Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

kitchen & wc

meeting room

store

view from The Street

St MARY'S CHURCH EAST BERGHOLT

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

partition abutts arcade columns

Project

The Priory Church of St Mary Bungay Client

Friends of St Mary's Bungay view up through meeting room roof

Cad File

Scale

Mac 6

1:100 @ A1 March 2010

Drawn By / D a t e

Checked By / Date

BD March 2010

Title

floor plan and views of St Marys Church, East Bergholt D r a w i n g N o.

R e v N o.

1005/sk/02 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

kitchen & wc

meeting room

EAST BERGHOLT

WCs up cupbds

cupbds

south aisle

vestry organ

sink

choir vestry

kitchen & tower access

bell chamber over ladder to ringing chamber switches

priory ruins altar

up

up u p

nave

views in & out from St Marys Street meeting room

font

chapel north aisle

up

porch orc chamber mberr over m ov

ST MARYS 1

WCs up

vestry organ

cupbds

cupbds

south aisle

sink

choir vestry

store & tower access

bell chamber over ladder to ringing chamber switches

priory ruins altar

up

nave

up up

views in & out from St Marys Street meeting room

TRANSPARENCY

store

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Project

The Priory Church of St Mary Bungay Client

font

chapel north aisle

kitchen up

Friends of St Mary's Bungay Cad File

Scale

Mac 6

1:100 @ A1 March 2010

Drawn By / D a t e

Checked By / Date

BD March 2010

porch orc chamber mberr over m ov

Title

ST MARYS 2

comparative strategies D r a w i n g N o.

R e v N o.

1005/sk/03 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

up

vestry organ

cupbds

cupbds

south aisle

sink

choir vestry bell chamber over

ladder to ringing chamber switches

priory ruins up

altar

up

south aisle

nave

font

chapel north aisle

up

porch chamber over

Rev Date

0 metres

5

Revision

Drawn By

up 10

approximate scale

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Project

The Priory Church of St Mary Bungay south aisle

nave

Client

north aisle

Friends of St Mary's Bungay Cad File

Scale

Mac 6

1:100 @ A1 March 2010

Drawn By / D a t e

Checked By / Date

BD March 2010

Title

floor plan and typical section D r a w i n g N o.

R e v N o.

1005/sk/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

view 1 up

vestry

cupbds

FEMALE WC

cupbds

south aisle

C H

organ

view 2

MALE WC

sink

KITCHEN choir vestry

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

bell chamber over

ladder to ringing chamber switches

1200

view 5 PANTRY

view 3

priory ruins up u p

altar

nave

up

view 3

MEETING

view 4

view 2 view 4

font

chapel north aisle view 1

view 5

up

DESIGN OPTION 1

porch chamber over

view 1 0 metres me met m etres es

5

up 10

app app pproxim oximate ate sca scale le e approximate

DESIGN OPTION 2

up cupbds

south aisle

vestry

cupbds

FEMALE WC

sink

choir vestry bell chamber over

Rev Date

view 2

organ

view 3

MALE WC 1200

view 5

view 3

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

priory p rio oryy ruins ru uiinss

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

altar

up

MEETING

nave

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

up Drawing Status

PRELIMINARY view 2

view 4

Project

The Priory Church of St Mary Bungay

view 5 C

KITCHEN

Client

H

font

chapel north aisle 1200

view 4

Revision

ladder to ringing chamber switches

view 1

Friends of St Mary's Bungay Cad File

Scale

Mac 7

1:100 @ A1 ST/Apr 2010

Drawn By / D a t e

Checked By / Date

Title

Design Options 1 & 2 up

porch chamber over

D r a w i n g N o.

R e v N o.

1005/SK/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

5

5

770

31m

768

00m

92m

769

771

NOTES

23m

2

452

23m

e Th a y w ad

Bro

452

771

5

766 767 2

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Clare Castle

452

452

Motte & Baileys TIN MAL G LA

Po n

NE

Hall

d

Visitor Centre former goods shed

NE

TH

ER

G

AT E

ST

RE

ET

Car Park

Former Rail Bridge

Foot Bridge C

lift

on

451 Dr ive

w Ne

t Cu gate

ay ilw a R

cemetary Sluice

Pond

t er S Riv

d tle an sm Di

BM

45

.6

7m

m

10 92

sF ar

A

451

remains of priory church (Augustinian founded 1248)

our

2

450

remains of cloister existing church

00m

2

former inrmary

Clare Priory

450

00m

proposed extension Pond

44.2m

Drain

Stable House retreat cottages

Foot Bridge

Priory Farm

w Ne

AD RO

Cu

t

N HE AS

Rev Date

449

Revision

Drawn By

449 44.8m

our

t er S Riv

Pond

BM 45 .32m

Drain

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

ed

Sp illw ay

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

ra

ss

Drawing Status

G

FOR APPROVAL

in Dra

Project

Drain

n w

448

Extension to the Church e

at Clare Priory

448

Client

Dr ain

ay ew us Ca

Parish Church at Clare

s Priory Lodge

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:1000

ST Mar 10

Checked By / Date

Title

Location Plan 2

447

37m

2

771

37m

D r a w i n g N o.

R e v N o.

5

769

A/2019/A/01

31m

00m

92m

771

766

770

768

5

5

767

447

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

remains of original priory church

cloister Existing covered link to priory to be taken down new sewerage treatment plant

Existing porch taken down to ground level and paved floor taken up and replaced with new stone paving to provide as near as possible level access new

drain foul

Trench 2 see archaelogical report

Junction 1

Clare Priory

see drawing no A/2019/BR/24

existing church

Trench 1 see archaelogical report

3

7 Tre nch

Trench 3

6

see archaelogical report

9

8 10 7 9 6

Existing exposed mediaeval wall

ath vel p ng gra

see drawing no A/2019/BR/25

16

5

proposed extension 14

5

Suggested outline of mediaeval stair footing (0008) existi

Junction 2

8 6

10

12

4 3

9 8

10 3

Trench 5

rwp

see archaelogical report new soakaway

3

4

5

5

6

6

7

10

rwp

3

Trench 4 see archaelogical report

rwp in r dra wate

ace

surf new

A

out-buildings

Stable-house

n w

existing trees to be retained

Rev Date

Revision

Drawn By

e Inkpen Downie Architecture & Design Ltd

s Drain

Pond

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR CONSENT Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

1:200

ST Nov 09

Checked By / Date

Title

Site Plan D r a w i n g N o.

R e v N o.

A/2019/BR/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


EXISTING BUILDING

A

B

C

D

E

C

F

G

H

A

1

1 RAMP

cupboard

RAMP

D

B

C

D

E

F

G

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

H

A

1

1

D

ENTRANCE

steps

NOTES

stair

MEETING

LOBBY

adapted wc

new floating raised floor steps

sliding folding doors

sliding folding doors

proposed new stud walls

niche

2

medieval build

SACRISTY

3

3 floor to extension raised above level of existing to cope with future flooding

2

2 EXISTING BUILDING

storage

2

A

SACRISTY A 3

3

H

B

2950

5

5

6

6

5

2950

2838

5A ALTAR

Meeting/ Reconcilliation Room

F

5900

2950

H

B

TABERNACLE

5900

5A 6

4

SANCTUARY

5

F

3A 4

E

2950

E

4

2838

5900

SANCTUARY

5900

3A 4

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

TABERNACLE

6

ALTAR

Choir / Organ Loft

top light

AMBO

AMBO PLANT

7

7

PRESIDENTIAL CHAIR

C PROPOSED EXTENSION

7

7

top light

Mezzanine level Plan

A C1

C1 2838

B

C

2950

5900

GROUND FLOOR PLAN

2838

D

2950

E

F

G

B

5900

C

2950

D

2950

5900

E

F

G

F

G

5900

ROOF PLAN A

B

C

D

E

H

1

1

2

2

Rev Date

Revision

Drawn By

SACRISTY A 3

3

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

4

5900

3A 4

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

2950

SANCTUARY

FOR INFORMATION

H

Project

5

5

2838

2950

Extension to the Church at Clare Priory 5900

5A 6

6 Choir / Organ Loft

Client

The Parish Church at Clare Priory Cad File

Scale

Drawn By / D a t e

Mac 4

1:50

JI Dec 2008

Checked By / Date

7

7

Title

GF, Drainage & Foundation Plan Mezzanine level Plan C1

D r a w i n g N o.

R e v N o.

2838

B

C 5900

FOUNDATION & DRAINAGE PLAN

FIRST FLOOR PLAN

2950

D

2950

E 5900

F

G

A/2019/BR/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e. 5900

NOTES

1350

8 7 6

10

6

9

5

8

5 5900

16

4

14

3

12

3

10

5900

8

6

10 UP 10 R at 162.50

UP 4 R at 162.50

2950

7

9

650

1350

8

500

10 9

6 5

8 2950

hinged openable timber screen with metal gause backing and concealed steel frame steel frame to provide access for cleaning windows and to light fittings and speakers concealed behind.

5 5900

16 3

4

3

4

5

5

6

6

7

340

14

3

12

5900

5900

5900

Rev Date

3

Revision

Drawn By

ROOF PLAN

10

9

10

Inkpen Downie Architecture & Design Ltd 2 Balkerne House UP 10 R at 162.50

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk UP 4 R at 162.50

650

2950

8

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

500

BUILDING REGULATIONS Project

Extension to the Church hinged openable timber screen with metal gause backing and concealed steel frame steel frame to provide access for cleaning windows and to light fittings and speakers concealed behind.

2950

at Clare Priory Client

Parish Church at Clare 3

5

4

5

6

6

7

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:50

ST Dec 2009

Checked By / Date

340

3

Title 5900

5900

5900

Roof Plan &

ROOF STRUCTURE PLAN

Roof Structure Plan D r a w i n g N o.

R e v N o.

A/2019/BR/08 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

7

WEST

6

5

4

3

2

1

GRID NORTH

A

B

C

D

E

F

G

H

glazing ventilation

5A light weight glazed connection to roof

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

zinc roof finishes on timber structure structure exposed to centre section timber principle and secondary roof structure timber columns Timber vertical screening glazing Timber vertical screening

Proposed floor level to be set above existing (approx 300mm). This enables new structure to float over existing structure without disturbance to fabric. See Engineers proposals.

glazing Floating slab

A

Section on AA Read this section in conjunction with fig 8 and trenches 2, 5 and 6.

Existing footing depth not known

Section on BB

Footing to staircase

See engineers Proposals. New structure to be supported on piled foundations. Piles to be positioned to avoid archaeological remains

2

3

3A

4

Phase 2

Phase 3 CLA 037 SAM (26290)

Read this section in conjunction with FIGURE 2 SCC archaeological Evaluation Report CLA 037 SAM (26290)

H 1

low level opening to modern section of wall

Phase 1

5

6

G

F

E

D

C

B

A

7 C1

reinstate opening as niche

stone bench with glass balustrade

ramp to proposed raised floor area

low level opening to modern section of wall

Section on CC

Read this section in conjunction with FIGURE 5 SCC archaeological Evaluation Report CLA 037 SAM (26290)

Read this section in conjunction with FIGURE 4 SCC archaeological Evaluation Report CLA 037 SAM (26290)

Section on DD

section taken through ramp

Read this section in conjunction with FIGURE 3 SCC archaeological Evaluation Report CLA 037 SAM (26290) Rev Date

G H

G

F

E

D

C

F

E

D

C

B

C1

B

Revision

A

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

C1 glazing

Drawn By

glazing

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Scale

Drawn By / D a t e

Mac 4

1:100

Dec 2008

Checked By / Date

Title

Section on FF

Sections AA to FF

Section on EE D r a w i n g N o.

R e v N o.

A/2019/BR/11 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

zinc roof finishes on timber structure

Stone coping

Brick

timber vertical screening

glazing

4140

timber vertical screening 4240

Stone face work

Steel framed glazing and doors

Steps in stone to match facings

East Facing Elevation Timber boards between vertical timber shading blades

Zinc Roofing Zink rainwater goods Rev Date

Revision

Drawn By

Stone facework

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

2565

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status 1590

FOR INFORMATION Project

Extension to the Church

2600

2600

at Clare Priory Glazing

Client

Parish Church at Clare 1350

3360

3310

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:50

ST Nov 09

Checked By / Date

Title

East & West Elevations D r a w i n g N o.

West Facing Elevation

R e v N o.

A/2019/BR/18 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Ventilation to plant room constructed in brick and tile

South Facing Elevation Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:50

ST Nov 09

Checked By / Date

Title

South Elevation D r a w i n g N o.

R e v N o.

A/2019/BR/19 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

roof structure to centre section exposed internally timber principle and secondary roof structure timber columns

Rev Date

Timber vertical screening

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

N/A

JI

Checked By / Date

Title

3D Roof Structure D r a w i n g N o.

R e v N o.

A/2019/BR/21 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


E

H

F

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

D

G

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

B1

New lead flashing

TABERNACLE

top light

Existing cast iron gutter

NOTES

C SANCTUARY

C

AMBO

Stainless steel roof glazing structure

ALTAR

top light

Roof glazing

B1

Detail 16 (scale 1:5) A1

A1

Gutter Lead flashing

B2

A2

A2

A3

A3

7

SECTION THROUGH ROOF GLAZING

SACRISTY

PLAN 1:200 16

Cast iron gutter.

E B2 F

Double glazing.

G

D H

zinc finishes to roof facias and soffittes

zinc finishes to roof facias and soffittes

Ventilation to roof void.

8

10

9

H/W vertical blades with chamfered edge profile, held with stainless steel connectors. Timber obtained from sustainable sources and to be of a suitable variety so as not to require a finish treatment. (intention is to allow to weather to a silver patination)

Structural steel bracket to support roof glazing Insulation to wrap around ventilated gutter.

4

H/W vertical blades with chamfered edge profile, held top and bottom with stainless steel connectors. Timber obtained from sustainable sources and to be of a suitable variety so as not to require a finish treatment. (intention is to allow to weather to a silver patination)

3

3

Stainless steel lattice beam to be constructed before the arches for structural security. Double glazing in steel sections.

Double glazing in steel sections.

Vertical external shading

Main structural column

Main structural column

1590

Double glazing in steel sections

1590

Circular steel section

Choir / Organ Loft

Glazed roof cover

Main structural column

Section on B2 see detail 3A 200

200

200

200

200

200

200

200

200

200

Make up of floor. Extension:- 40mm Masonry Slabs on 20mm mortar bed on 80mm screed on rigid insulation on insitu reinforced suspended concrete slab on piles. Underfloor heating pipes in screed. Pile placed to avoid archaeology. Where slab approaches existing building slab thickness and reinforcement increased to allow cantelever over existing footing without bearing on historic fabric.

Make up of floor. Existing Church:- 40mm Masonry Slabs on 20mm mortar bed on 75mm concrete topping on Polystyrene infill blocks between prestressed beams bearing on block sleeper walls. Sleeper walls @ centres to be determined laid on existing floor. Whole assembly to form light weight unit capable of being removed without damage to existing historic fabric. New floor to be stopped short of edge to allow continuous perimeter ventilation.

2

Rev Date

Revision

Drawn By

strip out existing parquet flooring Make up of floor. Ramp:- 60mm Stone Slabs bearing on block sleeper walls. Sleeper walls cut to match ramp gradient and have sufficient distance from the existing building walls. Insulation to be dropped on the aluminium shaped sheet between the sleeper walls. Slabs to cantilever over the sleeper wall and to be stopped short of edge to allow continuous perimeter ventilation.

6

Make up of floor. New bridging floor to be built on exiting historic footing. Expansion capacity built on either side of the arches.

2600

00

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION

5

Project concrete topping

13

Extension to the Church

1

150 75

12

at Clare Priory Client

void

Parish Church at Clare

void

void Cad File

Mac 7 2019

Scale

Drawn By / D a t e

1:20

ST Aug 09

Checked By / Date

Title

Section on A1

Section on A2

Section on A3

Section on B1

Detail Sections A2 & A3 & B1 & B2 Detail 16 D r a w i n g N o.

R e v N o.

A/2019/BR/30 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

existing church wall new formed stone arches centre to the existing windows New level up concrete on existing footing Existing floor level

11

3D view for stone arches Corner detail

suggested outline of medieval footing

trench 1

trench 6 trench 2

medieval footing found in trench 6

suggested outline of medieval footing medieval footing found in trench 3

trench 3

Section on HH (through proposed arches) Stone shapes for arches

E

H

F

D

G

TABERNACLE

C SANCTUARY

AMBO

C

ALTAR

top light

top light

B1

B1 A1

B2

A2

A2

A3

A3

Rev Date

Revision

Drawn By

SACRISTY

Choir / Organ Loft

A1

PLAN 1:200

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

E B2 F

G

D

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

H

FOR INFORMATION

Make up of floor. Existing Church:- 40mm Masonry Slabs on 20mm mortar bed on 75mm concrete topping on Polystyrene infill blocks between prestressed beams bearing on block sleeper walls.

Project

Extension to the Church proposed stone arches on elevation

1200

1200

1200

1200

1200

at Clare Priory

1200

Client

Parish Church at Clare FLOOR VOID EXISTING FLOOR LEVEL

Cad File

180 180

2040

Mac 7 2019

2400

Scale

Drawn By / D a t e

1:20

ST Aug 09

Title

trench 6 trench 1

Detail Sections DD & HH trench 2

suggested outline of medieval footing

D r a w i n g N o.

trench 3

Section on DD (through proposed existing church floor)

Checked By / Date

R e v N o.

A/2019/BR/31 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

E

H

F

D

G

TABERNACLE

C SANCTUARY

AMBO

C

ALTAR

top light

top light

B1

Make up of floor. Extension:- 40mm Masonry Slabs on 20mm mortar bed on 80mm screed on rigid insulation on insitu reinforced suspended concrete slab on piles. Underfloor heating pipes in screed. Pile placed to avoid archaeology. Where slab approaches existing building slab thickness and reinforcement increased to allow cantelever over existing footing without bearing on historic fabric.

B1 A1

B2

A2

A2

A3

SACRISTY

insulation to perimeter

PLAN 1:200 FLOOR VOID

E B2

EXISTING FLOOR LEVEL trench 6

A3

Choir / Organ Loft

proposed stone arches on elevation

A1

Section on GG (through proposed extension floor)

void

G

F

D H

trench 1

zinc roof finish

100

100

zinc facia

insect mesh

stainless steel gutter lining

60

60

ventilation gap

60

ventilation gap

Rev Date

Revision

Drawn By

50

50

60

60

50

150

stainless steel gutter lining

150

stainless steel gutter lining

perforated strip

ventilation gap

perforated strip

perforated strip

ventilation gap

50

Detail 8 (scale 1:5)

Detail 9 (scale 1:5)

Detail 10 (scale 1:5)

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

H/W vertical blade

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

1:20/1:5

ST Aug 09

Checked By / Date

Title

Detail 11

(scale 1:5)

Detail 12

(scale 1:5)

Detail 13 (scale 1:5)

Detail Section on GG & Details 8 to 13 D r a w i n g N o.

R e v N o.

A/2019/BR/32 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

H

E F

D

G

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

TABERNACLE

C SANCTUARY

AMBO

C

NOTES

ALTAR

top light

top light

B1

B1 A1

B2

A2

A2

A3

A3

SACRISTY

Choir / Organ Loft

A1

PLAN 1:200 E B2 F

G

D H

lead flashing

80 rafter

1000

rafter

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

BUILDING REGULATIONS Project

Extension to the Church at Clare Priory 150

Client

Parish Church at Clare Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:20

ST Nov 2009

Checked By / Date

Title void

Section on CC

Section on CC D r a w i n g N o.

R e v N o.

A/2019/BR/34 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


1

construct stainless steel lattice beam on existing wall for structural security reasons.

2

3

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

4

construct concrete foundation above existing footing.

5

2400

7

10

8

construct arches.

11

6

slide the stone arch pieces into the existing flint wall above the newly built footings.

2400

2400

construct columns in the existing flint wall.

secure middle arch with steel straps to the concrete footings & remove existing flint wall section in middle arch.

9

12

secure side arches with cross straps & fill the void under the middle arch with concrete.

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

13

remove existing flint wall section in side arches.

14

fill the remaining void with concrete above existing footing.

15

Extension to the Church

remove temporary straps and steel lattice beam & construct floor finish.

at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

1:50

ST Nov 09

Checked By / Date

Title

Stone Arches Structural Build-up Sequence D r a w i n g N o.

2400

2400

2400

R e v N o.

A/2019/BR/28 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Dorma HSW-GP Panel System

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

75

NOTES

75

14

3000

Detail 14

Make up of floor. Existing Church:- 40mm Masonry Slabs on 20mm mortar bed on 75mm concrete topping on Polystyrene infill blocks between prestressed beams bearing on block sleeper walls.

180 180

2040

15

proposed stone arches on elevation

1200

FLOOR VOID EXISTING FLOOR LEVEL

Elevation

1200

1200

180 180

1200

1200

1200

2040 2400 trench 6

Detail 15

130 65 80

130 65 80

7

Section

Plan Rev Date

Revision

Drawn By

Arches: 2040mm overall opening width. Panel width x height = 1200mm x 3000mm HSW-GP Panel Fully glazed without rails. Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

1:20/1:2

ST Nov 09

Checked By / Date

Title

Sliding Wall Detail D r a w i n g N o.

R e v N o.

A/2019/BR/36 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

25

12.5

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability what soever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

75

50

75

75

NOTES

28

50

Detail 3 (scale 1:2)

200

50

Detail 4 (scale 1:2)

Detail 2 (scale 1:2) 144 x 32

Detail 7

(scale 1:2)

50

Detail 1 (scale 1:2)

40mm masonry slabs Seperation on floor finish to prevent cracking Steel angle to prevent cracking on the floor finish 20mm mortar bed Underfloor heating pipes in 80mm screed 100mm rigid insulation DPM Reinforced suspended concrete slab on piles Underfloor void

Victorian period flint wall

Rev Date

Revision

Drawn By

Glazed curtain wall Sealant Timber 44mm thick section cut to shape of the flint wall Aluminium L section fixed to the glazing frame 50

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION

DPC

Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

1:2

ST Aug 09

Checked By / Date

Title

Detail 5 (scale 1:2)

Detail 6 (scale 1:2)

Details 1 to 7 D r a w i n g N o.

R e v N o.

A/2019/BR/33 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

27

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

100

10

100

25

75

110

NOTES

Detail 17 Detail 18 stone lintel

F Detail 19 4100

350

18

470

lead flashing

350

17

350

28 61

220

325

ARCH

blockwork coursing

19

350

280

C

20

280 220

35

325

68

325

22

470

48

B

Revision

Drawn By

34

Rev Date

92

Inkpen Downie Architecture & Design Ltd

31

280

325

A Tel 01206 577 244 arch@inkpendownie.co.uk

59

325

2 Balkerne House

Balkerne Passage

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

280

44

325

BUILDING REGULATIONS Project

350

Extension to the Church at Clare Priory

280

77.5

21

Client

16

Parish Church at Clare .00

120

470

60

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:20 / 1:5

ST Nov 2009

Checked By / Date

Title

470

Apse Details Exterior Elevation & Section DD D r a w i n g N o.

R e v N o.

A/2019/BR/37

ELEVATION

F

SECTION ON FF

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


2950

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

2950

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

500

23

22

hinged openable timber screen with metal gause backing and concealed steel frame steel frame to provide access for cleaning windows and to light fittings and speakers concealed behind.

24

340

Brick sleeper walls under the floor

100

310

INTERIOR APSE ELEVATION

Rev Date

Revision

Drawn By

PLAN ON BB Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

75 25 100 10

340

Project

Extension to the Church

140

100

BUILDING REGULATIONS

at Clare Priory Client

3

Parish Church at Clare

PLAN ON AA

PLAN ON CC

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:20

ST Nov 2009

Checked By / Date

Title

Apse Details Plans & Interior Elevation D r a w i n g N o.

R e v N o.

A/2019/BR/38 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

cavity tray brick outer leaf full cavity insulation

conc block inner leaf

stone outer leaf

stone outer lintel

concrete lintel

steel fixed light

timber lining

01 typical head

Typical window in brick work

04 typical head

Typical window in ashlar work

AN.2.2 special brick

02 typical reveal

AN.1.2 special brick

05 typical reveal Rev Date

Revision

Drawn By

steel sill welded to frame

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

cavity tray

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

stone cill

BUILDING REGULATIONS Project

Extension to the Church stone sub-cill

at Clare Priory Client

Parish Church at Clare

03 typical cill

06 typical cill

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:50/1:5

ST Aug 2009

Checked By / Date

Title

Typical Fixed Window Details D r a w i n g N o.

R e v N o.

A/2019/BR/35 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Detail 20

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Scale 1:2

NOTES

Detail 22 Scale 1:2

500

Detail 24 Scale 1:5

Detail 21 Scale 1:2

Detail 22 Scale 1:5

Detail 23 Scale 1:2

Detail 20 Scale 1:5

Detail 21 Scale 1:5

.00

Rev Date

120

60

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR APPROVAL Project

140

340

Extension to the Church at Clare Priory

100

100

Client

Detail 23

Parish Church at Clare Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:5/1:2

ST Aug 2009

Checked By / Date

Title

Apse Window Details

Scale 1:5 D r a w i n g N o.

R e v N o.

A/2019/A/39 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

NOTES

CURTAIN WALL SYSTEM IMAGES

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

FOR INFORMATION Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

N/A

ST Nov 09

Checked By / Date

Tit le

Curtain Wall System Images D r a w i n g N o.

R e v N o.

