TA B L E O F C O N T E N T

1.0 COMPANY PROFILE

4.0 PRELIMINARY STUDIES

1.1 BACKGROUND 1.2 MISSION, VISION & VALUES 1.3 ORGANIZATION CULTURE 1.4 ORGANIZATION CHART 1.5 TEAM MEMBERS

3.1 SITE ANALYSIS 3.1.1 LOCATION PLAN 3.1.2 SITE PLAN 3.1.3 CONTEXTUAL DIAGRAMS 3.1.4 SWOT ANALYSIS 3.1.5 SITE PHOTOS 3.2 PRECEDENT STUDIES 3.2.1 BONDI BEACH CONTAINER HOME

2.0 PROJECT INTRODUCTION 2.1 PROJECT BRIEF 2.2 CLIENT’S REQUIREMENT 3.0 PROJECT MANAGEMENT 3.1 PROJECT SUCCESS CRITERIA 3.1.1 PROJECT TRIPLE CONSTRAINTS 3.1.2 KEY SUCCESS INDICATORS 3.2 WORK BREAKDOWN STRUCTURE 3.3 GANTT CHART 3.4 TABLE OF DEPENDENCIES 3.5 PERT CHART DIAGRAM 3.6 CRITICAL PATH METHOD NETWORK DIAGRAM

5.0 DESIGN DEVELOPMENT 5.1 ARCHITECTURAL DESIGN 5.1.1 DESIGN PROPOSAL 5.1.1.1 FLOOR PLANS 5.1.1.2 ELEVATIONS 5.1.2 MATERIALITY/TEXTURE 5.1.3 DESIGN RESPONSE 5.1.4 SCHEDULE OF AREA 5.2 INTERIOR DESIGN 5.2.1 DESIGN PROPOSAL 5.2.2 FURNITURE/FITTING LAYOUT 5.2.3 FURNITURE & FITTING SPECIFICATIONS 5.3 LANDSCAPE DESIGN 5.3.1 DESIGN PROPOSAL 5.3.2 LANDSCAPE LAYOUT 5.3.3 VEGETATION TEXTURE 5.3.4 ROAD PAVEMENT TEXTURE 5.3.5 LANDSCAPE SPECIFICATIONS


TA B L E O F C O N T E N T

5.4 RENDERINGS 5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS 5.5.1.1 PHASE ONE (GROUNDWORK) 5.5.1.2 PHASE TWO (FOUNDATION) 5.5.1.3 PHASE THREE (STRUCTURAL) 5.6 MECHANICAL & ELECTRICAL 5.6.1 ELECTRICAL LAYOUT PLAN 5.6.1.1 PROPOSED LIGHTING FIXTURES 5.6.1.2 PROPOSED FAN FIXTURES 5.6.2 SOLAR PANEL SYSTEM 5.6.3 RAINWATER HARVESTING SYSTEM 5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.2 ALTERNATIVE COSTING PROPOSAL 5.7.3 COMPARISON OF COSTING METHODS 6.0 APPENDIX 5.1 MEETING AGENDA 5.2 CLIENT CONSULTANT MEETING MINUTES 7.0 REFERENCES


1.0

C O M PA N Y PROFILE


1 . 1 C O M PA N Y P R O F I L E

“Excellence Built on Trust� SAG Architects Sdn. Bhd. was founded in 2001, establish to provide customers with an architecturally-led approach to construction design and engineering based in the industry. We are a service company providing combined multi-disciplinary services of architectural design, structural engineering, mechanical and electrical engineering and cost consultancy. Our vast suite of capabilities allows us to intersect with one another to provide all aspects of architectural design and professional construction service under one roof. With its efficient and effective use of its designs and technological resources, SAG Architects Sdn. Bhd. is committed to deliver a practical and innovative architecture that is precisely tailored to its customers.


1 . 2 M I S S I O N , V I S I O N & VA LU E S Mission

Our Values

To become the premier organization that provides a complete scope of architectural services and consultancy of all segments under one roof. We work tirelessly to ensure that our projects are mutually successful and endeavor to forge relationships that stand the test of time.

Integrity We are dedicated to upholding our long established reputation of honesty and integrity in all our business relationships.

Respect We are committed to an underlying attitude of respect in all our interactions. Relationships

Vision By 2020, our clients and the industries we serve will recognize SAG Sdn. Bhd. as a trusted partner and transformational organization providing the highest level of service, design, technical expertise and business performance while creating places that enhance the human experience.

We value and invest in ongoing and new relationships with clients and team members.

Enthusiasm We will foster an attitude of enthusiasm in all we do. Development We will seek to continually improve through education and research.


1 . 3 O R G A N I Z AT I O N C U LT U R E

Integrity

Team Work

Loyalty

The organization of SAG is held together by the values of integrity, team work and loyalty. We believe that communication and tolerance plays a valuable role in our company as it bonds our team and creates a sociable environment. This builds a healthy working environment of passionate team members that aspire to produce the best of work for the people. As meeting their needs and requirements is what defines our company’s success.


1 . 4 O R G A N I Z AT I O N C H A R T

PROJECT MANAGER AIMI FARZANA AHMAD NORIZAN Responsible of planning, overseeing and documenting all aspects of the project

ARCHITECT ADIBAH BAHIAH AWANG Responsible of planning, designing and overseeing construction works of the project. Acts as head of consultants

STRUCTURAL & CIVIL ENGINEER

MECHANICAL & ELECTRICAL ENGINEER

INTERIOR ARCHITECT

LANDSCAPE ARCHITECT

QUANTITY SURVEYOR

AMIR FAUZAN AMIRUDDIN

GHAIDA RASHAD NOMAN

MUHAMMAD MUZHAMMIL

MUHAMMAD AZZAM AZIZ

SHERY EDRINA SALEHUDDIN

Responsible of designing, planning and overseeing construction and maintenance of building structures

Responsible of installing and operating the electrical systems to ensure compliance with necessary codes

Responsible of designing interior spaces to achieve functional and aesthetical objectives

Coordinate the arrangement of existing and proposed land features and structures.

Manages all project costs from the initial calculations to the final figures.


1.5 TEAM MEMBERS

Project Manager Aimi Farzana Ahmad Norizan

Architect Adibah Bahiah Awang

Interior Architect Muhammad Muzhammil Azham

Landscape Architect Muhammad Azzam Aziz

Working Experience

Working Experience

Working Experience

Working Experience

Project Manager SAG Architects Sdn. Bhd. (2008 -current)

Project Architect SAG Architects Sdn. Bhd. (2010-current)

Interior Architect SAG Architects Sdn Bhd (2015 - current)

Landscape Architect SAG Architects Sdn. Bhd. (2013 - current)

Project Architect DP Architects Pte. Ltd. (2005-2008)

Design Architect Zuryati Awang Architect (2008-2010)

Interior Designer DP Architects Pte. Ltd. (2012-2015)

Landscape Architect YHSA Architects Sdn Bhd (2011-2013)

Project Architect Unit ONE Design Sdn. Bhd (2000-2005)

Assistant Architect YHSA Architects Sdn. Bhd. (2006-2008)

Junior Designer AJM Interiors Sdn Bhd (2010-2012)

Landscape Architect Zuryati Awang Architect (2008-2011)

Educational Background

Educational Background

Educational Background

Educational Background

MArch Architecture, Taylors University Malaysia

MArch Architecture, University of Melbourne

BA (Hons)Interior Architecture, Limkokwing University Malaysia

BA (Hons) Landscape Architecture, Limkokwing University Malaysia

BSc (Hons) Architecture, Taylors University Malaysia)

BSc (Hons) Architecture, University Teknologi Malaysia (UTM)


1.5 TEAM MEMBERS

Civil & Structural Engineer Amir Fauzan Amiruddin

Mechanical & Electrical Engineer Ghaida Rashad Noman

Quantity Surveyor Shery Edrina Salehuddin

Working Experience

Working Experience

Working Experience

Civil & Structural Engineer SAG Architects Sdn Bhd (2011 – current)

Mechanical & Electrical Engineer SAG Architects Sdn Bhd (2013-current)

Quantity Surveyor SAG Architects Sdn Bhd (2012-current)

Civil & Structural Engineer WPA Partners Sdn Bhd (2008-2011)

Mechanical & Electrical Engineer Airfare Ltd, China (2010-2013)

Quantity Surveyor Juruukur Bahan AJM (2008-2012)

Technical Assistant SNA Consult Sdn Bhd (2005-2008)

Project Engineer Petro Safe Sdn Bhd (2007-2009)

Junior Quantity Surveyor Bongsor Bina Sdn Bhd (2005-2008)

Educational Background

Educational Background

Educational Background

BEng (Hons) Civil Engineering University Kebangsaan Malaysia

BEng (Hons) Mechanical Engineering Taylors University Malaysia

Bachelor in Quantity Surveying (Hons) Curtin University Australia


2.0

P RO J EC T INTRODUCTION


2.1 PROJECT BRIEF Taylors Management has approached our company with an idea of a pavilion that will house architectural and

design models for display to the university community and the public due to urgency to complete it for the upcoming International Conference to be held at the university compound. 2.2 CLIENT’S BRIEF Client

: Taylors University Lakeside Campus

Proposal

: Building a two-storey pavilion at Taylors University Lakeside Campus open parking area.

