY

E

L

M

D

ER

ES

CI

IG

A

N

E IC

SE RV

PR O

D

U

CT

0%

HEALTH & SAFETY / SUSTAINABILITY


HEALTH AND SAFETY At StructureTone, we take health and safety very seriously and work to the highest standards at all times. CREDENTIALS • 1 Reportable accident in 3 years • 3million Man Hours without incident • 7 Consecutive RoSPA Gold Awards • 2015 RoSPA Gold Medal We strive for improvements in our health and safety standards and take only effective measures by conducting monthly reviews which is completed by the senior management team. StructureTone’s Health & Safety Management System runs in line with ISO 18001 accreditation which is externally audited by CHAS We strive for improvements in our health and safety standards and take effective measures, which add value in sustaining these improvements.


ENVIRONMENTAL SUSTAINABILITY IN OUR OFFICES

ON OUR SITES

CARBON NEUTRAL

RECYCLING

Our operational CO2 is offset through the Carbon Neutral company

2016 target of 95% (audited)

PAPER RECYCLING

BREEAM Proactively adopt (with Client support)

Twice weekly pick-up by London Recycling

2 BREEAM ‘Excellent’ Projects completed in 2015

PRINTER TONER CARTRIDGES

LEED

All recycled after use

First UK contractor to receive LEED Platinum

FSC Accredited or recycled paper

SKA 2 SKA Gold projects 2013 - 2015

No other paper used in the office

WASTE RECYCLING Our contractor, City Cleaning have achieved Safe Contractor certification

LOWER ENERGY Where possible, low energy lighting has been installed

PCs Energy saving features are enforced on every computer

IT Virtualization to reduce number of servers used

CARBON OFFSET Proactively promote (with Client support)

CONSIDERATE CONTRACTOR INITIATIVE Proactively promote (with Client support)

CARBON FOOTPRINT REDUCTION eg. Consolidation centre to reduce haulage related CO2 emissions

MATERIAL SELECTION Promote building product/material evaluation to actively reduce CO2 footprint and recycle/reuse Green Travel Plans


