Page 1

STUDIO PORTFOLIO

Hayden Pattullo & Shea Gibson



contents

PROGRAM AND SPATIAL GENERATION

DESIGN PHILOSOPHY

5

NARRATIVE/PROGRAMME Project Vision | Precedents | Parti | Project Progamme Development

17

29

SITE STRATEGY/CONTEXTUAL\RESPONSE

ARCHITECTURAL INTENT/APPROACH/SOLUTION

Site Analysis | Site Plan | Site Sections | 1:1000 Model

Plans | Sections | 1:400 Model | Elevations | Material Palette |

The Moh-Kins-Tsis Gathering House at Fort Calgary celebrates and preserves Canadian Indigenous culture through the interpretation and the physical manifestation of indigenous linguistic traditions. 1 A1

Administration Building Grand Hall & Outdoor Boardwalk

Wood Blocking

150mm Gravel

Prairie Grass Vegetation

Metal Flashing Wood Panel Finish

150mm Soil Medium

Wood Sheathing 2 x 4 Blocks

102mm Type 4 Rigid Insulation

Perimeter Fassening

Filter Fabric Protective Course Drainage Layer Root Barrier Roof Membrane Cover Board

Water Proofing Membrane

It is a new home and beacon for indigenous cultural learning for both indigenous and non-indigenous people, designed to remember, honour, and safeguard Indigenous culture and language. HSS Beam

9.2mm Structural Gypsum Board 76mm Steel Q-Decking Suspension Cabling @ 600mm OC

Glulam End Cap

Perimeter Radiant Ceiling Panel

Glulam Knife Connection

9.2mm Structural Gypsum Board Ceiling Grid T 9.5mm Plasterboard

Kawneer 1620 Curtain Wall Infill Detail #1

125mm Concrete Structure

Grand Hall Upper Level

Outdoor Boardwalk

6mm Double Pane Glass with 12mm Argon Gas Air Space

43

59 Translucent Painted Canvas

Grand Hall Lower Level

65 Steel Rebar

100mm Rammed Earth Wall

It is an architecture that celebrates the proud history and autonomy of indigenous peoples, recognizes the ENVELOPE & DETAIL DELINEATION AESTHETIC/VISION/SUMMARY BUILDING SYSTEMS\SUSTAINABLE DESIGN GOALS cultural and historic significance of “place,” and Wall Sections | the Detailshope | Accessibility & Lifepromise Safety Structural System | Environmental\Mechanical Systems | Sustainability Strategies | embraces and of reconciliation; it is Perspectives | Concept Restatement | Conclusion Key Room Analysis an architecture of dialogue to inspire and promote conversation. Kawneer 1620 Curtain Wall Infill Detail #6 Gravel Sill

Stainless Steel Glulam Bearing Support

200mm Cast in Place Concrete Support Column

38mm Concrete Finishing Panels @ 600mm

Expansion Joint

125mm Concrete Slab 6mil Polystyrene

200mm Compact Gravel

38 mm CT Insulation

Glulam Column Foundation Wall 1200 x 1550 x 450 mm

Foundation Rebar

Natural Soil

Foundation Wall Earth Footing 900 x 900 x 250mm

Glulam Column Footing 1200 x 1550 x 450 mm

Rammed Earth Footing 1800 1800 x 600mm



NARRATIVE / PROGRAMME


project vision

DESIGN PHILOSOPHY

N PHILOSOPHY

ns-Tsis Gathering House at Fort Calgary nd preserves Canadian Indigenous culture interpretation and the physical on of indigenous linguistic traditions.

ome and beacon for indigenous cultural both indigenous and non-indigenous gned to remember, honour, and safeguard culture and language.

tecture that celebrates the proud history my of indigenous peoples, recognizes the historic significance of “place,” and he hope and promise of reconciliation; it is ure of dialogue to inspire and promote n.

6

The Moh-Kins-Tsis Gathering House at Fort Calgary celebrates and preserves Canadian Indigenous culture through the interpretation and the physical manifestation of indigenous linguistic traditions. It is a new home and beacon for indigenous cultural learning for both indigenous and non-indigenous people, designed to remember, honour, and safeguard Indigenous culture and language. It is an architecture that celebrates the proud history and autonomy of indigenous peoples, recognizes the cultural and historic significance of “place,” and embraces the hope and promise of reconciliation; it is an architecture of dialogue to inspire and promote conversation.


comprehensive narrative

The Moh Kin T’sis Gathering House is an architectural intervention within the Fort Calgary site grounds that aims to use the shared tool of language to achieve cross-cultural reconciliation between Canadian indigenous people and European descendants, while at the same time providing Calgarian indigenous groups a facility that respects and accommodates their right to cultural autonomy. Historically, Fort Calgary is unique in Canadian history as a site that saw both the archetypically negative relations between indigenous peoples and European immigrants, as well as some of the more rare positive interactions seen through trade seen on the site. The central key to this trade was visual iconographic language that could be understood though both indigenous and European cultural lenses.