Usage

: To house selected architecture and interior design models for display to the public.

Timeline

: 6 months

Budget

: Up to RM500,000

Objective

: • Able to cater 100 –150 person at time

• Interlinked with campus linkways • Energy efficient • Progressive image • Development proposal options • Implementing usage of containers in design


3.0

P RO J EC T MANAGEMENT


3.1 PROJECT SUCCESS CRITERIA 3.1.1 PROJECT TRIPLE CONSTRAINTS SCOPE •

The functional elements that when completed makes up the end deliverable for the project. The scope itself is generally identified up front so as to give the project the best chance of success. ‘Scope-creep’ should be addressed and handled effectively and efficiently

• •

TIME • • A successful project is one being delivered on time, within budget, meet the relevant scopes and customer satisfaction. The project triple constraint is a powerful tool during the decision making of this project. The set target should be realistic and able to achieve the project’s objective. Any fluctuations to the key attributes, whether unexpected or requested by client will affect the other attribute.

Site supervision by assigned contractor with architect and engineer to ensure smooth work flow. Project to adhere strictly to the stipulated timeline of 6 months to avoid any delay on project completion. Strict adherence to Gantt Chart throughout the course of the project, any delays in the critical path will cause a ‘domino effect’ on project duration

COST

• • •

The cost of the project consist of all resources cost, labor rates, bills of materials etc. Project cost to adhere within the given budget of RM500,000. Optimized spending on resources by reducing and reusing materials


3.1 PROJECT SUCCESS CRITERIA 3 . 1 . 2 K E Y S U C C E S S I N D I C AT O R S

PROJECT EFFICIENCY • Meeting time schedule • Completing with Budget

IMPACT ON CUSTOMER • Meeting functional perfomance • Fullfilling customers needs

DIRECT AND BUSINESS SUCCESS • Immediate commercial recognition • Immediate revenue and profit enhanced

FOUR PRIMARY CATEGORIES AT PROJECT COMPLETION PHASE

PREPARING THE FUTURE • Able to create new opportunities • Added capabilities and competencies


3.2 WORK BREAKDOWN STRUCTURE


3.3 GANTT CHART SCHEDULE


3 . 4 TA B L E O F D E P E N D E N C I E S

ACTIVITIES SCHEMATIC DESIGN A B C DESIGN DEVELOPMENT D E F CONTRACT DOCUMENTATION

PREDECESSOR

DURATION

A B

1

C D D, E

4

A. Detail Drawing B. Costing C. Tender CONTRACT IMPLEMENTATION

G H I CONTRACT IMPLEMENTATION

F G G,H

2

A. Construction B. Authority C. Coordination FINAL COMPLETION

J K L FINAL COMPLETION M

I J J,K

9

L

2

SCHEMATIC DESIGN A. Site Analysis B. Design Concept C. Authority DESIGN DEVELOPMENT A. Detail Design B. Work Schedule C. Authority CONTRACT DOCUMENTATION

A.

Handing Over

2 2

1 2

1 2

1 1


3.5 PERT CHART DIAGRAM

Diagram illustrating the flow of activities from A to M. Note that one activity is dependent on the other.


3 . 6 C R I T I C A L PAT H M E T H O D ( C P M ) N E T W O R K D I A G R A M

CRITICAL PATH Critical path represents the project duration, it determines the shortest time to complete the project. The red diagrams indicates Diagram the any flowdelay of in any one of them will cause the criticalillustrating path, whereby activities Noteproject that duration (domino-effect). an overall from delay Ain to theM. overall one activity is dependent on the FLOAT other. The blue box indicates float, whereby the activity is not as critical and allowed to have a slack time


3.0

P R E L I M I N A RY S T U D I ES


3 . 1 S I T E A N A LY S I S 3.1.1 LOCATION PLAN SUBANG

D

PETALING JAYA

E

C F

A H

B

SHAH ALAM

SITE TAYLOR’S UNIVERSITY PUCHONG G

A. B. C. D. E. F. G. H.

SUNWAY PYRAMID SS 18 LRT SUBANG JAYA MEDICAL CENTRE SUBANG JAYA KTM STATION SETIA JAYA KTM STATION TO KUALA LUMPUR TO PUTRAJAYA TO SHAH ALAM

2.8 KM 5.8 KM 4.8 KM 5.1KM 3.4 KM 25MIN 30MIN 20MIN


3 . 1 S I T E A N A LY S I S 3.1.2 SITE PLAN + INTRODUCTION

ADMIN BLOCK

COMMERCIAL BLOCK

EDUCATION BLOCK

LAKE

SIT E A

Location SPORTS CENTER

DK SENZA

D’LATOUR

: Taylor’s University Parking Lot, Commercial Block Land Size : 1.7 acres / 6880 sqm Land Usage : Commercial Project Type : Pavilion Occupancy : 150 people


3 . 1 S I T E A N A LY S I S 3.1.3 CONTEXTUAL DIAGRAMS

LAKE

AM PM

WATER BODIES

VEGETATION SLOPE & TERRAIN


3 . 1 S I T E A N A LY S I S 3.1.3 CONTEXTUAL DIAGRAMS

6MINS FROM COMMERCIAL BLOCK 7MINS FROM EDUCATION BLOCK

200M FROM LDP

Secondary access point 6MINS FROM PARKING LOT

Primary access point

4MINS FROM DKSENZA

VEHICULAR PEDESTRIAN ACCESS POINTS


3 . 1 S I T E A N A LY S I S 3.1.4 SWOT ANALYSIS

STRENGTH • • • •

Prime view facing the campus lakeside High terrains act as barrier from noise and sun Central location, accessible from all points Within walking distance from architecture studio

WEAKNESS • Underused space, currently used as parking area • Lack of vegetation • Poorly maintained

OPPORTUNITIES • • • •

Possible meeting point/social space for students Even ground level reduces earthwork costs Terrain utilized as landscaping feature Lake view as main selling point

THREATS •

Area not guarded-prone to vandalism, security issue


3 . 1 S I T E A N A LY S I S 3.1.5 SITE PHOTOS

Main route from parking lot to commercial block

Underused parking space

Prime view of the campus and the lake

Vegetation and terrain acts as a barrier


3.2 PRECEDENT STUDIES 3.2.1 BONDI BEACH CONTAINER HOME ALEX JAVUREK

The proposed container home addresses the panoramic view of the Bondi beach as it’s main selling point. The building utilized levels and slopes to further enhance the view of the beach.


3.2 PRECEDENT STUDIES 3.2.1 BONDI BEACH CONTAINER HOME ALEX JAVUREK DESIGN RESPONSE

TREATMENT OF LOCATION Enhancement of existing terrain through addition of platforms

ENVIRONMENTAL Openings allow cross ventilation through building with green roofs protecting it from overheating

CIRCULATION Barrier free circulation eases movement through building

SPATIAL PLANNING Spaces arranged according to its function with public spaces on the ground floor and private spaces on the first floor

MATERIALITY Usage of wooden slabs and green roof breaks the stark nature of the container


5.0

D ES I G N D E V E LO P M E N T


5.1 ARCHITECTURAL DESIGN 5.1.1 DESIGN PROPOSAL 5.1.1.1 FLOOR PLANS 2500

9500

BOOK STORE

FOYER

7000

5000

2500

6000

OFFICE RECEPTION + SOUVENIR

2500

INDOOR GALLERY

TERRACE

2500

ACTIVITY SPACE

9500

OUTOOR GALLERY

2500

STORAGE

4000

WATER TANK

CAFE

9500

2500

M&E

EATING SPACE + GALLERY

4000 TOILET TOILET

4000

Ground Floor Plan, 1:200

First Floor Plan, 1:200

TERRACE


5.1 ARCHITECTURAL DESIGN 5.1.1 DESIGN PROPOSAL 5.1.1.2 ELEVATIONS

East Elevation, NTS

West Elevation NTS


5.1 ARCHITECTURAL DESIGN 5.1.1 DESIGN PROPOSAL 5.1.1.2 ELEVATIONS

South Elevation, NTS

North Elevation NTS


5.1 ARCHITECTURAL DESIGN 5.1.2 MATERIALITY & TEXTURE

BOOK STORE

FOYER

OFFICE RECEPTION + SOUVENIR

INDOOR GALLERY

Metal Decking Building walls, roof, service areas OUTOOR GALLERY

STORAGE

Redwood Timber Flooring Retail, office, Indoor gallery, café, activity room

CAFE

WATER TANK

EATING SPACE + GALLERY

Hollow Concrete Blocks Toilet feature wall

Ground Floor Plan, 1:200

TOILET TOILET

Timber Floor Decking Foyer, Outdoor gallery, eating space, terraces


5.1 ARCHITECTURAL DESIGN 5.1.2 MATERIALITY & TEXTURE

TERRACE

Aluminium Powder Coated Fixed Glass window Activity Room, Gallery

ACTIVITY SPACE

Mild Steel Staircase with Redwood Timber steps M&E

Aluminium Powder Coated Double Leaf Glass Folding Door Activity Room First Floor Plan, 1:200