ALZHEIMER’S SOCIETY

AMAZON

ADOBE SOFTWARE SYSTEMS BACHEFINANCIAL

ABERCROMBIE & FITCH

ANDAZ HOTEL

BACS

CABLE & WIRELESS COLT

CANCER RESEARCH UK

DIGITAL ISLAND

DDB

AMRO

BNP PARIBAS

BPP HOLDINGS CITY UNIVERSITY

DENTON WILDE SAPTE DLA PIPER

DONOVAN DATA SYSTEMS

ERNST & YOUNG

F&C PROPERTY ASSET MANAGEMENT

FIDELITY CROSSING HRO UK LTD

GALILEO CONNECT HARRODS

HAVAS

HSBC BANK PLC

JP MORGAN CHASE

GEFICA INDUSTRIES AG HBOS PLC

80%

REPEAT BUSINESS CLIENTS

OUR CLIENTS

EDELMAN

EDEXCEL FACEBOOK

GLOBAL CENTRE

GLOBAL

HEIDRICK & STRUGGLES

INFLOW TECHNOLOGIES

KBC FINANCIAL

DEPARTMENT DLJ/PERSHING

DONALDSON LUFKIN & JENRETTE EXODUS

PRODUCTS UK

AT&T

BANK OF ENGLAND

CISCO SYSTEMS

DIGITAL REALTY

ABOVENET

ARCADIAGROUP

BANK OF CHINA

BLOOMBERG

CRAVATH SWAINE & MOORE

OF HEALTH

AON BENFIELD

BAIN CAPITAL

BILL & MELINDA GATES FOUNDATION

ABN

HOWREY

INTERXION

KEMPINSKI HOTEL

ISIS

KENNEDYS

88%

AVERAGE CLIENT SATISFACTION RATING 2015


KNIGHT SECURITIES

LATHAM & WATKINS

LEN HART REAL ESTATE CAPITAL

HOLDINGS

LEVEL 3 COMMUNICATIONS MATTHEW S DONTZIN

MILLENNIUM PARTNERS OGILVY

LAZARD BROTHERS & CO LTD

LITTLE GYM

MCGRAW-HILL

NEW ZEALAND MINISTRY

OLIVER WYMAN

LE MÉRIDIEN HOTEL

RABOBANK INT

RBS SEMPRA COMMODITIES

ANAESTHETISTS

ROYAL COURTS OF JUSTICE

S I D LE Y AU S T I N

S E LL A R

METLIFE

NOMURA

PARLIAMENTARY ESTATES

PERELLA WEINBERG

REGUS

OMNICOM

ROYAL COLLEGE OF

SCOTIABANK

SCOT TISH WIDOWS

S I M P SO N T H AC H E R & B A R T LE T T

SOC I E T E G E N E R A LE

STARWOOD CAPITAL

T.ROWE PRICE

THE ROYAL COLLEGE OF GENERAL PRACTITIONERS

STATE STREET BANK

TISHMAN SPEYER

UNIVERSITY OF LONDON

MFS

NORWICH UNION

ST GEORGE

THOMSON REUTERS

MACQUARIE

VERNE GLOBAL

WORKPLACE MANAGEMENT LTD

84%

SUMITOMO CORPORATION

TRAFELE DELT FUNDS WEIL GOTSHAL

WILLIS

THOMASWEISEL TRIP ADVISOR WOOLWORTH

XL SERVICES

OF PROJECTS DELIVERED IN LIVE ENVIRONMENTS

0

REPORTABLE ACCIDENTS SINCE 2015


OUR EXPERIENCE


Bird & Bird

12 New Fetter Lane, London EC4A 1AG Value / Size:

ÂŁ21m / 141,662 sq ft

Form of Contract: JCT 2005 Design & Build Procurement Route: Two Stage Description: The project comprises the internal fitting out of the entire building other than Landlord areas. The ground floor reception area, first floor, eleventh and twelfth floors will be fitted out from shell to form Client and meeting areas (including a catering facility on eleventh), with the second to tenth being working floors fitted out from Developer Cat A standard. IT/AV and furniture will be procured direct.

CLIENT TEAM Project Manager:

Wheeler Group Consultancy Ltd.

Architect:

MCM Architecture

Cost Consultant:

Wheeler Group Consultancy Ltd.

M&E Consultant:

Chapman BDSP


OMERS

Level 28/29 Leadenhall Tower, 122 Leadenhall St, London

Value / Size:

ÂŁ3.8m / 25,000 sq ft

Form of Contract:

JCT Management Building Contract

Contract Period:

19 weeks

Description: CAT A and CAT B Fit Out of Level 28 and Level 29 to the Leadenhall Building, also known as The Cheesgrater. The work comprises the build out of CAT A and CAT B office space to a medium to high end level of specification. This includes the installation of a new feature interconnecting stair, fitting interior finishes, services, IT and AV to reception areas, conference rooms, offices, open areas, comms rooms, tea points and breakout areas etc. and the installation of furniture. Bespoke feature ceilings. STO, Bronze, SAS all independent.

SUSTAINABILITY CREDENTIALS BREEAM:

Excellent

CLIENT TEAM Project Manager:

Gardiner & Theobald

Architect:

HLW International

Cost Consultant:

Gardiner & Theobald

M&E Consultant:

ChapmanBDSP


Ogilvy & Mather

Sea Containers house, 20 Upper Ground London, SE1 9PD Value / Size:

£24m / 226,000 sq ft

Form of Contract:

JCT Design & Build

Procurement Route: Fixed Price Lump Sum Contract Period:

36 weeks

Description: • F ull fit-out from shell to levels 1, 2 12 and 13 including catering and AV installations. • Full fit-out from Cat A finish to levels 6-11 • New elevated roof terrace to level 14 including lift access from level 13 below and associated structural works • Staircases, balustrades and finishes to large openings on levels 2-13 and associated structural works • Cycle stores and Catering Staff Area to Basement level

• C reation of new river deck at level 13 including realigning existing curtain walling and associated structural works • Minor external works comprising way finding totem and works to external lighting to create “tidal clock”. • Minor works to Ground Floor Reception comprising café kitchen fit-out, power and data to reception desk and new Post Room

SUSTAINABILITY CREDENTIALS BREEAM:

Excellent

CLIENT TEAM Project Manager:

Bollingbrook Ltd

Architect:

BDG / Matheson & Whiteley

Cost Consultant:

Bollingbrook Ltd

M&E Consultant:

ARUP


Grafton Advisors 101 New Cavendish Square, London

Value / Size:

£5.2m / 50,000 sq ft

Form of Contract:

Design & Build

Procurement Route: Lump Sum Fixed Price

Contract Period:

35 weeks

Description: Reinventing the CAT A space to “CAT A PLUS”, where some CAT A features can function as finished feature. With Structure Tone’s expertise, this was achieved by: • Transforming the usually unsightly exposed services with a futuristic, clean aesthetic with chrome finish throughout. • Innovative use of lighting, integrating LED units within the chilled beams and additional flat panel LED fittings fixed directly to the underside of the cable trays to provide the requisite lighting levels and distribution.