Today, the fort physically and metaphorically stands as the mitigating territory between the significant indigenous landmark of the river confluence and the imposing modern Euro-centric city typology. As such, the Moh Kin T’sis Gathering House proposal utilizes the tool of language to re-appropriate the fort as a negotiatory territory between cultures, and as a legible procession space through which European descendents can undertake a journey of learning and indigenous peoples can continue their traditions and language. Thus, the Moh Kin T’sis Gathering House is an urban home and a beacon for indigenous cultural learning for both indigenous and non-indigenous people, designed to remember, honour, and safeguard indigenous culture and language. It is an architecture that celebrates the proud history and autonomy of indigenous peoples, recognizes the cultural and historic significance of “place,” and embraces the hope and promise of reconciliation; it is an architecture of dialogue to inspire and promote conversation. 7


conceptual precedents Glazing material and form effect | interior & exterior Hans Christian Andersen Museum | Kengo Kuma and Associates

Glulam Structure Precedent Campamento Base Mont-Blanc | Kengo Kuma & Associates

Timber mullion & glulam beam system Foshan New City Village Walkway Bridge

Finishing materials | unretated timber strips (with bark) | rammed earth Deer Clan Longhouse | Simone Veil Schools | Nk’Mip Desert Cultural Centre

8

8


overview program data sheet Program Group

Program Item

# people

#

Area (sf)

Area (m2) Initial

Area (m2) Phase 3

Differential

PROGRAM NOTES / COMMENTS /REQUIREMENTS

%

Public Component 23% Include vestibule Embedded within Main Lobby

Main Lobby

1

807

74.97

770.00

595.00

Reception

1

108

10.00

W/I ML

0.00

Gift Store

1

344

32.00

W/I ML

0.00

Cafe / Fireplace nook

1

344

32.00

W/I ML

0.00

Exhibition/Display / Public Notice Area

1

269

25.00

W/I ML

0.00

Washrooms

2

86

8.00

18.00

10.00

1%

Basic offices (desk, 2 visitor chairs)

2

349

32.40

93.00

46.00

Administrative support workstations

2

161

15.00

W/I Offices

0.00

3% managing director / administrator exec. Assitant / intern

Boardroom / meeting room

1

174

16.20

32.00

16.00

1% Admin. Meetings

Traditional Healing

1

516

48.00

150.00

82.00

Healing Training

1

300

20.00

W/I Above

0.00

4% traditional indigenous healing space medical and alternative procedures supported

Classroom/Seminar Room

1

516

48.00

45.00

3.00

Business Centre

1

291

27.00 W/I Grand Hall

0.00

Outreach Centre

1

200

20.00

Operated from reception or café staff overview from reception or café

Administration / Support

Healing / Consulting

30.00

10.00

1% include A/V capabilities Clothing/ornament/tools 1% Engagement with surrounding communities

Assembly Spaces Spiritual / Meditation Spaces

2

436

40.50

30.00

10.00

Gathering space / Grand Hall

1

1,076

100.00

390.00

243.00

Commercial Kitchen

1

646

60.00

92.00

32.00

Theatre / Auditorium

1

3,228

300.00

608.00

263.00

Performance support spaces

1

484

45.00

W/I Theatre

0.00

Lounge / Social Circle space

1

218

20.25 W/I Grand Hall

0.00

Elders' rooms / Elders' care facilities

2

436

40.50

45.00

5.00

Daycare space

1

581

54.00

175.00

121.00

Educational Kitchen

1

339

31.50

W/I Daycare

0.00

Arts & Crafts classrooms

0

0

0.00

0.00

0.00

Gymnasium

1

605

56.25

115.00

59.00

Washrooms w/showers & lockers

2

1% plan in conjunction w/ Grand Hall and Elders' facilities 11% Sub-dividable open space, clear span structure 3% 15% 200 to 300 seats Green room, AV controls, backstage, storage quiet space close to Elders' facilities

Community Services

Exterior Function Extension Spaces

603

56.00

105.00

49.00

TBD

TBD

TBD

TBD

1% Elders as cultural resource / elder wellbeing focus 5% for visiting children / cultural immersion dietary traditions / nutrition education cultural immersion / popularization / education 3% Oki-Chi-Taw (Cree Combat arts), youth activities 3% per ABC; included in gross TBD outdoor cookin, sports, children play, etc…