A/2019/BR/40 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

This detail is a variation on the Wright Style Standard Details for SR Series Drawing no: INK001-D

800

1860

180

Plan

1520

BN65M BN65M GL15 Bead

5050TDN H10166F 5050ZDN D45F

D81 D80

D81 D80

BN65M

H10166F

GL15 Bead

GL15 Bead

5050TDN D45F

5050ZDN

D81 D80

H10167

5

24

5

50

H10023

18

10

20

50

20

50

10

50

20

50 60

2040

Plan Detail

18

5

24

5

140

40

GD6404FS WRHT9014F SR60140-2

GD6024R OL6013

GLASS SUPPORT

60

H10090

GLAZING BLOCK WZxxxx SCREW

50

4140

ASUL6009

5050ZDN Rev Date

Revision

Drawn By

10

H10166F D45

50

5050TDN

20

BN65M

GL15 Bead D81 D80

50

D80 D81 20

Balkerne Passage

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

FOR APPROVAL Project

GL15 Bead

BN65M 50

2 Balkerne House

Tel 01206 577 244 arch@inkpendownie.co.uk Drawing Status

50

2040

Inkpen Downie Architecture & Design Ltd

5050L

Extension to the Church at Clare Priory

8

Client

Parish Church at Clare

Section Detail

Cad File

Scale

Drawn By / D a t e

Mac 7 2019

1:10/1:2

ST Mar 2010

Checked By / Date

Title

Entrance Door Details D r a w i n g N o.

R e v N o.

A/2019/A/41 Section

Elevation

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


D o not sca le di mens ions off dra wings. Use w rit ten or ca lcu lated d imensions. The cont rac tor i s responsible for checking a ll dimensions be fo re ordering or start ing work .

WHITE BRICK IMAGES

Th is dra wing has been p roduced for the cl ient for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the c lient and wil l have a co m men su rate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g i s no t in tended fo r use by any o ther pe rson or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. I nkpen Down ie Arch itecture &Des ign accept no liabi lity whatsoever i f th is d raw ing is used by any other person o r fo r a n y o t h e r p u r p o s e.

NOTES

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Draw ing S ta tus

FOR APPROVAL Project

Extension to the Church at Clare Priory Client

Parish Church at Clare Cad File

Mac 7 2019

Scale

Drawn By / D a t e

N/A

ST Mar 10

Checked By / Date

Tit le

White Brick Images D r a w i n g N o.

R e v N o.

A/2019/A/42 Co p yri ght re se r ve d b y In kp en D ow ni e A r chit ect ur e & De si gn. Thi s dr awi ng s hal l not be re pr odu c ed o r u s ed w itho ut p ri or pe r mi s sio n of th e p art ne rs hi p.


1087.5

Stone

The wall to be constructed on a level surface created by paving slabs. Mortar to be lime putty mortar if possible. 1040

ELEVATION

SECTION

Inkpen Downie Architecture & Design Ltd 2 Balkerne House Balkerne Passage Tel 01206 577 244 arch@inkpendownie.co.uk Client Project

Parish Church at Clare Clare Priory Extension

D r a w i n g N o.

A/2019/BR/50

Revision

Colchester CO1 1PA Fax 01206 563 377 www.inkpendownie.co.uk

2019 T i t l e Sample Brick Wall S c a l e 1:20

Project no.

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor is responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the project on the site shown. It was prepared for a purpose agreed with the client and will have a commensurate degree of accuracy. It is not a record "as built". This drawing is not intended for use by any other person or for any other purpose than that specified here. Inkpen Downie Architecture & Design Limited accept no liability whatsoever if this drawing is used by any other person or for any other purpose.


1084

3988

WC

Kitchen

GF02

GF01 803 100

40

337

32

40a

1155

11

OAD

30

A

1305

845

825

820

830

530

1200

4249

.5

TR AUL HAIN

Metres

1223

16

918.8

Storage

1171.5

2291

GF05

420

920

NOTES

A

2979

Study GF08

Lobby

Lobby

GF04

GF10 858

160

800

798 2733

80 970

1703

2919

100

3105

80

1807

60

1753

40

3134

20

805.3

0

19

20

43.0m

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

1095

1799

S

OS MAP Scale 1:1250

3907

E

2467

N W

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

800

19

1029

780

Storage

Music Room

GF06

GF09

4510

125

Entrance

1343

566

942 GF12

1360

1130

930

850

2005

367

1295

1355

340

1359

1939

1289

941 180

1208

4048

961

300

1277 1187

100

2130

2171

3191 1672

3640

1474

GF13

350

4354

3848

1084

1130

730

330 4404

2181

60

Tran sport )

5563

GF07

Living Room

3911

900

48.5m

400

GROUND FLOOR PLAN

2190

450

2015

2318

2091

2130 190

1894

1810

860

Bathroom

A

A

2085

FF10

Bathroom FF02 1850

120

SECTION AA

1768

750

Lobby 809

952

Storage

1955

FF09

Bedroom

FF01

2368

1728

1440

FF08 4036

Bedroom

Bedroom

FF04

FF03 A 26 Aug 09 Rev Date

OS Map added

ST

Revision

Drawn By

3145

4650

Bedroom FF06

Storage

Storage

FF05

FF07

Inkpen Downie Architecture & Design Ltd Balkerne Passage

3271

Tel 01206 577 244 arch@inkpendownie.co.uk

FIRST FLOOR PLAN

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

SURVEY

1323

1002

2 Balkerne House

Project

40 Hainault Road

280

906

REAR ELEVATION (to garden)

872

800

flagstone floor random sizes around 200mm x 600mm

1543

Client

1725

electric board 1288

973

A

975

meter main fuses

2163

225

967

blocked door

existing GF floor joists 140x90 @ 330CC

2974

1454

3485 1980

1496

865

515

gas boiler

500

2680

scaffold board

pressure vessel

existing GF floor joists 100x100 @ 500CC

A

heating controls fixed to u/s floor

100x90 330CC

2070

sump 750mm deep

1707

1299

1369

1441

don

Living Room

4973

60a

GF03

2691

Kitchen 6

2770 3641

GF11

1529

48

3986

Storage

800

STAT ION RO AD

(Lon

290

994

40b

42

210

100 3696

Cad File

Scale

Mac 7/819

1:50/1:1250 ST/Mar 09

Drawn By / D a t e

Checked By / Date

BD/Mar09

Title

Existing Floor Plans, OS Map 270

BASEMENT FLOOR PLAN

Section & Elevation D r a w i n g N o.

R e v N o.

6561

A/819/S/01

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


B

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

new timber shelves to be used as emergency exit through the openable roof light

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

new roof light new lightwell rebuild this wall

NOTES

900

shelves

heating controls fixed to u/s floor

A

existing scaffold board and posts to be removed. new adequate support to structural engineers design

C

A

new lowered floor

re-site existing gas boiler & pressure vessel to ground floor

SWITCH 1 Gang switch

new cupboard under the stairs move existing electric board, meter & main fuses

new interior tanking detail all around the basement

new timber shelves

ELECTR

SWITCHES

294 294 294

SD interlinked smoke detector

new cupboard doors to existing opening

ELECTRICAL KEY

2 Gang switch

C

3 Gang switch

new boxing

4 Gang switch new cupboard

Two Way One Gang Switch

BASEMENT FLOOR PLAN

Two Way Two Gang Switch Three Way One Gang Switch

B move existing as meter and other equipment onto the new lining

provide guarding around the roof light to comply with approved Doc K2/3

Three Way Two Gang Switch

2 layers of plaster board all around

new roof light

POWER

new timber staircase & balustrades on either side

D ROA LT NAU HAI

outline of the basement and the new light well

Switched Socket Outlet

allow for removing & resiting the existing RWP and hand pipe as required

re-site the existing boiler to ground floor storage

2

Twin Switched Socket Outlet

3

Tripple Switched Socket Outlet

POWER

ply Sup 5 amp

5 amp Switched Socket Outlet blocked door F

Floor Socket

Storage GF05

Electrical wiring

Study GF08 fire door 30mins

fire door 30mins

Living Room

Lobby interlinked smoke GF10

detector

fire door 30mins

r Wate

ly upp al S Ga ctric r Ele e fo site n li d n ume ed o pres check to be pply s Su

SD

fire door 30mins

COMMUNICATIONS & FITTINGS SD

Smoke Detector

HD

GF07

SITE PLAN @ 1/200

Heat Detector Electric Extract Fan

Storage GF11

GROUND FLOOR PLAN

TV

Living Room

Television Aerial Socket

GF13

Music Room

T

Telephone Socket

GF09 ASDL

ASDL Socket

S

COMMU

Speaker Socket Wall mounted speaker Ceiling mounted speaker

C Rev Date

Revision

Drawn By

900

B A

294 294 294

SD

Inkpen Downie Architecture & Design Ltd 3

2 Balkerne House 3

D

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

LIGHTING & ELECTRICAL LAYOUT

TENDER

E

LIGHT FITTINGS KEY

Repairs and Alterations to

LIGHTS A

provide guarding around the roof light to comply with approved Doc K2/3

B

openable rooflight

Ceiling (Surface Mounted) Delta Light Xilo 111 JAC C

Delta Light PUK 4

REAR ELEVATION

Wall (Surface Mounted) Delta Light Orbit

allow for temporary removal and refixing of all existing pipes and services disturbed by the work.

Client

Cad File

Scale

Mac 7/819

1:50 / 1:200 ST/Jul 10

Checked By / Date

BD/May 10

Title

Proposed Site Plan, Floor Plans, Elevation Lighting and Electrical Layout D r a w i n g N o.

E

Drawn By / D a t e

Wall (Surface Mounted) Helmut Grasser Lighting Sikion

D

40 Hainault Road

Wall (Surface Mounted)

lead upstand C

Project

Ceiling (Recessed) Aurora AU-HCD352 Satin Silver

R e v N o.

A/819/T/01 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


2130

B new timber shelves to be used as emergency exit through the openable roof light

2091

2318

C

975

existing floor level 1465

2300

existing floor level

490

new interior tanking detail all around the basement

new lowered floor 210.4

new cupboard under the stairs move existing electric board, meter & main fuses

120

new glazed cupboard doors to be fitted on the existing opening

239239239

interlinked smoke detector SD

new cupboard doors to existing opening

2218

new timber staircase

A

1504

900

re-site existing gas boiler & pressure vessel to ground floor

new ceiling under the existing joists

blocked door on ground floor level

new lowered floor

existing scaffold board and posts to be removed. new adequate support to structural engineers design

NOTES new shelves to be used as a ladder on emergency fire exit through the rooflight new cupboard/storage retain existing floor level in this section

new floor level reuse existing flagstones

120

shelves

heating controls fixed to u/s floor

rebuild existing wall new opening into existing blocked up window opening

450

190

rebuild this wall

form new lightwell

existing floor joists to be repaired

new space saver staircase to comply with approved Doc K1.

new lightwell

C

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

new roof light

new roof light

A

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

new ceiling under the joists

proposed lowered floor level

DRAINAGE CHANNEL

DRAINAGE CHANNEL

DRAINAGE CHANNEL

DRAINAGE CHANNEL

new boxing

BASEMENT FLOOR PLAN

SECTION BB

SECTION AA

new cupboard

BUILDING REGULATIONS NOTES

B q p the new lining

provide guarding around the roof light to comply with approved Doc K2/3

re-site the existing boiler to ground floor storage

new timber staircase & balustrades on either side

new opening into existing blocked up window opening

allow for removing & resiting the existing RWP and hand pipe as required

underpinning to existing walls to structural engineers design

2300

new roof light outline of the basement and the new light well

2218

2 layers of plaster board all around

1.2 Provide continuous damp proof membrane over slab. DPM to be Delta MS-20 and installed completely in accordance with the manufacturers specifications and recommendations.

5.2 The rise to be max 210.5mm and the going to be min 294mm.

1.4 50mm Kingspan K3 Floorboard with underfloor heating in 75mm mesh reinforced screed on top.

490

1.5 A new concrete chamber to be constructed under the new staircase to accomodate the new tanking pump.

DRAINAGE CHANNEL

DRAINAGE CHANNEL

2. NEW WALLS BELOW GROUND

Study

SD

fire door 30mins

GF07

Storage GF11

Living Room GF13

Music Room GF09

Delta MS-500 Minimum 12.5mm plasterboard Vertical 50mm x 25m treated timber battens fixed with size 12 screws into Delta-plugs 62.5mm Kingspan Kooltherm K17 insulated dry-lining board between timber battens Floor build-up: Flagstones Underfloor heating in 75mm screed 50mm Kingspan Koolterm K3 floor insulation Delta MS-20 Concrete slab to accomodate 125mm x 75mm void for drainage channel

DETAIL

1:10

6.2 Internal doors as per notes on drawing. 6.3 All internal doors opening to the lobby & stair area to be 30min fire doors. 6.4 All fire doors to have 3 hinges and an intumescent strip. 6.5 Centre pane U value of new roof light to be maximum 1.2W/msq/deg C

2.3 Exposed courses of outer leaf to 225mm below finished ground level to be executed in face brickwork. Brick strength to engineers calculations.

7.1 New hexagonal rooflight to be openable and to have trickle ventilation.

3. DRAINAGE BELOW GROUND 3.1 Drainage for the tanking system pump to be installed in accordance with the manufacturers specifications and recommendations. 3.2 Pipes bends and fittings generally to be proprietary plastics system to BSEN1401-1 class SN4, with flexible joints, kitemark certified installation to be in complete accordance with BSEN 752, manufacturers instructions and recommendations. 3.3 Before starting work, check invert levels and positions of existing drains, sewers, inspection chambers and manholes against drawings , report discrepancies, protect existing drains to be retained and maintain normal operation.

7.2 Provide a minimum of 5000 square mm equivalent ventilation area in the new cellar. 8. HEATING 8.1 Re-site the existing boiler from the basement to the ground floor storage room. 8.2 Extend the existing heating system into the repaired basement area. 8.3 The contractor is to design and install the installation generally to comply with BS5449, BS 5410 or BS6880, BS6700, BS7074-1, BS8000, BS EN 832. and all relevant water regulations and by-laws. 8.4 Balance and commission the system on completion and provide a full set of as installed drawings, operation and maintenance instructions.

9. ELECTRICAL, LIGHTING & POWER 9.1 Extend the existing electric system to the repaired basement area.

3.4 Drains generally to be 100dia laid to a min fall of 1 in 40 for branches and 1 in 80 for main runs. Or 150mm dia laid to a fall of 1 in 60 for branches and 1 in 150 for main runs.

9.2 The contractor is to design and install the Installation to be completed in accordance with BS 7671, BS EN 60335, BS EN 60439, BS EN 60669.

3.5 Pipes generally to be laid at a min depth of 600mm and laid on 100mm depth and then surrounded with granular fill. Pipes at shallower depths to be bedded and surrounded in granular fill and spanned with a PC concrete paving slab. Shallow pipes under building or parking area to be surrounded in concrete.

9.3 Reasonable provision to be made for the design, installation, inspection and testing of the installation in order to protect persons from fire and injury.

3.6 Pipes passing through walls to be spanned with 1 course PC lintel with 50mm clearance all round pipe, opening to be bridged with a rigid sheet material. 3.7 New inspection chambers up to 1000mm deep to be proprietary 450 dia plastics chambers with preformed channels, bedded on concrete and surrounded in pea shingle to manufacturers instructions. 3.8 New chambers in excess of 1000mm to be constructed of pre-cast concrete rings to BS 5911, 1000 diam to 1500 deep and 1200 diam up to 3000 deep. Chambers to be built off an in-situ conc base 150mm thick. Channels to be formed of proprietary channel fittings set in weak concrete benching floated to a smooth finish falling to the channel. Provide metal step irons to all chambers in excess of 1000 deep. Provide proprietary pre-cast concrete cover slab.

provide guarding around the roof light to comply with approved Doc K2/3

6.1 All glazing including double glazing to windows and internal single glazing to screens and doors etc to be glazed using safety glass.

7. VENTILATION

2.5 Minimum 12.5mm plasterboard on treated timber battens and 50mm insulation between the battens.

DRAINAGE CHANNEL

6. GLAZING, ROOFLIGHT & DOORS

2.2 New wall to the lightwell to be reinforced concrete blockwork to structural engineer's specification

2.4 Proprietary tanking system on the walls to be Delta MS-500 and installed completely in accordance with the manufacturers specifications and recommended details.

75

detector

75

GF10

fire door 30mins

fire door 30mins

Living Room

SECTION CC

fire door 30mins

Lobby interlinked smoke

2.1 Rebuild the existing rear elevation brick wall to structural engineers specifications and recommendations.

20 50

GF08

GROUND FLOOR PLAN

5.1 New staircase to be a space saving staircase to comply with Building Regulations Part K1 alternating tread stair description.

new timber staircase

Storage GF05

5. NEW STAIRCASE

1.1 Build up new concrete slab lowered floor with underpinning to structural engineers design and specification.

1.3 Damp proof membranes should link with wall tanking system to form an impervious barrier.

new lowered floor reuse existing flagstones

blocked door

1. NEW FOUNDATIONS AND FLOOR BUILD UP

3.9 Provide proprietary cast-iron access cover to all new chambers, strength to suit anticipated traffic loading & type to accomodate finishes where set in paved areas.

9.4 Installation to be carried out by a competent electrician who will provide an appropriate BS 7671 electrical installation certificate for the work. 9.5 The installation is to include the following: general lighting and small power electrical wiring for heating installation

A 11/05/10 minor amendments for building regulations application Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

9.6 Ensure all wall mounted switches and sockets are fitted at heights to satisfy the requirements in M1 Dwellings clause 8.3 diagram 29.

BUILDING REGULATIONS

9.7 Provide a full set of as-installed drawing operation and maintenance instructions.

Project

9.8 Make provision for a minimum of one per four fixed light fittings to be high efficiency light fittings (i.e. light fittings only capable of accepting lamps having a luminous efficacy greater than 40 lumens per circuit watt e.g. fluorescent tubes or compact fluorescent lamps not GLS tungsten lamps with bayonet cap or Edison screw bases).

Repairs and Alterations to 40 Hainault Road Client

4. INTERNAL WALLS & FLOORS

openable rooflight lead upstand

REAR ELEVATION

4.1 New basement partition wall next to the staircase to be stud partition: 50 x 75 softwood stud partitions at min 600 centers with plasterboard either side.

Cad File

Scale

Mac 7/819

1:50 / 1:10 ST/Mar 10

4.2 Existing timber suspended floor over existing cellar area to have all struts and props and later insertions and repairs removed, defective timbers are to be replaced and original structure to be repaired and strengthened in accordance with structural engineers recommendations. Lorr to be upgraded to type C in accordance with B Regs, section 5 part E. 22mm timber boarding Min mass per unit area 15kg/m3. Plaster Board to ceiling Min mass per unit area 10kg/m3. Screw fixed. An absorbant layer of mineral wool Min mass per unit area 10kg/m3 laid in the cavity.

Title

4.3 All new floor joists to be supported in accordance with structural enginners recommendations. Provide lateral restraint straps to floors where to floor joists are parallel to walls, straps to be 1.5 meters long 30 x 5mm galvanised mild steel, fixed to top of joists with noggins in between.

Drawn By / D a t e

Checked By / Date

BD/May 10

Proposed Floor Plan, Sections, Elevation Details and Building Regulation Notes D r a w i n g N o.

A/819/BR/01

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

2091

2130

D

lead sheet roof covering on 25mm sawn timber boarding with penny gaps

2318

2 layers of plaster board all around existing floor joists to be repaired

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

450

2000

190

NOTES

new ceiling under the existing joists

2300 120

new glazed cupboard doors to be fitted on the existing opening

existing floor level

490

210.4

new lowered floor

306

2218

new timber staircase

proposed lowered floor level

E

DRAINAGE CHANNEL

E

SECTION AA Glidevale FV250 Fascia ventilators

306

306

DRAINAGE CHANNEL

new ceiling under the joists new roof light form new lightwell

BUILDING REGULATIONS NOTES

rebuild existing wall new opening into existing blocked up window opening

D

1504

1.2 Provide continuous damp proof membrane over slab. DPM to be Delta MS-20 and installed completely in accordance with the manufacturers specifications and recommendations. 1.3 Damp proof membranes should link with wall tanking system to form an impervious barrier.

existing floor level

1.4 50mm Kingspan K3 Floorboard with underfloor heating in 75mm mesh reinforced screed on top.

120

1465

975

new shelves to be used as a ladder on emergency fire exit through the rooflight new cupboard/storage retain existing floor level in this section

new floor level reuse existing flagstones

LIGHTWELL ROOF STRUCTURE PLAN @ 1:10

1. NEW FOUNDATIONS AND FLOOR BUILD UP 1.1 Build up new concrete slab lowered floor with underpinning to structural engineers design and specification.

1.5 A new concrete chamber to be constructed under the new staircase to accomodate the new tanking pump. DRAINAGE

DRAINAGE

CHANNEL

CHANNEL

2. NEW WALLS BELOW GROUND 2.1 Rebuild the existing rear elevation brick wall to structural engineers specifications and recommendations.

SECTION BB

lead roof cover under the existing timber boarding

2.2 New wall to the lightwell to be reinforced concrete blockwork to structural engineer's specification 2.3 Exposed courses of outer leaf to 225mm below finished ground level to be executed in face brickwork. Brick strength to engineers calculations. Glidevale FV250 Fascia ventilator

2.4 Proprietary tanking system on the walls to be Delta MS-500 and installed completely in accordance with the manufacturers specifications and recommended details. 2.5 Minimum 12.5mm plasterboard on treated timber battens and 50mm insulation between the battens.

2300

underpinning to existing walls to structural engineers design new timber staircase

3.3 Before starting work, check invert levels and positions of existing drains, sewers, inspection chambers and manholes against drawings , report discrepancies, protect existing drains to be retained and maintain normal operation.

490

new lowered floor reuse existing flagstones

DRAINAGE CHANNEL

SECTION CC

DRAINAGE CHANNEL

3.4 Drains generally to be 100dia laid to a min fall of 1 in 40 for branches and 1 in 80 for main runs. Or 150mm dia laid to a fall of 1 in 60 for branches and 1 in 150 for main runs. 3.5 Pipes generally to be laid at a min depth of 600mm and laid on 100mm depth and then surrounded with granular fill. Pipes at shallower depths to be bedded and surrounded in granular fill and spanned with a PC concrete paving slab. Shallow pipes under building or parking area to be surrounded in concrete. 3.6 Pipes passing through walls to be spanned with 1 course PC lintel with 50mm clearance all round pipe, opening to be bridged with a rigid sheet material. 3.7 New inspection chambers up to 1000mm deep to be proprietary 450 dia plastics chambers with preformed channels, bedded on concrete and surrounded in pea shingle to manufacturers instructions. 3.8 New chambers in excess of 1000mm to be constructed of pre-cast concrete rings to BS 5911, 1000 diam to 1500 deep and 1200 diam up to 3000 deep. Chambers to be built off an in-situ conc base 150mm thick. Channels to be formed of proprietary channel fittings set in weak concrete benching floated to a smooth finish falling to the channel. Provide metal step irons to all chambers in excess of 1000 deep. Provide proprietary pre-cast concrete cover slab. 3.9 Provide proprietary cast-iron access cover to all new chambers, strength to suit anticipated traffic loading & type to accomodate finishes where set in paved areas. 4. INTERNAL WALLS & FLOORS 4.1 New basement partition wall next to the staircase to be stud partition: 50 x 75 softwood stud partitions at min 600 centers with plasterboard either side. 4.2 Existing timber suspended floor over existing cellar area to have all struts and props and later insertions and repairs removed, defective timbers are to be replaced and original structure to be repaired and strengthened in accordance with structural engineers recommendations. Lorr to be upgraded to type C in accordance with B Regs, section 5 part E. 22mm timber boarding Min mass per unit area 15kg/m3. Plaster Board to ceiling Min mass per unit area 10kg/m3. Screw fixed. An absorbant layer of mineral wool Min mass per unit area 10kg/m3 laid in the cavity. Insert two rows of solid noggings between existing joists. 4.3 All new floor joists to be supported in accordance with structural enginners recommendations. Provide lateral restraint straps to floors where to floor joists are parallel to walls, straps to be 1.5 meters long 30 x 5mm galvanised mild steel, fixed to top of joists with noggins in between. 5. NEW STAIRCASE 5.1 New staircase to be a space saving staircase to comply with Building Regulations Part K1 alternating tread stair description. 5.2 The rise to be max 210.5mm and the going to be min 294mm.

6. GLAZING, ROOFLIGHT & DOORS 6.1 All glazing including double glazing to windows and internal single glazing to screens and doors etc to be glazed using safety glass.

min.25

2218

3.2 Pipes bends and fittings generally to be proprietary plastics system to BSEN1401-1 class SN4, with flexible joints, kitemark certified installation to be in complete accordance with BSEN 752, manufacturers instructions and recommendations.

10.00째

new opening into existing blocked up window opening

min.150

3. DRAINAGE BELOW GROUND 3.1 Drainage for the tanking system pump to be installed in accordance with the manufacturers specifications and recommendations.

6.2 Internal doors as per notes on drawing. 6.3 All internal doors opening to the lobby & stair area to be 30min fire doors.

DPC Rev Date

Revision

Drawn By

6.4 All fire doors to have 3 hinges and an intumescent strip. 6.5 Centre pane U value of new roof light to be maximum 1.2W/msq/deg C 7. VENTILATION 7.1 New hexagonal rooflight to be openable and to have trickle ventilation. 7.2 Provide a minimum of 5000 square mm equivalent ventilation area in the new cellar.

LIGHTWELL SECTION DD Inkpen Downie Architecture & Design Ltd

8. HEATING 8.1 Re-site the existing boiler from the basement to the ground floor storage room.

2 Balkerne House

Balkerne Passage

8.2 Extend the existing heating system into the repaired basement area.

Tel 01206 577 244 arch@inkpendownie.co.uk

8.3 The contractor is to design and install the installation generally to comply with BS5449, BS 5410 or BS6880, BS6700, BS7074-1, BS8000, BS EN 832. and all relevant water regulations and by-laws.

Drawing Status

8.4 Balance and commission the system on completion and provide a full set of as installed drawings, operation and maintenance instructions. 9. ELECTRICAL, LIGHTING & POWER 9.1 Extend the existing electric system to the repaired basement area. 9.2 The contractor is to design and install the Installation to be completed in accordance with BS 7671, BS EN 60335, BS EN 60439, BS EN 60669.

