Page 1

DWELLING ACCESS: Track following the Charles Plimmer Park along the Southern Walkway on Mount VIctoria A track will be made to lead to the ramp of the dwelling with either entrance into the main living space or the front door on the East side.

N

LOCATION PLAN: Charles Plimmer Park. Main Access from Palliser Road and a road track up to the site. Some of the existing trees to be removed on the West side for the dwelling and enabling the kitchen to get the city views. Existing trees on the South side will remain the same to offer privacy from the houses on Stafford St. Image not to scale.

Location Plan

Site Plan 1:500

Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing: Site and Location Plan Drawn Scale: 1:500

Date: 20/10/17 as shown on A3

Project No. 1

Sheet No:

1.1


2.0 2

1 3.0

N

16680

2460

W004

W007/008

ED003

ED002

W005/006

ED002

LAUNDRY

W003

ED002

Timber Decking

ED002

9440

W

00 9

50 34

BEDROOM 2

W014

1

2.0

W

W001/002

EN

11540

BEDROOM 1 6430

H TC KI

LIVING

5020

D001

0 01 D002

W014

D002 ED001

00 58

W014

HALLWAY D003

4.0

W013/14

ED003

BATHROOM

UTILITIES

2120

2120

W011

2

D002

7210 W012

6690 4520

17330

Floor Plan 1:100

Project: Russell Residence Charles Plimmer Dog Excerise Park

Date: 20/10/17

Drawing: Floor Plan Drawn Scale: 1:100

as shown on A3

Project No. 1

Sheet No:

1.2


ne

4270

6 deg roof pla

2450

W001

W003

Timber Decking

W002 ED001

East Elevation 1:100

CLADDING MATERIALS: Shadow Clad Natural Groove. Finished with timbakote timber pro stain

2450

4270

Tarc Tray Double Lock Standing Seam Cladding

W007

W005 W004

W009 W008 W006 ED002

ED002

ED002

ED003

North Elevation 1:100

Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing: East and North Elevations Drawn Scale: 1:100

Date: 20/10/17 as shown on A3

Project No. 1

Sheet No:

2.0


4 4.0 Refer to Window schedule for skylight W014 Vertical Tray Colorsteel roofing placed over building paper, purlins and rafters

R1.9 Insulation on internal walls

13 mm gib lining attached onto rondo battens

R2.9 Roof Insulation

10mm gib attached to timber framing on all interior walls

Vertical Tray Tarc Tray cladding over 25mm H3.1 cavity battens over Flexible Wall underlay

Vertical Shadowclad Natural Groove

190 Lintel

140mm Lintel W008

LIVING

HALLWAY

ED002

W007

15mm Ecodure Unfinished Oak flooring overlay on 18mm plywood

1 4.0 Joists 140x45mm @ spacing of 553mm Bearers 90x 90mm @ spacing 1560

3

Piles 125 x 125mm 600mm into the ground or until solid ground

4.0

Pile Footings 400x 200mm

R1.3 Floor Insulation

Section 1:50

Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing:

Section 1

Drawn Scale:

1:50

Date: 20/10/17 as shown on A3

Project No. 1

Sheet No:

3.0


Trackless 3 Panel Sliding Glass Door

Shadowclad Natural Groove

10mm plasterboard lining

Flexible Wall underlay Door framing

Internal Ecodue Unfinished Oak Flooring Overlay 15mm

Sliding Door Track

Timber Decking

Plywood flooring placed on joists

Shadowclad exterior box corner finishing size 13mmx13mm

Air Seal

External Corner 1:5 Joists 145 x 45mm

Flashing Tape Boundary Joist

Colour Tray Colour Steel roofing in selected colour

Living Room Deck Detail 1:5

Shadow clad

10mm Gib

Flexible Wall underlay

Roof Rafter

Bottom Plate

Timber cavity Battens TImber Decking 15

Joist

Boundary Joist

50 x 3mm thick EPDM washer

12mm thick by 150mm long H3.2 CCA treated solid timber packer at fixings

Soffit

12mm thick by 150mm long H3.2 CCA treated solid timber packer at fixings

Top plate 90 x 45mm Flashing to include kick out

10mm GIB

Damp Proof Course Cavity Batten

75mm upstand cavity base closure vent strip. Position to give 15mm drip edge to cladding