Operations Support Areas Shipping/Receiving/Mail

1

132

12.25

70.00

58.00

2% Partially handled by Reception / includes some storage

Janitorial/Building maintn./ storage

2

65

6.00

30.00

24.00

1%

Recycling / garbage

1

436

40.50

W/I S+R

0.00

Sound Recording Studio

1

Vert. Circulation - emergency, freight

2

Mech./Electrical Rms. (excluding shafts)

1

Machine Rooms

2

Computer Lab

3

70.00 1,076 1,695

100.00 157.50

Vestibules Server and Telecom Room

250.00

144.00

7%

20.00

20.00

1%

100.00

57.00

3% website operation, computer labs, research networks

100.00

100.00 0.00

65

6.00

W/I Mech

5,450

506.49

60.00

Exterior Performance Space

TBD

TBD

TBD

TBD

Exterior Healing / Meditation Space

TBD

TBD

TBD

TBD

Ceremonial Spaces

TBD

TBD

TBD

TBD

Community Gardens

TBD

TBD

TBD

TBD

2,182

0

Grossing Factor @ 33%

0 33%

waste / recycling / kitchen grease collection 1% 2 recording spaces, tracking room, and a control room 2% 2 - staircases, elevator (in grossing)

20.00

3% w/ specialized HVAC @ lighting 2% (excl. storage, receiving, etc.)

Landscape, Services & Parking

Parking: Employees, public Bus drop off area

TBD

TBD

TBD

TBD

Ramps, docks, driveways, drop off areas

TBD

TBD

TBD

TBD

22,034

2,041

3,418

1,947

21,520

2,000

5,186

482

min. 500 seats + land formation for use or demonstration traditional plant use 0 30 stalls required; underground parking structure school groups, tours as required

Total Landscaping Area and Parking Summary Target Gross Building Area Total Public Area Actual Gross Building Area

171% 17% Maximum variance permitted: 10% 82% Variable

3418

9


parti

ARCHITECTURAL REFERENCES REFERENCE CITY

US CO M M CA UN LG ITY AR Y

UN ITY M

FO

RT

NO GE DI IN

US

IN

DI

GE

CI

NO

TY

OF

INDIGENOUS VILLAGE CONFIGURATION

CO M

CA L

GA

RY

DIVIDE SUBDIVISION

GA FC AL YO

RY GA

CIT

ITY UN M FO RT

N

CA L

TIO

SC OM

EC

RS

TE

GE NO U

IN

IN DI

R

RY

VE

RI

FORT CALGARY

REFERENCE FORT REFERENCE RIVER

10


MOST PUBLIC

Gradient of Program Sensitivity Reception Exhibition Display

Cafe Gift Shop Bathrooms

Theatre

Gymnasium Performance Support

Grand Hall

Lounge Sound Library

Seminar Room Business Centre

Education Kitchen

LESS PUBLIC

Outreach Centre

Mediation Training Elder Centre

Daycare

Mechanical/Electrical + IT Area Garbage + Shipping + Janitor Offices + Workstations

LESS SACRED

Commercial Kitchen

Showers Recording Studios

Spiritual Healing Meditation

MOST SACRED

11


early development

Gradient Program Layout

Meditation Spiritual Healing

Most Sacred Least Public

More Sacred Less Public

Meditation Training Education Kitchen Showers

More Sacred Less Public

Outreach Centre Daycare Grand Hall

More Sacred

Most Public

Less Sacred

Reception

Less Public

Cafe

More Public

Gift Shop Bathrooms Exhibition Display

Less Sacred Less Public

Least Sacred Least Public Mechanical/Electrical IT Area Garbage + Janitorial Shipping & Receiving