CO1 1PA

TENDER lead roof cover timber boarding with penny gaps

Project

Repairs and Alterations to

min 25mm continuous air path Glidevale FV250 Fascia ventilator

40 Hainault Road Client

9.3 Reasonable provision to be made for the design, installation, inspection and testing of the installation in order to protect persons from fire and injury. 9.4 Installation to be carried out by a competent electrician who will provide an appropriate BS 7671 electrical installation certificate for the work.

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

DPC

9.5 The installation is to include the following: general lighting and small power electrical wiring for heating installation

Cad File

Scale

Mac 7/819

1:50 / 1:10 ST/Jun 10

Drawn By / D a t e

Checked By / Date

BD/May 10

Title

9.6 Ensure all wall mounted switches and sockets are fitted at heights to satisfy the requirements in M1 Dwellings clause 8.3 diagram 29.

Proposed Sections, Details and

9.7 Provide a full set of as-installed drawing operation and maintenance instructions.

Building Regulations Notes

9.8 Make provision for a minimum of one per four fixed light fittings to be high efficiency light fittings (i.e. light fittings only capable of accepting lamps having a luminous efficacy greater than 40 lumens per circuit watt e.g. fluorescent tubes or compact fluorescent lamps - not GLS tungsten lamps with bayonet cap or Edison screw bases).

D r a w i n g N o.

LIGHTWELL SECTION EE

R e v N o.

A/819/T/02 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

1.5mm dia stainless steel wire 30mm block board shelf

round cover

stainless steel support

clamp with side exit for wire 300

30

350

NOTES

75

TYPICAL SHELF ATTACHMENT DETAIL @ 1:2

350

300

900 900

timber balustrade timber staircase

400

350

470

350

DRAINAGE CHANNEL

holes on the partition wall

DRAINAGE CHANNEL

TYPICAL WALL SHELF ATTACHMENT DETAIL @ 1:2

SHELVES SECTION @ 1:10 DRAINAGE CHANNEL

210.4

210.4

TYPICAL WALL SHELF ATTACHMENT DETAIL @ 1:10

210.4

stone floor covering to spec clause M40/10

210.4

floor tiling to spec clause M40/05

SECTION ON GG @ 1:20

DRAINAGE CHANNEL

SECTION ON FF @ 1:20

G 242

242

242

242

242

9

7

5

431.4

3

1 Rev Date

70

11

900

840

12

8

6

4

2 338.6

LOW SHELF STRUCTURE PLAN @ 1:10

F

10

Revision

Drawn By

F

G

CUPBOARD SECTION @ 1:10 75

40

36

STAIRCASE PLAN @ 1:20

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

100

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

36

Drawing Status

TENDER Project 40

36

75

36 100

Repairs and Alterations to

FLOOR BUILD UP DETAIL @ 1:10

40 Hainault Road Client

Delta MS-500 Minimum 12.5mm plasterboard Vertical 50mm x 25m treated timber battens fixed with size 12 screws into Delta-plugs 50mm insulation between timber battens

1:50 / 1:10 ST/Jun 10

Drawn By / D a t e

Checked By / Date

BD/May 10

75

Title

75

Shelf, Cupboard and Staircase Details D r a w i n g N o.

DRAINAGE CHANNEL

UPPER SHELVES STRUCTURE PLAN @ 1:10

Scale

Mac 7/819

20 50

Floor build-up: Flagstones Underfloor heating in 75mm screed 50mm Kingspan Koolterm K3 floor insulation Delta MS-20 Concrete slab to accomodate 125mm x 75mm void for drainage channel

Cad File

TYPICAL SHELF ATTACHMENT DETAIL @ 1:2

R e v N o.

A/819/T/03 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Existing house

NOTES d air uil ep eb dR -R se nth air ali Pli ep oc ck ll R ir-L Bri pa Wa ew & Re -N ll nth air Wa Pli ep & R ll nth Wa Pli & nth Pli

NORTH

r ss r be m CL ce be am Ac am er ch m fro Ch Wat n tio 0m S 00 ec 60 22 sp vel No4 85 CL 80 m in rt le IL 0m inve 25

Steel & block shed 23

87

m ax

22

ss ce ber Ac am Ch Water S 8 No

& ve Le te Gra 63 87 cess ber Ac am er Ch Wat S No2

id Gr Ca

ttle

RW

m fro r Dia Gutte mm m 68 5m 12

le yc e Bic rag sto

mp e su ag drain l

90

m fro r Dia Gutte mm m 68 5m 12

r be m CL am ch m fro n tio 0m ec l 60 10 88 63 insp leve CL 81 m rt IL 0m inve 45 m ax

ss r ce be Ac am er Ch Wat S No3

21

08

58

RW

Brick & block shed

90

& G IN E RK AG PA OR ST

48

n sio ten Ex

GF

SV

P

No

BE

17

93

58

08

P

0

IL

cut

11 condition to site

44

laid

to fall min

RW

M

4

m fro Dia r mm tte 68 Gu RW 5mm 12

BE

condition to site cut

DR

OO

M

8 k stacV No st ub AA w ith

56 90 ss r 40 ce be 93 89 Ac am Ch ul CL 83 IL Fo No4

OM

ss r ce be 9280 Ac am 00 Ch ul CL 85 IL Fo No3

43 condition to site cut

cut condition to site

condition to site

19

cut

94

33

110

mm

laid

min to fall

0 nt 1:8 gradie

1

Dia Gutte mm m 89 0m RW m 15 fro

TH BA

90 94

m fro Dia r mm tte 89 Gu RW 0mm 15 r

RO

RW

OM

m fro r Dia Gutte mm m 68 5m 12

condition to site

RO

10

18

1 A

91

ss r 90 ce be Ac am CL 94 00 Ch ul IL 86 Fo o1 0 N

01 condition to site cut

94

23

90 94

UT

ILIT

Y

cut condition to site

11

cut cut

condition to site

0m

condition to site

m

m fro Dia r mm tte 68 Gu RW 5mm 12

91

ra

20

Lin

18

m

tel

to

96

11

10

00

M OM

95

99

93

cut

99

89 1

condition to site

D

CO 6

p ste to

SV

tee

P

0m

m

laid

to

in ll m fa

ient ad gr

80 1:

m fro Dia r mm tte 89 Gu RW 0mm 15

94 97

up

no

2

98

S AT

63

. ing en & op or do te ing pla ist le ex so se over -u Re and to

ing Br

M

O 90 DRO 94 R BE

k stac V st ub AA w ith 6 No

condition to site

4

10

98

EN

58

03

cut

4 k stacV No st ub AA w ith

93

98

Scr

ee

n6

58

90 97

68

ps ste

up

5 k stacV No st ub AA w ith

FA

ss r ce be Ac am er Ch Wat S 5 No

05

2

3

condition to site cut

Y M IL

RO

TE

S

MA

. ve sto g of rin bu nts nd od me wo ire grou e to requ ath abov tly ne ec with be nated dir ce laid termi air ide rdan and d an prov acco ve to in of sto ht up ct du fitted rer Boug tail. air be actu b. de sla el to To uf manaring lev be ound gr

OM

-S

UIT

GD

E k stac V st ub AA w ith 11 No Dia Gu mm m 89 0m RW m 15 fro

RW

tte

m fro r Dia Gutte mm m 68 5m 12

?? ?? 00? CL 84 IL

r

ss r ce be Ac am er Ch Wat S No7

ss r ce be 90 88 00 Ac am Ch ul CL 81 IL Fo No5

Timber framed shed

40 99 EN

3

KIT

CH

3 No

98

10

03

18

SIT

. ve sto g of rin bu nts nd od me wo ire grou e to requ ath abov ne

GD

4

13

tly ec with be nated dir ce laid termi air ide rdan and d an prov acco ve to in of sto ht up ct du fitted rer Boug tail. air be actu b. de sla el to To uf manaring lev be ound gr

06

40 99

ess Acc

8

TIN

G

01

Scr

RO

ee

n7

OM to

ing ist ex

me

ed ram rF be Tim F G

w ne ll Instaening op

rn Ba

d ze t gla igh l he ful

fra

r

Dia Gutte mm m 89 0m RW m 15 fro

?? ?? 22 CL 81 IL

ss r ce be Ac am er Ch Wat S 12 No

NK TA

11

?? ??90 CL 78 IL

40 96

9

OIL

04

ild

40 ss r 81 96 ce be 18 Ac am YCL 40 Ch ul IT IL 90 Fo TIL U No7

r

ce be ?? Ac am er ?? ?? Ch Wat ?? S 11 CLIL No

10

Bu

B

n3

7

RE

m fro Dia r tte mm Gu 110 tter RW x Gu Bo

ss

ee

90 97

Scr

29

C

CE AN TR EN

0 condition to site

C

ON

5

cut

10

condition to site cut

n s tha les

GD

ps ste

88

C 86

@

W

40 93

08

3 91

mp

48

03

48

12

IL

92

C

condition to site

93

0m n 15 rgi ma

l tai De

k stac V st ub AA w ith 10 No cut

13

OM

le ng shi

p to

W

condition to site

RO

Ste m fro r Dia Gutte mm m 68 5m 12

ST

cut

G

RW

k stac V st ubith AA w 2 No

condition to site

TIN

EN

cut

SIT

CH

RE

O k 9 stac V No st ub AA w ith

G

80 1:

KIT

SIN ES DR OM RO

ient ad gr

2

condition to site

M

cut

OO

in ll m fa

r

condition to site cut

to

ss r ce be Ac am Ch ul Fo 0 No8 1:2

ce be Ac am er Ch Wat S 8 40 No 93 71 CL 88 IL

DR

laid

ss

BE

Steel framed open sided shed

ss r ce be ???? Ac am 00 Ch ul CL 77 IL Fo No6

B 00 25 ns

ES lo fe Gal Sa 0 mm 55 5 o Ec nk 46 ed t Ta H1 x nd Bu Outle 25 n 14 Tita ttom x W Bo 450 L2

Line and remains of original enclosing wall as evidenced on site. Wall intact between these points. Wall reduced to footings between these points

5

gra dient 1:80

cut

TH BA

4

97

0m inve 25 m ax 110 mm

GD

RE

15

1 No

Fo No2 fall to 80 laid 1: m ient m fro r 0m ad Dia Gutte 11 gr mm m 68 5m m in 12

OO

condition to site

SV

10

96

38

DR

80 92 20 CL 85 IL

cut

16

94

ss r ce be Ac am er Ch Wat S 9 No

7

G

14

d uil r be m CL am ch m fro yB aAcircess ber CL 93880000 spectioln600m F D Chamul IL m in rt leve 45

Brick shed

7

90 94

ss r ce be 9230 Ac am 96 Ch ul CL 86 Fo o9 IL N

ing

80 88 40 ly Gul ul IL 93 CL Fo No1

Line and remains of original enclosing wall as evidenced on site. Wall reduced to plinth between these points.

LE YC BIC

Sewage treatment plant with out flow to new pond see drainage Building regulations notes.

?? ?? CL 7455 IL

ss

ss r ce be Ac am er Ch Wat S No6

r

ce be Ac am er Ch Wat S 13 No

Rev A

?? ?? 22 CL 81 IL

090608

Rev Date

Amended for Buildings Regulations Application

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Open sided steel barn

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TENDER Project

Bacons Farm Barn Chappel Conversion & Extension Client

Pond fed directly by surface water and by out flow from sewage treatment plant via reed bed.

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 200

090122 JI

Checked By / Date

Title

Site Plan

th Pa

D r a w i n g N o.

A/609/T/03

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.

(


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Plinth & Wall Repair- Rebuild

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Plinth & Wall Repair-Localised Repair Plinth & Wall Repair-New Brick Plinth

Access Chamber S Water No3

8971 8990

9000 9608

9048

21 16 9140

9608

9048

9190

9100

9808

BUILDING REGULATIONS NOTES

23 8758

CL 8810 IL 8163 450mm inspection chamber max invert level 600mm from CL

Grate Level 8763 Access Chamber S Water No2

8600

22 RW 68mm Dia from 125mm Gutter

9125

9008

9060

Access Chamber S Water No4 CL 8500 IL 8022 250mm inspection chamber max invert level 600mm from CL

NOTES

9210 9170

RE

9743 9843 15

9440

14 9340

9743 9340

9148

9358 9358 9340

9240

9148 Access Chamber S Water No8

9210

Gully Foul IL 8880 No1 CL 9340

RW 68mm Dia from 125mm Gutter

9843 457

9843

17

9400 9438

444

IL 9056

Access Chamber CL 9300 Foul IL 8800 No2 250mm inspection chamber max invert level 600mm from CL

RW 68mm Dia from 125mm Gutter

Dairy Building Oil fired boiler with wood burning stove and aga all serving a thermal storage system to provide hot water and heating. Dairy building to be heating using underfloor heating.

0 11

RW 68mm Dia from 125mm Gutter

110mm laid to fall min gradient 1:80

mm laid to min fall

9340

0 1:8 nt die gra

9438

EN-SUITE GF11

4.575 x 4.475 - 20.48 sq M

2.800 x 2.160 - 6 sq M

100

RW 100

9433

BATHROOM GF10 GD 13

Build up No 3 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. Mineral wool insulation packed into void. 12.5mm ply fixed direct to existing frame overlaid with 12. 5 mm plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythene all joints overlapped & taped with existing boarding re fixed.

140

140

cut to site condition

cut to site condition

cut to site condition

GD 14

Build up No 2

100

BEDROOM 2 GF08

timber open screen

GD 24

Build up No 2a

cut to site condition

WC GF12 1.090 x 1.862 - 2.03sq M

Build up no 2

COMMON ENTRANCE GF01

LOBBY GF02 3.500 x 1.800 - 6.30sq M

Extract to kitchen mounted in void and accessed via stair for period maintenance.

5.218 x 2.945 - 15.37sq M

GD 17

9640

COATS

9790

B

Build up No 4

GD 18

10034 0 00

6

7

Duct to carry heating pipes from back boiler to heat store

10043

Build up No 4

5 9863

HALLWAY & STEPS GF13

9858

GD 20

5

6 9863

9640

3

4 9868

RW 89mm Dia from 150mm Gutter

9320

Build up No 3

2.624 x 1.979 - 5.20 sq M

GD 27

440

GD 26

RW

STORE GF22

4.088 x 4.648 - 19.00 sq M

1.914 x 1.290- 2.47 sq M

Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab

BATHROOM GF24

3.490? x 5.530 - 11.25 sq M

2.250 x 1.670 - 3.75 sq M

MASTER BEDROOM GF17

5.380? x 9.651 - 45.86 sq M

5.970 x 5.806? - 28.57 sq M

LOBBY GF20

GD 22

DRESSING ROOM GF18

Duct to carry heating pipes from back boiler to heat store

327 32

FAMILY ROOM GF15

KITCHEN GF14

777

GD 28

Boiler Flue Termination through roof

UTILITY GF21 4.200 x 3.342 - 14.04 sq M

RW 89mm Dia from 150mm Gutter

EN-SUITE GF19

1.914 x 1.604- 3.07 sq M

2.250 x 2.700 - 6.07 sq M

GD 29

cut to site condition

mezzanine over

RW 89mm Dia from 150mm Gutter

9340

GD 23

RW

1

9458

RW

10181 9340 A 9101 9423

stub stack with AAV No 8

Screen 4 take down existing and modern frame to this opening and replace with full height glazed frame

GD 07

Screen 5 Glazed H/W screen with steel frame and HW louvres hinged at top for occasional lifting for cleaning

Wood burning stove GF Timber Framed Barn with back boiler

FFL 9490

RW

Install new full height glazed frame to existing opening

GD 06

Wood burning stove with back boiler

GD 05

Thermal store

Screen 7

RW 68mm Dia from 125mm Gutter

FFL 9790

stub stack with AAV No9

air duct to provide air directly to wood buring stove. To be fitted in accordance with requirements of manufacturer of stove and laid beneath ground bearing slab. Bought up and terminated above ground level to detail.

stub stack with AAV No 10

stub stack with AAV No 11

RW 89mm Dia from 150mm Gutter

Barn & Extension Oil fired boiler with wood burning stove all a thermal storage system to provide hot water and heating. Ground floor to be heated using underfloor heating and 1st floor using radiators.

Access Chamber Foul CL 9490 No10 IL 8600

FFL 9940

RW 89mm Dia from 150mm Gutter

450 337

WC GF23

stub stack with AAV No 6

1801

GD 30 GD 30

cut to site condition

9940

9940

insulated flue contained within false work made up of 75 x 75mm RA steel angle framework elded construction with formed metal bearing rails @ 600mm vertical centres supporting rib lath formed radius and plastered. Framework in turn supports brakets @ min 2000mm centres to support flue. Framework bolted down to brick plinth wall and braced back to timber frame at mid rail wall plate & collar.

9470

Wood burning stove no 2

91

6.767 x 1.289 - 8.05 sq M

Step

GD 21 2015

9790

440

Access Chamber Foul CL 9340 No4 IL 8389

2 9703

9858

min gr adien t 1:80

FFL 9490

FFL 9940

9423

cut to site condition

Mezzanine above measures 3.660 x 5.621 - 18.15 sq M Wood burning stove no 1

A

1 9458

HALLWAYGF16

take down existing and modern frame to this opening and replace with half height glazed frame

Re-use existing door & opening. Bring steps up to and over sole plate

10181

2

Build up No 1

9310

stub stack with AAV No 5

air duct to provide air directly to wood buring stove. To be fitted in accordance with requirements of manufacturer of stove and laid beneath ground bearing slab. Bought up and terminated above ground level to detail.

3 9703

7.044 x 7.055?- 45.07sq M

m lai d to fa ll

3.464 x 3.451 - 11.96 sq M

GD 25 cut to site condition

Screen 6

SITTING ROOM GF03

110m

BEDROOM 5 GF25 GD 04

RW

GD 03

4 9868

5.040 x 1216 - 6.13sq M

Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab.

RW

Duck boarded floor set at height of centre winder.

9310

cut to site condition

08 9813

Timber frame windows fitted in front of existing timber frame

Access door ? hatch to void.

Screen 3

GD 16

8

Boiler

cut to site condition

GD 19

cut to site condition

stub stack with AAV No 4

B

10043

9248

9340

cut to site condition

FFL 9790 SVP No3

GF E

20 GD 02

3 steps 10000

cut to site condition

Access to tee

min gradient 1:80 110mm laid to fall

9620

FFL 9640

7

4.786 x 3.636- 17.40 sq M

Extract duct taken under floor and up through stud work to cooker hood.

min gradient 1:80 110mm laid to fall

10034

BEDROOM 4 GF26 RW

9108 GD 01

11

3.482 x 2.733 - 9.52sq M

9300

FFL 9340

8

Build up No 5

Boiler

9993

UTILITY GF04 using s

10000

Access Chamber 1881 Foul CL 9640 No7 IL 9040

9813

RW

18

2 steps

10 9529

Support the rafters take down the entire frame to this section and replace in green oak 1881

d drainer. g machine.

9

9989

9

cut to site condition cut to site condition

RW 68mm Dia from 125mm Gutter

Access Chamber Foul CL 9280 No3 IL 8500

9240

11

10 9529 9993

3.283 x 1.338 - 4.40sq M

12 9188

D 9989

9220

9190 C D

ENTRANCE GF05

cut to site condition

C

D 09

9240

ramp @ less than 1:20

20 9320 9248

9340

Access Chamber S Water No11 CL ???? IL ????

Form new opening in block wall to align with opening in timber frame

cut to site condition

RW 110mm Dia from Box Gutter Gutter

9348 Widen existing opening with steel over

RW

Access Chamber Foul No8

9340 Lintel to Detail 9190

CL 9280 IL 8520

GD 15

9340

9108

9188

GF Dairy Building 13

Build up No 2a

RW 68mm Dia from Step to shingle margin 150mm 125mm Gutter

FFL 9490 18

12

Thermal store

9240

Access Chamber S Water No9

cut to site condition

IL 8696

Timber framed and glazed doors with side lights

3283 x 3.442 - 11.30 sq M

Build up No 1

RE

Screen 2

KITCHEN GF06

cut to site condition

stub stack with AAV No 2

9348

9433

9270

cut to site condition

13

19

GD 10

SVP No 7

1 step

9340

h/w screen overhanging floor and balustrade 900mm x 1200mm hatch access with pull down ladder

7.508 x 9.261 ? - 42.77sq M

FFL 9490

9340

PARKING & BICYCLE STORAGE GF27 4.817 x 15.986 - 77.00 sq M

SITTING / DINING ROOM GF07

9230 Access Chamber S Water No8 CL 9340 IL 8871

RW

Screen 1

3.131 x 3.250 - 10.18 sq M

Access Chamber Foul CL 9230 No9 IL 8696

Build up No 6 Plaster on 12.5mm plaster board on studs. 12.5mm ply fixed direct to existing frame overlaid with breather membrane. 25 x 50mm S/W battens fixed through shea direct to frame with a layer of Kontrol Duo i fixed in accordance with Building Regulatio manufacturers specification. 25 x 50mm S/W fixed over to support the feather edged boa

Build up No 2A Plaster on 12.5mm plaster board on 25 x 50mm battens on existing brick/block work.

2.800 x 2.000 - 5.6 sq M

GD 12

Bicycle storage

Build up No 5 Plaster on 100mm block. 100mm cavity with fill insulation. 102mm brick external leaf.

Build up No 2 Plaster on 12.5mm plaster board on 25 x 50mm battens on Celotex insulation fixed direct to existing brickwork to Building Regulations specification and manufacturers requirements.

Build up no 2 RW

19

Build up No 4 Plaster on 12.5mm plaster board between on 38 x 38mm s/w battens. Mineral wool insulation packed into void.12.5mm ply fixe direct to existing frame overlaid with 12. 5 m plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythen joints overlapped & taped battened out and covered in moisture resistant plaster board tiled.

Build up No 1 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. 12.5mm ply fixed direct to existing frame overlaid with celotex rigid insulation to Building Regulations specification and manufacturers requirements. 25 x 50mm S/W battens fixed through sheathing direct to frame with a layer of Kontrol Duo insulation fixed in accordance with Building Regulations and manufacturers specification. 25 x 50mm S/W batten fixed over to support the feather edged boarding.

cut to site condition

BEDROOM 1 GF09

GD 11

9320

RW

Build up No 1

SVP No1

HEATING

RW 68mm Dia from 125mm Gutter

9790 9340 CL ???? IL 8400? Access CL ???? IL 7890 Chamber S Water No5

Access Chamber S Water No7

Access Chamber S Water No12

Access Chamber Foul CL 8890 No5 IL 8100

CL ???? IL 8122

8890

Rev A 9640

090608

Rev Date

Amended for Buildings Regulations Application

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TENDER Access Chamber S Water No13

Project

CL ???? IL 8122

Bacons Farm Barn Chappel Conversion & Extension Client

Cad File

Scale

Drawn By / D a t e

Mac 7-609

1:50

ST/Apr 09

Checked By / Date

JI/

Title

Foundations & Drainage D r a w i n g N o.

Access Chamber Foul CL ???? No6 IL 7700

R e v N o.

A/609/T/04 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


17

100

GD 11

Build up no 2

100

BATHROOM GF10 GD 13

cut to site condition

Build up No 3 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. Mineral wool insulation packed into void. 12.5mm ply fixed direct to existing frame overlaid with 12. 5 mm plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythene all joints overlapped & taped with existing boarding re fixed.

140

140

GD 12

cut to site condition

cut to site condition

GD 14

Build up No 2

100

Screen 1

BEDROOM 2 GF08

19

SD

Smoke Detector

HD

Heat Detector

floor joists

9433

PARKING & BICYCLE STORAGE GF27

Storage Floor Dairy Building

4.817 x 15.986 - 77.00 sq M

cut to site condition

h/w screen overhanging floor and balustrade 900mm x 1200mm hatch access with pull down ladder

RW

rafters FIRE ALARM Mains powered automatic fire detection and alarm system to BS5839 part 6 Code of practice for the design and installation of fire detection and alarm systems in dwellings to at least Grade E type LD3 Standard.

P

timber open screen

3.131 x 3.250 - 10.18 sq M

Bicycle storage

cut to site condition

P

Build up No 6 Plaster on 12.5mm plaster board on studs. 12.5mm ply fixed direct to existing frame overlaid with breather membrane. 25 x 50mm S/W battens fixed through sheathing direct to frame with a layer of Kontrol Duo insulation fixed in accordance with Building Regulations and manufacturers specification. 25 x 50mm S/W batten fixed over to support the feather edged boarding.

Build up No 2A Plaster on 12.5mm plaster board on 25 x 50mm battens on existing brick/block work.

2.800 x 2.000 - 5.6 sq M

NOTES

Build up No 5 Plaster on 100mm block. 100mm cavity with full fill insulation. 102mm brick external leaf.

Build up No 2 Plaster on 12.5mm plaster board on 25 x 50mm battens on Celotex insulation fixed direct to existing brickwork to Building Regulations specification and manufacturers requirements.

RW

RW

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate RW degree o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

RW

22.1 sqm

2.800 x 2.160 - 6 sq M

Build up No 4 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. Mineral wool insulation packed into void.12.5mm ply fixed direct to existing frame overlaid with 12. 5 mm plaster board with all joints taped and filled 25 x 50 mm battens over laid with polythene all joints overlapped & taped battened out and covered in moisture resistant plaster board and tiled.

Build up No 1 Plaster on 12.5mm plaster board between studs on 38 x 38mm s/w battens. 12.5mm ply fixed direct to existing frame overlaid with celotex rigid insulation to Building Regulations specification and manufacturers requirements. 25 x 50mm S/W battens fixed through sheathing direct to frame with a layer of Kontrol Duo insulation fixed in accordance with Building Regulations and manufacturers specification. 25 x 50mm S/W batten fixed over to support the feather edged boarding.

