1 minute read

TRANSPORT

Public Transport

T18 Facilitate the delivery of public transport routes

Advertisement

In the next 5 years

LUPT # km of route added

Update: The Liffey Valley to City Centre Core Bus corridor planning application has been submitted to An Bord Pleanála. The Proposed Scheme has an overall length of approximately 9.2km. It will commence at the Fonthill Road where it will tie into the new bus interchange facility on the northern boundary of the Liffey Valley Shopping Centre. The Proposed Scheme will continue along the Fonthill road to the south of Liffey Valley Shopping Centre in a southerly direction towards Coldcut Road. From here it will travel along the Ballyfermot road, Sarsfield Road and on to the City Centre. The Liffey Valley Bus Interchange will be completed in February 2023.

Actions Awaiting Budget

T19 Cycle training programme for 6th Class students / pedal power labs

In the next 5 years LUPT, Road Safety Officer

# of students participating

Update: Cycle Right Training was provided at 12 schools across the county in 2022, 662 students participated.

• St. Maelruan’s, Old Bawn Tallaght (100)

• Lucan East ET, Lucan (53)

• Lucan East ETS, Lucan (48)

• St. Annes N.s. Fettercairn (48)

• St. Roses, Tallaght (19)

• Divine Word, Marley Grange (75)

• St. Andrews, Lucan (55)

• St. Dominics, Tallaght (45)

• Queen of the Apostles, Clonburris (66)

• Ballycragh (76)

• St. Mary’s BNS, Rathfarnham (52)

• Gaelscoil, Knocklyon (26)

Update: The TII installed two new Variable Message Signs on the N7 either side of Newland’s Cross in 2022. Messaging is controlled by TII’s Motorway Traffic Control Centre. Messages displayed will include weather alerts and to support An Garda Siochana road safety campaigns.

Ongoing

This article is from: