a product message image
{' '} {' '}
Limited time offer
SAVE % on your upgrade

Page 18

January 2017

southbristolvoice

18

n NEWS: BEDMINSTER GREEN

Now not one energy centre but two are Notes:

© Origin3 Studio Ltd

THIS DRAWING IS NOT TO BE SCALED. EXCEPT F PURPOSES OF PLANNING APPLICATIONS AND FOR PLANS WHERE THE SCALE BAR MUST BE USED. A REFER TO FIGURED DIMENSIONS.

Now there are three developers coming up with plans for Bedminster Green

CONTRACTORS, SUBCONTRACTORS AND SUPPLI MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS.

close to each other is an open question. Meanwhile a new planning application has been fielded by a third company, Acerbic, based in Clifton. Acerbic owns a narrow strip of land at the bottom of the railway embankment between Sheene Road and where the Malago river cuts through the embankment. This strip used to be owned by British Rail and was used for a gantry crane. It was never part of the Pring & St Hill factory site, which is now Plot 1. Acerbic wants to place 360 solar panels along the narrow strip, in three rows up to 8m high, to generate electricity. Whether this would affect the viability of Mr O’Brien’s plan for Plot 1 is unclear. Mr O’Brien told the Voice that Urbis Development a planning application would be submitted in December (after the Bedminster Green Voice went to press) for 217 flats in buildings ranging from 6-7 Framework Area Plan

THIS DRAWING IS TO BE READ IN CONJUNCTION W STRUCTURAL, MECHANICAL AND ELECTRICAL EN DRAWINGS AND ALL DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT.

PLOT 003 Plot 003 0.60 hectare 1.48 acres

Plot SCP 0.98 hectare 2.42 acres

Plot 004b 0.48 hectare 1.19 acres

Right: Plan showing the plots which make up Bedminster Green, courtesy Urbis. The solar site is shown by the yellow line – not to scale. centre – in the same position originally chosen by Urbis. There is nothing to stop two developers putting in planning

Plot 002 0.03 hectare 0.09 acres Plot 004a 0.44 hectare 1.10 acres

2 00

THE PROPOSALS for the redevelopment of Bedminster Green – the large area between East Street and Windmill Hill – has been thrown into confusion by the emergence of several potentially competing plans. First it emerged that Urbis, the company charged by the city council with producing a masterplan for the area, has failed to reach a deal with developer Paul O’Brien, who has bought Plot 1, likely to be the first site to be constructed. This means Urbis is unable to site its proposed district energy centre where it wanted – at the western end of Plot 1, on Malago Road next to the railway line. Instead, Urbis is looking to move the energy centre to another plot – so far undisclosed – on Bedminster Green. Meanwhile Paul O’Brien told the Voice that one of his companies, Rollo Homes, is looking to develop its own energy

Plot 005a 0.38 hectare 0.95 acres

PLOT 004 PLOT 005 Plot 005b 0.32 hectare 0.78 acres

Plot 005c 0.09 hectare 0.22 acres

Plot 001b 0.40 hectare 0.99 acres

PLOT 001 Plot 001a 0.18 hectare 0.46 acres

Proposed solar site

F E D C B A

Updated Framework Area Plan Phase plot naming update Phase plot naming updated land staus added plot naming updated plot 4 added

dr dr dr dr dr dr

Rev

Revision Details

Dr

8 - 10 Whiteladies Road Bristol BS8 1PD

www.origin3studio.co.uk mail@origin3studio.co.uk

applications for energy centres on different sites. But whether planners would allow two similar developments

Client's Name

Job Title

Drawing Title

Scale

1 : 1250 @ A1 metres

20

Drawn

WEA – the friendly place to learn in your local community!

TF Job No

3095

60

80

100

Checked

-

21.

Drawing No

SK(00)106

Status

Stage 1 - Preparation & B

C:\Users\davidrhodes.ORIGIN3STUDIO\Documents\My Local BIM\3095-O3S-XX-XX-AR-M3-BedminsterGreenMasterplan_CENTRAL_david@origin3stud

Venue: Windmill Hill City Farm These courses are FREE for those on a means tested benefit • Exploring Colour and Paint 9 weeks Wednesday 10am-12.30pm starting 18.01.17 • Yoga for Everyone 9 weeks Friday 1.15-2.45pm starting 20.01.17 • Silver & Copper Jewellery Making Beginners 9 weeks Thursday 10-12.30 starting 12.01.17 • Silver & Copper Jewellery Making Improvers 9 weeks Thursday 1-3.30pm starting 12.01.17 • Stained Glass for Beginners 10 weeks Friday 1.00-3.15pm starting 13.01.17 • Stained Glass Intermediate 15 weeks Fri 9.30am-12.30pm starting 24.02.17 • Reading and Writing Poetry 7 weeks Thurs 10-12 pm starting 19.01.17 • Pattern Making and Sewing 7 weeks Tues 10am-12.00pm starting 17.01.17

£83 £50 £83 £83 £83 £165 £52 £52

Students will be invited to contribute on a voluntary basis towards the cost of materials where appropriate.

Other WEA courses at various locations throughout Bristol:

Barton Hill Settlement ESOL and ICT Various Locations Calligraphy (Sea Mills), Creative Writing, Introduction to Science, Introduction to Volunteering, Maths

40

In partnership with Bristol Museums Exploring the Museum through Drawing, Creative Writing at M Shed and Keeping an Illustrated Journal

For more information or a brochure please call 0117 916 6500 To enrol please ring 0845 458 2758 or online at www.wea.org.uk/courses To advertise, contact sales@southbristolvoice.co.uk or Ruth on 07590 527664

Profile for South Bristol Voice

South Bristol Voice January 2017  

South Bristol Voice January 2017  

Advertisement