STORAGE AREA

EN-SUITE GF11

4.575 x 4.475 - 20.48 sq M cut to site condition

BEDROOM 1 GF09

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

B

9358

9438

STORAGE AREA

G

14

SITTING / DINING ROOM GF07

R

SD

GD 10

22 mm T &G chipboard floor on s/w joists to engineers specification with 50 x 100 stud walls lined with plaster board. Large face fixed hinged panel made up with framed ledged and braced s/w ex 30 x 100 with 18mm mdf panel with locking mechanism to give access to loft space.

R

7.508 x 9.261 ? - 42.77sq M

Screen 2 Timber framed and glazed doors with side lights

access hatch

BATHROOM FF02 3.624 x 1.914 - 6.94 sq M

Balustrade made up using plasterboard to both sides of 50 x 100mm stud work with ex 32 x 130 mm s/w capping rebated with 6 x 6 mm rebate to both sides at junction with plasterboard. Plaster board to be trimed with plasterers bead all round and to all exposed corners.

FD 01

HD

cut to site condition

3283 x 3.442 - 11.30 sq M

F

3.755 x 2.929 - 11.00 sq M

cut to site condition

GF Dairy Building

F

FD 02

SD

K

J

A

LANDING FF01

FD 03

cut to site condition

9490

BEDROOM FF03

900 x 1200 loft hatch with drop down extendable ladder. Loft hatch to be detailed to Finish flush with ceiling within bed room.

KITCHEN GF06

2.740? x 3.930? - 9.16 sq M

H

9348

Widen existing opening with steel over

ENTRANCE GF05

Form new opening in block wall to align with opening in timber frame

3.283 x 1.338 - 4.40sq M

12 9188

Build up No 2a

Build up No 2a

13 3.755 x 2.930 - 11.00 sq M

RW

18

Storage Floor New Extension

20

9108 GD 01

2 steps

GD 15

BEDROOM FF04

RW

GD 02

9248 Build up No 5

RW

Build up No 5

D

9529

10000

9340

9993

Support the rafters take down the entire frame to this section and replace in green oak 1881

3.500 x 1.800 - 6.30sq M

Extract to kitchen mounted in void and accessed via stair for period maintenance.

5.218 x 2.945 - 15.37sq M

Re-use existing door & opening. Bring steps up to and over sole plate SD

GD 17

9640

COATS

9790

SD

L

B

Build up No 4

GD 18

08 8

9310

10043

Build up No 4

10034 00

9813

5

6

7

Duct to carry heating pipes from back boiler to heat store

9863

cut to site condition

4

Steps

GD 24 cut to site condition

A

9458

9423

HALLWAYGF16 6.767 x 1.289 - 8.05 sq M

090812 090608

Rev Date

O

Steps

GD 30 GD 30

Steps

Rev B Rev A

Added smoke alarm information and above ground drainage. Amended position of columns on receipt of Engineers information. Amended for Buildings Regulations Application

Revision

Drawn By

9101

SD

cut to site condition

SD

BEDROOM 5 GF25

L

O

3.464 x 3.451 - 11.96 sq M

GD 04

3.

GD 21 cut to site condition

GD 22

9940

insulated flue contained within false work made up of 75 x 75mm RA steel angle framework elded construction with formed metal bearing rails @ 600mm vertical centres supporting rib lath formed radius and plastered. Framework in turn supports brakets @ min 2000mm centres to support flue. Framework bolted down to brick plinth wall and braced back to timber frame at mid rail wall plate & collar.

Build up No 3

DRESSING ROOM GF18

Duct to carry heating pipes from back boiler to heat store

Inkpen Downie Architecture & Design Ltd GD 25

2 Balkerne House

2.250 x 1.670 - 3.75 sq M

327

E D

SD

HD

SD

450 337

FAMILY ROOM GF15

KITCHEN GF14

MASTER BEDROOM GF17

5.380? x 9.651 - 45.86 sq M

5.970 x 5.806? - 28.57 sq M

STORE G

4.088 x 4.648 - 19.00 sq M

1.914 x 1.290- 2.

Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab

440

9940

Wood burning stove no 2

440

9790

cut to site condition

2015

7.044 x 7.055?- 45.07sq M

Mezzanine above measures 3.660 x 5.621 - 18.15 sq M

SD

N

10181

Extract duct taken under floor and up through stud work to cooker hood.

E D

GF Extension

RW

SITTING ROOM GF03 Wood burning stove no 1

4.786 x 3.636- 17.40 sq M

RW

GD 04

1

take down existing and modern frame to this opening and replace with half height glazed frame

GD 20

BEDROOM 4 GF26

2 9703

Screen 6

9858

HALLWAY & STEPS GF13 9868

3

C

L

GD 03

5.040 x 1216 - 6.13sq M

Hearth of non combustible material and to stand a minimum of 12mm above any combustable material. Omit insulation from beneath hearth area and lay hearth direct to concrete slab.

RW

Duck boarded floor set at height of centre winder.

cut to site condition

9

Timber frame windows fitted in front of existing timber frame

Access door ? hatch to void.

Screen 3

GD 16

d drainer. g machine.

1.090 x 1.862 - 2.03sq M

COMMON ENTRANCE GF01

LOBBY GF02

3.482 x 2.733 - 9.52sq M

1st Floor Barn

WC GF12 Build up no 2

SD

UTILITY GF04 using ps

GD 19

cut to site condition

1 step

9989

cut to site condition

cut to site condition

D 09

3 steps

Build up No 1

11 10

cut to site condition

cut to site condition

C

GD 30 SD

CO1 1PA

PRELIMINARY

LOBBY GF20 BATHROOM GF24

3.490? x 5.530 - 11.25 sq M

Project

2.624 x 1.979 - 5.20 sq M cut to site condition

GD 27

WC GF2 EN-SUITE GF19

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

777

See detailed drawings for information about mezzanine

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

GD 26

1.914 x 1.604- 3

Bacons Farm Barn Chappel

2.250 x 2.700 - 6.07 sq M

mezzanine over

cut to site condition

Steps

RW

GD 23

R GD 07

Client

RW

Glazed H/W screen with steel frame and HW louvres hinged at top for occasional lifting for cleaning

G

GD 28

Conversion & Extension

A M

GF Timber Framed Barn

UTILITY GF21

SD

4.200 x 3.342 - 14.04 sq M

C

WC GF23

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 50

090122 JI

Checked By / Date

1.914 x 1.604- 3.07 sq M

Title GD 29

M

cut to site condition

H

Screen 5 Build up No 1

Screen 4 take down existing and modern frame to this opening and replace with full height glazed frame

Build up No 1

RW

1.914 x 1.290- 2.47 sq M

Boiler Flue Termination through roof

cut to site condition

STORE GF22

G F Plan & F F Barn Plan RW GD 05

Install new full height glazed frame to existing opening

D r a w i n g N o.

GD 06

Screen 7

J

A/609/BR/05 K

N

B

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


H

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

G

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Frame Repair- Remove timber Frame Repair-Repair or replace timber

RW

NOTES

cut to site condition

Frame Repair-Add new timber

Refer to engineers drawing for the sizes of the timber

Frame Repair-Softwood RW

RW

cut to site condition

cut to site condition

cut to site condition

Roof Plan 1:100 Boiler flues Stove flues

P

This area to be joisted out to provide storage. See sections.

cut to site condition

cut to site condition

P

R

R F

F Build up No 5

existing timber rafters

A

RW

additional timber rafters

Remove modern purlin

RW

K

J

RW

Hatched area to have ceiling joists to be boarded at with plaster board. Remaining area to be plastered underside of the roof.

cut to site condition

cut to site condition

cut to site condition

3 steps

cut to site condition

1 step

N Allow to replace all indicated timber rafters in this area 38mm x 38mm softwood to either side of the existing oak rafters cut to site condition

All new members of historic frame is to be green oak

O

O

C

38mm x 38mm softwood to either side of the rafters

L

cut to site condition

RW

cut to site condition

RW

cut to site condition

L

Rev Date

Revision

Drawn By

cut to site condition

50mm x 50mm softwood to either side of the existing oak rafters

E D

Step cut to site condition

cut to site condition

Inkpen Downie Architecture & Design Ltd cut to site condition

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

38mm x 38mm softwood to either side of the existing oak rafters

E D

RW

CO1 1PA

Drawing Status

TENDER

cut to site condition

38mm x 38mm softwood to either side of the existing oak rafters

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

Project

Bacons Farm Barn Chappel 50mm x 50mm softwood to either side of the existing oak rafters

50mm x 50mm softwood to either side of the existing oak rafters

Conversion & Extension cut to site condition

cut to site condition

Client

RW RW

RW

N H

G

B

Cad File

Scale

Mac 7-609

1:50 / 1:100 ST/Jun 09

Drawn By / D a t e

Checked By / Date

JI/

Title

C

A M

M

Roof Structure Plan 1:50

Roof Structure Plan & Roof Plan D r a w i n g N o.

50mm x 50mm softwood to either side of the existing oak rafters

R e v N o.

A/609/T/08 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.

J

K


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

WF 01 WF 02

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

Screen 5

WG 01

WF 03

Howarth Timber side hung casement narrow module 488mm x 900mm (W x H)

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

WG 02

WG 03

Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)

Screen 4

Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)

BATHROOM WG 04 WG 05

Screen 7

FFL

9640 FFL

9340 8890

PROPOSED SOUTHEAST ELEVATION Southeast Elevation

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk WF 05

WF 06

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION

WF 07

Project

Bacons Farm Barn Chappel Conversion & Extension

DPC Howarth Timber side hung casement narrow module 488mm x 900mm (W x H)

Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)

WG 12

BATHROOM

Existing ground level to be lowered

Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)

WG 13

WG 28

Client

WG 14 9743 9608

WG 11 FFL

9248 9048

9008

9358

9438

FFL

Cad File

Scale

Drawn By / D a t e

Mac 7-609

1: 50

ST/Apr 09

Checked By / Date

8758

Title

Elevations Southeast & Northwest D r a w i n g N o.

Northwest Elevation

A/609/BR/11

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

STORE

WC

WG 06 Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)

WG 07 9640

Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)

WG 08

FFL FFL

9490

9008

8890

Northeast Elevation

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

WF 08

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Bacons Farm Barn Chappel

WG 24

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

WG 25 WG 18

WG 19

WG 20

WG 21

WG 22

Client

WG 23 Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)

WG 09

Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)

WG 10 9813

9743 FFL 9101

9008

Conversion & Extension

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

WG 26

FFL

Cad File

Scale

Drawn By / D a t e

Mac 7-609

1: 50

ST/Apr 09

Checked By / Date

Title

Elevations Northeast & Southwest

Southwest Elevation

D r a w i n g N o.

A/609/BR/12

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

rafters purlins Hardwood window 2640mm x 620mm(W x H) Section details to match with the Howarth Timber windows in the building

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

Howarth Timber side hung casement narrow module 488mm x 900mm (W x H)

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

BATHROOM

Section on DD

ensure window is located in relation to timber frame to provide 450mm min escape route.

Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)

Howarth Timber side hung casement narrow module 488mm x 750mm (W x H)

Section on LL Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

rafters purlins

Bacons Farm Barn Chappel Conversion & Extension

2391.4

Client

BATHROOM

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 50

Jan 2009

Checked By / Date

Title

Frame Repairs Sections DD, EE & LL D r a w i n g N o.

A/609/BR/14

Section on EE

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

WF 04 WF 09

ensure window is located in relation to timber frame to provide 450mm min escape route.

600

WG 15

WG 16

WG 17

STORE

WC

FFL

9490 9248

Section on NN

1337.7

STORAGE

2522.6

578.9

Section on AA

Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)

PARKING BICYCLE STORAGE

WG 09

STORE

Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)

WC

Rev Date

Revision

Drawn By

WG 10

9101

9008 8758

Section on CC

Section on FF

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Bacons Farm Barn Chappel Conversion & Extension STORAGE

UTILITY

BATHROOM

BEDROOM 5

Howarth Timber narrow module H-Bar lookalike escape window 915mm x 1200mm (W x H)

Howarth Timber Horizontal Bar narrow module window 488mm x 1200mm (W x H)

Client

PARKING BICYCLE STORAGE

BEDROOM 5

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 50

Jan 2009

Title

Frame Repairs Sections AA, BB, CC, FF, NN & OO

9008

D r a w i n g N o.

A/609/BR/15

Section on BB

Checked By / Date

Section on OO

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

STORAGE AREA

remove existing failed plate. insert new. cut foot of studs and tennon into new plate. 10000

9490

9940

10043

9348 9188

PLinthe

Section on KK

Section on GG

WG 27 Rev A

090608

Rev Date

Amended for Buildings Regulations Application

Revision

Drawn By

Section on RR Section on JJ Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Project

Bacons Farm Barn Chappel Conversion & Extension

STORAGE AREA

Client

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

Timber or steel beam supported on the block to take floor and ceiling joists and stud walls

Howarth Timber narrow module lookalike escape window 915mm x 900mm (W x H)

BEDROOM 2

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 50

Jan 2009

Checked By / Date

Title

Frame Repairs Sections GG, HH, JJ, KK, PP & RR D r a w i n g N o.

Section on HH

ensure window is located in relation to timber frame to provide 450mm min escape route.

A/609/BR/16

Section on PP

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

STRUCTURAL REPAIRS KEY:

Frame Repair- Remove timber

Plinth Repair- Rebuild

Frame Repair-Repair or replace timber

Plinth Repair-Localised Repair

Frame Repair-Add new timber

Plinth Repair-New Brick Plinth

Frame Repair-Softwood

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

SECTION ON GG

SECTION ON AA

Strap around post after ply sheathing has been applied.

This wall is in ver

Possible repair or replacement to plate required subject condition once exposed

SECTION ON HH

Rev Date

SECTION ON EE

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd

ed ey Su

rv

Su

rv

ey ed di m en sio di m n en va sio rie d n fro va rie m 47 d fro 97 m to 26 48 19 17 to 26 80

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Strap around post after ply sheathing has been applied.

Project

Bacons Farm Barn Chappel Conversion & Extension Client

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 50

Jan 2009

Checked By / Date

Title

Frame Repairs Sections D r a w i n g N o.

R e v N o.

A/609/BR/18

SECTION ON DD

SECTION ON CC

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. STRUCTURAL REPAIRS KEY:

Frame Repair- Remove timber Frame Repair-Repair or replace timber Frame Repair-Add new timber Frame Repair-Softwood

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g Plinth Repair-Localised Repairi s n o t i n t e n d e d f o r u s e b y a n y o t h e r p e r s o n o r f o r a n y o t h e r p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability Plinth Repair-New Brick Plinthw h a t s o e v e r i f t h i s d r a w i n g i s u s e d b y a n y o t h e r p e r s o n o r f o r a n y o t h e r p u r p o s e.

Plinth Repair- Rebuild

NOTES

SECTION ON LL

TYPICAL SCARF SOLE PLATE REPAIR

TYPICAL REPAIRS TO SHOULDER Once wall plate has been removed repair shoulder and tenons to top of post Pull sholder back against post using galvanised bolts and epoxy joint filling adhesive .

TYPICAL STUD SCARF AND SOLE PLATE JOINT REPAIR

TYPICAL POST SCARF AND SOLE PLATE SCARF

Allow for repairing tenons and re-pegging joints.

FRAME REPAIRS TYPICAL DETAILS

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR INFORMATION Project

Bacons Farm Barn Chappel Conversion & Extension Client

remove existing failed plate. insert new. cut foot of studs and tennon into new plate.

Cad File

Scale

Drawn By / D a t e

Mac 3-609

1: 50

Jan 2009

Checked By / Date

Title

Frame Repairs Sections & Details D r a w i n g N o.

SECTION ON JJ

SECTION ON KK

SECTION ON MM

R e v N o.

A/609/BR/19 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


B

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

6 225

NOTES Main posts beams and joists to be in green sawn oak. Sections as architects details. Connections in accordance with Structural Engineers details.

225

75

A

Floor to be in 22 mm thick oak tounged and grooved boarding with edge mouldings, handrails and balustades in planned and fully dried joinery grade oak.

c

Ceiling to mezzanine and solid panels to balustrade in lime plaster on timber laths.

28

120

120 x 225

1

50

336

1

45

120 x 225

5 28

120 x 225

A

120 x 225

A

10

3

62

1110

120 x 225

44

23

1

Plan 1

1

B

Section on AA

3

110 44

2 22

5

2 225

4

A

6

30

c

225

4

120

194

Vertical section Balustrade and Post

5940 to be confirmed on site5940

2600 to be confirmed on site

180x 180

7

E

Rev Date

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

110

Balkerne Passage

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

PRELIMINARY Project

E

364

Elevation

Section on BB

Tel 01206 577 244 arch@inkpendownie.co.uk

Bacons Farm Barn Chappel Conversion & Extension 44

Client

81

7 Cad File

Scale

Drawn By / D a t e

Checked By / Date

Mac 3-609 1: 20, 1:10.1:2 090122 JI

Vertical section Balustrade and Post

Title

Mezzanine Assembly & Details D r a w i n g N o.

R e v N o.

A/609/ BR/25 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

170 Passivent stream line ventilator with side mounted nylon chain operation 2 No 1200mm long

HW frame

4

29

70

17

114

7

50

Passivent stream line ventilator with side mounted nylon chain operation 2 No 1200mm long

42

140

68

NOTES Hinge made up using 10mm thick stainless steel plate welded to steel frame and bolted to HW frame with pivot made from 15mm dia SS pin Nylon washers SS washers and grub screws.

10

1

193

1

60

94 32

7

16

34

3

2

7

50 x 50 x 6mm box section welded frame with 6mm x 60 x 60 steel flat sections welded to frame drilled and countersunk to take no 10 CS head machine screws with washer and nut to secure 25 x 125mm sawn louvre blades. Steel to be galvanised and painted black.

8

120

20

120

5

2 double glazed 24mm 6mm laminated inner skin & 6mm toughened outer skin.

8 site dim to centre to mid rail

40

70

H/W block 44 x 44 mm plan size with nylon pad to top screwed to cill in two locations to support louvred panel

170

9 4

5

6

3

10

9

Screen 5

Screen 4

Rev Date

Revision

Drawn By

See drawing A/609/BR/34 for dimensions and notes regarding section sizes to timber frame

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

4

6

5

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

10

11

12

13

PRELIMINARY Project

Bacons Farm Barn Chappel Conversion & Extension Client

Cad File

Scale

Mac 3-609 1 : 20 &1: 5

Drawn By / D a t e

Checked By / Date

090122 JI

Title

3 D View of Hinge

Screen Details Glazed Entrance & Louvred Screens D r a w i n g N o.

R e v N o.

A/609/ BR/30 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


12.5mm plaster board on 38x38 s/w battens (battens reduced to 38x25 where detail requires) Battens fixed to ply & existing frame

Final position of windows to be agreed on site. The windows provide a means of escape in some circumstances and require a 450mmwide openning.

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Keymer plain tiles fixed on 25 x 35mm treated sw battens to manufacturer's instructions Breather membrane Pro Clima SOLITEX taped and sealed in accordance with manufacturers instructions fixed to 25 x 50mm counter batten.

Duo Kontrol wrapped around batted and taped to celotex

Multifoil insulation, Kontrol Duo 25mm (IDA UK Ltd p.0870 950 6612) fixed to 25 x 50 mm treated s/w battens in accordance with manufacturers instructions. Over lap multi layer quilt with rigid wall insulation and seal together by taping.

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES Read this drawing in conjunction with building regulations notes.

Existing boarding repaired as nevessary and fixed to existing rafters in accordance with Structural Engineers requirements.

Trim counter battens as shown and over lap insulation and tape

External Wall

PLAN SECTION TYPICAL WALL & WINDOW DETAIL

Plywood sheathing (thickness & fixing details to structural engineer's specification

50mm Celotex GA3000 insulation above rafters Vapour barrier (seal vapour barrier to all exposed timber) 12.5mm plasterboard with skim coat

Fix breather flashing membrane to roof and leave sufficient material hanging down to over lapp vertical membrane. Take roof breather membrane over and lapp into gutter. Fix vertical breather membrane up and under flashing membrane.

50mm Celotex GA3000 insulation

Kontrol Duo

Fit sprocket and fascia timber after completing membrane overlaps make up fascia piece ex 50 x 150 rebated to master weather board and chamfered to top edge.

25 x 50mm treated SW batten planted over frame and nailed through to stud

Continouus tilting piece

Breather membrane - wrapped over structure including roof, to provide continuous unbroken membrane. All overlaps to be dimensioned and taped to manufacturer's instructions.

Metal Gutter on rafter brackets (Side Fixed)

25 x 50mm treated SW batten planted over frame and nailed through to stud Ex 50 x 38 screwed and glued to 25 x 100mm side panels cut to notch under and over feather edged boarding. Side panel to be grooved to take cement panel. Cement board to be drilled to take flues from appliance. Size of panel to be varied to suite dia of flue terminal and module of feather edged boarding. Mastic sealant

PLAN SECTION TYPICAL DETAIL THROUGH ROOF

Feather edge boarding as elsewhere

Mineral wool (Non combustable Material)

20 mm thick cemment board finished to match boarding External Wall

Existing structural timber frame wallplate and rafters

Plywood sheathing (thickness & fixing details to structural engineer's specification 50mm Celotex GA3000 insulation 25 x 50mm treated SW batten planted over frame and nailed through to stud

PLAN / VERTICAL SECTIONS & ELEVATION TYPICAL VENT DETAIL

Kontrol Duo 25 x 50mm treated SW batten planted over frame and nailed through to stud Breather membrane - wrapped over structure including roof, to provide continuous unbroken membrane. All overlaps to be dimensioned and taped to manufacturer's instructions. Feather edge boarding as elsewhere 12 5 mm pb with skim coat on 38 x 38 mm battens

Mid Rail - height to underside variable, with mid rails staggered from bay to bay. Detail shown as upper average height approx 1880mm above top of wall plate to plinth wall. (Lower average height aprox. 1750mm above top of wall plate to plinth wall). 000 x 00mm floor joists @ 000 ctrs as per SE specification & Drawings

12.5mm plasterboard with skim coat as per specification New First Floor Timber Frame Structure TO BE INDEPENDENT FROM EXISTING HISTORIC TIMBER FRAME 150 x150 oak timber posts supporting 260 x 250mm oak flitch beams to SE specification, fixing & joint details as Structural Engineers drawings. Spacing of posts in line with existing timber frame structure as shown on plans.

VERTICAL SECTIONS & ELEVATION LINEAR VENT DETAIL

Insulation to Plinth Wall Externally by external wall insulation continued below timber frame at thickness to suit, as shown. Existing windows to Dairy building to be replaced. Timber section sizes to match existing

PLAN SECTION DETAIL FOR WF09

25 x 50mm treated SW battens planted over frame and nailed through. Ensure ventilated cavity is maintained behind boarding with 25mm continuous air gap to top and bottom.

ex 25 x 225 sw window board

B

090327

added window details.

A

090205

amended detail to roof build up re-engineers proposal for strengthening of rafters.

Rev Date

Revision

Drawn By

Proprietary ventilation product or suitable perforated mesh to prevent insects entry to air gap. Fix insect mesh before insulation

skim coat on 12.5mm plaster board on 25 x 50mm sw batten on 50mm celotex on existing brick work.

Inkpen Downie Architecture & Design Ltd Insulation to Plinth Wall Internally by compressible perimeter insulation continued beyond floor level as shown, with solid timber skirting and bullnose timber shelf at setback in brickwork. Skirting SW 125 x 19mm to all external & internal walls. All timber to be painted or stained as per specification.

Bitumen based DPM

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status S/W skirting

New First Floor Timber Frame Structure 150 x150 oak timber posts set in galvanised shoe to Structural Engineers drawings & specification.

PRELIMINARY

New Brickwork Plinth and Repairs Generally, rebuild brickwork plinth to match existing bond and details Insert DPC & ensure DPC overlaps with DPM In any areas where not rebuilding plinth rake out joints to depth of 30mm and point into place. Treat brickwork prior to laying floor build up with chemical injection. Floor finish Floor finish in stone / ceramic tiling, client choice Chemical injection DPC

FFL

DPM turned up wall behaind insulation to overlap and be bonded to dpc. Perforated land drain

NEW EXTERNAL GROUND LEVEL

Screed Floor insulation laid on solid concrete base. 20mm compressible insulation to perimeter. perforated land drain to base of walls laid to take surface water away from buildings.

Min 80 mm screed with reinforcement/underfloor heating system on polythene 500 gauge separating layer

Conversion & Extension 'Breather gap' ventilated by open perpends at appropriate centres as agreed with Conservation Officer with

Client

perforated land drain Cad File

Floor board rigid insulation, Celotex GA3000 65mm to give U-value 0.21W/m2K

DPM polythene 1200 gauge on ground bearing insitu concrete slab.

Conservation Officer

VERTICAL SECTION TYPICAL DETAIL DAIRY BUILDING

Bacons Farm Barn Chappel

EXISTING INTERNAL FLOOR LEVEL

'Breather gap' between new concrete slab floor and plinth wall with ventilation detail as agreed with

VERTICAL SECTION DETAIL FOR WF09

Project

VERTICAL SECTION TYPICAL EAVES MIDRAIL AND PLINTH DETAIL

NEW EXTERNAL GROUND LEVEL

Scale

Mac 3-609 1: 5

Drawn By / D a t e

Checked By / Date

090122 JI

Title

Typical Sections Eaves Wall & Sole Plate Details D r a w i n g N o.

A/609/ BR/33

R e v N o.

C

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

for details see drawing no: A/609/BR/33

for details see drawing no: A/609/BR/33

for details see drawing no: A/609/BR/33

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

for details see drawing no: A/609/BR/33

for details see drawing no: A/609/BR/33

STORE

WC for details see drawing no: A/609/BR/33

9101

Section on CC for details to the staircase & handrail see drawing no: A/609/BR/25 hardwood skirting carpet floor finish on ply oak staircase plasterboard ceiling Rev Date

for details see drawing no: A/609/BR/33

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

FOR APPROVAL Project

Bacons Farm Barn Chappel Conversion & Extension Client

for details see drawing no: A/609/BR/33

Cad File

Scale

Drawn By / D a t e

Mac 7-609

1: 20

ST May 2009

Checked By / Date

Title

Sections CC & EE D r a w i n g N o.

