Page 1

SELDON MAY TAGAO

PORTFOLIO


+63 916 746 4115

CONTENTS i

RESUME / ABOUT

1

Undergraduate Thesis

7

HOSPITALITY

8

2

Fersal Hotel

San Vicente, Palawan, Philippines

OFFICE

3 4 5 6

ACIENDA Designer Outlet

9

Tagaytay, Philippines

RETAIL PS OFFICIEL (formerly Patricia Santos Atelier)

Bonifacio Global City, Taguig, Philippines

JB Music & Sports Bacoor, Cavite, Philippines

4x5 BIG ASS FANS GLASS SHOWROOM Makati City, Philippines

10 11

RESTAURANTS SOUV!

The Podium Mall, Philippines

Cyma - Greek Taverna

Trinoma Mall, Quezon City, Philippines

RECREATION Arcadia Sports Complex Davao City, Philippines

RESIDENTIAL Alfonso Vacation House Alfonso, Cavite, Philippines

EkoDorm

España, Manila, Philippines

INTERNSHIP AND UNDERGRADUATE WORKS


SELDON MAY T. TAGAO Architect

Contact

6404 Conlon Ave., El Cerrito, CA 94530 +1 (510) 993-5167

A team player with high exposure to a diverse range of projects, which include residental developments, hospitality, retail, commercial & heritage conservation. Has acquired strong graphical skills for planning, visualizations and 3D rendering. Able to handle multiple tasks and deadlines. Excellent communication skills and always open for new things. J. Zobel St. Project 4, Quezon City, Philippines 1109 +63 916 746 4115

Education

2012 - 2017 University of Santo Tomas Bachelor of Science Major in Architecture 2010 - 2012 Stella Maris College Secondary 2008 - 2012 Second Philippine International School Secondary

Work Experience

MARCH 2018 - NOVEMBER 2019 Junior Architect - Project Architect Liza Crespo Ecotecture

seldonmay23@gmail.com

Languages

English | Filipino | Ilocano

Achievements •Roque Ruaño Award for Outstanding Leadership Recipient – Award for being the Editor in Chief of UST Vision Magazine •UAPSA-UST National Architecture Week 2014 Infographic Design Contest 2nd place

Quezon City, Philippines

• Developed designs from preliminary sketches to 3D models and drafting

of architectural and construction drawings. Prepared contract documents and specifications. Went on weekly meetings on jobsites and prepared presentations for clients. Coordinated with engineers, contractors, suppliers and clients. Worked in feasibility studies and other pre-design services. I have also worked on editing the audio video presentation of the company.

SEPTEMBER 2017 - FEBRUARY 2018 Junior Architect - Project Head Estudio Pintado Design & Construction

Internship

Basic

FEBRUARY 2015 - JULY 2016 Architectural Intern (Undergraduate) Tropiks Design Studio • Produced presentation drawings, shop drawings, 3D models, scaled models and renderings for various small and large-scale development and heritage conservation projects. • Other scope included site visits and conceptualization of new projects.

Seminars and Trainings Attended EVOLVING PARADIGMS 8th National Architecture Symposium Speaker: Ar. KENGO KUMA, Ar. TAKAHARU TEZUKA, and Pritzker Prize Winner Ar. Fumihiko Maki SMX Convention Center Pasay, April 23, 2016 STRATEGIES ON DESIGNING COASTAL CITIES A forum on resilient foreshore architecture University of the Philippines – Diliman, Q.C., Philippines, February 28, 2014 MAÑOSA: BEYOND ARCHITECTURE LECTURE SERIES Styling the Nation Gerard Lico -History Styles of Philippine Architecture Ar. Bobby Mañosa (National Artist for Architecture)

Quezon City, Philippines

• Worked on planning and designing of various low to mid and high-rise projects. Scope of work included: space planning, conceptualization, 3D modelling, architectural visualization for both interior and exterior and shop drawings (mechanical, electrical, plumbing, sanitary and fire protection layout). • Other scope of work included site visits, preparation of building permits, GANTT charts and other documents necessary for the construction.