12

Less Sacred Less Public

Seminar Room Business centre

Sound Library Lounge Theatre


NG ON SITE PROGRAM MASSING Elder Centre + Offices + Workstations

Grand Hall

Showers + Recording Studios

Private Outdoor

Seminar Room + Outreach Centre + Business Centre

Partial Sightline

Garbage + Shipping + Janitor Exhibition Display + Cafe

Lobby Reception

Education Kitchen

Washrooms + Gift Shop

Mediation + Healing + Training

Parking Ramp Possibility

Lounge + Sound Library

Mechanical/Electrical + IT Area

Theatre Commercial Kitchen

Daycare + Gymnasium + Performance Support

13


PROGRAM BUBBLE DIAGRAM program development




SITE STRATEGY | CONTEXTUAL \ RESPONSE


site analysis PROGRAMMATIC SITE DIAGRAMS EXISTING BUILDINGS

PROGRAM USE

RESIDENTIAL

FLOOD WAY/FRINGE

FLOODWAY

FLOOD FRINGE

OVERLAND FLOW

INFRASTRUCTURE

RAIL

COMMERCIAL

PARKING

ROADWAYS

PATHS

BICYCLE LANES

GREEN SPACES

BUILDING HEIGHTS

1

2

3

4

5+

TRANSIT

AREA NOT IN FLOOD PLAIN

RIVER

LAND USE

18

SUN STUDY: MORNING

SUN STUDY: NOON

SUN STUDY: EVENING


FLOODWAY

FLOOD FRINGE

OVERLAND FLOW

AREA NOT IN FLOOD PLAIN

RIVER

LAND USE

SUN STUDY: MORNING

Sunset 9:00 PM

SUN STUDY: NOON

Sunset 9:00 PM

Sunrise 6:00 AM

Sunset 9:00 PM

Sunrise 6:00 AM

4:30 PM

8:30 AM

4:30 PM

SUN STUDY: EVENING

Sunrise 6:00 AM

4:30 PM

8:30 AM

8:30 AM

12:00 PM

12:00 PM

12:00 PM S-R S-UN

S-FUD C-COR2

DC

I-C CC-ET

S-CRI CC-ERR

CC-X CC-EMU

R-C2 S-CS C-COR1 M-H1 CC-ER CC-EIR S-SPR

VIEW DISTANCES

BUILDINGS ON SITE

SUMMER SOLSTICE DAYLIGHT

WINTER SOLSTICE DAYLIGHT

BUILDINGS ON SITE

SUMMER SOLSTICE DAYLIGHT

WINTER SOLSTICE DAYLIGHT

BUILDINGS ON SITE

SUMMER SOLSTICE DAYLIGHT

WINTER SOLSTICE DAYLIGHT

WIND ANALYSIS

HISTORICAL LANDMARKS

N 1000 WNW

ENE 750 NE

NW

5 00 WNW

ENE 250

W

E

WSW

ESE

SW

SE

SSE

SSW S 0

<1

<5

<12

<19

<28

<38

<50

<61 km/h

19


site plan

East Village Community Playground Community Gardens Storm Water Retention Pond Bow River Pathway 6th Street SE 9th Avenue SE Fire Pit Gathering Space West Entry Pathway 9th Avenue Pathway Pow Wow Dance Circle Sun Dance Circle Drop-Off Parking Garbage/Receiving Access Sweat Lodge Herbal Garden Playground Outdoor Performance Space Historic Fort Calgary Site For Calgary Barracks Fort Calgary Interpretive Centre RCMP Red Sentinels Edge Landscaping Bow River Elbow River Parkade Entry

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25


10 20

50

100 m


urban sections

10 5

22

50 20


10 5

50 20

10 5

50 20

23


study models

phase 1 models

24


phase 2 models

25


study models

phase 3 models

26


site model

27



ARCHITECTURAL INTENT / APPROACH / SOLUTION


plan Buildings Tribal Centre Administration Wellness Building Spiritual Centre

A B C D

Exhibition Space Stair Well Machine Room Computer Lab Lockers Kitchen Gymnasium Day Care Auditorium Lounge Cafe Gift Shop Waste & Recycling/Shipping Storage/Janitorial Main Lobby Reception Seminar Room Boardroom Offices/Workstations Mechanical/Electrical Server Business Centre Grand Hall Spiritual Space Elder’s Room Recording Studio Washroom Healing Training/Healing Space Outreach Centre Fort Calgary Site Interpretive Center Outdoor Performance Space Playground

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Parking Bicycle Lockers & Storage Bicycle Chain Up Stair Wells Storage Room Mechanical Rooms Machine Rooms

1 2 3 4 5 6


10

C

50

5

24

20 23

25

19

18

26

14 17

19 20

4

16

22

21 10

19

5

27

B A

13

D

14 19

26

3 6

12

28

3

2

11

15

29 1

3

30

2 3

6 4 5

9

6

5

31

8 7

2

1

10

32

50


sections

administration

32


tribal centre - kitchen + auditorium

33


elevations


north elevation

35


elevations


southeast elevation

37


elevations


west elevation

39


model design

1:50 sectional model - auditorium

40


1:300 building model

41



BUILDING SYSTEMS \ SUSTAINABLE DESIGN


structural design



structural design

46


47


mechanical systems

48


49


equipment schedules

50


System

Zone

Area Level

Floor Area

Service Schedule

Area Served

System

Distribution

Air Supply Unit Location

Rational for System Selection

Comments

VAV

Underfloor Access System

Mechanical Room

System consistency throughout the buildings. See below

Intake at south end and exhaust at north end.

Waste & Recycling/Shipping, Janitorial, Stairwell, Machine Room, Washrooms, CafĂŠ, Lobby, Mechanical, Vestibules

VAV

Underfloor Access System

Mechanical Room

Concealed system that enables the celebration of the architectural gestures of the ceiling. Hides mechanical and embraces the structure of the buildings.

Also houses boilers and chillers that support all 4 buildings, with underground piping below grade.