• Installation of a new glazed roof light, improving the adjacent work environment as well as the overall appearance. • Bespoke design for WC’s and associated spaces. This is required to appear as individual as the exposed services solution, using extraordinary materials, components and detailing. High quality refurbishment of the existing Reception, consistent with the aesthetic of the reinstated floors. Installation of new showers/ lockers at basement level, improving the office occupants amenity provision.

CLIENT TEAM Project Manager:

Savills

Architect:

Griffiths Design Consulting Limited

Cost Consultant:

Fanshawe LLP

M&E Consultant:

Watkins Payne Partnership


Thomson Reuters External Utilities Building

The Dock, East india Quay, Poplar E14 Value: £19m Form of Contract:

JCT without quantities

Procurement Route: Fixed Price Lump Sum Contract Period:

94 weeks

Description: • This project comprises the construction of a new five storey External Utilities Building (EUB) to house the installation of a new UKPN 132kV substation and 11kV generator and mains distribution system to provide Thomson Reuters with additional system capacity at their existing DTC facility in Poplar, London. Four HV generator sets provide the initial extra back up capacity. • The new structure has a footprint of 22m wide and 60m long and is situated over an existing historical dry dock. The structure is supported on a series of over 150 piles which are positioned in order to ensure the walls of the dock are preserved, as this forms part of the English Heritage planning conditions. • The west-bound tunnel of Crossrail is located under the north end of the building at a depth of 30m below the current ground level. We have developed a piling design to carry the required loads through the sub-strata to a maximum depth of 23m, ensuring we are 1m away from the exclusion zone, stipulated by Crossrail.

CLIENT TEAM Project Manager:

Faithful + Gould

Architect:

ARC MC

Cost Consultant:

Faithful + Gould

M&E Consultant:

Hurley Palmer Flatt


OMNICOM

Bankside, 2&3, Southwark Street, London, SE1 0SW

Value / Size:

ÂŁ6.3m / 350,000 sq ft

Form of Contract:

JCT Management Building Contract

Procurement Route: Two stage Contract Period:

16 weeks

Description: CAT B fit-out, installing Travetine reception walls and reception desks to both buildings, constructing and doors, new carpets, signage, decorations throughout 18 floors and new cafeteria 21 new conference suites including Credenzas construction of audio/ studio spaces 31 number tea points and one umber pantry, M&E upgrade, demountable

SUSTAINABILITY CREDENTIALS LEED:

Gold

CLIENT TEAM Project Manager:

GVA second London Wall

Architect:

Gensler

Cost Consultant:

Bigham Anderson Partnership

M&E Consultant:

Troup Bywaters & Anders


Amazon EU Fashion Studio 24-34 Pearson Street, London, E2 8JD

Value / Size:

£4.4m / 40,000 sq ft

Form of Contract:

JCT Design & Build

Procurement Route: Fixed Price Lump Sum Contract Period:

23 weeks

Description: Amazon’s 46,000sf photography studio is situated on Geffrye Street under the arches of the East London train line near Hoxton railway station. The building itself was a former glass factory and a steam train repair yard that date back more than 100 years. Structure Tone commenced with the complete refurbishment of the property in December 2014 that included the following: the installation of 22 photography bays, video editing facilities, a fashion library, an office space, a steel-framed internal mezzanine structure, below ground utilities and the largest cyclorama in London — all within a 24-week programme. Larger than Amazon’s equivalent facility in Brooklyn, New York, it is currently the biggest photography studio in Europe.