TERRACE

Perforated Metal Railing Terraces


5.1 ARCHITECTURAL DESIGN 5.1.3 DESIGN RESPONSE

Zoning Areas are distributed according to Its function to ensure smooth circulation

Addressing the context Building addresses both the lake and the Terrain at the same time

Ventilation Loose floor plan breaks up the spaces To allow wind flow

Circulation/Frontage Double frontage allows easy access of people From both commercial block and parking lot


5.1 ARCHITECTURAL DESIGN 5.1.4 SCHEDULE OF AREA

NO

SPACE

AREA (m2)

1

FOYER

60

2

RECEPTION

30

3

OFFICE

15

4

GALLERY (INDOOR)

100

5

GALLERY (OUTDOOR)

118

6

ACTIVITY SPACE

60

7

CAFE

10

8

EATING AREA +GALLERY

96

9

TOILET (M)

10

10

TOILET (F)

10

11

SERVICES (WATER TANK + M&E)

12

12

STORAGE

7

TOTAL

528


5.2 INTERIOR DESIGN 5.2.1 DESIGN PROPOSAL

CONCEPT : INDUSTRIAL DESIGN • Upscale hand crafted, home furnishings and accessories • Adding a raw, unfinished look to the designed spaces • Informed by the understated details and tenacious architecture of factories, warehouses, and wrought industry, they infuses mixed metals, wood, and glass in unexpected ways to forge a cool, clean, and polished industrial loft.


5.2 INTERIOR DESIGN 5.2.2 FURNITURE/FITTING LAYOUT Legend

Ground Floor Plan, NTS

First Floor Plan, NTS


5.2 INTERIOR DESIGN 5.2.3 FURNITURE/FITTING SPECIFICATIONS ITEM

SUPPLIER

SPECS

Type : Small Book Display Unit Woody Furniture Material : Hardwood timber, Steel pipes Sdn Bhd Dimension : 1.8x0.5x1.85 m

Type : Large Book Display Unit Woody Furniture Material : Hardwood timber, Steel pipes Sdn Bhd Dimension : 5.4x0.5x1.85 m

QUANTITY

3

1

Book display unit

Muz Design Sdn Bhd

Material : Hardwood timber, Steel Dimension : 1.2x0.5X0.5 m

14

Wooden bench

Muz Design Sdn Bhd 4 seater dining table

Type : Dining table with 4 chairs Material : Hardwood timber and steel Table Dimension : 0.9m x 0.9m x 0.75m Chair radius: 0.35m Chair height: 0.5m

6


5.2 INTERIOR DESIGN 5.2.3 FURNITURE/FITTING SPECIFICATIONS ITEM

SUPPLIER

3 seater round table

Muz Design Sdn Bhd

Muz Design Sdn Bhd

SPECS Type : Study table with 3 chairs Material : Hardwood timber and steel Table Dimension : 0.9m x 0.9m x 0.9m Chair radius: 0.35m Chair height: 0.5m Type : Small display unit Material : Hardwood timber and bent lightwood Dimension : 1.7m x 0.5m x 1.7m

QUANTITY

3

4

Small Display Unit

Type : Large display unit Muz Design Sdn Bhd

Material : Hardwood timber and bent lightwood Dimension : 5.6m x 0.5m x 1.7m

1

Large Display Unit

Muz Design Sdn Bhd

Café set

Type : Café counter top table & timber rack Material : Hardwood timber and steel pipes Counter top table dimension : 2.6m x 0.7m x 0.6m Rack dimension : 3.0m x 0.4m x 0.3m

1


5.2 INTERIOR DESIGN 5.2.3 FURNITURE/FITTING SPECIFICATIONS ITEM

SUPPLIER

SPECS

QUANTITY

3 seater round table

Muz Design Sdn Bhd

Type : Office set w/ hardwood timber, stainless steel and recycled wood Desk Dimension : 1.4m x 0.8m x 0.7m Chair Dimension : 0.5m x 0.5m x 0.6m

1

Office set

Muz Design Sdn Bhd

Type : Reception desk w/ lightwood timber, recycled wood and steel frame Dimension : 3.5m x 0.6m x 0.7m

1

Reception Desk

Muz Design Sdn Bhd Glass Railing

Type : Glass railing Material : Frosted glass finishes Dimension : 4.0m x 0.2m x 1.1m

1


5.2 INTERIOR DESIGN 5.2.3 FURNITURE/FITTING SPECIFICATIONS ITEM

SUPPLIER Muz Design Sdn Bhd

Wall bench

SPECS

Type : Wall attached bench Material : Hardwood timber and steel framing Dimension : 1.5m x 0.5m x 0.3m

QUANTITY

1

Type : Outdoor gallery units w/ dark steel finishes Muz Design Sdn Bhd

Dimension : 1.1m x 0.1m x 1.8m

20

Muz Design Sdn Bhd

Type : Indoor gallery units Material : recycled wood, lightwood timber and steel pipes Dimension : 1.3m x 0.4m x 1.9m

4

Outdoor Gallery Display Units

Indoor Gallery Display Units

IKEA Malaysia

Indoor plant with planter box

Type : Indoor plant with box w/ bamboo palm and ceramic planter box Dimension : 0.4m x 0.4m x 1.0m

3


5.2 INTERIOR DESIGN 5.2.3 FURNITURE/FITTING SPECIFICATIONS ITEM

SUPPLIER Ilux Lighting Sdn Bhd

Wall bench

SPECS Type : LED Track light Material : Steel pipes and aluminium finishes Diameter: 0.2m L X H : 7.8m x 0.4m

QUANTITY

2

LED Track Light

Type : LED Tube light Ilux Lighting Sdn Bhd

Material : Steel pipes and aluminium finishes

7

Type : LED Wall light Material : Steel pipes and aluminium finishes

12

Type : Pendant light Material : Steel pipes and metal mesh finishes

18

LED Tube Light

Ilux Lighting Sdn Bhd

LED Wall Light

Ilux Lighting Sdn Bhd

Pendant Light


5.2 INTERIOR DESIGN 5.2.3 FURNITURE/FITTING SPECIFICATIONS ITEM

SUPPLIER

Johnson Suisse

SPECS

QUANTITY

Type : Water Closet w/ ceramic finishes 6

WC

Johnson Suisse

Bathroom Sink

Bathroom sink w/ ceramic finishes

2


5.3 LANDSCAPE DESIGN 5.3.1 DESIGN PROPOSAL

CONCEPT : MODERN CONTEMPORARY • The idea is to blur the line between Taylor’s University’s modern architecture and the pavilion itself so they are seamless and seen as one. • Introduction of new kind of landscape gives a new sense of purpose to the existing parking area.

EXIT ENTRY

Site Master Plan, NTS


5.3 LANDSCAPE DESIGN DESIGN 5.3.2 LANDSCAPE LAYOUT

Legend Bucida Molineti

Cytostachs lakka

Gardenia tubifera Thyrsostachys siamensis Ficus

Samanea saman Gardenia tubifera

Gardenia tubifera

EXIT ENTRY

Site Plan, NTS


5.3 LANDSCAPE DESIGN DESIGN 5.3.3 VEGETATION TEXTURE

Bucida Molineti Provide shade for the pedestrian, and also the leave are not too thick as it doesn’t block any view.

Samanea Saman Long branches creates shades

Gardenia tubifera Beautiful with yellow flowers Good scent

Ficus -unique tree that easy to shape either put it inside the planter or create a fence.

Cytostachs lakka Contrast in term of leave shape and the red color of the leave.

Petra volubilis - Create shaded to pergola - Beautiful flowers

Thyrsostachys siamensis Create partition Create contrast to show variety of trees.

Cuphea hyssopifolia -shrub to cover soil and roots trees


5.3 LANDSCAPE DESIGN DESIGN 5.3.3 VEGETATION TEXTURE

Citronella(geranium) -good scent -prevent mosquito

Bintje -plant pot for small plant -used for citronella

Carpet grass -to maximize ttba vegetation

White plant pot -ceramic material -used for ficus

Concreate bench -for people to sit on the site area


5.3 LANDSCAPE DESIGN DESIGN 5.3.4 ROAD PAVEMENT TEXTURE

White river stone

Road Line Paint

Black river stone

Asphalt Road

Poured Concrete


5.4 RENDERINGS

Perspective View 1


5.4 RENDERINGS

Perspective View 2


5.4 RENDERINGS

Landscape


5.4 RENDERINGS

Parking area landscape


5.4 RENDERINGS

Foyer/Reception


5.4 RENDERINGS

Indoor Gallery


5.4 RENDERINGS

Outdoor Eating Area


5.4 RENDERINGS

Outdoor Eating Area


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE ONE (GROUNDWORK) • • • • • • • • •

Site clearance Setting Out Earthwork/Excavation Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

PHASE TWO (FOUNDATION) • • • •

Pad footing Concrete stump Concrete Slab Foundation Backfilling

PHASE THREE (STRUCTURAL) • Staircase • Steel Frame for timber platform • Roof Structure


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE ONE (GROUNDWORK) • • • • • • • • •

Site clearance Setting Out Earthwork/Excavation Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Legend Construction Site Earthwork & Excavation Site Perimeter Drainage