Section on EE

R e v N o.

A/609/BR/38 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

A

B C

Code 6 type lead sheet

A detail b

detail a

detail e

minimum fall between drips to be 1 in 80

detail d

detail c

detail f

SECTION CC 2050

2050

2050

2050

SECTION BB SOUTHWEST NORTHWEST ELEVATION ELEVATION

SECTION AA lead box gutter lead flashing lead gutter

C

B

(detail f)

Rev Date

(detail e)

A

Revision

Drawn By

A Inkpen Downie Architecture & Design Ltd 2 Balkerne House 1354 2050

2050

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

2050

PLAN 1:20

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

TENDER lead gutter

Project

standard roll 45 x 45 40mm overlap

detail b

welded stainless steel gutter

min 50mm

lead flashing

min 100 / max 225

lead gutter - min fall 1:80 Code 6

lead gutter - min fall 1:80 525

40

Bacons Farm Barn Chappel

lead flashing

min 100 / max 225

lead flashing

detail a

lead gutter - min fall 1:80 welded stainless steel gutter

Conversion & Extension Client

detail c

Cad File

Scale

Mac 7/609

1: 20 / 1:10 ST/Jun 09

Drawn By / D a t e

Checked By / Date

Title

Gutter Detail

detail e detail d

detail f

D r a w i n g N o.

R e v N o.

A/609/T/43 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

ELECTRICAL KEY

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

COMMUNICATIONS & FITTINGS

SWITCHES

SD

1 Gang switch

Smoke Detector RW

HD

2 Gang switch

NOTES

cut to site condition

3 Gang switch

Electric Extract Fan

4 Gang switch

Electric Extract Fan with light fitting TV

Two Way One Gang Switch RW

RW

Heat Detector

T

Two Way Two Gang Switch

ASDL

Two Way Three Gang Switch

Television Aerial Socket

F

F

F

F

F

Telephone Socket ASDL Socket cut to site condition

S

Three Way One Gang Switch 2

2

Speaker Socket

cut to site condition

2

cut to site condition

2

2

2

2

Wall mounted speaker

2

cut to site condition

2

cut to site condition

2

Three Way Two Gang Switch

cut to site condition

1 Gang switch - Pull cord

Ceiling mounted speaker

Three Way Three Gang Switch

cut to site condition

POWER

2

cut to site condition

3

2

Switched Socket Outlet

F

F

Twin Switched Socket Outlet

F

F

Tripple Switched Socket Outlet

GF03 Mezzanine Electrical Layout

2 5 amp

5 amp Switched Socket Outlet Floor Socket

2

5 amp

2

2

2

2

2

F

Barn First Floor Electrical Layout

5 amp Floor Socket Shaver Socket 2

purlins

Electrical wiring

sloping ceiling

2

2

sloping ceiling

2

Cooker Socket

2

2

2

RW

sloping ceiling

COMMUNICATIONS & FITTINGS

2 seperate switching spur outlets for the fridge freezer

sloping ceiling

2

RW

2

2

RW

2

2

2

sloping ceiling

sloping ceiling

cut to site condition

2

original beam

RW cut to site condition

RW

cut to site condition

sloping ceiling

2

2 seperate switching spur outlets

sloping ceiling

2 seperate switching spur outlets

2

2

sloping ceiling

2 2 seperate switching spur outlets for the boiler

cut to site condition

sloping ceiling

cut to site condition

2 3 steps

2

2

2

1 step

cut to site condition

cut to site condition

Rev Date

original beam

cut to site condition

Revision

Drawn By

cut to site condition

2

new mezzanine structure

2

2

sloping ceiling

Step

sloping ceiling

2 cut to site condition

2

2

2

F 2 cut to site condition

2

Inkpen Downie Architecture & Design Ltd 2

cut to site condition

2

2

2

2

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

2 seperate switching spur outlets for the fridge freezer

2

2

2

2

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

2

RW Drawing Status

TENDER

2 seperate switching spur outlets for the boiler

cut to site condition

2

2 seperate switching spur outlets

2

2

2

2

2

2

Project F

Bacons Farm Barn Chappel

2 seperate switching spur outlets 2

2

2

new mezzanine beam

cut to site condition

2

2

cut to site condition

2

2

Conversion & Extension Client

RW RW

RW

Cad File

Mac 7-609

Ground Floor Electrical Layout

Scale

Drawn By / D a t e

1: 50

ST Jun 09

Checked By / Date

Title

Ground Floor & First Floor Electrical Layout

2

2

D r a w i n g N o.

R e v N o.

A/609/T/46 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


G

G

ELECTRICAL KEY

LIGHTS

SWITCHES

A

Aurora 240V T2 Aluminium adjustable fluorescent cabinet light

B

Pendant

Pendant

L

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

1 Gang switch

2 Gang switch

louis poulsen Enigma 825

Delta Light Xilo C 411 T50

G

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

RW

3 Gang switch

B-C

NOTES M

C

G

Wall (Surface Mounted)

F

G

C

Wall (Surface Mounted)

E

5 amp

cut to site condition

D

F

E

E

D

P

Aurora AU-HCD352 Satin Silver

cut to site condition

D

5 amp

cut to site condition

5 amp

Ceiling (Recessed)

E

N

5 amp

P

B W

W cut to site condition

Delta Light Heli 1 white

Three Way Two Gang Switch

Wall (Surface Mounted) Delta Light Orbit

1 Gang switch - Pull cord

C

O

5 amp

5 amp

5 amp

5 amp

O

Three Way Three Gang Switch

U O

Wall (Surface Mounted)

Pendant Q

C

POWER

Delta Light Xilo CL 450

Delta Light Backspace 36

O P

5 amp

P

5 amp

P

B

5 amp Switched Socket Outlet

Wall (Surface Mounted) Aurora AU-BLL826

R

cut to site condition

P

F

Two Way Three Gang Switch

Wall (Recessed)

O

5 amp

C

Three Way One Gang Switch

Delta Light Visa

G

G

Two Way One Gang Switch

Wall (Surface Mounted) louis poulsen Oslo uplight

N

C

Delta Light Uniline Modules T16 Non Stop Down

F

F

RWD

4 Gang switch

Two Way Two Gang Switch

Delta Light Xilo W

RW

Uplight

cut to site condition

cut to site condition

E

cut to site condition

G

LIGHT FITTINGS KEY

F

N

Floor Socket

C

P E

D

C

E

Ceiling (Surface Mounted) Delta Light Xilo 111 JAC C

G

cut to site condition

C

R

5 amp

5 amp

S

Mounted) Low energy fluorescent with fitting

5 amp

J A A

O

O

O

GF03 Mezzanine Lighting Layout

Barn First Floor Lighting Layout

COMMUNICATIONS & FITTINGS

Pendant

Electric Extract Fan with light fitting louis poulsen PH 5 white

Delta Light Jeti Tower

A

O

Electrical wiring

T

Stand alone

J

5 amp Floor Socket

louis poulsen PH Artichoke dia 720 white

RCeiling (Surface

H M

5 amp

Pendant

B

Pendant U

purlins

V B

sloping ceiling

K

Delta Light Xilo CL 250

sloping ceiling

Wall (Surface Mounted) Delta Light Ober

V A 5 amp

H

U sloping ceiling

A

J

A

Wall (Surface Mounted)

W

RW

louis poulsen Io Wall/Ceiling

K 5 amp

RW

V

V

cut to site condition

D

N

cut to site condition

D

sloping ceiling

D

cut to site condition

D

3 steps

sloping ceiling

sloping ceiling

cut to site condition

sloping ceiling

cut to site condition

1 step

V

sloping ceiling

RW

A

V

louis poulsen Flindt 475 pendant

Pendant

5 amp

B

5 amp

F

5 amp

5 amp

V V

K

J

O

O V

R

D

D

C RW D

original beam

cut to site condition

V Rev Date

Q

D

D

D

D

D

sloping ceiling

Step D

D

5 amp

cut to site condition

5 amp

A

A

A

5 amp

5 amp

J

C

A

C cut to site condition

E

Q E

5 amp

H

2 Balkerne House

C

O

C

S

M

K

K

Drawing Status

Project

R

K A

O

5 amp

5 amp

5 amp

J

5 amp

F

C

B

Bacons Farm Barn Chappel

E

new mezzanine beam

J

H H

H

cut to site condition

5 amp

See detailed drawings for information about mezzanine E O

O

O

Conversion & Extension Client

cut to site condition

O

CO1 1PA

TENDER

cut to site condition

E

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

RW

H

O

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

F

L

A

Inkpen Downie Architecture & Design Ltd

cut to site condition

O

E D

Drawn By

E D

sloping ceiling

J

Revision

cut to site condition

D

new mezzanine structure

U

RW

L

cut to site condition

sloping ceiling

D

cut to site condition

D

L

sloping ceiling

original beam

H

RW RW

Cad File

RW

Mac 7-609

Ground Floor Lighting Layout C

A M

ST Jun 09

Checked By / Date

N

B

Ground Floor & First Floor Lighting Layout

M

5 amp

D r a w i n g N o. 5 amp

G

Drawn By / D a t e

1: 50

Title

T

H

Scale

R e v N o.

A/609/T/45 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.

J

K


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

N Outline of existing kennel to be demolished

Conservatory

Roof Terrace

Dormer roof extended over glazed bay

+21.88 Roof Terrace

(Lowered by 350mm)

New rooflight FLOOR PLAN LOCATION POINT

Glass roof to belvedere access to roof terrace

Crab apple tree (dotted) to be removed

Lean-to extension to new garden wall

Lean-to roof over new extension

Rev Date

Revision

Drawn By

Telegraph pole moved

Drawing Status

SITE PLAN

PLANNING Project

Regency House Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50 1:100

ST/08.05.2007 BD/

Checked By / Date

Title

SITE GROUND / ROOF FLOOR PLANPLAN D r a w i n g N o.

R e v N o.

A/708/P/02 A/708/P/01 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

N Larder

Fireplace Existing cupboard & false wall removed

New bi-fold panelled doors

1800

Purpose made cast-iron grating covers to existing lightwell with fine mesh to underside to prevent debris getting into well. Covers to be removable for access.

+9.92

Kitchen

Up

Conservatory

+9.92

+10.50

Living Room +10.49

New double doors within existing opening

Up

Existing opening blocked double doors on hallside retained to form shallow cupboard

+10.50

Cupboard removed; electrical fuse board relocated under stairs

+9.92

Existing cellar door blocked

Ceiling Slope Up

FLOOR PLAN LOCATION POINT

Up

Original cellar door position reinstated Up

Wall removed

Window blocked

Pump and Gully

New service lift (50kg) & Enclosure

New glazed doors within existing window openings Opening widened to allow vehicular access through garage

Laundry +9.92

Lean-to removed

Hall

Opening blocked New partition

+9.91

WC +9.94

Up

New doorway & steps

Mrs Johnson's Study

Wrought iron railings & gate

Elec. cupd

Covered Run

Porch

Cloakroom

Manhole removed

Up

Bins New garden wall

Rev Date

Garage

Bins Enclosed

Existing rear wall of cottage removed at G. Floor level. New steel beam over

Dog Flap

Kennel

Revision

Drawn By

Kennel lined with acoustic insulation. Roof over kennel & run to be lined with acoustic insulation.

New garden wall

Lean to extension to form garage

North wing formerly Greyfriars North

Fireplace

Mr Johnson's Study

Existing WC partition removed

Drawing Status

PLANNING Project

Regency House Side opening, sectional sliding garage door Timber vertical boarding

GROUND FLOOR PLAN

Telegraph Pole Moved Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

GROUND FLOOR PLAN D r a w i n g N o.

R e v N o.

A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

RWP

Bathroom

New door to ensuite bathroom

Doorway blocked

Bedroom +14.08

Cup'd

Original fireplace investigated and replacement installed Up

Balcony

RWP

Drawing Room

Up

+14.12

+12.42

Wall & staircase to North wing removed - New floor to hall

Porch Roof FLOOR PLAN LOCATION POINT

Up

RWP

Door opening raised to suit hall floor level

New lift & enclosure

Reinstate original door to bedroom from half landing

Hall Bedroom

RWP

+14.12

Bedroom +12.39

New door opening Up

Ensuite Bathroom Rev Date RWP

Revision

Drawn By

+12.45 Up

Skylight

Glass roof over porch

Up

Up

Balcony

Parapet

Lead roof over new bin enclosure

Drawing Status

PLANNING Project

Regency House Client

FIRST FLOOR PLAN

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

FIRST GROUND FLOOR FLOOR PLAN PLAN D r a w i n g N o.

R e v N o.

A/708/P/03 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

3200 Min.

NOTES

Window Box

Cupbd SL

Up

Wardrobes

New balcony existing sash window replaced with french doors

Door repositioned to enable spiral staircase to be positioned to allow sufficient headroom over main stair

Existing balcony enclosed with glazed bay

Dressing Room

New spiral stair up to roof terrace

+17.71

New partition

Bedroom +17.74 Window Box

Bathroom WC

Cupbd

New rooflight in bathroom dotted

FLOOR PLAN LOCATION POINT

1350mm Headroom

Shower

New lift & enclosure

1700mm Headroom

Linen Store

Bathroom

New window

+15.12

New partitions

Up from first floor landing

Up 980mm

Up 540mm New opening Rev Date

Bedroom +14.58

SECOND FLOOR PLAN

Revision

Drawn By

Up

New window

Drawing Status

PLANNING Project

New fully glazed belvedere to roof terrace

Regency House Client

Roof Terrace +21.88

(Lowered by 350mm)

Spiral staircase 1200mm diameter; 1300mm min. stairwell 21 risers, 199mm = 4180mm

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

THIRD FLOOR PLAN

SECOND GROUND &FLOOR THIRDPLAN FLOOR PLANS D r a w i n g N o.

R e v N o.

A/708/P/04 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

Existing shutters (full height) to be cut in half at upper midrail position

NOTES

New bottom rail to top shutter inserted & mouldings adapted (original panel dotted) Upper midrail altered to become top rail of bottom shutter

Fully glazed belvedere access to roof terrace

Existing railings

Floor of terrace lowered

GROUND FLOOR SHUTTER ALTERATIONS 1:20

22.23

350

22.20

Hipped slate roof extended to cover glazed bay

21.03

20.99

Curved lead dormer over central sash

20.59

20.20

Central sash window replaced with french doors

New glazed bay enclosure to balcony

Bedroom New balcony with cast iron railings as pattern on first floor

Dressing Room Lover floor level of former balcony to match internal F.F.L

17.74

17.41

17.42

Drawing Room

Cup'd

Bedroom

14.12

13.81

13.30

Existing shutters to be altered. See detail above. Rev Date

Living Room

9.80

Drawn By

Kitchen

11.10

New cast iron grating cover to cellar light well

Revision

Conservatory 10.49

10.50

9.92

9.87 9.97

Cellar

New bi-fold doors

Floor level lowered to existing kitchen F.F.L

New timber surround to range recess

New glazed doors within existing window opening through to new conservatory

Drawing Status

PLANNING

7.77

Arbitrary Datum 7.00m Arbitrary Datum 7.00m

Project

Arbitrary Datum 7.00m

Regency House Client

CROSS SECTION A-A

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

GROUND FLOOR PLAN CROSS SECTION A-A D r a w i n g N o.

R e v N o.

A/708/P/05 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

1100

Centre sash replaced with casement doors to match existing on first floor. New balcony with cast iron railings as pattern below.

F.F.L

Revision

Drawn By

900

Rev Date

Brick plinth & stone coping to match neighbouring property. Cast iron railings above.

New gate

Continuation of railings across entire frontage subject to agreement with neighbours

Drawing Status

PLANNING Project

Regency House Client

SOUTH GREEN ELEVATION

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

SOUTH GROUND GREEN FLOOR ELEVATION PLAN D r a w i n g N o.

R e v N o.

A/708/P/06 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

New glazed belverede access to roof terrace painted timber structure & 'heritage' patent glazing to roof. Glass to be self cleaning ie pilkinton activ.

Investigate boarded gablet continue hipped roof & slate of main roof if possible.

Cast metal conservation roof light Existing balcony enclosed with glazed bay

F.F.L

Timber framed double glazing in gable triangle of lean to extension both sides

Rev Date

Red brickwork with coursed pebble flintwork panels

Revision

Drawn By

Acoustic lining

New lean-to replacement of existing structures

New kennel & covered run behind new garden wall

New glazed doors within existing window opening

New lead canopy on carved brackets

New conservatory: * Painted timber frame * Powdercoated aluminium roof bars & rainwater goods * Double glazing throughout

Drawing Status

PLANNING Project

Regency House Client

WEST ELEVATION

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

WEST GROUND ELEVATION FLOOR PLAN D r a w i n g N o.

R e v N o.

A/708/P/07 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

Natural slate

New oriel window with curved lead roof

Curved lead roof over arched window

Existing dormer roof extended over bay Red brickwork Existing balcony enclosed to form glazed bay

New kennel & covered run with wrought iron railings

2.4 metres New glazed doors in widened opening door posts removable to allow vehicular access to garden

New lead canopy on carved brackets

SOUTH ELEVATION OF COTTAGE WING

Casement doors within blind window top section lights corridor

New sash window to bedroom

Corridor F.F.L 15.12 14.58

Natural slate lean-to roof

Rev Date

Revision

Drawn By

Drawing Status

9.89

PLANNING Wall & railings continued around boundary to match those on south green elevation

New fanlight over street door

NORTH ELEVATION TO LORNE ROAD

New casement window in existing opening

Wide board timber door

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

Project

Regency House Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/08.05.2007 BD/

Checked By / Date

Title

NORTH GROUND & FLOOR SOUTH PLAN ELEVATIONS D r a w i n g N o.

R e v N o.

A/708/P/08 A/708/P/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

take down existing brick kennel structure including floor slab and dog run enclosure, make good wall of adjoining structure line of boundary

line of boundary

NOTES

N new c.i. gutter

all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay paving to area shown levels to match extng line of boundary

Arrangement of paving provisional to be confirmed before proceeding on the site.

line of boundary

01 REPLACEMENT OF EXISTING PAVING Marshalls natural stone paving Standard Yorkstone Diamond Sawn Paving Colour: Scoutmoor 02 REUSING EXISTING PAVING

adjust existing coping at junction to existing

extng plinth wall, coping removed, posts and chains removed and raised to match original. new stone coping to match existing and metal railings

Reuse existing back garden paving on defined areas

new conservatory

new lead slatestrip off finishes from extng dormer structure and extend, re-lay deck to flat top to pitch from side for svp to side and lay new lead roof finish,lay new slates to lower sloping section rwp

existing lead flat area

remove existing roof light make good sarking felt and slates remove timber cladding from existing vertical abutment and clad with slate hanging on battens and Tyvek or similar breathable membrane

03 NEW PAVING New quarry tile paving in kennel and run to be continue on the walls to 1000mm height

all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone terrace to area shown. with pockets left out for planting to be agreed with the employer, levels to be determined and agreed on site

new c.i. gutter new inset mh cover

new motorised sliding rooflight

Roof Terrace all existing paving materials in this area be708/04 seetodrg taken up and natural stone paving set-aside for line of extng rear wall of reuse lay new stone paving to area shownterrace levels to match extng

new c.i. gutter

curved lead roof to centre sash of venetian window rwp

lead chute outlet from terrace

new lead flashings at abutments

new lead rolls to hips

strip off extng timber boarding and reclad existing dormer cheeks with slate hanging

line of existing hip, remodel this area to form vertical abutment with tile hanging at junction to rear roof slope

renew lead valley flashing

New Diamond Sunpipe renew lead roll to short length of hip

resite existing rear wall of terrace to align with existing vertical abutment and clad with slate hanging on battens and Tyvek or similar breathable membrane cut and trim extng roof structure to structural engineers spec continuous lead flashing at abutment, and lead coping detail to terrace upstand

reform back gutter and stepped flashing to existing chimney stack

Crab apple tree (dotted) to be removed new inset mh cover

new c.i. gutter

new lead slate for svp

new inset mh cover

extng plinth wall, rake out loose mortar joints, (sound cement mortar may be left in place) and repoint in a lime putty mortar repair/ replace stone coping and install new iron railings

M L K J I H G

18/04/08 04/04/08 27/03/08 05/03/08 16/08/07 18/07/07 03/07/07

F

04/06/07

E

29/05/07

new c.i. gutter new lead slate for svp

new inset mh cover

Location of garden wall is changed Kennel to be omitted & Additional note about paving Kennel proposal to be retained Kennel to be omitted & smaller bins encl. Parapet repairs & Remove garden gate on SG Elev Paving materials defined Scale to 1/50 & Remove two sun pipes & Re-shape skylight over the porch Re-shape skylight on the roof terrace & Re-locate sunpipes Re-shape skylight over the porch

ST ST ST ST ST ST BD ST ST

D

22/05/07

New skylight to the porch & Reshape skylight over the entrance

ST

C

21/05/07

Change on skylight to the roof terrace

ST

B

18/05/07

Conservation sun-pipe system

ST

A

09/05/07

Enlarging existing balcony

Rev Date

ST

Revision

Drawn By

new lead slate for svp cranked over in roof space

Provisionally Repair stone parapet

new c.i. gutter

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

existing flat roof to be refurbished see drg 708/03

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk new lead roof to bin-store

all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng

new slate roof over garage extension new inset mh covers

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

new c.i. gutter

Regency House new metal gate and gateway with york-stone threshold with bullnose nosing

SITE PLAN

extng plinth wall, rake out loose mortar joints, (sound cement mortar may be left in place) and repoint in a lime putty mortar repair/ replace stone coping and install new iron railings

extng telegraph pole all existing paving materials in this area to be taken up and natural stone paving set-aside for reuse lay new stone paving to area shown levels to match extng

extng telegraph pole resited

Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

GROUND FLOOR SITE / ROOF PLANPLAN D r a w i n g N o.

A/708/C/01 A/708/C/02

R e v N o.

M

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

F

NOTES 01 REPLACEMENT OF EXISTING SOLID FLOORS

E

areas indicated thus to be broken up and carted away

kitchen ventilation new svp

lay a new floor of: 150mm blinded hardcore 1200 gauge polythene dpm 75mm insulation 150mm concrete 50mm sand cement screed

provisionally new 100 diam rwp & gulley extng door and frame and brick soldier course removed and opening bricked up

extng aga to be retained

extng window removed, opening extended to ground level and new door and frame with fanlight fitted

02 DRAINAGE BELOW GROUND

N

02.1 Pipes bends and fittings generally to be Hepworth or similar proprietary clay system system to BS EN 295-1 and Kitemark certified, or AgrĂŠment certified, with flexible joints, installation to be in complete accordance with BSEN 752, manufacturers instructions and recommendations.

retain extng cupboard

RWP

02.2 Before starting work, check invert levels and positions of existing drains, sewers, inspection chambers and manholes against drawings , report discrepancies, protect existing drains to be retained and maintain normal operation.

DG30

Purpose made cast-iron grating covers to existing lightwell with fine mesh to underside to prevent debris getting into well. Covers to be removable for access.

Fireplace extng timber floor cut and trimmed to new dwarf wall below built off new foundation

WG07

new timber steps and balustrade to match main stair

Kitchen

+10.50

GF03

A

Up DG09

new 100 diam stub stack

11.5 Pipes passing through walls to be spanned with 1 course P C lintel with 50mm clearance all round pipe, opening to be bridged with a rigid sheet material.

GF04 +9.92

new opening with bi-fold panelled doors

WG06

02.4 Pipes generally to be laid at a min depth of 600mm and laid on 100mm depth and then surrounded with granular fill. Pipes at shallower depths to be bedded and surrounded in granular fill and spanned with a PC concrete paving slab. Pipes under building to be surrounded in concrete.

new conservatory

+9.92

retain existing dwarf wall

A

11.3 Drains generally to be 100dia laid to a min fall of 1 in 40

DG10

GF02

new mh 02.6 Manhole and inspection chamber up to 1000mm deep and with max 2 branches each side of the main channel to be proprietary 450 dia plastics chambers with preformed channels, bedded on concrete and surrounded in pea shingle to manufacturers instructions.

