Issuu on Google+

P

O

R

F

O

L

I

O

SOJIN PARK

11 E 32ND STREET 10G, NEW YORK, NY 10016 + 1 717.271.9667 SOJINPARKDESIGN@GMAIL.COM

S

A

M

P

L

E


DEAR SHEEP: THE SLEEP THERAPY CENTER 120 E 42ND STREET, NEW YORK, NY 10017 GROUND FLOOR

3RD FLOOR

2ND FLOOR 1 Entrance 4 Reception 7 Sleeping Areas

2 Information 5 Waiting area 8 Kitchen/Bar

3 Check In/Out 6 Consultation 9 Healthy CafĂŠ

ROOM

WALKABLE AREA

OPEN TO BELOW

7C

CONCEPT MODEL

8

9

7

7B

7A

6

5

2

3

4

1

Designed by Sojin Park

Dear Sheep - The Sleep Therapy Center of New York - is a new state-of-the-art sleeping program that helps you get into a great sleep cycle. Everyday, we sleep. Depending on how well you slept last night, your mood, concentration, productivity, and physical well-being is affected during the daytime. Dear Sheep assists you in unraveling the mysteries of sleep, allowing you to feel refreshed and able to be your most productive self.


+ CONSULTATION

+ SHOWER

SLEEP

ROOM 7C

FAÇADE ROOM 7A

HALLWAY - 3RD FL

LOBBY & RECEPTION

ROOM 7B

Designed by Sojin Park

WALK-IN

+


CHOCOLATE SPA 154 LUDLOW STREET, NEW YORK 10002 OPEN TO BELOW

UP

3F - CHOCOLATE SPA OPEN TO BELOW

UP

2F - CHOCOLATE SPA

1F - CHOCOLATE BAR

SC

E

ULG

IND

B1 - CHOCOLATE FACTORY

T

DAN

UN +AB

OV

ER

+D

ES

TIN

AT

IO

N

Designed by Sojin Park

DI


DN UP


RHYTHM & INTERSTITIAL

MOVEMENT & SHAPE

CONCEPT DRAWING

AMERICAN DANCE FESTIVAL THEATER 23 W 55TH STREET, NEW YORK 10019

2ND FLOOR

Designed by Sojin Park

GROUND FLOOR


Designed by Sojin Park


Designed by Sojin Park

HIGH RISE OFFICE BUILDING REVIT PROGRAM


Lighting Fixture Schedule

F6

F6

F3

F4

F3

4

F1

F1

F1

F4

F4

F4

F2

CP Wall - Interior View 1

F5

F3

F1

F2

CP Wall - 3D View 1

2

1

CP Wall - 3D View 2

Project 2 - High Rise Development

A03

Prepared by: Sojin Park

Curtain Panel Pattern Based Exterior Wall Study

4/09/2014

Instructor:

Pawel Gurdak

F2

F5

F3

1

F1

F1

F1

Light Fixture

Type

Pendant Light - Linear - 1 Lamp: 96" - 277V Pendant Light - Linear - 1 Lamp: 96" - 277V Pendant Light - Linear - 1 Lamp: 96" - 277V Ceiling Light - Flat Round: 60W - 120V Ceiling Light - Flat Round: 60W - 120V Ceiling Light - Flat Round: 60W - 120V Ceiling Light - Flat Round: 60W - 120V Downlight - Spot: 90 Degree Tilt - 277V Downlight - Spot: 90 Degree Tilt - 277V Downlight - Spot: 90 Degree Tilt - 277V Downlight - Spot: 90 Degree Tilt - 277V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Downlight - Recessed Can: 6" Recessed Downlight Downlight - Recessed Can: 6" Recessed Downlight Downlight - Recessed Can: 8" Incandescent 277V Downlight - Recessed Can: 8" Incandescent 277V

F2 F2 F2 F4 F4 F4 F4 F3 F3 F3 F3 F1 F1 F1 F1 F1 F1 F1 F6 F6 F5 F5

Enlarged Waiting Area Reflected Ceiling Plan 3/8" = 1'-0"

Project 2 - High Rise Development

A06

Prepared by: Sojin Park

Enlarged Waiting Area Reflected Ceiling Plan

4/09/2014

Instructor:

Pawel Gurdak

Project 2 - High Rise Development

A10

Prepared by: Sojin Park

3D Renderings

4/09/2014

Instructor:

Project 2 - High Rise Development

A11

Prepared by: Sojin Park

3D Renderings

4/09/2014

Instructor:

Pawel Gurdak

E1

Conference 409

Furniture Schedule Type of Furniture

Reception 401 1 A07

P3

Waiting Area 402 P1

403

P1

Room Schedule - Level 4 Number

Department

402 401 405 403 404 406 407 408 409

Waiting Area Reception Circulation Restroom Utility Offices Reception Storage Conference

332 SF

4

Knoll Counter

3

Knoll_Studio_Frattini_Propeller_Conference_Tables _Rectangular_Segmented_Square_Drum_Base

1

Steelcase Lounge Table

1

Reception

404

Circulation

P2 1 A05

Storage

Offices

Reception

406

407

Utility Waiting Area

Storage 1

Knoll Lounge Chair

Conference

405

Utility

140 SF 261 SF 107 SF 82 SF 69 SF 56 SF 74 SF 214 SF

6

Offices

Circulation

Area E1

Waiting Area Reception Circulation Restroom Utility Offices Reception Storage Conference

1

Knoll_Studio_Associates_Handkerchief_Chair

Level 4 - Room Legend

Restroom

Name

Qty

High Tower Sofa

Level 4 - Room Programming 3/32" = 1'-0"

1

Restroom

408

Enlarged Waiting Area Furniture Plan 3/8" = 1'-0"

Project 2 - High Rise Development

A04

Prepared by: Sojin Park

Room Programming

Project 2 - High Rise Development

A07

4/09/2014

Instructor:

Prepared by: Sojin Park

Enlarged Waiting Area Furniture Plan

4/09/2014

Instructor:

Project 2 - High Rise Development

A09

Prepared by: Sojin Park

Project 2 - High Rise Development

A12

Prepared by: Sojin Park

Blow Up Axonomrtric View

4/09/2014

Instructor:

3D Renderings

4/09/2014

Instructor:

Pawel Gurdak

Pawel Gurdak

Pawel Gurdak

P1

3

A05

4 A05

Interior Elevation

A05

2

2

Interior Elevation 1/2" = 1'-0"

3

Detail Section - Model 1" = 1'-0"

Offices 406

EQ

EQ

D01

P1

Enlarged Office Floor Plan 1 1/2" = 1'-0"

Project 2 - High Rise Development

A05

Prepared by: Sojin Park

Enlarged Office Floor Plan and Case Work Details

4/09/2014

Instructor:

Pawel Gurdak

4

Detail Section - Drafting 1" = 1'-0"

1

Axon 3d View

Pawel Gurdak

Pawel Gurdak

Designed by Sojin Park

EQ

EQ

P1


DISASTER RELIEF AIRCRAFT OF THE RED CROSS BOEING 747-8 INTERCONTINENTAL

FLOOR PLAN

LIGHT DISTRIBUTION DIAGRAM

LIGHT

HOSPITAL

LAB

RECEPTION

FOOD

LAVATORY

SHELTER/ STORAGE

REFLECTED CEILING PLAN

FRONT VIEW

SOLAR PANEL

Designed by Sojin Park

TOP VIEW


[Sojin Park] Work Sample 2014