Site Plan


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE ONE (GROUNDWORK) • • • • • • • • •

Site clearance Setting Out Earthwork/Excavation Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Site Plan

Legend Temporary Structure

Loading bay

Construction Site

Power line Supply

Hoarding

Water Supply

Project information board


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE ONE (GROUNDWORK) • • • • • • • • •

Site clearance Setting Out Earthwork/Excavation Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Temporary Structures • Site Office • Toilet • Workers Accommodation • Pantry • Meeting Room • Storage

Image 4.5 Proposed Structure: Cargo Container


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE ONE (GROUNDWORK) • • • • • • • • •

Site clearance Setting Out Earthwork/Excavation Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Project Information Board Steel Hoarding Panels Specifications Panel Size : 1.5 meter (w) x 2.5 meter (h) Thickness : 8mm (blue coated) Frame : Timber (80mm x 20mm)


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASE TWO ONE (FOUNDATION) (GROUNDWORK) • • • • • • • • •

Pad footing Site clearance Concrete stump Setting Out Concrete Slab Foundation Earthwork/Excavation Backfilling Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Legend Construction Site

Pad Footing Stump Concrete Slab Foundation

Site Plan


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASE TWO ONE (FOUNDATION) (GROUNDWORK) • • • • • • • • •

Pad footing Site clearance Concrete stump Setting Out Concrete Slab Foundation Earthwork/Excavation Backfilling Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Types of Pad Footing

Legend Construction Site

Pad Footing Stump Concrete Slab Foundation

Pad Footing Plan


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASE TWO ONE (FOUNDATION) (GROUNDWORK) • • • • • • • • •

Pad footing Site clearance Concrete stump Setting Out Concrete Slab Foundation Earthwork/Excavation Backfilling Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

1. Building the Formwork

4. Stump Re-bar

2. Spacer Block (Tahu)

5. Addition ties

3. Re-bars baskets

6. Concrete commences

Type 1 Foundation

Type 2 Foundation


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASE TWO ONE (FOUNDATION) (GROUNDWORK) • • • • • • • • •

Pad footing Site clearance Concrete stump Setting Out Concrete Slab Foundation Earthwork/Excavation Backfilling Temporary Structure Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Gravel Fill

Formwork Erection

Vapor Barrier

Steel Reinforcement Installation

Pouring Concrete

Curing


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASETHREE ONE (STRUCTURAL) (GROUNDWORK) • • • • • • • • •

Staircase Site clearance Steel Frame Setting Outfor timber platform Earthwork/Excavation Roof StructureStructure Temporary Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Types of Timber finishes • • • • • •

Durability Moderate-strength Rot resistant Thermal insulation High Cost Low Maintenance

• • • • • •

Durability (100 years) High-strength Rot resistant Weather proof High cost High Maintenance

• • • • • •

Durability Rapid Installation Multiple Color Weather proof High cost High Maintenance

Red Balau

Cengal

Composite Plastic


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASETHREE ONE (STRUCTURAL) (GROUNDWORK) • • • • • • • • •

Staircase Site clearance Steel Frame Setting Outfor timber platform Earthwork/Excavation Roof StructureStructure Temporary Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Joint Method

Legend Timber Decking

Decking System

Container base Steel Framing Concrete Slab Foundation Ground Floor Plan


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASETHREE ONE (STRUCTURAL) (GROUNDWORK) • • • • • • • • •

Staircase Site clearance Steel Frame Setting Outfor timber platform Earthwork/Excavation Roof StructureStructure Temporary Water & Electrical supply Perimeter Drainage Project Information Board Hoarding Access

Platform Components


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASETHREE ONE (STRUCTURAL) (GROUNDWORK) • Staircase Site clearance Frame • Steel Setting Outfor timber platform • Roof Structure Earthwork/Excavation • Temporary Structure • Water & Electrical supply • Perimeter Drainage • Project Information Board • Hoarding • Access

Sections

Elevation


5.5 CIVIL & STRUCTURAL 5.5.1 CONSTRUCTION PROCESS

PHASE PHASETHREE ONE (STRUCTURAL) (GROUNDWORK) • Staircase Site clearance Frame • Steel Setting Outfor timber platform • Roof Structure Earthwork/Excavation • Temporary Structure • Water & Electrical supply • Perimeter Drainage • Project Information Board • Hoarding • Access

Steps Installation

Elevation


5.6 MECHANICAL & ELECTRICAL 5.6.1 ELECTRICAL LAYOUT DIAGRAM 5.6.1.1 PROPOSED LIGHTING FIXTURES

Legend

EATING AREA

LINEAR PARK

GALLERY

LED Tube Light

LED Wall Light

LED Pendant Light

LED Ground Light

LED Track Light

LED Garden Light

ACTIVITY ROOM

First Floor Plan FOYER

Ground Floor Plan


5.6 MECHANICAL & ELECTRICAL 5.6.1 ELECTRICAL LAYOUT DIAGRAM 5.6.1.1 PROPOSED LIGHTING FIXTURES

ITEM LED Tube Light

SUPPLIER

PHILIPS LED Tube light LED Pendent Light PHILIPS LED light LEDPendant Track Light PHILIPS LED Track light LED Wall Light

PHILIPS

LED Wall light PHILIPS LED Ground light

SPECS Lamp Wattage: 20W Color Rendering Index, CRI: 82RA Color Temperature, K: 2730K Color Designation: Cool White Lumens, LM: 1200LM Lamp Wattage: 60W Color Rendering Index, CRI: 100RA Color Temperature, K: 2700K Color Designation: Warm White Lumens, LM: 245LM Lamp Wattage: 40W Color Rendering Index, CRI: 82RA Color Temperature, K: 2700K Color Designation: Warm White Lumens, LM: 265LM Lamp Wattage: 40W Color Rendering Index, CRI: 82RA Color Temperature, K: 2700K Color Designation: Warm White Lumens, LM: 265LM Lamp Wattage: 40W Color Rendering Index, CRI: 100RA Color Temperature, K: 2100K Color Designation: Cool White Lumens, LM: 1200LM

QUANTITY

12

18

13

22

11


5.6 MECHANICAL & ELECTRICAL 5.6.1 ELECTRICAL LAYOUT DIAGRAM 5.6.1.1 PROPOSED LIGHTING FIXTURES

ITEM

SUPPLIER

PHILIPS

SPECS Lamp Wattage: 20W Color Rendering Index, CRI: 82RA Color Temperature, K: 2730K Color Designation: Cool White Lumens, LM: 1200LM

LED Garden light

BENEFITS OF LED BULBS

• • • •

Consumes less energy Extended lifespan of 35,000-50,000 hours Less maintenance Recyclable with non toxic materials

QUANTITY

17


5.6 MECHANICAL & ELECTRICAL 5.6.1 ELECTRICAL LAYOUT DIAGRAM 5.6.1.2 PROPOSED FAN FIXTURES

Legend Wall Fan

EATING AREA

LINEAR PARK

GALLERY

ACTIVITY ROOM

First Floor Plan FOYER

Ground Floor Plan


5.6 MECHANICAL & ELECTRICAL 5.6.1 ELECTRICAL LAYOUT DIAGRAM 5.6.1.2 PROPOSED FAN FIXTURES

ITEM

SUPPLIER

PANASONIC

SPECS Air Velocity: 237 Air Delivery: 95 Motor HP: 0.08 Motor Type: 4Pole Condenser Motor Noise Level (dB): <60 Blade Size: 45cm (18”)

Wall Fan

BENEFITS OFF WALL FANS

• Consumes less energy • Adequate ventilation as building is mostly naturally ventilated • Suitable for spaces with low ceilings

QUANTITY

11


5.6 MECHANICAL & ELECTRICAL 5.6.2 SOLAR PANEL SYSTEM

ITEM

SUPPLIER

Solar Naturally (M) Sdn Bhd

SPECS Photovoltaic (PV) Modules 1.5kW Solar Panel Array 250W Panels Panels: 6 Solar Panels, 1.6m x 1m Roof Area Required: ≤10m2 of Roof Power Generated: 6.60 kWh/day

Solar Panel

BENEFITS OF SOLAR PANEL SYSTEM

• • • • •

Reduce dependency on fossil fuels Combatting greenhouse gas emissions Reduce electricity bills Reduce maintenance cost Highly reliable with extended warranty period

QUANTITY

6


5.6 MECHANICAL & ELECTRICAL 5.6.2 SOLAR PANEL SYSTEM 5.6.2.1 SOLAR PANEL SYSTEM DIAGRAM

Solar Photovoltaic Module: As the sunlight hits the PV installation, the module converts the sun energy into electric direct current (DC). The DC power that the installation produces is then wired into the inverter. Power Inverter Box: The power inverter converts the direct current into an alternating current (AC). This AC power is the standard current used to power electrical appliances.

Electrical Service Panel: The alternating current then flows from the inverter to the electrical service panel that distributes electricity into the building.