Stairwell, Machine Room, Computer Lab, Locker Rooms, Kitchen, Daycare, Gymnasium, Auditorium

VAV

Underfloor Access System

Machine Room

See Above

Louvre for spaces located on roof.

Seminar Room, Washrooms, Janitorial, Offices, Boardroom, Grand Hall, Mechanical, Vestibules

VAV

Underfloor Access System

Mechanical Room

See Above

Houses primary server and over technological systems, because or relation to offices.

Outreach Centre, Healing Space, Hallway, Mechanical, Vestibules

VAV

Underfloor Access System

Mechanical Room

See Above

NA

VAV

Underfloor Access System

Mechanical Room

See Above

NA

Expanded Hours

Elder’s Room, Sound Recording, Spiritual Space, Mechanical

Business Hours

Commercial Kitchen

Commercial Kitchen

Required by Code

NA

Type AHU1

Yellow

Parking

1955 m2

Continuous

Garage AHU2

Purple

Tribal Centre

Parking 2285 m2

Expanded Hours, Continuous

AHU3

Orange

Tribal Centre

2285 m2

Business Hours, Expanded Hours, Continuous

AHU4

Green

Administration

688 m2

Business Hours, Expanded Hours, Continuous

AHU5

Blue

Wellness

Underground

285 m2

Building

Business Hours, Expanded Hours, Continuous

AHU6

MUA1

Red

Orange

Spiritual Centre

120 m2

Tribal Centre

125 m2

Business Hours,

51


vav system distribution ACU ROUGH DUCT ROUTE VAV TERMINALS

3

1

10 5

50 20

3

1

10 5

52

50 20


sustainability initiatives

LEED Target Score Sheet LEED v4 for BD+C: New Construction and Major Renovation Y & N Y & N 1

30

1 1 1 2 2

5

LOCATION & TRANSPORATION

1 1

Credit Credit Credit Credit Credit Credit Credit Credit

3

SUSTAINABLE SITES

2 3

2

WATER EFFICIENCY

3 2

4

2

2

9

3 2 2 2

Construction Activity Pollution Prevention Site Assessment Site Development - Protect Habitat Open Space Rainwater Management Heat Island Reduction Light Pollution Reduction

1

1

1

LEED for Neighbourhood Development Location Sensitive Land Protection High Priority Site Surrounding Density and Diverse Uses Access to Quality Transit Bicycle Facilities Reduced Parking Footprint Green Vehicles

Prereq Credit Credit Credit Credit Credit Credit

1

4

Integrative Process

2

16 1 2 5 5 1

7

Credit

Prereq Prereq Prereq Credit Credit Credit Credit

Outdoor Water Use Reduction Indoor Water Use Reduction Building-Level Water Metering Outdoor Water Use Reduction Indoor Water Use Reduction Cooling Tower Water Use Water Metering

1

16 1 2 5 5 1 1 1

Required 1 2 1 3 2 1

Required Required Required 2 6 2 1

MATERIALS & RESOURCES Prereq Prereq Credit Credit Credit Credit Credit

Storage & Collection of Recyclables Construction & Demolition Management Planning Building Life-Cycle Impact Reduction Environmental Product Declarations Sourcing of Raw Materials Material Ingredients Construction & Demolition Management

Required Required 5 2 2 2 2

17 16

ENERGY & ATMOSPHERE

4 4 1 2 3 1 2

2 14

Prereq Prereq Prereq Prereq Credit Credit Credit Credit Credit Credit Credit

12

2

2 2 2 1 1 3 1

Fundamental Commissioning & Verification Minimum Energy Performance Building-level Energy Metering Fundamental Refridgerant Management Enhanced Commissioning Optimize Energy Performance Advanced Energy Metering Demand Response Renewable Energy Production Enhanced Refrigerant Management Green Power and Carbon Offsets

1

INDOOR ENVIRONMENTAL QUALITY

1

Prereq Prereq Credit Credit Credit Credit Credit Credit Credit Credit

1

1

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke Control Enhanced Indoor Air Quality Stategies Low-Emitting Materials Construction Indoor Air Quality Plan Thermal Comfort Interior Lighting Daylight Quality Views Acoustic Performance

4

2

INNOVATION

3 1

2

Credit Credit

4

REGIONAL PRIORITY

1 1 1 1

Credit Credit Credit Credit

Innovation LEED Accredited Professional

Regional Prioity: Specific Credit Regional Prioity: Specific Credit Regional Prioity: Specific Credit Regional Prioity: Specific Credit