DG12 DG08

DG07

Existing opening blocked new double doors on hallside to form shallow cupboard Up

GF01 +10.49

new double doors within existing opening

+10.50

+9.92 Ceiling Slope

GF05

new shelving to existing alcoves

DG06

extng canopy to back door removed and new canopy fitted

Up

DG13

drainage hole for lift shaft to the cellar

WG05

new 100 diam 1:40 drain connections

cupboard removed; electrical fuse board relocated

Up

02.8 Manholes over 1m deep to be fitted with step irons.

03.1 Provide new Grade A fire alarm system rated a minimum of L2 in accordance with BS 5839-6 and Mechanical and Electrical Engineers drawings and specification. 03.2 New shaft for serviice lift to be constructed and fire stopped to provide 30 minutes fire resistance. Service lift doors at each floor level to be rated FD30S to BS 5588

RWP

DG16

new blockwork lift shaft new svp & boxing

U

Laundry +9.92

GF06

tumble dryer duct route

door and frame removed opening infilled

extng timber floor cut and trimmed, new 150mm block partition constructed off extng foundation & pinned to underside of beam over dry lining flush with plaster over to this side

existing screens removed and fielded paneling and architrave to match door linings applied to underside of lintel

+9.94

+10.01

door and frame removed opening infilled

100mm step up

new FD30S door to opening

DG02

DG03

Mrs Johnson's Study

WG03

GF08

GF13

Cloakroom

new wall to be built on the existing foundation

DG28

GF12

insulated dry lining +10.11 U value 0.35 new gulley

DG22

DG01 WG02

WG01

Mail

RWP

Up

airbrick terminator

new bin store DG23

D new timber step to match hall

F

GF15 +9.97

new door opening & steps down

DG21

N M L K J I H G F E D

Revision

Drawn By

C

New garden wall

Existing rear wall of cottage removed at G. Floor level. New steel beam over DG26

extng manhole resited

D

elec. meter

extng mh CL 10.00 IL 9.10 remove extng interceptor (trap)

new i.c. new rwp & gulley

extng telegraph pole

DG25

side opening, sectional sliding garage door - timber vertical boarding 2710

+10.01

890

iam 0d 10 r tng e ex sew e d to um ion es ct pr nne co

extng elec.pole to be resited

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

New drainage: ACO MultiDrain MD System or equivalent. 150mm stainless steel grill

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Existing brick pier

CONSTRUCTION Project

Regency House

DG24

existing pavement line

Drawn By

P O

extng door and frame removed and built into new svp new wall opening m.g. plaster reveals

+10.01

new garden wall

ST

S R

17/06/08 Ramp is added to the garage. Levels change. M&E ST info added. Lift shaft drainage hole to cellar. DG18 location change. 09/06/08 DG21 position to original. Back of the garden wall to ST be red brick. 04/06/08 Additional notes. Flint walls shown. DG21 location ST provisionally changed. 09/04/08 Garden wall location change ST 04/04/08 Kennel removed & Additional note about garden wall ST location 27/03/08 Kennel proposal to be retained ST 04/03/08 New sash to GW01 & size change in bins enc & kennelST removed & elec. pole moved & omit DG17&DG20 8/11/07 Amendments to building inspector's requirements BD 19/09/07 Replacement of existing floor to GF05 & GF10 ST 23/08/07 Floor and ceiling note change on kennel ST 14/08/07 Smaller lift shaft ST 13/08/07 Add column in GF03 boxing ST 17/07/07 Kennel run detail change ST 22/06/07 Drains & build regs notes added ST/BD 20/06/07 Add room & door & window nos. ST 01/06/07 215mm brick wall to the garage ST 29/05/07 Reshape skylight over the porch & Enlarge lift size ST 22/05/07 New skylight to the porch & Reshape skylight over ST the entrance 21/05/07 Partitions are removed in entrance area ST 18/05/07 Lift enclosure size ST 11/05/07 Garage walls with insulation ST

Rev Date

new door opening

gas meter

E remove existing casement window & new sash window to match with the left side original window

GROUND FLOOR PLAN

new rwp & gulley

ST ST

C B A

insulate between joists to give U value 0.35 two layers plasterboard and skim to ceiling to give 1 hour fire resistance

Porch

Up

new rwp & gulley

GF14

140mm step up

plaster this side & make good plaster to beam soffit

C

new i.c.

Garage

Up

DG04

B

DG19

DG18

existing skylight resited & opening remodeled

Revision

WG13

new DG29 elec. GF11 cupd

GF10

Rev Date

new rwp & gulley

+10.11

WC

Dec/08 Kitchen and laundry layouts added 11/08/08 Insulation addition to porch area & bins enclose layout changed & flint panelling finish detail changed & garage door width changed & omit larder W 07/07/08 Garage & bins enclosed levels changed. Lift rotation changed.

boiler flues

new rwp & gulley

existing door & frame resited

new svp stub stack

Y X

extract fan

190mm step up

DG05

T

new i.c.

new 1:40 100 diam drain

GF09

Hall

02.12 Existing drains to be retained are to have traps cleaned out, grilles and covers replaced where missing and left free running.

WG12

new mh

Mr Johnson's Study GF07

New service lift (50kg) & Enclosure

02.10 Wastes are to terminate in a square hopper fitted with an open metal grid and separate sealed connection for waste pipes into a back inlet. All gullies connecting into foul drainage are to be fitted with a trap.

V

Pump and Gully

extng 150 diam connection to sewer

remove gas fire and immeadiate surround and, retain overmantle and fire place surround

B

1000 1000

North wing formerly Greyfriars North

Fireplace

WG04

DG15

existing wall removed plaster made good including fluted beading at corner

02.9 Rainwater pipes to terminate in a proprietary shoe over a rainwater gully with square hopper fitted with a metal grating.

03 FIRE PROTECTION MEASURES

extng window and frame and brick soldier course removed and opening bricked up

DG14

Up

02.7 Manholes in excess of 1.2m deep or with more branches to be 1200x675 in class 'B' engineers bricks in cement mortarbuilt off 150mm concrete base, channels to proprietary fittings set in weak concrete and floated to a smooth finish in mortar. Cover to be 100mm reinforced concrete with proprietary access cover to BS EN 124 , inset to take infill with paving material fabricated from welded and galvanized mild steel, sized: to minimum building regulations.

drain new 1:40 100 diam

Living Room

Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

GROUND FLOOR PLAN D r a w i n g N o.

A/708/C/02

R e v N o.

Y

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

new steel column to structural engineers specification

NOTES

F

03. RAINWATER GOODS 03.1 Rainwater goods generally to be cast iron to BS 460 with spigot and socket connections. Provide Swan Neck offsets to suit suit roof overhang in each individual situation

E new stepped lead flashing to abutment to conservatory

03.2 Rainwater system design and installation to be in accordance with BS 6367 and manufacturers instructions and recommendations. 04. SANITARY PIPEWORK 04.1 Pipework to generally be plastics to BS 5255, BSEN 1329-1, BSEN 1451-1, BSEN 1455-1 or BSEN 1566-1plastics grade to be appropriate to internal / external exposure. Exposed (external pipework) to be cast iron

new cast aluminium ogee eaves gutter

provisionally new rwp

04.2 Installation to be a primary ventilated stack system designed in accordance with BSEN 12056 and manufacturers specification and recommendations.

extng rwp new svp & boxing

extng bathroom fittings & finishes stripped out and renewed

DF05

new bulkhead to existing alcove to match otherside including continuation of plaster cornice new door to ensuite bathroom

Bathroom Bathroom FF07

door and frame removed and opening infilled

DF09

new partitions to extng bathroom area

Balcony

04.5. Main stacks to be vented to at least 900mm above any opening. To be taken above existing eaves level, and finished with a perforated metal or wire bird cage.

+14.08

Cup'd

extng floor boards to be taken up in this room and floor structure leveled using new joists fixed alongside and stitched with nails to existing, floor to be relaid on completion

DF08

FF08 Up

A

WF02

FF06

DF04

04.4 Min. 32mm dia. traps with 75mm depth of seal to new wash hand basins. Min. 40mm dia. traps with 75mm depth of seal to all sinks, showers and baths. Min. 75mm dia. traps with 50mm depth of seal to all WCs. Min. 40mm pipework to wash hand basin, bath and sink connections.

Bedroom

DF14

new cupboard

A

04.3 Min. 100mm dia. stacks with min. 450mm between invert of drain and lowest connection, with min. 200mm dia. radius curve to connection with invert.

remove extng shelves

05 EXISTING FLAT ROOF TO PORCH/ SINGLE STOREY AREA 05.1 existing parapet to be carefully taken down to roof level, existing stone copings and string courses to be set-aside and reused. 05.2 parapet to be rebuilt in new bricks in a lime mortar and re-using existing stone elements supplemented by repacements in matching stone

WF03

extng door moved

Cup'd

05.3 existing asphalt roof finishes to be scabbled up, carted away and existing roof deck made good and overlaid with 18mm wbp plywood

DF07

FF05

Drawing Room

05.4 joints in ply wood to be prepared to roof system manufacturer's recommendations lay vapour barrier followed by proprietary tapered warm roof insulation to give a max U value of 0.25 W/ m sq/ deg C lay agrement approved high performance roof system with insurance backed guarentee of 30 years

new rwp Up

+14.12

+12.42 DF03 DF06

new shelving to existing alcoves

remove extng wall, insert steel to struct eng spec, box out and reinstate plaster cornice

Up

new lead canopy to back door

WF04

05.5 provide lead cover flashings to roof system manufacturer's details and lead sheet association recommendations at all abutments including , parapet, roof lights and first floor walls of house 06 GLAZING/ GUARDING OF GLAZING 06.1 New glazing details to be submitted to and approved by the conservation officer before proceeding 06.2 replacement windows, or new windows within existing historic elements to be single glazed if required by the conservation officer. Windows, including rooflights not required to be single glazed by the conservation officer shall be double glazed with Low E soft coated glass and 16mm cavity to give a maximum U value of 1.8 W/m sq /deg C 06.3 new or altered roof lights to be glazed with safety glass and guarded to the requirements of approved document N of the building regulations

FF01

DF10

form pier including fluted beading to external angles

extng rwp

Hall

new svp & boxing

+14.12 DF12

Bedroom

New oriel window with curved lead roof

WF05

O

door and frame raised to suit hall floor level

N M L K J I H

WF06

new rwp

FF02

FF09

Bedroom

new rwp

+12.39

DF02

+12.45

DF13

WF07

DF01

extng rwp

G F E D C B A

B

FF03

form new door opening and sloping bulkhead over

Up

new ensuite bathroom

new svp & boxing

extng cupboards removed

remove stair and reinstate floor over this area

B

18/07/08 Bath size changed in FF07. Shower size changed in FF03. Lift rotation changed. Garden wall location change Kennel to be omitted & smaller bins encl. amendments to building inspector's requirements Smaller lift shaft Add column in FF07 boxing New bathroom layout FF03 Proposed fireplace removed, building regs and construction notes added 21/06/07 Reorganise bathroom layout 20/06/07 Add room & door & window nos. 29/05/07 Reshape skylight over the porch & Enlarge lift size 22/05/07 New skylight over the porch, on the balcony 18/05/07 Lift enclosure size 16/05/07 Moving the existing door of the bedroom 09/05/07 Enlarging existing balcony

18/03/08 04/03/08 08/11/07 14/08/07 13/08/07 18/07/07 22/06/07

Rev Date

remove stair and insert floor over this area

Revision

ST ST ST BD ST ST ST ST/BD ST ST ST ST ST ST ST Drawn By

fall

Balcony FF10

Up

fall

extng rwp

C

existing roof to be cut and trimmed and existing raisedskylight to be moved 200mm.

C

new skylight to match extng extend extng flat roof and parapet over porch

fall

lead chute thro parapet

fall

new lead flashing to abutment extng rwp & hopper

07 GUARDING OF ROOF TERRACES 07.1 Guarding of existing roof terraces to be retained as existing. Where terrace level is being increased by addition of warm roof insulation, then the perimeter parapet or balustrade wiill be raised by the same ammount, with the agreement of the conservation officer. 07.2 where terrace level is being altered then it will be adjusted to acheive perimeter guarding complying with approved document K of the building regs

reinstate original door to bedroom from half landing cut and trim extng floor to new blockwork lift enclosure

FF04

remove existing wardrobes and make good WF01

1000

1000 DF11

open up and plaster existing alcoves to each side of chimney breast

lead chute thro parapet

D

new rwp & hopper new lead roof over new bin enclosure

Inkpen Downie Architecture & Design Ltd

new svp & boxing

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk new slate roof

D

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION new rwp

F

E

Regency House garden wall with brick coping detail

FIRST FLOOR PLAN

Project

new cast iron ogee eaves gutter Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

FIRST GROUND FLOOR FLOOR PLAN PLAN D r a w i n g N o.

A/708/C/03 A/708/C/02

R e v N o.

O

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

take down existing partition on this line and construct new partition in 100 x 50mm regularised studwork off steel work inserted into depth of floor to structural engineers specification

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

new steel column for new partition to structural engineers specification

NOTES

F'

F

E

allow for taking down existing ceiling over staircase and landing area to expose existing roof structure and reinstate on completion

extng main stair

WS03

svp

Cupbd

remove existing cupboard

DS04

walk-in shower with 40 trapped waste

Up

remove existing rooflight over and make good finishes

A

32 trapped waste from whb's

WS02

extend and adapt extng landing balustrade

WS04

40 trapped waste from bath

take out existing stair to roof terrace and replace with new spiral stair

strip out finishes sufficient to insert stiffening to roof structure to structural engineers specification and reinstate on completion

SF08

Bathroom

SF05

raised platform to this area at 200mm above floor level

WS08

SF06

Greyfriars North

DS02

strip out extng flat roof area below existing dormer and extend dormer over in cluding flat lead roof with vaulted area and new windows to dormer cheeks and front

DS01

Bedroom +17.74

DS03

WC WS01

Regency House

+17.71

resite existing door and frame, infill existing opening

A

strip out existing bathroom fittings and finishes from this area, insert temporary supports to roof and remove partitions

SF11

SF09

SF07

existing partitions reconfigured in 100 x 50 reglarised sw at 600 max centres with sound absorbant quilt between

SF10

Dressing Area

Light Tube

Cupbd DS05

Wardrobe retain existing fireplace

DS08

svp svp

existing floor cut and trimmed around new block work lift shaft which extends through ceiling over

WS05

+15.12 +15.12

remove existing cupboards form new opening, cut and trim existing floor and insert new steps

infill existing roof access and form new 900 x 600 hinged access hatch

SF04

DS09

new svp

existing hatch

existing bathroom fittings cupboards and partitions stripped out of this area and new partitions constructed of 75 x 50 regularised studwork at 600 mm centres with accoustic absorbant quilt between, sheathed with 9,5mm ply one side for robustness, and 12,5mm plasterboard and skim both sides

LOCATION PLAN 1:500

SF04 Bathroom Bathroom

DS09

new linen cupboard with 4 No slatted shelves of ex 75 x 25mm slats on ex 50 x 50 framing,

B

G

1000 1000

New lift & enclosure 32 connection from whb 100 connection from WC through roof-space

DS07

Up from first floor landing

B Up 980mm

SF01

DS06

SF02

Up 540mm New opening

WS06

SF03 +14.58

16/07/08 11/07/08 15/04/08 26/03/08 05/03/08 19/09/07

M L K J I H

10/09/07 14/08/07 13/08/07 18/07/07 17/07/07 20/06/07

G

12/06/07

F E D C B A

04/06/07 30/05/07 24/05/07 21/05/07 18/05/07 11/05/07

Bathroom SF08 layout amended Spiral staircase & lift positions are changed. SF08 Bathroom layout is changed Railings to roof terrace to be match with existing Balcony to be omitted - WS08 Additional partition wall in SF04 & boxing around the pipes in SF08 Additional Location Plan Cancelation of lift access to dressing room & lift size Railing notes & column for partition New bathroom layout SF04 Note change on SF04 new partitions Add room & door & window nos, building regs and construction notes added. Re-size WC and hall, re-position staircase to the roof (255mm to the south), re-size roof terrace & skylight Enlarge staircase well on to the roof Enlarge lift size & terrace level change Remove proposed window Staircase to the roof Lift enclosure size Removing proposed new window, blocking existing window

Rev Date

Bedroom WS07

T S R P O N

Revision

BD ST ST ST ST ST ST ST ST ST ST ST/BD ST ST ST ST ST ST ST Drawn By

Up

C

C new lintols inserted and existing blind window opened up to match existing

F

SECOND FLOOR PLAN

remove stair and insert floor over this area

F'

TF02

Roof Terrace +21.88

(Lowered by 350mm) Up

Storage space

TF01

provide leadlined chutes through existing roof space to discharge over roof slope below provide removeable protective grille at terrace outlet

THIRD FLOOR PLAN

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION E

+22.23

Balkerne Passage

Project

remove existing balustrade including reval of lead coping and flashings to terrace surround

A

2 Balkerne House

D

F

retain existing railings

renew lead cladding and coping to vertical side sand top of terrace surround adapt and extend existing metal balustrade panels to provide enclosure to all four sides of terrace

Inkpen Downie Architecture & Design Ltd new svp & boxing

Tel 01206 577 244 arch@inkpendownie.co.uk

D

strip off existing mineralised felt flat roof finish take up existing deck and reform to new level including step, lay new roof finish as specified for porch roof (see drg 708/03)

existing window and cill removed and opening infilled with brickwork

resite & reuse existing railings

Regency House

take down existing roof access enclosure cut and trim existing roof structure to structural engineers sopecification and re-align rear (west) wall of roof terrace to give clearance for new stair

Client

new electrically operated sliding rooflight over stair and storage area to give access to terrace

Cad File

new railings to be match with existing Staircase by specialist manufacturer: 1390mm diameter to give 600mm clear width; 1450mm min. stairwell 22 risers, 190mm = 4180mm - newels: 2 no 89 diam stainless steel poles supporting s/s angle tread brackets - treads: float glass - balustrades: curved and flat 10mm transparent acrylic panels bolted into edge of tread panels - handrail: 42mm diam stainless steel fixed to top of balustrade panel

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

SECOND GROUND &FLOOR THIRDPLAN FLOOR PLANS D r a w i n g N o.

A/708/C/04 A/708/C/02

R e v N o.

T

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Existing shutters (full height) to be cut in half at upper midrail position

NOTES Contemporary Styled Roof Access Skylight, Electrically Operated. Manufacturer's recommendations and details

Strip out existing roof cover Retain the structure to this point

New bottom rail to top shutter inserted & mouldings adapted (original panel dotted) Upper midrail altered to become top rail of bottom shutter

Retain existing railings

Contemporary Styled Roof Access Skylight, Electrically Operated.

Existing railings

22.23 Hipped slate roof extended to cover glazed bay

22.20

350

TERRACE

New slate cover wall

350

GROUND FLOOR SHUTTER ALTERATIONS 1/20

22.23

New railings to be match with the existing

Retain existing roof and parapet structure

New railings to be match with the existing Retain existing roof and parapet structure

18mm Plywood over the existing joists

Existing railings from other side of terrace resite

Renew lead cladding

Resite & reuse existing railings

Floor of terrace lowered

Decking Protection layer Membrane Rigid insulation Vapour barrier 18mm Plywood

New slate cover wall

Floor of terrace lowered New structure

STORAGE SPACE

22 21 20 19

Retain existing slate roof

21.03

18 17

20.99

Curved lead dormer over central sash

16 15

20.59

14

ROOF SPACE

13

20.20

Retain existing structure

12 11 10

8

Bedroom

New glazed bay enclosure to balcony

New studwork New ceiling partitions Connection with existing roof structure

9

7 6

1445

5 4

Bathroom

3

Lover floor level of former balcony to match internal F.F.L

2

17.74

1

17.41

17.42

Existing roof structure

Retain existing brick wall

ROOF TERRACE SECTION 1/20

New floor Existing floor joists New steel beam to Structural Engineers details and recommendations

Drawing Room

Cup'd

Bedroom

L K J I H G F E D

14.12

13.81

13.30

Existing shutters to be altered. See detail above.

New stairs & balustrade Match with existing balustrade detail in Main Hall

Living Room

04/06/08 15/04/08 26/03/08 05/03/08 13/08/07 17/07/07 13/07/07 29/06/07 04/06/07

C B

Additional notes. Amendments on notes. ST Roof terrace access shape & detail is changed ST Railings to roof terrace to be match with existing ST Balcony to be omitted WS08 ST New glass railings on roof terrace ST Renew lead cladding on terrace roof ST Remove proposed door & retain existing window ST Roof detail & Details and notes on section AA ST Enlarge staircase well on to the roof & Angle change ST on west side of the roof 01/06/07 Change on skylight to the roof & staircase ST 21/05/07 Change on skylight to the roof & staircase ST

A

11/05/07 Change on skylight to the roof

Rev Date

ST

Revision

Drawn By

Kitchen

11.10

Conservatory New cast iron grating cover to cellar light well

9.80

+10.50

10.49

9.92

9.87

Inkpen Downie Architecture & Design Ltd

9.97

2 Balkerne House

Cellar

7.77

Arbitrary Datum 7.00m Arbitrary Datum 7.00m

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk New bi-fold doors

retain existing dwarf wall

Floor level lowered to existing kitchen F.F.L

new heigher ceiling to this area to level with GF03

New timber surround to range recess

New glazed doors within existing window opening through to new conservatory

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm

CONSTRUCTION Project

Arbitrary Datum 7.00m

Regency House Client

CROSS SECTION A-A

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50/ 1:20 1:50

ST/12.06.2007 BD/

Checked By / Date

Title

CROSS GROUND SECTION FLOOR PLAN A-A D r a w i n g N o.

A/708/C/05 A/708/C/02

R e v N o.

L

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

Plaster

NOTES 29

NEW TIMBER STAIRS SECTION 1/10

Tread

38

Wedge

Skirting board

22.23

180

Curved lead roof over arched window

540

180

250

180

250

Existing dormer roof extended over bay

20.99

Existing balcony enclosed to form glazed bay Kingspan Kooltherm Insulated Dry-lining Board under existing rafters 17.74

Strip out the current ceiling finish New insulation & finish under the current rafters

17.42

New timber stairs

+15.12

Bedroom

1880

Hall

Bedroom

2230

Corridor

3300

3300

2320

Steel lintels to structural engineers details

+14.58

Reinstate original door to bedroom from half landing

9.80

9.87

F E D C B A

3410

04/06/08 Notes amended. New flint wall screen to west elev. Cottage SF bedroom roof amended 05/03/08 DG20 to be omitted 13/07/07 New floor insulation thickness to 75mm 02/07/07 Stair detail & Details and notes on section BB 04/06/07 Angle change on west side of the roof 21/05/07 Entrance to the bedroom in Cottage

Rev Date

Elec. cupd

10.50

+9.92

9.92

Garage +9.92

1910

Existing stairs removed

2270

WC

Opening blocked

2210

Hall

Revision

ST ST ST ST ST ST Drawn By

New flint paneling 2250

3350 10.49

Ensuite Bathroom

+12.45

+12.39

Mr Johnson's Study

New door

1980

Bedroom 13.81

2200

+14.14

2480

+14.14

Opening blocked Expose toe of existing foundation and agree support for new leaf of brickwork

+9.91

Inkpen Downie Architecture & Design Ltd 2 Balkerne House New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Arbitrary Datum 7.00m Arbitrary Datum 7.00m

Arbitrary Datum 7.00m

Regency House Client

CROSS SECTION B-B

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50/ 1:10 1:50

ST/12.06.2007 BD/

Checked By / Date

Title

CROSS GROUND SECTION FLOOR PLAN B-B D r a w i n g N o.

A/708/C/06 A/708/C/02

R e v N o.

F

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

New skylight to be match with the existing

New roof cover Manufacturer's details and recommendations

Bedroom

New roof structure over the porch

13.83

The hole on the ceiling to be shaped as circle

Existing brickwork

Curved lead roof over arched window

Cloakroom

Existing dormer roof extended over bay

30.6

Ensuite Bathroom

0째

New timber boards fixed to timber structure Match with the brickwork on the left

Porch Opening blocked

Walls in this area to be plastered

Existing balcony enclosed to form glazed bay

PORCH CEILING SECTION 1/20

Casement doors within blind window top section lights corridor

2230

Existing window opening blocked Corridor F.F.L 15.12

Bedroom

Balcony

WG11

Enlarge the existing balcony over the porch 13.83

New window 1980

WG10

Ensuite Bathroom

10.49

9.87

A

18/05/07 Entrance door in porch area is moved

Porch Garage

Drawn By

New door Expose toe of existing foundation and agree support for new leaf of brickwork

+10.01

9.92

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk Existing door to be moved to the new front brick wall Brick wall to be plastered

Arbitrary Datum 7.00m Arbitrary Datum 7.00m

ST

Revision

Opening blocked

+10.11 9.80

New flint paneling

L K J I H G F E D C B

11/08/08 Levels amended for garage & porch. Porch ceiling ST detail amended. 09/06/08 Notes amended. New flint wall screen to west elev. ST Porch ceiling detail amended 14/04/08 Brick garden wall location change ST 05/03/08 DG20 & kennel & covered run to be omitted ST 13/07/07 New floor insulation thickness to 75mm & slab 150mm ST 10/07/07 Timber step in Cloakroom ST 03/07/07 Details and notes on the section CC ST 02/07/07 Porch ceiling detail ST 25/06/07 Roof to Porch & New skylight shape ST 18/06/07 Retain existing window position in entrance area ST 04/06/07 Angle change on west side of the roof ST 22/05/07 New skylight over the porch ST 21/05/07 Wall in porch area is plastered ST

M

Rev Date

New timber step 10.50

+12.45

New floor

1910

3090

Entrance Partitions removed

New skylight

New door to WC

155

3050

Mrs Johnson's Study

New panel to match the door linings

3100

Cloakroom Continuation of railings across entire frontage subject to agreement with neighbours

2170

13.83

N

14.58

New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm Arbitrary Datum 7.00m

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Regency House Client

CROSS SECTION C-C

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50/ 1:20 1:50

ST/12.06.2007 BD/

Checked By / Date

Title

CROSS GROUND SECTION FLOOR PLAN C-C D r a w i n g N o.

A/708/C/07 A/708/C/02

R e v N o.

N

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Curved lead roof over arched window

Existing dormer roof extended over bay

Existing balcony enclosed to form glazed bay

Casement doors within blind window top section lights corridor

Take down and rebuild existing brick parapet Use existing bricks in good condition

Existing window opening blocked Corridor F.F.L

New stone coping on whole parapet

15.12

Renew stone 14.58

Enlarge the existing balcony over the porch

13.83

I H G

Existing brick wall

Renew stone

WG08

New brick wall Same pattern with the existing.

WG09

New brick raised pillar

Garage

F E D C B A

09/06/08 Notes amended. Garden wall pillar height change. ST 14/04/08 Height of garden wall changed ST 04/03/08 New sash window to WG01 & Smaller bins encl. & ST DG20 to be omitted 17/08/07 Balcony parapet notes ST 13/07/07 New floor insulation thickness to 75mm & slab 150mm ST 02/07/07 New brickwork on the elevation ST 26/06/07 Retain study window & renew cloakroom window ST 04/06/07 Angle change on west side of the roof ST 01/06/07 215mm brick wall to the garage ST

Rev Date

Revision

Drawn By

Existing pillar

Bins Enclosed +9.89

+9.91

Inkpen Downie Architecture & Design Ltd 2 Balkerne House Wall & railings continued around boundary to match those on south green elevation

New fanlight over street door

New garden wall Remove existing casement window & new sash window to match with the left side original window

Arbitrary Datum 7.00m

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

New RWP Match with the left side existing

Existing door to be moved and re-used on the front new brick wall

New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Regency House Client

CROSS SECTION D-D

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

CROSS GROUND SECTION FLOOR PLAN D-D D r a w i n g N o.