5.6 MECHANICAL & ELECTRICAL 5.6.3 RAINWATER HARVERSTING SYSTEM

ITEM

Rainwater Harvesting System

SUPPLIER

DD Techniche Sdn Bhd

SPECS Water Tank 680 liters, 150 gallons UPVC Gutters ⌀200mm UPVC Downspouts ⌀100mm

BENEFITS OF RAINWATER HARVESTING SYSTEM

• • • •

Reduce water usage Easy installation Low maintenance cost Reduce water bills

QUANTITY

1


5.6 MECHANICAL & ELECTRICAL 5.6.3 RAINWATER HARVESTING SYSTEM 5.6.3.1 RAINWATER HARVESTING SYSTEM DIAGRAM

Rain runoff from the roof is directed via the roof gutters in to the down pipes. The water is then channeled via the terrace where it passes through a filter system. Water Filter: The filter is used to remove pollutants from the rainwater collected. The filter unit consist of a chamber filled with filtering media such as fibre, coarse sand and gravel layers to remove debris and dirt from water before it enters the storage tank. Flush Diverter: The pollutants are then routed away from the storage tank. The diverter is designed to be filled with contaminated water. Water Tank: the filtered water will be channeled in to the water storage. Water Pump: The absence of gravitational force requires the use of water pump to distribute the harvested water into the designated areas.


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.1 CIVIL & STRUCTURAL COSTING 1)

LABOUR COST AND PLANNING

A. No. 1.

PRELIMINARY Item Site Office

2. 3.

Steel Hoarding Panel Timber Hoarding Frame

4.

Project Information Board

B. No.

GROUND WORK (DUARTION 21 DAYS) Item

1.

Fencing

2.

Hoarding

3.

Site Clearance

4.

Earthwork/Excavation

5.

Setting Out

C. 1.

2. 3.

Description Cargo container (6000mm x 2500mm)rent (2500mm x 2500mm) Hardwood timber (4000mm) Types of Labour General workers,unskilled Construction worker,skilled,local Dump Truck/Lorry Operator Excavator operator,skilled,local Surveyor,skilled,local

FOUNDATION WORK (DURATION 21 DAYS) Pad Footing Construction worker,skilled,local Formwork General workers,unskilled Concrete Slab Concreter,skilled,local Carpentarformwork,skilled,local, Bar bender,skilled,local

Unit per unit

Quantity 5

Unit Price RM 400.00

Total Price RM 2000.00

per unit per unit

30 100

RM 30.00 RM 12.00

RM 900.00 RM 1200.00

per unit

1

RM 200.00

RM 200.00

Number of workers 5

Per day (wage rate) RM 50.00

Lump Sum

Total Price

-

RM 5250.00

3

RM 65.00

-

RM 4095.00

2

RM 80.00

-

RM 3360.00

2

RM 200.00

-

RM 8400.00

1

-

RM 30,000.00

RM 30,000.00

5

RM 65

-

RM 6825.00

3

RM 50

-

RM 3150.00

3 2

RM 65 RM 65

-

RM 4095.00 RM 2730.00

2

RM 65

-

RM 2730.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.1 CIVIL & STRUCTURAL COSTING D.

STRUCTURAL WORK (DURATION 21 DAYS) 1.

Steel Framing Deck

2.

Timber Platform

3.

Staircase

2)

General welder,skilled,local Construction worker, skilled,local General worker,unskilled

3

RM 65

-

RM 4095.00

5

RM 65

-

RM 6825.00

3

RM 50

-

RM 3150.00

Sub total price

RM 89,005

CONSTRUCTION EQUIPMENT COST AND PLANNING No. 1. 2. 3. 4. 5. 6. 7. 8.

Model Hino Nissan Nissan Nissan Nissan Nissan Nissan Nissan

Types of Equipment Excavator Dump Truck Concrete mixer Generator Bar bender Bar Cutter Compactor Machine Welder Machine

Quantity 1 1 2 1 1 1 1 1 Sub total price

Daily Rental RM 630.00 RM 720.00 RM 200.00 RM 250.00 RM 50.00 RM 50.00 RM 100.00 RM 150.00 RM 2150.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.1 CIVIL & STRUCTURAL COSTING 3) CONSTRUCTION MATERIAL AND COST D. STRUCTURAL WORK (DURATION 21 DAYS) No. Item Supplier 1. Steel Framing Deck General 1. Formwork BAUER Malaysia Sdn Bhd welder,skilled,local Pad footing 2. Timber Platform Construction worker, Slab framing skilled,local 2.3. Ready Mix Concrete CEMEX Malaysia Staircase General worker,unskilled Concrete pad footing Concrete slab 3. Re-Bar CEMEX Malaysia Pad footing Concrete slab 4. Roofing Material Brickwell Engineering Sdn Bhd C channel â&#x20AC;&#x201C; Aluminium (100mm x 25mm x 6000mm) Insulation Metal Sheet 5. Steel Framing iLiving Homes Sdn Bhd Steel beam/joist (100mm x 50mm x 6000mm) Timber Platform (100mm x 2500mm x 20mm) 6. Staircase iLiving Homes Sdn Bhd Mild Steel Beam Timber Steps (1200mm x 300mm x 20mm) Steel Railing 7. Container Container House Design 12m new dry shipping container 6m new dry shipping container 8. Tensile Fabric Structure Gaia Textile 9. Steel Pergola Belham Living

3 5 3

Unit m2

m3

Quantity RM 65 1120.5 RM 65 820.3 RM 50 3.3

Tonne

Unit Price -

Total Price RM 4095.00

-

RM 3220.00 RM 6825.00 RM 5420.00

-

RM 3150.00 RM 7540.00 Sub total price RMRM 89,005 8290.00 RM 8040.00 -

per unit

30

RM 25.00

RM 750.00

m2 per unit

30 20

RM 12.00 RM 25.00

RM 360.00 RM 500.00

-

-

-

RM 3000.00

per unit

25

-

RM 14,350.00

no.

8 3

RM 10,000.00 RM 9500.00

RM 80,000.00 RM 28,500.00

sqm no.

60 1

Sub total price

RM 150.00 RM 2000.00 RM 160,320.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.1 CIVIL & STRUCTURAL COSTING

TOTAL PRICE FOR CIVIL AND STRUCTURAL COST : Price 1) Labour cost and planning 2) Construction equipment cost and planning

RM 89,005.00 RM 2150.00

3) Construction material and cost

RM 160,320.00 RM 251,475.00

TOTAL PRICE


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.2 MECHANICAL & ELECTRICAL COSTING No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

1.

2.

3. 4. 5.

Item A. ELECTRICAL APLLIANCES LED Tube Light LED Pendent Light LED Track Light LED Wall Light Outdoor Ground Light Outdoor Garden Light Wall Fan Portable Air Conditioner Street Lamp Switch Socket Outlet, 13A 250V Solar Power PV System, 1.5KW: 6 Solar Panels, 1.6m x 1m Power Inverter Box Tracking Meter A. WATER SUPPLY AND SANITARY Water Supply System: Water Tank, Fiberglass , 680 liters (150 gallons) Water Pump UPVC Distribution Pipes ⌀25mm & ⌀40mm Rainwater Harvesting System: Water Tank 680 liters, 150 gallons PVC Gutters PVC Downspouts Water Filter Water Pump Toilet Sink with Tap Toilet Bowl Bidet Spray

Supplier

Unit

Quantity

Unit Price

Total Price

Philips Philips Philips Philips Philips Philips Panasonic LG SETM Sdn Bhd LWD Sdn Bhd Solar Naturally (M) Sdn Bhd

no. no. no. no. no. no. no. no. no. no. no.

12 18 12 20 14 17 7 6 16 28 1

RM 17.00 RM 28.00 RM 89.00 RM 29.00 RM 40.00 RM 65.00 RM 123.00 RM 1870.50 RM 160.00 RM 6.00 RM 8800.00

RM 204.00 RM 504.00 RM 1068.00 RM 580.00 RM 560.00 RM 1105.00 RM 861.00 RM 11,223.00 RM 2560 RM 168.00 RM 8800.00

MUI FATT Sdn Bhd

no.

1

RM 2800.00 RM 2800.00

DD Techniche Sdn Bhd

no.

1

RM 4700.00 RM 4700.00

Johnson Suisse Sdn Bhd Johnson Suisse Sdn Bhd Big Bath Sdn Bhd

no. no. no.

3 6 6

RM 140.00 RM 160.00 RM 23.00 TOTAL PRICE

RM 420.00 RM 960.00 RM 138.00 RM 36,651


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.3 INTERIOR DESIGN COSTING A.

Total Price

DOORS, WINDOWS,RAILING AND HOLLOW CONCRETE BLOCK No. 1.

2. 3.

4.

5. 6. 7.

Item Powder Coated Aluminium Glass Folding Door (1800 X 2100) PVC Bathroom Door Powder Coated Aluminium Fixed Glass Window (6000 X 2100) Powder Coated Aluminium Casement Window (1350 x 1600) Single Leaf Stainless Steel Door (900 X 2100) Mild Steel Railing With Perforated Metal Panels Hollow Concrete Block

Supplier Yee Ming Aluminium Sdn Bhd

Unit no.

Quantity 2

Unit Price RM 2800.00

Total Price RM 5600.00

Onitek Sdn Bhd Yee Ming Alumnium Sdn Bhd

no. no.

6 4

RM 450.00 RM 4410.00

RM 2700.00 RM 17,640.00

Yee Ming Aluminium Sdn Bhd

no.