Shadowclad Flexible Wall Underlay

Treat all Shadowclad cut edges with Holdfast Metalex Clear

Exterior Wall to Roof Connection 1:5

Exterior Deck Connection to Interior 1:5 Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing: Construction Details Drawn Scale: 1:5

Date: 20/10/17 as shown on A3

Project No. 1

Sheet No:

4.0


2460

Diagonal Crosshatch tiles for the dog shower

25mm plywood shelves

Raised area for dog DOG SHOWER

Window per window schedule W003

Plywood dog ramp for dog to walk up to shelf

5040

Door per door schedule ED002

Mercer Questo Stainless steel laundry sink 520 x 420mm

2060

Plywood Shelf attached for dog to stand on

670

Laundry Plan 1:20 Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing: Laundry Joinery Drawings Drawn Scale: 1:20

Date: 20/10/17 as shown on A3

Project No. 1

Sheet No:

5.0


1750

4250

Plywood Walls with a waterproof protective seal

520

520

520

3750

520

adj.

600

adj.

adj.

adj.

All cupbards to be 18mm pure coat melteca with pure coated melteca handless doors

25mm Plywood shelf attached to wall Diagonal Crosshatch tile splash back

ED002

Foreno Slimline Round Wall Mount Shower Head Foreno Pulldown Sink Mixer

adj.

adj.

fix.

fix.

adj.

adj.

fix.

fix.

adj.

Foreno Slide Shower

1080

adj.

850

Mercer Questo Stainless Steel Laundry Sink

50

Pure coat melta 18mm toe kick

DOG SHOWER

600

350

390

390

340

Fisher and Paykel Fabric Smart Front Loader

25mm raise to stop water from the dog Shower

Stainless Steal Seat

Laundry Elevation 1:20 Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing: Laundry Joinery Drawing Drawn Scale: 1.20

Date: 20/10/17 as shown on A3

Project No. 1

Sheet No:

5.1


EXTERNALS DOORS

INTERIOR DOORS

2450 820

GENERAL NOTES: Read inconjuction with all drawings and specification. All glazing to comply with NZS 4223. All joinery & glazine is to be designed for a VERY HIGH wind zone. FLASHINGS: All flashings to be supplied by window manufacturer. Double Glazing in the windows and doors to help reduce the impact of the noise from the dogs.

820

820

1510 720

960

1070

790

710

ED001

ED002

1970

2110

2450

2110

2100

2450

NOTES: ALUMINIUM JOINERY Aluminium joinery to be double glazed APL 35mm series with powdercoated finish. All door flazing to be safety glass. Door hardware is to be stainless steel.

D001- Laundry Sliding Door

ED003

D002- Sliding Door for bedrooms and bathroom

D003- Utility Cupboard

Door Schedule 1:50

2650

2850

1850 750

W003

1850

620

W004

W005/006

1000

750 300

300

800

1200

750

1850

W001/ W002

1550

750 50

350

460

2250

W009

W007/008

1180

1850 640

NOTES: ALUMINIUM JOINERY All windows will have aluminium joinery that will be double glazed APL 35mm with a powdercoated finish. Window hardware is stainless steel.

750

Installed Blinds

2690

390

1000

1850

NOTES: SKYLIGHT Electric Venting Skyight Pre-installed electric motor, control system and rain sensor. High Performance double glazing.

750

4050

1800

650

750

1040

Wireless Control System Radio frequency controller with advanced control options for both skylight and blind operations. Internally mounted rain sensors, exposed to the rain and when the skylight is open, automatically closes the skylight once rain is detected. Timer function included.

300

990

2450

750

1250

1050

750

1850

W010

W011

W012

W013/14

1050 W015

Skylights (x3) Velux VSE606 Electronic Opening Skylights

Window Schedule 1:50 Project: Russell Residence Charles Plimmer Dog Excerise Park

Drawing: Door and Window Schedule Drawn Scale:

1:50

as shown on A3

Date: 20/10/17 Project No. 1

Sheet No:

6.0

358 gibbss technical 2017  
358 gibbss technical 2017  
Advertisement