Page 1

Shunyi Olympic Rowing-Canoeing Park

DIANO Francesca, XIE Yingying, MANDRILE Manuele, GUO Yong ,2008.03.09


Plan conditions analysis – – – –

Post-Games objectives – – – –

Current situation Existing planning Olympic games summary Venue for international competition and professional training base Recreation center and aquatic sports center shift of the using mode of water resource Inducement of local tourism economy

Gaps – Problems of water – Problems of interaction – Problems of scale

Strategies – WATER: avoiding evaporation; water usage senariles; self-sustainability ; serving surrounding area – INTERACTION: spacial structure goes with the structure of the city – SCALE: zoning plan inside the site, different stages of construction

Subjects – – – –

MASTER PLAN TANK: structure, buildings, landscape, water treatment ROWING COURSE: bridges and dams, surfaces, landscape OTHER: land art, pipe, marks and etc.


CONDITIONS


Current situation


Existing planning


Olympic Games


SUMMARY


• • • • •

An opportunity for city development An heritage of the Olympics Keep the value of Olympic Develop the value of the city Make it part of the city and the highlight of Beijing


OBJECTIVES


• VENUE for international competition and professional training base • Recreation CENTER and aquatic sports center • INDUCEMENT of local tourism economy • Shift the using mode of water resource—a BASE


GAPS


Problems of Water, Interaction and Scale • Water Beijing City belongs to the II district of rainfall, but high evaporation and penetration makes it a city short of water.


• Interaction


• Scale

918M

2746M


STRATEGIES


• WATER: – avoiding evaporation; water usage scenarios; selfsustainability ; serving surrounding area

• INTERACTION: – spacial structure goes with the structure of the city – finally be one important spot of the city

• SCALE: – zoning plan inside the site(for seasons) – time stages of construction(timeline)


Water Strategies


Avoiding evaporation • Reduce the area of water surface • Water storage tank and landscape on it • Pipe system to supply water


Water usage scenarios


A

B

C&D


Serving the surrounding


Serving the surrounding


Interaction Strategies


Current situation


Scale Strategies


Zoning plan


Construction stages


Construction stages


Construction stages


Construction stages


Construction stages


SUBJECTS


Master Plan


Tank


Rowing Course


Industry and Activities


THE END Thank you☺☺☺☺

shunyi2  

presentation_2008-03-09

Read more
Read more
Similar to
Popular now
Just for you