4

RM 750.00

RM 3000.00

TACAM Steel

no.

3

RM 430.00

RM 1290.00

Berjaya Steel Railing Sdn Bhd Zenbes Sdn Bhd

no.

25

RM 360.00

RM 9000.00

no.

100

RM 2.20 Sub total price

RM 440.00 RM 39,670


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.3 INTERIOR DESIGN COSTING B.

Total Price

FURNITURES

No. 1.

Item Small book shelf w/hardwood timber and steel pipes with coated finishes (2.5m x 0.5m x 2.5m)

Supplier Woody Furniture

Unit no.

Quantity 3

Unit Price RM 500.00

Total Price RM 1500.00

2.

Large book shelf w/ hardwood timber and steel pipes and coated finishes (6.5m x 0.5m x 2.0m)

Woody Furniture

no.

1

RM 1200.00

RM 1200.00

3.

Wooden bench w/ hardwood timber and steel (0.55m x 0.57mm x 1.28m)

Woody Furniture

no.

14

RM 495.00

RM 6930.00

4.

Dining table with 4 chairs w/ hardwood timber and steel Table : (1.8m x 0.84m x 0.74m) Chair radius : 0.40m Chair height : 0.5m

Domico Furniture

no.

6

RM 1589.00

RM 9534.00

5.

Study table with 3 chairs w/ hardwood timber and steel Table : 1.2m x 0.9m x 0.74m Chair radius: 0.40m Chair height 0.5m

Domico Furniture

no.

3

RM 850.00

RM 2550.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.3 INTERIOR DESIGN COSTING 6.

Small display unit w/ hardwood timber and bent lightwood (2.0m x 0.5m x 2.0m)

Domico Furniture

no.

4

RM 450.00

Total Price RM 1800.00

7.

Large display unit w/ hardwood timber and bent lightwood

Domico Furniture

no.

1

RM 1740.00

RM 1740.00

(6.5m x 0.5m x 1.8m) 8.

Johnson Suisse Modena Water Closet 665mm (L) X 360mm (W) X 785mm (H)

Johnson Suisse

no.

6

RM 500.00

RM 3000.00

9.

Johnson Suisse Marbella Countertop Basin 550mm (L) X 540mm (W) X 195mm (H)

Johnson Suisse

no.

2

RM 300.00

RM 600.00

10.

Café set w/ hardwood timber and steel pipes Cashier: 2.6m x 0.7m x 0.6m Rack : 3.0m x 0.4m x 0.3m

Custom Made

no.

1

RM 150.00

RM 150.00

11.

Office set w/ hardwood timber and stainless steel Desk : 1.8m x 0.9m x 0.7m Chair: 0.5m x 0.5m x 0.6m

Marco furniture

no.

1

RM 1295.00

RM 1295.00

12.

Reception desk w/ hardwood timber and steel frame (3.5m x 0.6m x 0.7)

Domico Furniture

no.

1

RM 954.00

RM 954.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.3 INTERIOR DESIGN COSTING 13.

Glass rail w/ frosted glass finishes

Marco Furniture

no.

1

RM 650.00

Total Price RM 650.00

14.

Wall attached bench w/ hardwood timber and steel framing (2.0m x 0.5m x 0.4m)

Woody Furniture

no.

1

RM 463.50

RM 463.50

15.

Outdoor gallery units w/ dark steel finishes and light wood (1.5m x 0.1m x 2.0m)

Domico Furniture

no.

20

RM 500.00

RM 10,000.00

16.

Indoor gallery units w/ lightwood and steel pipes (1.5m x 0.5m x 2.0m)

Domico Furniture

no.

4

RM 900.00

RM 3600.00

17.

Indoor plant with box w/bamboo palm and ceramic planter box

IKEA Malaysia

no.

3

RM 300.00

RM 900.00

18.

LED Track light w/ steel pipes and aluminium finishes

Custom made

no.

2

RM 1300.00

RM 2600.00

19.

LED Tube light w/ steel pipes and aluminium finishes

Custom made

no.

7

RM 180.00

RM 1260.00

20.

LED Wall light w/ steel pipes and aluminium finishes

Custom made

no.

12

RM 70.00

RM 840.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.3 INTERIOR DESIGN COSTING 21.

Pendant light w/ steel pipes and metal mesh finishes

Custom made

no.

18

RM 50.00

Total Price RM 900.00

22. 23.

Wood decking (redwood) Expended metal mesh deck

Wood flooring Meton Metal Products

sqm sqm

253 234.2

RM 50.00 RM 87.00

RM 12,650.00 RM 20,375.00

24.

Labours and installs

RM 4500.00 Sub total price

TOTAL PRICE FOR CIVIL AND STRUCTURAL COST :

1) Doors,windows,railings and hollow concrete block 2) Furnitures TOTAL PRICE

Price RM 39,670.00 RM 89,991.50 RM 129,661.50

RM 4500.00 RM 89,991.50


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.4 LANDSCAPE ARCHITECT COSTING No. 1.

Item Bucida Molineti

2.

Gardenia tubifera

3.

Cytostachs lakka

4.

Thyrsostachys siamensis

5.

Samanea saman

6.

Ficus

7.

Petra volubilis

8.

Cuphea hyssopifolia

9.

Citronella(geranium)

10. 11. 12.

Carpet grass/Philippines grass Bintje White Planter

13.

Unit no.

Quantity 10

Unit Price RM 50.00

Total Price Total Price RM 500.00

no.

4

RM 190.00

RM 760.00

no.

4

RM 23.00

RM 92.00

no.

6

RM 60.00

RM 360.00

no.

8

RM 230.00

RM 1840.00

no.

27

RM 10.00

RM 270.00

no.

5

RM 10.00

RM 50.00

no.

124

RM 3.00

RM 372.00

no.

20

RM 12.00

RM 240.00

sqm

520.6sqm

RM 1.00

RM 520.60

no. no.

20 4

RM 1.50 RM 70.00

RM 30.00 RM 280.00

per 20kg

100kg

RM 15.00

RM 75.00

Terra Garden Sdn Bhd

per 20kg

100kg

RM 30.00

RM 150.00

Hanson Malaysia

sqm

1027.38sqm

RM 12.00

RM 12,328.56

White River Stone

Supplier SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd SJH Nursery & Landscaping Sdn Bhd Ikea Fah Lean Floral Trading Sdn. Bhd Terra Garden Sdn Bhd

14.

Grey River Stone

15.

Poured Concrete


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.4 LANDSCAPE ARCHITECT COSTING 16. 17. 18. 19. 20.

Asphalt Road Roadline Paint Concrete Bench Road Lamp Lamp post

Hanson Malaysia MCI Kian Razak 72 Razak 72

sqm no. no. no. no.

2934.6sqm 4 6 16 7

RM 23.00 RM 70.00 RM 230.00 RM 280.00 RM 130.00 TOTAL PRICE

Total Price RM 67,495.80 RM 280.00 RM 1380.00 RM 4480.00 RM 910.00 RM 92,414.00


5.7 COSTING 5.7.1 CONVENTIONAL COSTING 5.7.1.5 GROSS DEVELOPMENT COSTING Total Price

Conventional Cost 18% Civil and structural 49% 26%

Mechanical and electrical Interior Designer Landscape architect

7%

CIVIL AND STRUCTURAL COST

RM 251,475.00

MECHANICAL AND ELECTRICAL COST

RM 36,651.00

INTERIOR DESIGNER COST

RM 129,661.50

LANDSCAPE ARCHITECT

RM 92,414.00

TOTAL PROJECT COST Gross development cost = (Total project cost + consultation fee) = RM 510,201.00 + RM 100,000.00

RM 510,201.00 RM 610,201.00


4.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.1 CIVIL & STRUCTURAL COSTING 1) LABOUR COST AND PLANNING A. PRELIMINARY No. Item 1. Site Office

2. 3.

Steel Hoarding Panel Timber Hoarding Frame

4.

Project Information Board

A. GROUND WORK (DUARTION 21 DAYS) No. Item

A.

1.

Fencing

2.

Hoarding

3.

Site Clearance

4.

Earthwork/Excavation

5.

Setting Out

Description Cargo container (6000mm x 2500mm)rent (2500mm x 2500mm) Hardwood timber (4000mm) -

Types of Labour General workers,unskilled Construction worker,skilled,local Dump Truck/Lorry Operator Excavator operator,skilled,local Surveyor,skilled,local

FOUNDATION WORK (DURATION 21 DAYS) Pad Footing Construction worker,skilled,local 2. Formwork General workers,unskilled 3. Concrete Slab Concreter,skilled,local Carpentarformwork,skilled,local, Bar bender,skilled,local 1.

Unit per unit

Quantity 5

Unit Price RM 400.00

Total Price RM 2000.00

per unit per unit

30 100

RM 30.00 RM 12.00

RM 900.00 RM 1200.00

per unit

1

RM 200.00

RM 200.00

Number of workers 5

Per day (wage rate) RM 50.00

Lump Sum

Total Price

-

RM 5250.00

3

RM 65.00

-

RM 4095.00

2

RM 80.00

-

RM 3360.00

2

RM 200.00

-

RM 8400.00

1

-

RM 30,000.00

RM 30,000.00

5

RM 65

-

RM 6825.00

3

RM 50

-

RM 3150.00

3 2

RM 65 RM 65

-

RM 4095.00 RM 2730.00

2

RM 65

-

RM 2730.00


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.1 CIVIL & STRUCTURAL COSTING A. 1. 1. 1.