SUSTAINABILITY CREDENTIALS BREEAM:

Very good

CLIENT TEAM Project Manager:

Cushman & Wakefield LLP

Architect:

IA (Interior Architects)

Cost Consultant:

Bond Davidson

M&E Consultant:

YES Engineering


McGraw Hill 20 Canada Square, Canary Wharf, E1

Value / Size:

£2.85m / 42,000 sq ft

Form of Contract:

JCT Management Building Contract

Contract Period:

12 weeks

Description: Full fit out to Cat B from a dormant Cat A. Specialist ceilings, specialist lighting (LED) cellular offices and meeting rooms. Large video conference meeting rooms/copy/water hubs and collaborative multi-function coffee hub area with full AV presentation

SUSTAINABILITY CREDENTIALS BREEAM:

Excellent

CLIENT TEAM Project Manager:

CBRE

Architect:

Pringle Brandon Perkins + Will

Cost Consultant:

CBRE

M&E Consultant:

SPIE


JP Morgan Chase 60 Queen Victoria Embankment, London EC4

Value / Size:

£74m / 450,000 sq ft

Form of Contract:

JCT Management Building Contract

Procurement Route: Two stage Contract Period:

86 weeks

Description: • Refurbished lobby and entrance areas on John Carpenter Street • Office accommodation to levels G1, 2, 3, 3M, 4, 5 and 6 (part) including provision of new airconditioning installations • Works to roof to support Dining Suite on 6th floor • Client Dining Suite on 6th floor • Construct a feature retractable glazed corner to L6 southwest reception area • Construct new atrium and accommodation stair case from level 4 to 6

• Refurbishment to existing toilets supporting office areas • Refurbishment to restaurant facility on level B1 • Multi-function and training suite to level H1 (Old School Building) • Refurbishment of MEP infrastructure elements to offer greater resilience of the critical building services • Refurbishment of 5 passenger lift finishes.

SUSTAINABILITY CREDENTIALS BREEAM:

Very Good

CLIENT TEAM Project Manager:

GVA Second London Wall

Architect:

Gensler / TP Bennett

Cost Consultant:

Bruce Shaw

M&E Consultant:

ARUP


The Shard

32 St Thomas Street, London SE1 9SG Value / Size:

£18m / 320,000 sq ft

Form of Contract:

JCT Management Contract

Procurement Route: Fixed Price Lump Sum Contract Period:

32 weeks

Description: • Shell and core to CAT A fit out; L8 – 13 & 18 – 21 • This Taking ten floors of existing shell and core to CAT A in the Shard. • Works include complete MEPs fit-out, new ceilings and raised access flooring.

• Fit out of the passenger lift lobbies included polished plaster panels and architectural feature lighting.

SUSTAINABILITY CREDENTIALS BREEAM:

Excellent

CLIENT TEAM Project Manager:

REM (UK) Ltd

Architect:

Pringle Richards Sharret Architects

Cost Consultant:

Gardiner & Theobald LLP

M&E Consultant:

Troup Bywaters & Anders


Edelman

Howick Place, Victoria, London Value / Size:

£1.5m / 20,000 sq ft

Form of Contract:

JCT Design & Build

Procurement Route: Single Stage Lump Sum Contract Period:

12 weeks

Description: • • • •

Full CAT B fit out of new Office for Edelman Works included New Catering Facility and dinning area STL Carried out all works including AV and Catering works Project was completed on time with 13 Weeks but handed over certain sections early to facilitate clients requirements.

CLIENT TEAM Project Manager:

CBRE

Architect:

Gensler

Cost Consultant:

CBRE

M&E Consultant:

Elementa


CITCO

7 Albemarle Street, London W1S 4HQ Value / Size:

£5.1m / 5,500 sq ft

Form of Contract:

JCT Management Form

Procurement Route: Two stage Contract Period:

37 weeks

Description: • Restoration of heritage plasterwork cornices in the ground floor areas to bring back original Georgian detailing • Upgrade of heritage finishes • Repair and restoration of existing stone stair features • Removal of modern partitions to reinstate historical features • Rearrangement of modern openings to more appropriate proportions

• Removal of modern roof extension and replacement for more appropriate connections with the existing building, Redecoration of rooms to appropriate heritage specification • Upgrade of existing toilet provisions • Upgrade of service to business requirements

SUSTAINABILITY CREDENTIALS LEED:

Gold

CLIENT TEAM Project Manager:

CITCO

Architect:

Farrells

Cost Consultant:

