NOTES: 1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE NOTED.
27
2. ALL DIMENSIONS TO BE VERIFIED ON SITE
+4170
3. DIMENSIONS NOT TO BE SCALED FROM DRAWING 4. ANY DISCREPANCIES TO BE BROUGHT TO THE ATTENTION OF TECHNICAL DEPARTMENT PRIOR TO MANUFACTURE AND INSTALLATION ON SITE.
A.F.F.L
+4170 A.F.F.L
5. THIS DRAWING IS SOLELY A PROPERTY OF BOND INTERIORS.
1
CL-04
2800
+2800
+2800
A.F.F.L
A.F.F.L
150
27
A.F.F.L
230
175
230
4 8
15
135 40
150
492(SHUTTER)
150 2
2
350(SHUTTER)
150
LED Light As Per Appr. Sample
15mm Thick Plastering Tile Glue Existing Block Work
GI Clip 350(SHUTTER)
2
FF-05A 2 mm Thick 316 Grade SS Brush Finish Cladding Cabinet Hinges
FF-05 A
FF-05 A
18mm Thk MR MDF Back Panel PU-05 6mm Thk. Mirror As Per Appr. Sample
EQ
6mm Thk. Mirror As Per Appr. Sample
H06
Vanity Counter Detail @ Bath Room-1
1:2 @ A1
2
366
330
346
548
1 1
8mm thk. Stone push to open shutter with 12mm thk. Honey comb on 6mm thk.MR MDF backing
12
1080
18
Detail
Marble Counter Top
600
140
MR-06
2
28
230
230
612
R5
KEY PLAN
Finishes Legend.
18
2 457
01
18
845
2
75
850
532 457
163
18
300 225
1080
5
155
20
20
474 (SHUTTER)
845 (FIXED)
530
850
H06
474 (SHUTTER)
550
1080
B
GI Clip
Wash Basin Mixer BDM-MET-303-CP As Per Appr. Sample
600
Wash Basin Mixer BDM-MET-303-CP As Per Appr. Sample Marble Counter Top 5 x 5 mm Groove MR-06
1
230
2570
6mm Thk. Mirror Line Of LED Lighting Tissue Holder
2 175 5 20
2800
2800
2570
18
H06
850
A
EQ
2 mm Thick 316 Grade SS Brush Finish Cladding
This Unit
2800 2570
1490
1490
1490
FF-05 A
2
1
CODE
1
FF-05A
2
CL-04
MR GYPSUM BOARD CEILING As per appr. WITH WHITE FENOMASTIC PAINT sample (PA-01)-RAL 9010
3
MR-06
20MM NANO WHITE MARBLE-WHITE
As per appr. sample
4
PU-05
GREY PU PAINT (TBC)
As per appr. sample
300 300
FF-05 A
D
F.F.L
C H06
Elevation
H06
1:15 @ A1
Section
E
1:15 @ A1
Vanity Counter Detail @ Bath Room-1
H06
Section
1:15 @ A1
175
8
15 4
02
Detail
H06
Vanity Counter Detail @ Bath Room-1
18mm MR MDF Back Panel. PU-05 12
2
474 (SHUTTER)
18
150
2
28
612
18 42 590
530
As Per Fixture
18
18mm MR MDF Back Panel. PU-05
12
845 (FIXED)
2
1800
MR MDF Shutter PU-05
B H06
5
Sectional Plan
1:15 @ A1
+1080
Vanity Counter Detail @ Bath Room-1
A.F.F.L 40
01
150
1500
150
H06 350 (SHUTTER)
150
492(SHUTTER)
2
Detail
H06
Vanity Counter Detail @ Bath Room-1
1:2 @ A1
1360
40
277(TBC)
300
350 (SHUTTER) 2
05
LED Light As per Appr. Sample
PU-05
6mm Thk. Mirror
PU-05
This Item
Aligned 123
300
150
PU-05
1800
Stone Counter Top MR-06
A H06 A
Top Plan
1:15 @ A1
Vanity Counter Detail @ Wash Room
C H06 B
03
Detail
H06
Vanity Counter Detail @ Bath Room-1 C
1:2 @ A1
D
04
Detail
H06
Vanity Counter Detail @ Bath Room-1
1:2 @ A1
E
KEY PLAN F
27
CADD:
200 900
18
1100 900
2
200
18
150
18
425
200
600
175
70
150 2
As per appr. sample
3
1:2 @ A1
4
TBC
REMARKS
150X600MM WHITE CERAMIC WALL TILE MIRAGE RE_PLAIN/LATTE-PA-06
Vanity Counter Detail @ Bath Room-1
Vanity Counter Detail @ Bath Room-1
255 12
DESCRIPTION
F.F.L
F.F.L
Y:\Projects-2017\07_Residential\104,309_B+G+F Private villa on Plot No.613151, Nadd Al Sheba 2nd - 615 Dxb - wp\03_BI Work\05_Submission\105_12-04-2019_Vanity Final Revision\BI-AFV-D-FF-SD-H06_R1_Vanity unit at Bathroom 1.dwg
3
6
SL.NO
302
1
G
NOTE : Design as per tender drawing is followed 1. Bottle trap to be confirmed as per MEP design. 2.Please Note that the Internal Finishes of the Mirror Cabinets are to be confirmed. 3.Location Of Laundry Bins TBC.
4
01
Updated As Per Client Comments
SHG
LBD
05-04-2019
0
Issued for Approval
SHA
LE
07-03-2018
Rev.
Descriptions
Drawn
Date
Chkd
R E V I S I O N S: CLIENT:
LATIFA MUSABEH RASHED AL FATTAN AL FALASI
CONSULTANT.
GOLDEN SQUARE ENGINEERING CONSULTANTS P.O.BOX : 126049, DUBAI, UAE Phone : 04 3859882 Fax : 04 3859885 E_mail:info@gseng.ae
INTERIOR CONTRACTOR
Bond interiors P.O.Box 15758, DUBAI - UAE Tel : + 971 4 271 1727 / +971 6 5343222 Fax: + 971 4 271 3797 / +971 6 5340404 www.bondinteriors.com, Email: design@bondinteriors.com
5
PROJECT :
B+G+1 PRIVATE VILLA LOCATION: NADD AL SHIBA SECOND - 615
AREA
FIRST FLOOR CITY
LOCATION
Dubai
Dubai
PLOT No:
SHOP No:
613151
-
DRAWING TITLE
DETAILS OF VANITY UNIT AT BATHROOM 01 6 DRAWN BY
CHECKED BY
APPROVED BY
Labeed
Shaheena As Shown PLOT SIZE
BOND JOB ORDER
104.309-FST-BO-L
1:1 CONTRACT NO.
DRAWING REF
BI-AFV-D-FF-SD
A1 CONTRACT DRG. REF. NO.
PLOT DATE
Usman
PLOT SCALE
SCALE
DRAWN DATE
SHEET# 1/1 H
H06 REV. NO.
REV
-
DRAWING NO.
01