79 | 37| 8

Required Required Required Required 6 18 1 2 3 1 2

Required Required 2 3 1 2 1 3 1 1

5 1

1 1 1 1

LEED: GOLD 53


key room analysis - auditorium

54


Large Beams: 182x1000mm lodgepole pine glulam Small Beams: 182x449mm lodgepole pine glulam Cladding: 32mm natural poplar BarkClad Exterior Columns: 182 x 597mm lodgepole pine glulam Interior Columns: 182 x 597mm poplar glulam Exterior Pathway: 51 x 200mm Aspen lumber spaced @180mm O.C. on 51 x 255mm Aspen lumber rails

55


key room analysis

Exterior Walls

Interior Effect

Interior Floors

Interior Walls

56

Beams & Columns

Feature Walls

Interior Ceilings

Lower Level Roof

Pathway Material

Outdoor Paths


Electrical Ceiling Plan

HVAC Plan

Light Fixtures Supply Duct work

ss s

Downlight

Supply Panel

Ceiling Pendant

High Return Air s s s ss

Recessed Ceiling Light

VAV Terminal

Linear Lighting B

B

Y Junction

Outdoor Recessed Downlight

Vertical Duct

Outdoor Wall-Mounted Lighting B

Safety Equipment Fire Alarm Emergency Light B

Emergency Exit Sign Ceiling Mounted Sprinkler Head B

Wiring Loads Indoor Ambient Lighting Indoor Stage Lighting

B

Emergency Equipment Outdoor Lighting

10

5

10

50

20

5

50

20

57



ENVELOPE & DETAIL DELINEATION


wall sections 1 A1

Administration Building Grand Hall & Outdoor Boardwalk

150mm Gravel

Wood Blocking

Prairie Grass Vegetation

Metal Flashing Wood Panel Finish

150mm Soil Medium

Wood Sheathing 2 x 4 Blocks

102mm Type 4 Rigid Insulation

Perimeter Fassening

Filter Fabric Protective Course Drainage Layer Root Barrier Roof Membrane Cover Board

Water Proofing Membrane 9.2mm Structural Gypsum Board 76mm Steel Q-Decking HSS Beam

Suspension Cabling @ 600mm OC

Glulam End Cap

Perimeter Radiant Ceiling Panel

Glulam Knife Connection

9.2mm Structural Gypsum Board Ceiling Grid T 9.5mm Plasterboard

Kawneer 1620 Curtain Wall Infill Detail #1

125mm Concrete Structure

Grand Hall Upper Level Outdoor Boardwalk 6mm Double Pane Glass with 12mm Argon Gas Air Space

Translucent Painted Canvas

Grand Hall Lower Level

Steel Rebar

100mm Rammed Earth Wall 200mm Cast in Place Concrete Support Column Kawneer 1620 Curtain Wall Infill Detail #6

38mm Concrete Finishing Panels @ 600mm

Gravel Sill

Expansion Joint Stainless Steel Glulam Bearing Support

125mm Concrete Slab 6mil Polystyrene 200mm Compact Gravel

38 mm CT Insulation

Glulam Column Foundation Wall 1200 x 1550 x 450 mm

Foundation Rebar

Natural Soil

Foundation Wall Earth Footing 900 x 900 x 250mm Glulam Column Footing 1200 x 1550 x 450 mm

Rammed Earth Footing 1800 1800 x 600mm

60


1 A2

Rammed Earth Feature Wall Along Theatre

Wood Blocking Metal Flashing Mounting Roof Board 60mil TPO Roof Membrane 76mm Steel Q-Decking Wood Panel Finish Wood Sheathing 150mm Gravel 38 mm CT Insulation

Prairie Grass Vegetation Filter Fabric Protective Course Drainage Layer Root Barrier Roof Membrane Cover Board

150mm Soil Medium

102mm Type 4 Rigid Insulation Water Proofing Membrane 9.2mm Structural Gypsum Board 125mm Concrete Structure 76mm Steel Q-Decking Suspension Cabling @ 600mm OC