STRUCTURAL WORK (DURATION 21 DAYS) Steel Framing Deck General welder,skilled,local Timber Platform Construction worker, skilled,local Staircase General worker,unskilled

3

RM 65

-

RM 4095.00

5

RM 65

-

RM 6825.00

3

RM 50

Sub total price

RM 3150.00 RM 89,005

2) CONSTRUCTION EQUIPMENT COST AND PLANNING No. Model Types of Equipment 1. Hino Excavator 2. Nissan Dump Truck 3. Nissan Concrete mixer 4. Nissan Generator 5. Nissan Bar bender 6. Nissan Bar Cutter 7. Nissan Compactor Machine 8. Nissan Welder Machine

Quantity 1 1 2 1 1 1 1 1 Sub total price

Daily Rental RM 630.00 RM 720.00 RM 200.00 RM 250.00 RM 50.00 RM 50.00 RM 100.00 RM 150.00 RM 2150.00


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.1 CIVIL & STRUCTURAL COSTING 3) CONSTRUCTION MATERIAL AND COST No. Item 1. Formwork Pad footing Slab framing 2. Ready Mix Concrete Concrete pad footing Concrete slab 3. Re-Bar Pad footing Concrete slab 4. Roofing Material C channel â&#x20AC;&#x201C; Aluminium (100mm x 25mm x 6000mm) Insulation Metal Sheet 5. Steel Framing Steel beam/joist (100mm x 50mm x 6000mm) Timber Platform (100mm x 2500mm x 20mm) 6. Staircase Mild Steel Beam Timber Steps (1200mm x 300mm x 20mm) Steel Railing

Supplier BAUER Malaysia Sdn Bhd

Unit

Quantity 1120.5

m2 CEMEX Malaysia

Unit Price

Total Price

-

RM 3220.00 RM 5420.00

-

RM 7540.00 RM 8290.00 RM 8040.00

820.3 m3

CEMEX Malaysia

3.3 Tonne

-

Brickwell Engineering Sdn Bhd per unit

30

RM 25.00

RM 750.00

m2 per unit

30 20

RM 12.00 RM 25.00

RM 360.00 RM 500.00

-

-

-

RM 3000.00

per unit

25

-

RM 14,350.00

iLiving Homes Sdn Bhd

iLiving Homes Sdn Bhd


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.1 CIVIL & STRUCTURAL COSTING 7.

8.

Container 12m HC 2nd Hand Container 6m 2nd Hand Container

Alibaba Express

Steel Pergola

Belham Living

no. 8 3

TOTAL PRICE FOR CIVIL AND STRUCTURAL COST : Price 1) Labour cost and planning RM 89,005.00 2) Construction equipment cost and planning RM 2150.00 3) Construction material and cost RM 122,970.00 TOTAL PRICE RM 214,125

no.

1

RM 7000.00 RM 4500.00 RM 2000.00 Sub total price

RM 56,000.00 RM 13,500.00

RM 2000.00 RM 122,970.00


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.2 MEHCANICAL & ELECTRICAL No.

Item A.

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

1.

2.

3. 4. 5.

Unit

Quantity

Unit Price

no. no. no. no. no. no. no. no. no. no.

12 18 12 20 14 17 11 16 28 1

RM 17.00 RM 28.00 RM 89.00 RM 29.00 RM 40.00 RM 65.00 RM 123.00 RM 160.00 RM 6.00 RM 8800.00

Total Price

ELECTRICAL APLLIANCES

LED Tube Light LED Pendent Light LED Track Light LED Wall Light Outdoor Ground Light Outdoor Garden Light Wall Fan Street Light Switch Socket Outlet, 13A 250V Solar Power PV System, 1.5KW: 6 Solar Panels, 1.6m x 1m Power Inverter Box Tracking Meter A.

Supplier

Philips Philips Philips Philips Philips Philips Panasonic SETM Sdn Bhd LWD Sdn Bhd Solar Naturally (M) Sdn Bhd

RM 204.00 RM 504.00 RM 1068.00 RM 580.00 RM 560.00 RM 1105.00 RM 1353.00 RM 2560.00 RM 168.00 RM 8800.00

WATER SUPPLY AND SANITARY

Water Supply System: Water Tank, Fiberglass , 680 liters (150 gallons) Water Pump UPVC Distribution Pipes ⌀25mm & ⌀40mm

MUI FATT Sdn Bhd

no.

1

RM 2800.00 RM 2800.00

Rainwater Harvesting System: Water Tank 680 liters, 150 gallons PVC Gutters PVC Downspouts Water Filter Water Pump

DD Techniche Sdn Bhd

Toilet Sink with Tap Toilet Bowl Bidet Spray

Johnson Suisse Sdn Bhd Johnson Suisse Sdn Bhd Big Bath Sdn Bhd

no.

1

RM 4700.00 RM 4700.00

no. no. no.

3 6 6

RM 140.00 RM 160.00 RM 23.00 TOTAL PRICE

RM 420.00 RM 960.00 RM 138.00 RM 25,920


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.3 INTERIOR DESIGN COSTING A.

DOORS, WINDOWS,RAILING, STAIRCASES AND HOLLOW CONCRETE BLOCK

No.

Item

Supplier

Unit

Quantity

Unit Price

Total Price

1.

Powder Coated Aluminium Glass Folding Door (1800 X 2100)

Yee Ming Aluminium Sdn Bhd

no.

2

RM 2800.00

RM 5600.00

2.

PVC Bathroom Door

Onitek Sdn Bhd

no.

6

RM 450.00

RM 2700.00

3.

Powder Coated Aluminium Fixed Glass Window (6000 X 2100)

Yee Ming Alumnium Sdn Bhd

no.

4

RM 4410.00

RM 17,640.00

4.

Powder Coated Aluminium Casement Window (1350 x 1600)

Yee Ming Aluminium Sdn Bhd

no.

4

RM 750.00

RM 3000.00

5.

Single Leaf Stainless Steel Door (900 X 2100)

TACAM Steel

no.

3

RM 430.00

RM 1290.00

6.

Mild Steel Railing With Perforated Metal Panels

Berjaya Steel Railing Sdn Bhd

no.

25

RM 360.00

RM 9000.00

7.

Hollow Concrete Block

Zenbes Sdn Bhd

no.

100

RM 2.20

RM 440.00

Sub total price

RM 39,670


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.3 INTERIOR DESIGN COSTING A. FURNITURES No. Item 1. Small book shelf w/ hardwood timber and steel pipes (1.8m x 0.5m x 1.85m) 2. Large book shelf w/ hardwood timber and steel pipes (5.4m x 0.5m x 1.85m) 3. Wooden bench w/ hardwood timber and steel (1.2m x 0.5m x 0.5m) 4.

5.

6.

7.

Dining table with 4 chairs w/ hardwood timber and steel Table : 0.9m x 0.9m x 0.75m Chair radius: 0.35m Chair height: 0.5m Study table with 3 chairs w/ hardwood timber and steel Table : 0.9m x 0.9m x 0.9m Chair radius: 0.35m Chair height: 0.5m Small display unit w/ hardwood timber and bent lightwood (1.7m x 0.5m x 1.7m) Large display unit w/ hardwood timber and bent lightwood ( 5.6m x 0.5m x 1.7m)

Supplier Custom made

Unit no.

Quantity 3

Unit Price RM 300.00

Total Price RM 600.00

Custom made

no.

1

RM 900.00

RM 900.00

Custom made

no.

14

RM 75.00

RM 1050.00

Custom

no.

6

RM 310.00

RM 1860.00

Custom made

no.

3

RM 260.00

RM 780.00

Custom made

no.

4

RM 300.00

RM 1200.00

Custom made

no.

1

RM 900.00

RM 900.00

made


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.3 INTERIOR DESIGN COSTING 8. 9. 10.

11.

12.

13.

14.

15.

16.

17.

Water Closet w/ ceramic finishes Bathroom sink w/ ceramic finishes CafĂŠ set w/ hardwood timber and steel pipes Cashier: 2.6m x 0.7m x 0.6m Rack : 3.0m x 0.4m x 0.3m Office set w/ hardwood timber, stainless steel and recycled wood Desk: 1.4m x 0.8m x 0.7m Chair: 0.5m x 0.5m x 0.6m Reception desk w/ lightwood timber, recycled wood and steel frame (3.5m x 0.6m x 0.7m)

Custom made Custom made Custom made

no. no. no.

6 2 1

RM 130.00 RM 120.00 RM 150.00

RM 780.00 RM 240.00 RM 150.00

Custom made

no.

1

RM 780.00

RM 780.00

Custom made

no.