A/708/C/08 A/708/C/02

R e v N o.

I

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Existing brick arch

New lintels to engineer's spec. Frame to be match with the other door frames

New casement doors within blind window top section lights corridor

New railings to be match with the existing

For roof space storage area layout see drawing no: A/708/C/16

Existing skylight to be moved 200mm.

G

Use existing stone coping where applicable. Replace damaged coping with matching profile on outside.

Corridor Glazing bar to be at the same level with the existing

Replace old brick coping with new stone coping all the way round parapet

+15.12

New roof cover Manufacturer's details and recommendations

+14.74

kingspan insulated dry-lining board under the rafters

Take down and rebuild existing brick parapet Use existing bricks in good condition

New stone cill 150

Purlin

+13.83

Bathroom & Dressing Area

Purlin

r

Purlin

lift

Pr

inc

ipa

a lR

2301

fte

BOILER KITCHEN

2520

Roof Space

Existing structure

Walk-in shower

Floor Level +17.71

Lift shaft line

+15.12

L I F T

(Some details approximate)

Datum 16.00m

Hall

3300

Bathroom

New door to the bathroom to be match with the existing cupd. door

3290

Corridor Existing skylight to be moved 200mm. +14.74

PARTIAL SECTION G-G

+13.83

S H A F T

2480

New stone cill

Bedroom +14.12

+14.08

Bedroom Lintels to engineer's spec.

New door DG04

New bi-fold doors +12.39

New brick arch

N M L K J I H G F E

11/08/08 26/03/08 04/03/08 17/08/07 13/08/07 13/07/07 02/07/07 26/06/07 12/06/07 04/06/07

Parapet detail changed. Notes amended. ST Railings to roof terrace to be match with existing ST New sash window to WG01 ST Parapet notes on detail & Lift pit cancelation ST New glass railings to roof terrace ST New casement door detail 1/20 & New floor ins. dim. ST Details & notes on section EE ST Re-shape arch on Section GG ST Re-size dressing area and bathroom ST Roof terrace arrangement change ST

D C B A

01/06/07 25/05/07 22/05/07 18/05/07

Partial Section GG & Hole size change on chimney Lift size & hole to the chimney Roof light Lift enclosure size

+10.50

2230 +9.92

Laundry New stairs

Revision

ST ST ST ST Drawn By

3330

3410

WC 2000

Cloakroom

Existing partition 2210

3090

Rev Date

155

Hall

Lintels to engineer's spec.

2320

new floor joists sitting on the existing brick walls

Cloakroom

NEW CASEMENT DOORS SECTION D-D' SECTION 1/20

+17.71

Existing brick arch

Casement doors within blind window top section lights corridor

Bedroom

new DPC

Hall

Kitchen +10.50

+9.92

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Remove existing casement window & new sash window to match with the left side original window

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm

New Floor: Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Regency House Client

CROSS SECTION E-E

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

CROSS GROUND SECTION FLOOR PLAN E-E PARTIAL SECTION G-G D r a w i n g N o.

A/708/C/09 A/708/C/02

R e v N o.

N

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

Contemporary Styled Roof Access Skylight, Electrically Operated.

645

New railings to be match with the existing

23 22 21 20

Roof Space

retain existing ceiling joists

19 18

New staircase to the roof

17

1968

16 15 14

Purlin

13

Extend and adapt existing landing balustrade

Purlin

7 6 5

Purlin

4

Roof Space

Hall

+17.71

2000

2

New steel beam to Structural Engineers details and recommendations

Remove existing wall

Existing skylight to be moved 200mm.

Hall

Cupboard

+14.74

PARTIAL SECTION F'-F'

+14.12

2300

New trimmers to Structural Engineers details and recommendations

3290

1

Dressing Area

storage

3

+17.71

r

te

af

lR

ipa

inc

Pr

3300

8

Hall

2560

9

new floor joists

1600

4180

New staircase to the roof

10

3300

Bathroom

+14.08

+13.83

New floor joists

2200

3100

Entrance

New bi-fold doors

B A

3410

New fanlight over street door

Partitions removed

H G F E D C

Remove existing wall

2720

Dressing Area

2560

11

3280

12

Hall +10.50

26/03/08 13/08/07 17/07/07 03/07/07 18/06/07 12/06/07

Railings to roof terrace to be match with existing New glass railings to roof terrace Change of notes for staircase Details & notes on section FF and F'F' Retain existing window position in entrance area Re-size WC and hall, re-position staircase to the roof (255mm to the south), re-size roof terrace & skylight 07/06/07 Door to the balcony + window over the entrance door 04/06/07 Roof terrace arrangement change

Rev Date

Revision

ST ST ST ST ST ST ST ST Drawn By

Kitchen +10.50

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Regency House Client

CROSS SECTION F-F

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

CROSS GROUND SECTION FLOOR PLAN F-F PARTIAL SECTION F'-F' D r a w i n g N o.

A/708/C/10 A/708/C/02

R e v N o.

I

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

F.F.L

New stone coping on whole parapet

Take down and rebuild existing brick parapet

Renew stone in bad condition

D C B A

28/07/08 Garden railings to be confirmed by client & conservation officer 05/03/08 Balcony to be omitted 16/08/07 Remove garden gate & Renew parapet & Notes 02/07/07 Remove proposed door & retain existing window Revision

Drawn By

900

Rev Date

ST ST ST ST

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Brick plinth & stone coping to match neighbouring property. Cast iron railings above.

SOUTH GREEN ELEVATION

New metal railings Exact design to be confirmed with the client and the conservation officer

Investigate the parapet renew necessary points

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Regency House Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

SOUTH GROUND GREEN FLOORELEVATION PLAN D r a w i n g N o.

A/708/C/11 A/708/C/02

R e v N o.

D

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

remove haunching and replace missing chimney pots with pots to match existing and in cluding weather proof or gas cowls as appropriate, renew flaubnching on completion

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

CONFIRM COSTS OF ALL ADDITIONAL REPAIR WORK SHOWN HERE AS REV E BEFORE POROCEEDING ON SITE

remove bricks as necessary and remove remnants of mild steel angle window box supports

take down existing shutters and reduce in height to align bottom edge with window cill

remove and rebed loose bricks, rake out and repoint panel between lead flashing and cill level in lime putty mortar to match existing adjacent areas

F.F.L

insert temporary supports as necessary carefully remove brick work around existing cast iron balcony brackets and remove loose rust scale from built-in part of bracket

Take down and rebuild existing brick parapet

New stone coping on whole parapet

coat exposed iron with a proprietary bituminous rust inhibitor and over coating ( submit details of paint to be used before proceeding) replace bricks and harden up round bracket with cement lime sand mortar and slate slips, and point joints in lime putty mortar to match existing on completion note that this procedure should be carried out to a single bracket at a time

900

Renew stone in bad condition

Brick plinth & stone coping to match neighbouring property. Cast iron railings above.

New metal railings Exact design to be confirmed with the client and the conservation officer

Investigate the parapet renew necessary points

SOUTH GREEN ELEVATION o e s

balustrade end to be bracketed and fixed to brickwork with a chemical fixing at handrail level

PLAN OF BALCONY

E

11/09/08 Additional repair work shown.

BD

D

28/07/08 Garden railings to be confirmed by client & conservation officer 05/03/08 Balcony to be omitted 16/08/07 Remove garden gate & Renew parapet & Notes 02/07/07 Remove proposed door & retain existing window

ST ST ST

C B A

Rev Date

joints between balcony slabs built into outerleaf of house wall and spanning between cast-iron brackets

remove later mild-steel bracket repairs including drilling out bolts fitted through stone slabs

line of cast iron brackets below

remove remnants of existing stanchions including cleaning out lead from stone sockets and prepare for new balustrade.

Revision

ST

Drawn By

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

extng rwp

extng rwp

865

carefully emove existing iron railings including removing all fixing keep on site as pattern for new railings and carrt-away on completion

872

Drawing Status

963

fix new railings to match existing in pattern, section size and overall dimensions include chemically fixed brackets to bottom of balusters as detail raillings to be galvanised and then finished in black gloss paint

175 125

remove former cement repairs from existing stonework obtain specialist stone masons recommendations and carry out repairs accordingly using pieced in stone, pinned and resin bonded and plastic repair techniques report/agree extent of repairs before proceeding

3mm flat bar and gusset with split tube upper edge welded to base of balustrade stanchion

CONSTRUCTION

c/s chemical anchor into stone

Regency House

Project

existing slab Client

new balustrade fixed and leaded into socket to match existing

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1:50,1:20 & 1:10 ST/Aug 08

Checked By / Date

BD/

DETAIL AT BALUSTRADE FIXING SOUTH GREEN ELEVATION Title

280

6820 check all dims on site

280

D r a w i n g N o.

R e v N o.

A/708/C/11E Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

New railings to be match with the existing

Strip out boarded gablet, continue plane to main roof, vertical slate cover

purpose designed cowl to mechanical engineers spec.

Existing balcony enclosed with glazed bay

purpose designed cowl to mechanical engineers spec.

+17.71 Floor Level

Provisionally New cast iron gutter

New cast iron gutter

New cast iron gutter New unequal sash window in existing opening New stone cill

+15.12 Floor Level

Remove existing RWP

Clean existing brick face Timber framed double glazing in gable triangle of lean to extension both sides See joinery detail drawings: drawing no: A/708/C/WG08 & 09 New cast iron gutter

Ra

fte

r

Remove existing RWP

New unequal sash window in existing opening

Provisionally Remove existing RWP

N M L K J I H G F E D

kitchen vent metal grill or terracotta air brick

+12.39 Floor Level

C B A

07/07/08 Garage window revised. M&E info added. ST 09/06/08 DG21 to original location ST 04/06/08 New flint wall screen to the cottage. Provisional ST location change of DG21. 09/04/08 Garden wall location change ST 26/03/08 Railings to roof terrace to be match with existing ST 05/03/08 Kennel & DG17 to be omitted ST 05/10/07 Amendments on cottage window heights and positionsST 13/08/07 New glass railings to roof terrace ST 18/07/07 Note change for the roof terrace ST 03/07/07 Remove sunpipes & New RWP and gutters ST 04/06/07 Roof terrace arrangement change & sunpipes ST location change 22/05/07 Parapeth for the roof light & Lift sharf size ST 21/05/07 Angle of the garage roof ST 18/05/07 Conservation sun-pipe system ST

Rev Date

Revision

Drawn By

Red brickwork with coursed pebble flintwork panels

+9.92 Floor Level

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

New RWP boiler flues New lean-to replacement of existing structures Carry on flint paneling on demaged brick wall (Wall details to be approved by the conservation officer before proceeding on site.)

New RWP

New RWP New lead canopy on carved brackets Remove existing RWP

New door opening

extract fan metal grill or terracotta air brick

Existing window blocked

New conservatory: * Painted timber frame * Powdercoated aluminium roof bars & rainwater goods * Double glazing throughout

Provisionally New RWP

Provisionally Remove existing RWP

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Project

Regency House Client

WEST ELEVATION

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

WEST GROUND ELEVATION FLOOR PLAN D r a w i n g N o.

A/708/C/12 A/708/C/02

R e v N o.

O

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

purpose designed cowl to mechanical engineers spec.

New cast iron gutter

New oriel window with curved lead roof

purpose designed cowl behind the chimney to mechanical engineers spec. (not visible)

New brick raised pillar

Curved lead roof over arched window Existing pillar Existing dormer roof extended over bay

New red brick garden wall

New lead canopy on carved brackets

Existing balcony enclosed to form glazed bay

SOUTH ELEVATION OF COTTAGE WING O 11/08/08 Garage door width amended. Profiled brick detail changed on both sides of the garage door. Flint panelling finish detail amended on South Elev. N 28/07/08 Garden railings & gate to be confirmed by the client & conservation officer M 03/07/08 Levels changed. Garden railings added. Brick & flint wall to South Elev. M&E info added. L 09/06/08 Red brick garden wall to south elev. K 04/06/08 Height of existing pier on garden wall raised. J 14/04/08 Height of garden wall change I 05/03/08 New sash window to WG01 & DG20 to be omitted H 16/08/07 Garden wall height adjustment G 03/07/07 Rain water pipes & renew gutters F 26/06/07 Retain study window & renew cloakroom window E 04/06/07 Angle change on west side of the roof D 29/05/07 Garage door dimensions & Roof angle to 30째 Lower brick wall to the bins enclosure C 24/05/07 Proposed window removed on South Elevation B 15/05/07 Balcony over the porch, removed window at Cottage. A 09/05/07 Changes on windows, roof access, kennel

Remove existing RWP Casement doors within blind window top section lights corridor

Take down and rebuild existing brick parapet Use existing bricks in good condition

Existing window opening blocked

New cast iron gutter

Corridor F.F.L

New stone coping on whole parapet

15.12

14.58

Enlarge the existing balcony over the porch Natural slate lean-to roof

Rev Date

Revision

ST

ST ST ST ST ST ST ST ST ST ST ST ST ST ST Drawn By

New RWP Match with the left side existing

Renew stone in bad condition

New brick raised pillar

2264

Inkpen Downie Architecture & Design Ltd

+10.01

2 Balkerne House Existing pillar

+9.97

10.01

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Wall & railings continued around boundary to match those on south green elevation

New metal railings and gate Exact design to be confirmed with the client and the conservation officer

New fanlight over street door

NORTH ELEVATION TO LORNE ROAD

remove existing casement window & new sash window to match with the left side original window

Wide board timber door

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

Project

Regency House Client

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/12.06.2007 BD/

Checked By / Date

Title

NORTH GROUND & FLOOR SOUTH PLAN ELEVATIONS D r a w i n g N o.

A/708/C/13 A/708/C/02

R e v N o.

O

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

Outline of existing kennel to be demolished

NOTES

ADJACENT BUILDING

BW Ht 0.72

Slabs

FB

BW Ht1.86

IC CL 9.76 IL 7.21

Unidentified H7

Trellis Ht1.82

0.1Dia.

BRW BRW BW Ht1.80

Existing cupboard & false wall removed

Grass Lawn

Light Well for Basement

New bi-fold panelled doors

Cupboard removed; electrical fuse board relocated under stairs

CPS

IC CL 9.89 IL 9.54

Existing cellar door blocked

Up

0.1Dia.

Up

FLOOR PLAN

Porch

Up

Up

Existing WC partition removed

LOCATION POINT

Up

Wall removed

BW Ht1.80 Slabs

0.1Dia. Window blocked IC CL 9.91 IL 9.65

ADJACENT BUILDING Eaves 13.84

Pump and Gully

Ridge 14.64

New glazed doors within existing window openings

Staircase removed

Crab apple tree (dotted) to be removed

Lean-to removed

External Wall Line BW Ht 0.62

At Higher Level Opening blocked Existing partitions removed

Rev Date

New doorway & steps

Revision

Drawn By

Existing door to be moved to the front

IC CL 9.89 IL 9.57

0.1Dia.

Existing rear wall of cottage removed at G. Floor level. New steel beam over

No. 2 0.1Dia.

Up

IC (Trap)

Up

CL 10.00 IL 9.10

Holly H5

Up Up

TP

0.15Dia.

Eaves 14.74 Ridge 17.66 Drawing Status

FOR COMMENT Project

Regency House

Telegraph Pole Moved

EP

WV

(DEMOLISH) GROUND FLOOR PLAN

WV

Client

Cad File

Mac 7 - 708 Kerbstone

Scale

Drawn By / D a t e

1: 50

ST/04.06.2007 BD/

Checked By / Date

Title

(DEMOLISH) GROUND FLOOR PLAN GROUND FLOOR PLAN D r a w i n g N o.

R e v N o.

A/708/SK/15 A/708/SK/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design Ltd accept no liability whatsoever if this dra wing is us ed b y any other per son or for a n y o t h e r p u r p o s e.

NOTES

Up

D'

FLOOR PLAN LOCATION POINT

Flank / Stack Wall

Roof Space No Safe Access

Sloping Principal Rafter

Sloping Principal Rafter

SECTION D-D'

Purlin

al R

af

te r

Purlin

Sloping Principal Rafter

Sloping Principal Rafter

Sloping Principal Rafter

Purlin

Hatch

ci p

r te af

pa ci in

Approximate Line of Inner Eave Pr in

R al

Pr

in g

ip inc Pr

o Sl

ng pi

r te af lR

Purlin

Sl op

Approximate Line of Inner Eave

(Some details approximate)

Purlin

Purlin

Drawn By

D

Approximate Line of Inner Eave

Revision

Datum 16.00m

Rev Date Up

Drawing Status

FOR COMMENT Project

Regency House Client

ROOF STRUCTURE PLAN

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 50

ST/04.06.2007 BD/

Checked By / Date

Title

ROOF GROUND STRUCTURE FLOOR PLAN PLAN D r a w i n g N o.

R e v N o.

A/708/SK/14 A/708/SK/02 Copyright reserved by Inkpen Downie Architecture & Design Ltd. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

/ Stack Wall

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

G

NOTES

1000

new lift & enclosure

1000

1010

h =1900mm step up 270mm

Sloping Principal

5200

Purlin

1500

1520

power points

step up 270mm

2150

ceiling mounted compact fluorescent luminance switched by motion detector

1347

Storage

Roof Space

3000

access to the mechanical equipment

infill existing roof access and form new 900 x 600 hinged access hatch

doors to be vertical boarding ledged braced battened

retain existing ceiling joists

3500

917

insulation below the rafters Celotex TB3000 - 40.0mm or similar

900

1010

h =1600mm

insulation between the rafters Celotex GA3000 - 60.0mm or similar provide power for cupboard lighting to be fitted by others

Purlin 1059

1059

Sl op in g

600

1059

Storage

cupboard fit out at later stage by others Pr in ci p

Hatch

new floor joists new water cylinders

Purlin

allow for 38mm dia plain copper tube heating coil with thermostatic control and connected into the heating system

Purlin

Purlin

F

Purlin ipa

lR

af

te

Dressing Area

r

0

inc

144

Pr

1407

PLAN 1 : 20

2020

fter

fter

fter

expansion vessel

Roof Space

storage

+17.71

SECTION FF

1 : 20

retain existing roof structure

New steel beam to Structural Engineers details and recommendations

Remove existing wall

Rev Date

insulation between the rafters Celotex GA3000 60.0mm or similar

Revision

Drawn By

insulation below the rafters Celotex TB3000 40.0mm or similar

provide power for cupboard lighting to be fitted by others

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

cupboard fit out at later stage by others

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION

allow for 38mm dia plain copper tube heating coil with thermostatic control and connected into the heating system

Project

new water cylinders full: 400kg each.

Regency House

Roof Space

insulation 300mm mineral wool 2020

Client

1700

BOILER KITCHEN

storage

lift

Scale

Drawn By / D a t e

Checked By / Date

Mac 7 - 708

1: 20

ST/Jul 08

BD/

Title

Floor Level 270

Cad File

+17.71

ROOF SPACE LAYOUT D r a w i n g N o.

SECTION GG

1 : 20

new floor joists sitting on the existing brick walls

A/708/C/16

R e v N o.

C

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

R2

6

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

5

7

4

8

3

150

NOTES

2

9 20

21

22

19

10

1450

1

150 18 11

TF02

Roof Terrace 17

12

+21.88 +22.23

16

13

(Lowered by 350mm) 14

Storage space

Up

R1

15

level to be agreed

TF01

PLAN

Renew lead cladding

150

100

etain existing roof and parapet structure

TERRACE 952

22.23

1400

120 50

350

200 X

150

127

500

X

22

22

21

21

20

20

580

ROOF SPACE Retain existing structure

19

19 21.03

Roof Space

Rev Date

18

Revision

Drawn By

18 Existing roof structure

17

17

16

193

20.99

16

15

15

14

14

13

13

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

20.20

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

12

12

11

11

Drawing Status

10

10

CONSTRUCTION

9

9

8

8

Project

Bedroom

7

2560

3775 check on site

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Regency House

7 Hall

6

6

5

5

4

4

3

3

2

2

1

1

Client

Cad File

Scale

Drawn By / D a t e

Checked By / Date

Mac 7 - 708

1: 20

ST/Jun 2008

BD/

Title 17.74

2000

ROOF TERRACE ACCESS SYSTEM D r a w i n g N o.

SECTION R1

SECTION R2

R e v N o.

A/708/C/19 Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

D2

New skylight to Existing opening this area to be blocked Existing door to be moved to the front

NOTES

On the ceiling: new timber boards fixed to timber structure Match with the brickwork on the left See detail on: A/708/SK/07-J

New floor to this area

Porch +10.11

Red brick

Lead roof min.150

New doorway & steps

Existing stairs to be removed Walls in this area to be plastered

Plaster New brick wall Same pattern with the existing.

New RWP

Bins Enclosed

dimension to be checked on site after the mechanical equipment installation

Remove existing casement window & new sash window to match with the left side original window

New Floor: Natural stone paving 50mm Screed 50mm Concrede 150mm DPM Hardcore 150mm

Manhole removed

D1

Garage D1

+9.97

DPC

+10.01

Quarry tiles floor cover

DPC

+9.97

D3 2320

D3

Garage

min.150

Bins Enclosed

min.150

gas meter & mechanical equipment closure

2454

Wide board timber door

Up

1958

Existing brick wall

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

Quarry tiles up to 1000 1000mm on the walls

Cloakroom

New garden wall 1:40 gradient floor Existing brick wall

SECTION D3-D3

Bins

New roof structure over the porch

Corridor

New stone coping all the way round parapet

BINS ENCLOSED PLAN

+15.12 New skylight to be match with the existing

D2 +14.74

New stone coping on whole parapet +14.58 New brick parapet Match with the existing Renew stone in bad condition

170

Enlarge the existing balcony over the porch

+13.83

2480

F E D C B A

12/05/09 additional gutter & downpipe 11/08/08 parapet detail changed & levels changed & bins doors and partitions changed 05/03/08 New sash window to GW01 & Smaller bins encl. 23/08/07 Note change on plan 13/08/07 Floor covers, lintels, additional notes 28/06/07 Roof cover manufacturer's detail

Rev Date

Take down and rebuild existing brick parapet Use existing bricks in good condition

New RWP Match with the left side existing

downpipe alternative position

New brick wall Same pattern with the existing.

ST ST ST ST Drawn By

Bedroom

Circular opening on the ceiling

downpipe prefered position

Revision

ST ST

Lead roof New brick wall Same pattern with the existing.

Existing brick wall

Walls in this area to be plastered

+12.39

Inkpen Downie Architecture & Design Ltd

New brick arch Match with existing

Lead roof min.150

64 126

2 Balkerne House

lintel to structural engineers details

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Alumasc Heritage Cast Aluminium Rectangular downpipe 72mm x 72mm product code: RW33 New wide board timber doors

1958

New Floor: Natural stone paving 50mm Screed 50mm Concrede 150mm DPM Hardcore 150mm

New Floor: Natural stone paving 50mm Screed 50mm Concrede 150mm DPM Hardcore 150mm +9.97

DPC min.150

1000

Quarry tiles floor cover

min.150

DPC

Quarry tiles up to 1000mm on the walls

Bins Enclosed

Garage

Bins Enclosed

Alumasc Heritage Cast Aluminium Rectangular Shoe 75mm x 75mm +9.97

SECTION D1-D1

Porch

Existing stairs to be removed

Natural stone door threshold

Project

Regency House Client

Elec. Cupd Cad File

Mac 7 - 708 +10.11

Scale

Drawn By / D a t e

1: 20 50

ST/12.06.2007 BD/

Checked By / Date

+10.11 Title

+9.92

BINS GROUND ENCLOSED FLOOR PLAN DETAIL

+10.01

Remove existing casement window & new sash window to match with the left side original window

1:40 gradient floor

Existing door to be moved and re-used on the front new brick wall + Make good

2210

2454

Existing door to be moved and re-used on the front new brick wall

CONSTRUCTION 2020

Plaster

Existing opening to be blocked new door opening height 1960

Alumasc Heritage Cast Aluminium Gutter Victorian Ogee, product code: OG01

existing door opening height 1960

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

SECTION D2-D2

New Floor: Natural stone paving 50mm Screed 75mm Insulation 75mm Concrede 125mm DPM Hardcore 150mm

D r a w i n g N o.

A/708/C/20 A/708/C/02

R e v N o.

F

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


F3

PLAN

Entrance F1 The hole on the ceiling to be reshaped as ellipse

1/5

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

New frame Match / continue existing entrance door frame

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

F1

Existing skylight to be moved 200mm.

Mrs Johnson's Study

852

NOTES

Cloakroom

1294

EXISTING DOOR FRAME

NEW WINDOW

New fanlight over street door

1/5

130

SECTION

Up

New lintel to structural engineers details New frame Match with existing entrance door frame

240

F3

1/20

45

60

ENTRANCE PLAN

F2 64

F2

New timber cill Existing door frame

Existing roof structure

Existing skylight to be moved 200mm.

Replace old brick coping with new stone coping all the way round parapet

Balcony

Renew roof cover

Existing skylight to be moved 200mm.

+14.74

Existing concrete steps Take down and rebuild existing brick parapet Use existing bricks in good condition 13.83

+13.83

+13.83 B A

05/03/08 New sash window to GW01 13/08/07 Change on door & window frame details

Rev Date

ST ST

Revision

Drawn By

The hole on the ceiling to be reshaped as ellipse

The hole on the ceiling to be reshaped as ellipse

Inkpen Downie Architecture & Design Ltd

New fanlight over street door

2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

3100

3090

3050

3100

Drawing Status

CONSTRUCTION Project

Entrance Entrance

2200

Regency House

Mrs Johnson's Study

Client

Partitions removed

Cloakroom

Partitions removed

Cad File

Mac 7 - 708 +10.50

+10.50

Scale

Drawn By / D a t e

1: 20 50 / 1:5

ST/12.06.2007 BD/

Checked By / Date

Title

ENTRANCE GROUND FLOOR DOORPLAN & WINDOW DETAIL D r a w i n g N o.