CITCO

M&E Consultant:

Leonard Engineering Design Assoc


Simpson Thacher & Bartlett Level 19,21,22 - 1 Ropemaker St, London, EC2Y 9HU Value / Size:

£2.5m / 35,000 sq ft

Form of Contract:

JCT Management Form

Procurement Route: Two stage Description: • • • • •

CAT B fit out from CAT A New Reception Meeting Rooms Lawyer / Partner Offices Completed out of hours within a fully occupied

CLIENT TEAM Project Manager:

Gensler

Architect:

Gensler

Cost Consultant:

Bigham & Associates Inc

M&E Consultant:

Hurley Palmer Flatt


City University Cass Business School, 200 Aldersgate Street Value / Size:

£2m / 26,803 sq ft

Form of Contract:

JCT 2009 Design & Build

Procurement Route: Two stage Contract Period:

16 weeks

Description: CAT A to CAT B Fit-Out. The project comprised works to fit out part of the second floor office space to provide: Teaching Rooms, Harvard Style Lecture Theatre, Syndicate Rooms, Boardroom, Kitchen and Servery, Kitchenette / Tea Point, Offices and Reception / Social Spaces.

SUSTAINABILITY CREDENTIALS SKA:

Gold rating

CLIENT TEAM Project Manager:

City University

Architect:

NBBJ

Cost Consultant:

Woodey Coles LLP

M&E Consultant:

BDP


Latham & Watkins Levels 7,8,13 & 21 – 99 Bishopsgate, London

Value / Size:

£10m / 60,781 sq ft

Form of Contract:

Bespoke Client Contract

Procurement Route: Two stage Contract Period:

60 weeks

Description: Levels Grd – Shell & Core to CAT B Reception Levels 7 & 8 – Conference space and fee earner office Levels 13 & 21 – CAT A to CAT B office fit out to form fee earner space

SUSTAINABILITY CREDENTIALS BREEAM:

Very Good

CLIENT TEAM Project Manager:

Gensler

Architect:

Gensler

Cost Consultant:

Bigham Anderson Partnership

M&E Consultant:

Cundall


T.Rowe Price

60 Queen Victoria Street, Bank, London EC4N

Value / Size:

£11.3m / 124,310,781 sq ft

Form of Contract:

JCT Management Building Contract

Procurement Route: Two-Stage Lump Sum Contract Period:

60 weeks

Description: Phase 1 - NDC Works • Construction of an on floor “Network Distribution Centre” including UPS modules, Remote Power Panels, and In Row Cooling units • Installation of containerised “free cooling” chiller plant (three independent chiller modules at N+1) at roof level serving a “dual path” chilled water distribution system • Installation of a new Generator Control Panel including interlinking sub mains cabling Phase 2 to 6 – Fit-out levels 4 to 8 • Reconfiguration of existing meeting rooms • New Conference and meeting rooms • Creation of open space and flexible working • New staircase • Reception refurbishment • Dining, cafe and tea point facilities • New Comms room to replace existing on all floors • Additional toilets

CLIENT TEAM Project Manager:

JLL

Architect:

Gensler

Cost Consultant:

FS Partnership

M&E Consultant:

Cundall


Fidelity

5th Floor, St Martin Le Grand, London

Value / Size:

£5.2m / 40,000 sq ft

Form of Contract:

JCT Management Building Contract

Procurement Route: Two stage Contract Period:

22 weeks

Description: • Bespoke Reception

• 50 trading positions

• 35 Offices /

• 19 Client Meeting Rooms

• 2 Comms Rooms

• Open Plan Office Area

• 1 Pantry

• 3 Showers

• 1 Tea point

• Copy point

SUSTAINABILITY CREDENTIALS BREEAM:

Excellent

CLIENT TEAM Project Manager:

JLL

Architect:

Wheelerkanik

Cost Consultant:

GB Fitzsimon

M&E Consultant:

MacDonald Partnership


Bloomberg Confidential Location Value / Size:

£5.5m / 75,000 sq ft

Procurement Route: JCT 2005 with CDP Form of Contract:

Two Stage

Contract Period:

20 weeks

Description: CAT B Fit-out of Floors 4 & 5 ready for occupation. Partial Fit-out of the 3rd floor with conference rooms. Construction of a staircase interconnecting all three levels. • Key Project Features • New main staircase to epitomise client working environment • Reception area with custom design and built fish tank • Break out area | pantry for meeting and greeting customer and social

interaction • Training facilities and media walls to promote client brand • Working environment to be open whilst enhancing client working ethos and aesthetics

SUSTAINABILITY CREDENTIALS LEED:

Platinum

CLIENT TEAM Project Manager:

Bloomberg LLP

Architect:

M Moser Associates

Cost Consultant:

Stace

M&E Consultant:

Hurley Palmer Flatt


LIVE PROJECT

PROJECT TEAM

Which?