9.2mm Structural Gypsum Board 9.5mm Plasterboard

Computer Lab

Theatre

200mm Rammed Earth Wall 100mm Cast in Place Concrete Support Column

38mm Concrete Finishing Panels Expansion Joint

125mm Concrete Slab 6mil Polystyrene 200mm Compact Gravel

Natural Soil

Rammed Earth Footing 1800 1800 x 600mm

61


details 2 B1

2 B1

Curtain Wall Infill Details

2 B2

Curtain Wall Infill Details Glulam Beam Sealant Horizontal Aluminum Mullion

2 B2

Glulam To Rammed Earth Connection

Glulam To Rammed Earth Connection 182 x 1000mm Glulam Beam Steel Bolts

20mm Steel Bearing Plate Steel Rebar

Glulam Beam Sealant Pressure Plates

200mm Rammed Earth Wall 100mm Cast in Place Concrete Support Column

Horizontal 12mm Air Gap Aluminum Mullion 6mm Glass Pane

182 x 1000mm Glulam Beam

Seating Block

Steel Bolts

Pressure Plates Insulation

12mm Air Gap

20mm Steel Bearing Plate

Typical Mullion Section

6mm Glass Pane

Typical Mullion Plan

Inside Splayed Mullion 10 Degrees

Seating Block

Steel Rebar 200mm Rammed Earth Wall 100mm Cast in Place Concrete Support Column

Insulation

Typical Mullion Section

Typical Mullion Plan

Inside Splayed Mullion 10 Degrees

2 Green Roof Assembly Green Roof Assembly B3

2 B3

2 B4

1000 mm Soil and Vegetation Free Zone

Root Barrier Membrane Flashing

2 Raised Floor Assembly Raised Floor Assembly B4 600mm Full Panel Span

Prairie Grass Vegetation

Root Barrier

150mm Soil Medium

Membrane Flashing Metal Flashing

Protective Course

Wood Panel Finish

Drainage Layers

Screw Fixing to Perimeter Panel 38mm Concrete Finishing Panels

1000 mm Soil and Vegetation Free Zone

Filter Fabric

Wood Blocking

20 x 9mm Foam Edge Sealed with Aluminum Cut Panel To Suit

150mm Gravel

600mm Full Panel Span

Field Head Cap20

Floor To Finish 400mm

Locknut

x 9mm Foam Perimeter Head Cap Edge Sealed withStringer Aluminum Perimeter

Roof Membrane

2 x 4 Wood Blocks

150mm Gravel

Steel Rebar

Cover Board 102mm Type 4 Rigid Insulation Water Proofing Membrane 9.2mm Structural Gypsum Board

125mm Concrete Structure

76mm Steel Q-Decking Suspension Cabling @ 600mm OC

Filter Fabric

Perimeter Radiant Ceiling Panel

Protective Course

9.2mm Structural Gypsum Board

Drainage Layers

Perimeter Fassening

Prairie Grass Vegetation 150mm Soil Medium

Pedestal

Screw Fixing to Perimeter Panel 125mm Concrete Slab 38mm Concrete 6mm Polystyrene Finishing Panels

Steel Rebar 100mm Rammed Earth Wall 200mm Cast in Place Concrete Cut Support Column

Wood Sheathing

Panel To Suit

Expansion Joint Bearing Plate with Nelson Studs

200mm Compact Gravel

Wood Blocking Metal Flashing Wood Panel Finish Wood Sheathing 2 x 4 Wood Blocks

HSS Beam

Wood Soffit With Wood Panel Finishing

9.5mm Plasterboard Ceiling Grid T

Kawneer 1620 Curtain Wall Infill Detail #1

Outside

Perimeter Fassening

Inside

Steel Rebar

Roof Membrane Cover Board 102mm Type 4 Rigid Insulation Water Proofing Membrane 9.2mm Structural Gypsum Board

Field Head Cap Locknut Pedestal

125mm Concrete Slab 6mm Polystyrene

Perimeter Head Cap Perimeter Stringer

Steel Rebar 100mm Rammed Earth Wall 200mm Cast in Place Concrete Support Column Expansion Joint Bearing Plate with Nelson Studs