1

RM 370.00

RM 370.00

Glass rail w/ frosted glass finishes (4.0m x 0.2m x 1.1m) Wall attached bench w/ hardwood timber and steel framing (1.5m x 0.5m x 0.3m) Outdoor gallery units w/ dark steel finishes (1.1m x 0.1m x 1.8m) Indoor gallery units w/ recycled wood,lightwood timber and steel pipes (1.3m x 0.4m x 1.9m) Indoor plant with box w/ bamboo palm and ceramic planter box (0.4m x 0.4m x 1.0m)

Custom made

no.

1

RM 450.00

RM 450.00

Custom made

no.

1

RM 270.00

RM 270.00

Custom made

no.

20

RM 400.00

RM 8000.00

Custom made

no.

4

RM 650.00

RM 2600.00

IKEA Malaysia

no.

3

RM 300.00

RM 900.00


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.3 INTERIOR DESIGN COSTING 18.

22.

LED Track light w/ steel pipes and aluminium finishes Diameter: 0.2m L X H : 7.8m x 0.4m LED Tube light w/ steel pipes and aluminium finishes LED Wall light w/ steel pipes and aluminium finishes Pendant light w/ steel pipes and metal mesh finishes Timber deck (Merbau)

23.

Labours and installs

19. 20. 21.

Custom made

no.

2

RM 1300.00

RM 2600.00

Custom made

no.

7

RM 180.00

RM 1260.00

Custom made

no.

12

RM 70.00

RM 840.00

Custom made

no.

18

RM 50.00

RM 900.00

Wood flooring Malaysia

sqm

487.2

RM 30.00

RM 14,616.00

TOTAL PRICE FOR INTERIOR DESIGN COST : Price 1) Doors,windows,railings and hollow concrete RM 39,670.00 block 2) Furnitures RM 45,446.00 TOTAL PRICE RM 85,116.00

RM 3400.00 Sub total price

RM 3400.00 RM 45,446


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.4 LANDSCAPE ARCHITECT COSTING No. 1.

Item Bucida Molineti

2.

Gardenia tubifera

3.

Cytostachs lakka

4.

Thyrsostachys siamensis

5.

Samanea saman

6.

Ficus

7.

Petra volubilis

8.

Cuphea hyssopifolia

9.

Citronella(geranium)

10. 11. 12.

Carpet grass/Philippines grass Bintje White Planter

13.

White River Stone

14.

Grey River Stone

Supplier Unit SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping no. Sdn Bhd SJH Nursery & Landscaping sqm Sdn Bhd Ikea no. Fah Lean Floral Trading Sdn. no. Bhd Terra Garden Sdn Bhd per 20kg Terra Garden Sdn Bhd

per 20kg

Quantity 10

Unit Price RM 50.00

Total Price RM 500.00

4

RM 190.00

RM 760.00

4

RM 23.00

RM 92.00

6

RM 60.00

RM 360.00

8

RM 230.00

RM 1840.00

27

RM 10.00

RM 270.00

5

RM 10.00

RM 50.00

124

RM 3.00

RM 372.00

20

RM 12.00

RM 240.00

520.6sqm

RM 1.00

RM 520.60

20 4

RM 1.50 RM 70.00

RM 30.00 RM 280.00

100kg

RM 15.00

RM 75.00

100kg

RM 30.00

RM 150.00


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.4 LANDSCAPE ARCHITECT COSTING No. 15.

Item Poured Concrete

Supplier Hanson Malaysia

Unit sqm

Quantity 1027.38sqm

Unit Price RM 12.00

Total Price RM 12,328.56

16. 17. 18. 19. 20.

Asphalt Road Roadline Paint Concrete Bench Road Lamp Lamp post

Hanson Malaysia MCI Kian Razak 72 Razak 72

sqm no. no. no. no.

2934.6sqm 4 6 16 7

RM 23.00 RM 70.00 RM 230.00 RM 280.00 RM 130.00 TOTAL PRICE

RM 67,495.80 RM 280.00 RM 1380.00 RM 4480.00 RM 910.00 RM 92,414.00


5.7 COSTING 5.7.2 ALTERNATIVE COSTING 5.7.2.4 GROSS DEVELOPMENT COSTING Total Price

Alternative cost

22% Civil and structural enginner Mechanical and electrical 51%

Interior designer Landscape architect

21%

6%

CIVIL AND STRUCTURAL COST MECHANICAL AND ELECTRICAL COST INTERIOR DESIGNER COST LANDSCAPE ARCHITECT TOTAL PROJECT COST Gross development cost = (Total project cost + consultation fee) = RM 417,575.00 + RM 100,000.00

RM 214,125.00 RM 25,920.00 RM 85,116.00 RM 92,414.00 RM 417,575.00 RM 517,575.00


5.7 COSTING 5.7.3 COMPARISON BETWEEN CONVENTIONAL & ALTERNATIVE COSTING Total Price

Conventional Cost Civil and structural 18%

Mechanical and electrical

49%

Interior Designer

26%

Alternative cost Civil and structural

22%

Mechanical and electrical 51%

6%

RM 251,475.00 RM 36,651.00 RM 129,661.50 RM 92,414.00 RM 510,201.00

CIVIL AND STRUCTURAL COST MECHANICAL AND ELECTRICAL COST INTERIOR DESIGNER COST LANDSCAPE ARCHITECT TOTAL CONSTRUCTION COST Gross development cost = (Total construction cost + consultation fee) = RM 417,575.00 + RM 100,000.00

RM 214,125.00 RM 25,920.00 RM 85,116.00 RM 92,414.00 RM 417,575.00

RM 610,201.00

Landscape architect

7%

21%

CIVIL AND STRUCTURAL COST MECHANICAL AND ELECTRICAL COST INTERIOR DESIGNER COST LANDSCAPE ARCHITECT TOTAL CONSTRUCTION COST Gross development cost = (Total construction cost + consultation fee) = RM 510,201.00 + RM 100,000.00

Interior Designer Landscape architect

RM 517,575.00


5.7 COSTING 5.7.3 COMPARISON BETWEEN CONVENTIONAL & ALTERNATIVE COSTING Total Price

Construction Cost Budget = RM 500,000.00 Consultation fee = RM 100,000.00 Final costing = RM 517,575.00 2 options of costing : 1) 2)

Conventional cost = RM 610,201.00 Alternative cost = RM 517,575.00

The reduction cost between the alternative cost and conventional cost is 84% . The alternative cost was managed to achieve by implementing the usage of recycled materials,items and cheaper types of materials such as recycled wood and second hand containers. By incorporating energy saving items such as solar panel and rainwater harvesting, the pavilion will able to save more cost on the electricity. Furthermore, with the proposed greeneries by the landscape architect, it will be able to act as an alternative for reducing the use of electrical appliances such as the wall fan. By taking into consideration the other alternative and materials that can be use for the pavilion, we are able to achieve the alternative cost which is RM 517,575.00 and still within the budget.


6.0

APPENDIX


7.0

R E F E R E N C ES


"Debungor". Debungor.blogspot.my. N.p., 2017. Web. 11 May 2017. http://debungor.blogspot.my/2011_03_01_archive.html "Garis Panduan Landskap Negara". issuu. N.p., 2017. Web. 11 May 2017. https://issuu.com/nationallandscapedepartment/docs/garis_panduan_landskap_negara_e2

Total Price

"Jadual Kadar Harga Pokok - Jabatan Landskap Negara". Scribd. N.p., 2017. Web. 11 May 2017. https://www.scribd.com/doc/80237540/Jadual-Kadar-Harga-Pokok-Jabatan-Landskap-Negara 1.5kW Solar System. (n.d.). Retrieved May 11, 2017, from https://www.infiniteenergy.com.au/solar-system-sizes/1.5kw-solarsystem Components of a Rainwater Harvesting System. (n.d.). Retrieved May 11, 2017, from http://www.rainwaterharvesting.org/Urban/Components.htm Jones, M. R. (2012, August 29). How Home Solar Power System Works. Retrieved May 11, 2017, from https://www.youtube.com/watch?v=m6UgO6-HELc&t=84s T., D. (2016, August 27). Top 10 Benefits of Using LED Lighting. Retrieved May 11, 2017, from https://www.ledluxor.com/top-10benefits-of-led-lighting User, S. (n.d.). Components of a Rainwater Harvesting System. Retrieved May 11, 2017, from http://www.rainwaterconnection.com/rainwater-harvesting/8-rainwater-harvesting/7-rainwater-harvesting-components W. (2011, September 29). Rainwater harvesting. Retrieved May 11, 2017, from https://www.youtube.com/watch?v=UTBQ50YDz7k Dining Archives. (n.d.). Retrieved May 7, 2017, from https://www.industrialhome.com/product-category/dining/ Seating Archives. (n.d.). Retrieved May 8, 2017, from http://www.getbackinc.com/product-category/seating/ Chicago Furniture. (n.d.). Retrieved May 7, 2017, from https://wrightwoodfurniture.com/collections/industrial-warehouse Laban, J. (2009, Nov. & dec.). Gift Shopping Success Source: Three Potato Four. Retrieved May 8, 2017, from http://www.apartmenttherapy.com/shopping/store_profiles/three-potato-four-102301 Henkerson, G. (2014, January 22). Vintage Industrial, LLC. Retrieved May 10, 2017, from https://www.custommade.com/by/vintageindustrial/

Project Management report  
Project Management report  
Advertisement