Alan Ford Operations Director

2 Marylebone Road, London NW1 4DW Value / Size:

ยฃ18m / 64,401 sq ft

Form of Contract: JCT Design & Build Procurement Route: Two Stage Contract Period:

Steve Gibb Snr. Project Manager

42 weeks

Completion: 14/11/2016 Description: The works involve the refurbishment of existing occupied office building including one additional storey with a bespoke feature roof and a new faรงade to one elevation. Internally, the works involve the removal of an existing lift core, 3nr new lifts and the fitting-out to Category A & B office standard.

Mark Kirwan Commercial Manager

Andy Page Technical Services Manager

Jamie Grieg Design Manager

CLIENT TEAM Project Manager:

Arcadis (UK)

Architect:

KPF / HLW

Cost Consultant:

CORE 5

M&E Consultant:

Thomton Reynolds


PROJECT CHALLENGES The Which? Project is located at 2 Marylebone Road, London. A two-stage fixed price lump sum tender based over five floors and a roof terrace, totalling 64,500 square feet. The key element and greatest design challenge of the project is the addition of a fourth storey encapsulated by a zinc feature roof. During the pre-construction & early construction period Structure Tone have been working closely with the specialist Subcontractor & Design Team to develop the method of construction to improve the buildability and cost-certainty of the roof design. There is also a new faรงade extension to one elevation of the building containing a new lift shaft with three glazed passenger lifts serving Ground to Level 4. The new faรงade is clad with structural glazing, aluminium rainscreen and timber cladding.

The interior consists primarily of open plan offices with exposed soffits and services, along with brand new washrooms and showers. A commercial kitchen and servery is being installed on Level 4 alongside an auditorium. The auditorium is divided from the servery by a bespoke full height acoustic pivot wall which is another key CDP challenge on the project. Other works to the building include slab penetrations for new Mechanical & Electrical risers, a feature staircase from Level 3 to 4, roof terrace including green roof and a new goods lift serving Basement to Ground Floor.


NEWYORK

PHILADELPHIA

LONDON

770 Broadway New York, NY 10003 USA T: +1 (212) 481.6100

1500 Walnut Street, Suite 1410, Philadelphia, PA 19102 USA T: +1 (215) 563.7875

77 Gracechurch Street London, EC3V 0ST UK

BOSTON

SAN ANTONIO

DUBLIN

711 Atlantic Avenue Boston, MA 02111 USA T: +1 (617) 348.2800

10100 Reunion Place, Suite 333, San Antonio, TX 78216 USA T: +1 (210) 541.0651

Warrington House, First Floor, Mount Street Crescent, Dublin 2, Ireland

DALLAS

WASHINGTON DC

3333 Welborn Street, Suite 200 Dallas, TX 75219 USA T: +1 (214) 520.3353

2300 Clarendon Boulevard, Suite 900, Arlington, VA 22201 USA T: +1 (703) 526.1240

HOUSTON

WOODBRIDGE

4550 Post Oak Place Drive, Suite 335 Houston, TX 77027 USA T: +1 (713) 650.6420

10 Woodbridge Center Drive, Woodbridge, NJ 07095 USA T: +1 (732) 362.3500

T: +44 (0)20.7204.7000

T: +353.1.775.1800


StructureTone stand out for their reliability. Ultimately this project was a massive integration of 3 office locations into one. It was smooth and made to look very easy. Nicolas E. Lance | Vice President | MetLife International


For all enquiries please contact: Jonathan Ross

Business Development Director t: (0) 20 7204 7000 m: (0) 75 9510 6124 e: jonathan.ross@structuretone.co.uk

Structure Tone International Introduction  

Structure Tone Internationals has a highly accomplished specialist team of technology and construction professionals. Our highly expert team...