A/708/C/21 A/708/C/02

SECTION F1-F1

1/20

ELEVATION F2-F2

1/20

SECTION F3-F3

1/20

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


NEW ORIEL WINDOW DETAIL 1235

Plaster

1370 275

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

DPM

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

1325

820

275

NOTES

Fixed window DPC 264

Fixed windows

135

Cast iron weight for lower sash

째 343

Sash window

Glazing bar

Brick wall Stile of lower sash

PLAN 1:2

1712 642

535

42 106

535

45

PLAN 1:10

28

36

390

5

STRUCTURE PLAN 1:10

Ply formers

Weight for upper sash

Timber cill

Existing brick wall 35mm wide timber lathes

Lintel to structural engineers details

Ply formers Wedge Lead roof cover on sawn timber boarding DPM

93

50mm insulation

Plaster board

124 Lead cover

Ply former 42

Bead Top rail Continue existing roof line

Bead

Ply former

20

45

12

45

20

B A

19/08/08 Joinery details amended 14/08/07 Lead flashing & timber board sizes

Rev Date

Drawn By

45

1380

55

ST ST

Revision

35

Meeting rails

1980

Inkpen Downie Architecture & Design Ltd 2 Balkerne House 20

Ensuite Bathroom

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

45

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

Bottom rail

CONSTRUCTION

95

Project

Ply former

Sill bead

18

Timber cill

Regency House

50mm insulation fixed under ply

Client

66

600

Window board

Ply formers

28

Plaster 146

95 Cad File

WEST SIDE ELEVATION 1:10

SOUTH SIDE ELEVATION 1:10

Mac 7 - 708

Scale

Drawn By / D a t e

1:10 1: 50/ 1:2

ST/12.06.2007 BD/

Checked By / Date

Silicone T i t l e mastic sealant

ORIEL GROUND WINDOW FLOORDETAIL PLAN

Insulation fixed under ply Plaster

SECTION 1:10

SECTION 1:2

Ply former 35mm wide timber lathes

D r a w i n g N o.

A/708/C/22 A/708/C/02

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


100mm insulation & 50mm ventilation gap between ply

REV C Steel T columns

connection detail is to be checked with structural engineer

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

REV C ply formers fixed to the steel column DPC

Casement openable windows

Casement fixed windows Sash windows

75mm insulation in new wall structure

min.150

700

Lover floor level of former balcony to match internal F.F.L

New floor

BALCONY ENCLOSED PLAN 1:20

SECTION 1:20

SOUTH ELEVATION 1:20

REV C timber lintels fixed to the steel column

Breathable sarking membrane

WEST ELEVATION 1:20

New slate roof cover

50mm ventilation gap

REV D 18mm ply formers to be positioned on top of the timber lintels and each side of the fin and through bolted.

Ply formers

Breathable sarking membrane

New slate roof cover

Lead sheet roof cover on 35mm wide timber lathes with penny holes to allow ventilation

Breathable sarking membrane

New roof structure

Ply formers

Cast iron gutter

Cast iron gutter

Lead

Plaster board 150mm insulation between rafters

Bead

Plaster board 150mm insulation between rafters

Vapour barrier Plaster board under rafters

Top rail

Vapour barrier

150 mm insulation

New timber lintel to Structural engineers details

Soffit lining Existing brick wall

100mm rigid insulation

New timber lintel to Structural engineers details

Draft stripping all round the opening lights

Top rail

REV D Form cap to top of the posts with 6mm plate with 6mm fin welded to top of cap. The fin to take 2no 38mm wide x 150mm dp timbers positioned each side of the fin and through bolted.

Stile

Bottom rail Bead Timber cill

MIDDLE SASH WINDOW SECTION 1:5 REV F insulation and boxing to metal T section

Cast iron weight for lower sash Stile of lower sash

Single glazed window

Bead

TYPICAL SASH WINDOW SECTION 1:5

Silicone mastic sealant

New timber beam to Structural engineers details

Plaster board 30mm insulation between battens 75mm insulation between new wall structure

Weight for upper sash

PLAN 1:5

REV D Form Ts using 2no 100x50x8 angles welded back to back

Drawn By

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

CONSTRUCTION Bottom rail Drip

Project

Regency House

Timber cill

REV F bull-nose cill section

Slate roof cover

Timber column to structural engineers details

Revision

Top rail

Meeting rails

Timber cill

REV C Steel T column to support the roof, lintels and Existing roof structure ply formers above the sash windows

Rev Date

ST ST ST

Inkpen Downie Architecture & Design Ltd

Bottom rail

Lead flashing

Glazing bar

B A

2 Balkerne House

150

Meeting rails

ST ST

Head

Soffit lining Single glazed window boxing & insulation to metal T section

BD

19/08/08 Joinery details amended 24/07/08 Additional information from the structural engineer re: T columns & lintel junctions 23/07/08 Steel structural column addition to support the roof above sash windows 15/08/07 Lead arch above middle window detail change 13/08/07 150mm insulation on new roof

Bead

DPC

Draft stripping all round the opening lights

09/12/08 insulartion added to metal T section

E D C

Bead

Gutter Diamond expanded metal mesh

F

Client

Cad File

CASEMENT WINDOW SECTION 1:5

Mac 7 - 708

Scale

Drawn By / D a t e

1: 20 50 / 1:5

ST/12.06.2007 BD/

Checked By / Date

Title

BALCONY GROUND FLOOR ENCLOSED PLANDETAIL D r a w i n g N o.

A/708/C/23 A/708/C/02

R e v N o.

F

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


KENNEL DETAIL

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

215

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

36 29

152.5

Neighbour's wall Drainage channel & trap with pull-box inside, accessible to clean

Lead flashing

NOTES 50 Insulation 75mm

C2

Slate roof cover new rwp & gulley

1902.5 900

337.5

Breathable sarking membrane

215

665

215 894

DG27

C1

75 x 150

C1 Kennel GF17

Kennel lined with acoustic insulation. Roof over kennel to be lined with acoustic insulation.

10 Rafter Tilting fillet

Sound Breaker Bars

Acoustic lining H & H Group Hi-Clinic in between frame fixed to the rafters details to manufacturers recommendations Acoustic insulation to manufacturers recommendations

Two layers plaster board

675

Dog flap to manufacturers details

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

0

Acoustic insulation to manufacturers recommendations

88

.0

3째

1800

DETAIL

215

DG26

1/5

Cast iron gutter

25x125mm SW fascia board

150

2025

102.5

456

Covered Run GF16

50

Two layers plaster board Head

3779.5

Silicone mastic sealant 25mm rebated al round draft stripping

PLAN

Wide board timber door

1/20 C2

Interior

Exterior

Neighbour's wall Natural slate roof stepped lead flashing with the approval of the neighbour

B A

23/08/07 Floor note change 14/08/07 Lintels & under floor heating

Rev Date

Ra

fte

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

CO1 1PA

Drawing Status

Project

New wrought iron railings over 150mm brick wall

2000

Regency House Client

Dog flap Drainage channel & trap with pull-box inside, accessible to clean 1:50 gradient slope

200

1000 Quarry tiles up to 1000mm on the walls DPM up to 170mm

Kennel

170

170

1000 170

Quarry tiles up to 1000mm on the walls

Kennel

DPM up to 170mm

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

CONSTRUCTION

Plaster

Two layers Plasterboard

Dog flap to manufacturers details

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

New garden wall Red brick quoins, piers, arches & copings coursed pebble flint walling

Structural frame

Drawn By

r

Acoustic lining H & H Group Hi-Clinic Acoustic lining H & H Group Hi-Clinic

ST ST

Revision

Cad File

Mac 7 - 708

Scale

Drawn By / D a t e

1: 20 50 / 1:5

ST/12.06.2007 BD/

Checked By / Date

Title

KENNEL GROUNDDETAIL FLOOR PLAN New Floor: Quarry tiles Screed min 50mm Concrede 150mm DPM Hardcore 150mm

SECTION C1-C1

1/20

New Floor: Quarry tiles Elec. Underfloor Heating in min. 75mm Screed Insulation 75mm Concrede 100mm DPM Hardcore 150mm

SECTION C2-C2

1/20

New Floor: Quarry tiles Elec. Underfloor Heating in min. 75mm Screed Insulation 75mm Concrede 100mm DPM Hardcore 150mm

New Floor: Quarry tiles Screed min 50mm Concrede 150mm DPM Hardcore 150mm

D r a w i n g N o.

A/708/SK/24 A/708/C/02

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


NEW ENTRANCE CANOPY DETAIL

SHUTTER DETAIL

New canopy to existing door DG13

New shutters to existing window WF03

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

NOTES

132

85 54 89

Existing window

New shutters

316

PLAN 1:10 1344

85

60

160

60

85

WEST ELEVATION 1:10

ELEVATION FROM INSIDE 1:10

Existing brick wall Lead cover

Ply

B A

15/08/07 Canopy size change 14/08/07 Shutter hinge detail & slimmer canopy

Rev Date

ST ST

Revision

Drawn By

Inkpen Downie Architecture & Design Ltd 80

Existing window

2 Balkerne House

Balkerne Passage

140

Tel 01206 577 244 arch@inkpendownie.co.uk

2020 30 1512 40 12

CO1 1PA

CONSTRUCTION Project

Regency House

50x140 mm SW 535 575

Client

30x40 mm SW

54

30 28

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

610

80

140

40

85

25

Cad File

40

50

52

Mac 7 - 708

132

NORTH ELEVATION 1:10

Scale

Drawn By / D a t e

1:10 1: 50/ 1:5

ST/12.06.2007 BD/

Checked By / Date

Title

Brick wall Plaster Existing door frame

SECTION 1:5

Parliament hinge 100x100

New timber shutters

ENTRANCE GROUND FLOOR CANOPY PLAN DETAIL WINDOW SHUTTER DETAIL D r a w i n g N o.

PLAN 1:5

A/708/C/25 A/708/C/02

R e v N o.

B

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


TYPICAL SHELF DETAIL

GRATING COVER DETAIL

Shelves in rooms: GF01, FF05 (20 shelves in total)

New stainless steel grating cover to cellar light well F. H. Brundle Open Steel Flooring Panels

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Manufacturers Fixing Details

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

499

151

NOTES

1135

PLAN 1:10 163

30 30

17

30 30

13

559

49

548

151 102

9

PLAN 1:10

SW moulding tongued and grooved + glued to shelf

30 20x30 SW bearers placed + screwed to wall

ELEVATION 1:5

1379

591

SECTION 1:5

1379

7

581

162

581

300

300

PANEL PLAN 1:10

A

04/03/08 Note amendment

Arch crown height = 2440

ST

Revision

Drawn By

1369

1369

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

75

CONSTRUCTION

215

300

Arch springer height = 1890

300

Rev Date

Project

650

556 Additional 1 brick course

Regency House

Manufacturers fixing details Stainless steel panels to be cut to size and shaped to suit the geometry

Existing wall Client

Existing wall

Cad File

Mac 7 - 708 Ground level

Scale

Drawn By / D a t e

1:10 1: 50/ 1:5

ST/12.06.2007 BD/

Checked By / Date

Title in every 1000mm

SECTION 1:10

ELEVATION 1:10

Existing window

SECTION 1:10

SECTION 1:5

TYPICAL GROUNDSHELF FLOORDETAIL PLAN GRATING COVER DETAIL D r a w i n g N o.

A/708/C/26 A/708/C/02

R e v N o.

A

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Bedroom

+14.58

svp

600

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

new rwp

1980

Ensuite Bathroom

Cupboard +12.45

600 existing floor joists direction

heated towel rails

heated towel rails waste between floor joists

tile these walls to the ceiling tiled ceiling to this area

Garage

majestic 1100mm glass screen

floor mounted pillar supply bath filler centre waste

hudson reed wall shower

32 trapped waste from whb's

boxing for down pipe

Section BB 1:50

40 trapped waste from bath

majestic glass screen

trench heater 205mm wide 125mm deep, 2500mm long size to be confirmed with the mechanical engineer

shower head with pura modern slider kit ref a3212a tiled surface

tiled ceiling

FF03

855

200 new stud wall

+12.45

This drawing is to be read in conjunction with the document: "RH Bathware 20080715 97-2003 version.xls"

towel radiator

vertical boxing for the bath waste

New Ensuite Bathroom

600

Up

waste to be boxed under the ceiling of the garage

Bathroom

extend the boxing to take supply & waste pipes for the basins. create recesses on high level to take shelves & mirror in.

boxing to take the waste pipes in

towel radiator

SF08

2500

600

2210

new svp & boxing

NOTES

SF11

walk-in shower with 40 trapped waste

+17.71

existing floor joists direction

remove stair and insert floor over this area

205

600

900

1700

New Ensuite Bathroom

WC

existing floor joists direction

FF03

tile walls to ceiling

SF07 +17.71

Dressing Area

SF09

Cupboard

+17.71

SF10

tiled ceiling

Rev Date

1400 750

new svp & boxing

700

FF07 +14.08

existing floor joists direction

clear glass shower screen L1400mm x 750mm x H2000mm

whb m WC

waste to be concealed

2 Balkerne House

400

towel radiator

Project

svp

Regency House centre waste floor mounted pillar supply bath filler

WC

GF10

700

Client

Majestic Hinged Glass door LH Hung to fit 900x700 tray

+9.94

cupboard

step into the shower unit

Cad File

Mac 7 - 708

Bathroom

SF04 Up

tile these walls to the ceiling tiled ceiling to this area towel radiator

WC

Checked By / Date

BD/

600

n

105

GF10

Drawn By / D a t e

1:20 / 1:50 ST/July 08

BATHROOM & WC LAYOUTS

existing hatch

Bathroom

Scale

Title

+15.12

existing floor joists direction

FF07

CO1 1PA

CONSTRUCTION

svp

430

Colchester

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

new replica skirting new hatch to the roof space

stub stack

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

retain the existing skirting & box over

all the pipework, waste & supply pipes for this bathroom to remain concealed in the void beneath the floor. towel radiator

Inkpen Downie Architecture & Design Ltd

retain existing fire place

1000

755

Drawn By

70 1000

ceiling mounted shower head

Bathroom

Revision

D r a w i n g N o.

R e v N o.

A/708/C/27

D

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work. This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

roo/ng membrane dressed up terrace upstand llead facing on 12mm ply on 100 x50 sw line of 152 x 152 cranked steel below

NOTES

new light /tting locations on the wall opposite side

22

21 580

100 50

19 Roof Space

20

170

20

new light /tting location on the wall

Dimensions to be checked against as built before fabrication of the staircase

18

17

16

15

line of 2No 150 x 50 bolted together and to rear terrace wall

14 13

12

11

10

line of 2No 200x 50 bolted together

9

2560

8

7 Hall

6

5

200

170

1400

4

new terrace wall of 100 x 50mm sw framing with insulation between and 12mm ply sheathing to outer face 12.5mm plasterboard on vapour barrier to inside face

part plan of upstand

3

2

1

elevation of stair 1:50 scale

new light /tting location same location for the opposide side of this wall

150

100

lead 0ashing to lead sheet association recommended details

150 x 50 capping to terrace framing set at existing terrace wall height

new lead 0ashing and facing to lead sheet association recommended details 952

TERRACE

100 x 50 framing with 20mm ply to outside face 2No 200 x 50 bolted together with 20mm ply /xed to outside face

150

plasterboard and skim on 20mm ply sheathing

1400

350

200 high performance roof membrane dressed up terrace wall

150

slatted ipe decking on treated sw bearers

X

line of 152 x 152 crankked steel to each side of roof light shaft

X

vertical section thro side panel of roof light 127

500

lead 0ashing to lead sheet association recommended details

120 50

22

D Nov 08 1:20 plan of stair shown & light /tting positions shown

ST

C Nov 08 1:50 elevation of stair shown

BD

B

Rev Date

tile hanging on battens on Tyvek breather membrane on 12mm ply sheathing on 100x 50mm sw framing with insulation between plasterboard on vapour barrier to inside face

21

Oct 08 line of cranked steel shown

BD

Revision

Drawn By

20

Retain existing structure

lead 0ashing to lead sheet association recommended details

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

new light /ttings on the 0oor, equal distance from the pole.

19

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.co.uk

Drawing Status

18

CONSTRUCTION Project

Existing roof structure

17

Regency House 16

193

ROOF SPACE

200mm wide roo0ight upstand formed of 200 x 50mm sw framing with 20mm ply sheathing /xed to inside face

Client

15

vertical cross-section thro roof light

Cad File

Scale

Drawn By / D a t e

Checked By / Date

Mac7

1:10

BD 08/08

2008

Title

plan of stair 1:20 scale

Terrace access details D r a w i n g N o.

R e v N o.

A/708/C/28

D

Copyright reserved by Inkpen Downie Architecture & Design. This drawing shall not be reproduced or used without prior permission of the partnership.


GROUND FLOOR

Do not scale dimensions off drawings. Use written or calculated dimensions. The contractor i s responsible for checking all dimensions before ordering or starting work.

Door Number

DG01

DG04

Door Description

Entrance door

WC door

DG07

DG08

DG09

DG10

Kitchen door

Cupboard door

Living room door

Conservatory door

This drawing has been produced for the client for the p r o j e c t o n t h e s i t e s h o w n. I t w a s p r e p a r e d f o r a p u r p o s e agreed with the client and will have a commensurate d e g r e e o f a c c u r a c y. I t i s n o t a r e c o r d "as built". T h i s d r a w i n g is not intended for use by any other person or for any other p u r p o s e t h a n t h a t s p e c i f i e d h e r e. Inkpen Downie Architecture &Design accept no liability whatsoever if this drawing is used by any other person or for a n y o t h e r p u r p o s e.

25 20 12 18 531

15 25 15 30

Entrance architrave under the old fanlight

15

Existing window

35

1070 Approximate dimension

40

2. Ironmongery to conservatory to be in accordance with Hilary Brightman drawing number 05/01/11 with the addition of Chubb security five lever mortice deadlock to each pair of external doors New door

2100 230

1870

530

25

25

1930

25

60

90

690

3280

Floor to ceiling height 3330

810

50

536

NOTES

1. Remove ironmongery from door no: XDS14 see in drawing no: A/708/S/04; and set aside for reuse.

+9.92

180

130

Notes

Retain existing entrance door New fanlight over Match with existing door frame Ironmongery: Retain existing ironmongery. Add new Chubb security 5 lever mortice lock with brass escutcheons. keyed alike to other external doors

Re-use existing door to the hallway from existing laundry (See in drawing no: A/708/S/02, door no:XDG04) Adjust the frame for the new opening on brick wall

Existing screens removed and fielded paneling and architrave to match door linings (DG06) applied to underside of lintel. See drawing 708/C/45

Ironmongery: - reuse existing hinges, latch, knob furniture - supply & fit brass mortice bolt & release (A & H Brass cat no: 1711/1 or similar)

Existing entrance door frame PLAN 1:5

New double doors within existing opening. Match with DG07 Ironmongery: - 2 pairs 100mm brass finial butt hinges - 2 victorian knob bolt locking cat no: 4291/3 - horizontal mortice latch and dead bolt with key operation - 1 facetted glass knob furniture with P.B.base and matching escutcheons. to be supplied by the employer

New double doors within existing opening. See detail drawing no: A/708/C/DG07 Ironmongery: - 2 pairs 100mm brass finial butt hinges - 2 victorian knob bolt locking cat no: 4291/3 - horizontal mortice latch and dead bolt with key operation - 2 facetted glass knob furniture with P.B.base and matching escutcheons to be supplied by the employer

SECTION 1:5

New bi-fold doors. Match with the existing frame detail on the left side wall See drawing number A/708/C/39 for door and ironmongery details.

New glazed double doors within existing window opening Retain existing fan light See detail drawing no: A/708/C/DG10 Ironmongery: - 3 pairs 75mm brass butt hinges - 2 victorian bolts - mortice sash lock to suit narrow style key operation - brass lever furniture and matching escutcheons to be supplied by employer

GROUND FLOOR Door Number

DG11

DG12

DG16

DG17

DG18

DG19

DG20

DG21

DG22

DG23

DG24

DG25

Door Description

Larder door

Kitchen door

Lift door

Laundry door

Laundry door

Door to Garage

Garage door to the garden

Door to garden

Porch door

Bin enclosure doors

Door to bins enclosure

Garage door

dimension to be checked on site after the mechanical equipment installation 1022.5 1030

810

1010

R 1637

2100 1000

1945

2018

1890

1990

New door to kitchen New frame to match DG15 Ironmongery: Use existing door handle and decorative fingerplate from existing door no: XDG12, see in drawing no: A/708/S/02.

New lift door Match with the existing Study Omit this door door (DG15) Ironmongery: - 1 1/2 pairs brass butt hinges - mortice latch - brass knob furniture (1 knob only) to be supplied by employer

Re-use existing door and frame to garden (See in drawing no: A/708/S/02, door no:XDG21) & relocate. Ironmongery: Re-use existing ironmongery

New fire door within existing door opening Jeld-wen Smooth Atherton 1981 x 864 Check against available opening height and report before proceeding. Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - horizontal mortice latch and dead bolt with key operation - brass knob furniture and matching escutcheons to be supplied by employer

GROUND FLOOR

New paneled door and frame to match existing door DG22 and size to suit structural opening. Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - mortice latch - Chubb security 5 lever mortice lock with brass escutcheons. keyed alike to other external doors - 2 mild steel barrel bolts - brass knob furniture to be supplied by employer

Omit this door

FIRST FLOOR

Existing door to be moved and New wide board timber doors re-used on the front new brick wall New brick arch to be built at Ironmongery: - 1 pair galvanised M.S. tee hinges per leaf Ironmongery: - 1 black finish M.S. barrel bolt Re-use existing ironmongery Add new Chubb security 5 lever - 2 no black finish gate latches with ring handles mortice lock with brass escutcheons.keyed alike to other external doors

New wide board timber door New brick arch to be built at Ironmongery: - 1 pair galvanised M.S. tee hinges - 1 black finish M.S. barrel bolt - 2 no black finish gate latches with ring handles

Door Number

DG26

DG27

DG28

DG29

DF08

DF09

DF10

DF11

DF13

DF14

Door Description

Door to garden

Kennel door

Cupboard door

Cupboard door

Cupboard door

Bathroom door

Bedroom door

Lift door

Bathroom door

Cupboard door

70

1120

850

850

1130

20/01/09 - security locks to external doors added - locking deadbolts to new door latches added DG07, DG08, DG10, DG19 and DF10

BD

J

9/12/08

BD

860

250

Sloping 100

Floor to ceiling

1926

110 1820

220

6/11/08

G

15/08/08 Omitted doors: DG11, DG17, DG20 ST Additional notes: DG07, DG08, DS08 Size/design change: DG09, DG10, DG24, DG25, DG26 Ironmongery information added 14/04/08 DG26 size changed ST 04/03/08 DG27 & DG20 & DG17 to be omitted ST DG28 to be revised 17/08/07 No change on DF12 & DF09 Lift door cancelation ST 18/07/07 Re-use some existing doors & additional door details ST 03/07/07 New fire door (DG19) & Renew conservatory door ST 29/06/07 New kitchen door to the conservatory ST

F E

concealed cupboard

D C B A

Rev Date

Revision

BD

Drawn By

timber shelf

80

200

210

200

310

1880

1980

2116

2200

2065

2200

2065

2065

2200

100 220

105

490

220

2210

Floor to ceiling

3245 2200

135

DF14, DS04, DS05 omitted, DG18 amended, DG21 amended to replacement door, DS09 cut for heater ironmongery to be supplied by employer noted garage door by specialist supplier noted

H

930 710

100

Ironmongery: - 1 pair brass butt hinges per leaf - 2 brass ball catchers per leaf - 1 brass cupboard knob furniture per leaf supplied by the employer

Omit this door

1120

840

New door to wardrobe in Cloakroom New wide board timber door New brick arch to be built at Ironmongery: - 1 pair galvanised M.S. tee hinges - 1 black finish M.S. barrel bolt - 2 no black finish gate latches with ring handles

985 715 140

780

New partition

110

Notes

K

489

140

1224

This door and ironmongery to be omitted and door by specialist as AI number 15

ceiling

Omit this door

760

1990

2170

Notes

Approximate height of the current opening

810

Re-use existing door to old laundry (See in drawing no: A/708/S/02, door no:XDG29)

Current door moved

Ironmongery: Re-use existing ironmongery

Ironmongery: Re-use existing ironmongery

Reinstate original door to bedroom from half landing New door to the bathroom to be Match with the First Floor Bedroom door match with the existing cupd. door Ironmongery: Ironmongery: - 1 1/2 pairs 75mm brass butt hinges - 1 1/2 pairs 75mm brass butt hinges - mortice latch - horizontal mortice latch and dead bolt with key - glass knob furniture supplied by operation the employer - brass knob furniture and matching - brass mortice bolt & release escutcheons to be supplied by employer - mirror finger plate supplied by the employer

Re-use existing door to bedroom / relocate Ironmongery: Re-use existing ironmongery

Re-use existing door to first floor bedroom in cottage (See in drawing no: A/708/S/03, door no:XDF10) New frame to match with the existing Second Floor Bedroom door (DS01) Ironmongery: Re-use existing ironmongery

This door and frame to be omitted and cupboard to be carried out by paneling specialist

Inkpen Downie Architecture & Design Ltd 2 Balkerne House

Balkerne Passage

Tel 01206 577 244 arch@inkpendownie.co.uk

Colchester

CO1 1PA

Fax 01206 563 377 www.inkpendownie.c