200mm Compact Gravel

125mm Concrete Structure

76mm Steel Q-Decking Suspension Cabling @ 600mm OC

HSS Beam

Perimeter Radiant Ceiling Panel

Wood Soffit With Wood Panel Finishing

9.2mm Structural Gypsum Board 9.5mm Plasterboard Ceiling Grid T

Kawneer 1620 Curtain Wall Infill Detail #1

Outside

62

To Concrete Footing Natural Soil

Floor To Finish 400mm

Inside

To Concrete Footing Natural Soil


accessibility & life safety EXIT

EXITS/FIRE EXITS 2 HOUR FIRE RATED STAIR WELL HANDICAP WASHROOMS/PARKING STALLS

EXIT

EXITS/FIRE EXITS

HANDICAP AUTOMATIC DOORS

2 HOUR FIRE RATED STAIR WELL

1/12 - 8% SLOPED RAMPS

HANDICAP WASHROOMS/PARKING STALLS

EXIT

EXIT

EXIT

MEANS OF EGRESS

HANDICAP AUTOMATIC DOORS

EXIT

1/12 - 8% SLOPED RAMPS MEANS OF EGRESS

EXIT

EXIT

EXIT EXIT

EXIT EXIT

EXIT EXIT EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT EXIT

EXIT

EXIT

10 5

50 20

EXIT

EXIT

EXIT

EXIT

10 5

63

50 20

63



AESTHETIC / VISION / SUMMARY


renderings

66


67


68


69


70


71


72


73


74


75


76


77


final boards



summary board

Program & Spatial PROGRAM ANDGeneration SPATIAL GENERATION

Program Bubble Diagram PROGRAM BUBBLE DIAGRAM

Gradient of Program Sensitivity

Cultural Adjacency Massing Concept ARCHITECTURAL REFERENCES

Gradient of Program Sensitivity

MOST PUBLIC

REFERENCE CITY DIVIDE SUBDIVISION UN ITY M

UN ITY

CA

FO RT

NO US

LG AR Y

CO M

M

AR Y LG

UN ITY

CA Y OF

M

CIT

FO RT

CA

CO M

LG AR Y

N TIO EC

NO US

RS

GE

TE

IN DI

IN

Elder Centre

Commercial Kitchen

Showers Recording Studios

R

Mediation Training

Daycare

Mechanical/Electrical + IT Area Garbage + Shipping + Janitor

VE

LESS PUBLIC

GE

RI

Education Kitchen Outreach Centre

Offices + Workstations

CO M

OF CA

Lounge Sound Library

Seminar Room Business Centre

IN DI

TY CI

GE

Grand Hall

IN DI

Theatre

Gymnasium Performance Support

INDIGENOUS VIULLAGE CONFIGURATION

NO US

Exhibition Display

Cafe Gift Shop Bathrooms

LG AR Y

Reception

FORT CALGARY

Spiritual Healing Meditation

REFERENCE FORT

LESS SACRED

MOST SACRED

REFERENCE RIVER

Northeast Elevation

Community Building Section

2 A2

1 A1

Theatre Wood Components

Large Beams: 182x1000mm lodgepole pine glulam

C Main Level Floor Plan

Small Beams: 182x449mm lodgepole pine glulam 24

23

Cladding: 32mm natural poplar BarkClad Exterior Columns: 182 x 597mm lodgepole pine glulam

25

Interior Columns: 182 x 597mm poplar glulam

19

Exterior Pathway: 51 x 200mm Aspen lumber spaced @180mm O.C. on 51 x 255mm Aspen lumber rails 18 Exterior Walls

26

17 19

16

22

20

19

B

Pathway Material

Outdoor Paths

Interior Floors

Interior Walls

D

14 19

26

3

Theatre HVAC Plan

4 A2 15

29

Theatre HVAC Plan

5 A2

HVAC Plan

Electrical Ceiling Plan Light Fixtures

Supply Duct work

1

Downlight

Supply Panel

Ceiling Pendant

High Return Air

Recessed Ceiling Light

VAV Terminal

Linear Lighting

Y Junction

2

B

Vertical Duct

30

ss s

2

11

s s s ss

12

Lower Level Roof

Interior Ceilings

28 27

A

13

Feature Walls

Interior Effect

21 10

Beams & Columns

Theatre Material Palette

3 A2

14

B

Outdoor Recessed Downlight Outdoor Wall-Mounted Lighting B

Safety Equipment

3

Fire Alarm Emergency Light B

Emergency Exit Sign

4

Ceiling Mounted Sprinkler Head B

Wiring Loads

5

Indoor Ambient Lighting Indoor Stage Lighting

9

B

Emergency Equipment Outdoor Lighting

10

50

10

6

8

5 A2

7

32

80

Building

Program

A B C D

1 2 3 4 5 6 7 8

Tribal Centre Administration Wellness Building Spiritual Centre

50

5

20

5

20

31

Exhibition Space Stair Well Machine Room Computer Lab Lockers Kitchen Gymnasium Daycare

9 10 11 12 13 14 15 16

Auditorium Lounge Cafe Gift Shop Waste & Recycling / Shipping Storage / Janitorial Main Lobby Reception Seminar Room

17 18 19 20 21 22 23 24

Boardroom Offices / Workstations Mechanical / Electrical Server Business Centre Grand Hall Spiritual Space Elders Room

25 26 27 28 29 30 31 32

Recording Studio Washroom Healing Training / Healing Space Outreach Centre Fort Calgary Art Installation Interpretive Centre Outdoor Performance Space Playground

Structural System

50

10

5

20


project vision

DESIGN PHILOSOPHY

The Moh-Kins-Tsis Gathering House at Fort Calgary celebrates and preserves Canadian Indigenous culture through the interpretation and the physical manifestation of indigenous linguistic traditions.

re

It is a new home and beacon for indigenous cultural learning for both indigenous and non-indigenous people, designed to remember, honour, and safeguard Indigenous culture and language.

ard

It is an architecture that celebrates the proud history and autonomy of indigenous peoples, recognizes the cultural and historic significance of “place,� and embraces the hope and promise of reconciliation; it is an architecture of dialogue to inspire and promote conversation.

e

is

81

81


STUDIO PORTFOLIO

Hayden Pattullo & Shea Gibson