Software Skills

Memberships / Affiliations 2017 - 2018 United Architects of the Philippines – Graduate Auxiliary, Quezon City National Board of Directors Commissioner on Internal affairs / Creative Director 2019

United Architects of the Philippines Member

Intermediate

Expert

AutoDesk Revit AutoCad Sketchup & Vray Autodesk 3DsMax Lumion Adobe Photoshop Adobe Illustrator Adobe Indesign

Personal Skills and Competences Basic

Intermediate

Expert

Architectural Design Graphic Design Architectural Visualization Verbal and Written Communication Leadership Time Management

References Ar. Julius Anskar G. Garay, uap Architect - Friedmutter Group, California +1 (562) 547 - 7254 Ar. Liza Morales-Crespo, uap, AIA, LEED AP Architect - Liza Crespo Ecotecture, Manila / New York contact@lizacrespo.com Ar./EnP. Jonathan Manalad, uap, piep Architect / Faculty - University of Santo Tomas jvmanalad@ust.edu.ph / arch.manalad@gmail.com +63 917 878 0622


1

Undergraduate Thesis AGUAVERDE RESORT

Puerto Princesa, Palawan, Philippines This project is located in an emerging tourist destination in the Philippines. It has a contemporary design with affordable comfort. The hotel shall allow better air flow and dramatic views from both sea side and garden side. It features function spaces, customized arts and minimalist furniture.


Undergraduate Thesis


For Liza Crespo Ecotecture


2

SAN VICENTE HOTEL

San Vicente, Palawan, Philippines Phase: Design Development Phase Software used: Autocad for floorplans; Sketchup Vray and Lumion 8 for model and renderings. Responsibilities: Floorplans (3 floors), Model (Interiors), and architectural visualization This project is located in an emerging tourist destination in the Philippines. It has a contemporary design with affordable comfort. The hotel shall allow better air flow and dramatic views from both sea side and garden side. It features function spaces, customized arts and minimalist furniture.


OFFICE

3

ACIENDA DESIGN OFFICE / SHOWROOM Tagaytay, Cavite, Philippines

Phase: Design Development Phase Software used: Autocad for floorplans; Sketchup Vray and Lumion 8 for model and renderings; Adobe Photoshop for post processing. Responsibilities: Floorplans (3 floors), 3D Model, Renderings. This project will serve as an office, showroom and multi-purpose training rooms for the ACIENDA employees and clients. ACIENDA is a designer’s company that fabricates designer products from thecountry’s locally available materials.

For Liza Crespo Ecotecture


OFFICE

For Liza Crespo Ecotecture


RETAIL

4

PS OFFICIEL Bonifacio Global City, Taguig, Philippines Phase: Completed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post process Responsibilities: Floorplans, Construction drawings, 3D model, 3D renderings, source out materials, contact with Client and contractor, RFIs and RFQs, & Site Visits.

Photo by Albert Dumlao

For Liza Crespo Ecotecture


GENERAL CONSTRUCTION NOTES 1.

REFER TO SPECIFICATIONS AND RESPONSIBILITY SCHEDULE FOR GENERAL CONDITIONS AND ADDITIONAL INFORMATION.

2.

PATCH AND REPAIR ALL EXISTING SURFACES AS NECESSARY BEFORE APPLYING NEW FINISHES. ALL SOFT, POROUS, FLAKING OR OTHERWISE DEFECTIVE FINISHES SHALL BE REMOVED BEFORE APPLICATION OF NEW MATERIALS.

3.

OPENINGS, VOIDS, OR UNFINISHED SURFACES CREATED BY REMOVAL OR MODIFICATION OF EXISTING WORK SHALL BE FILLED OR PATCHED AND FINISHED AS NECESSARY TO MATCH EXISTING CONDITIONS FOR NEW FINISHES.

4.

VERIFY DEMISING WALL PENETRATIONS ARE SEALED TIGHT AS REQUIRED TO MAINTAIN REQUIRED FIRE SEPARATION.

5.

PROVIDE ALL WORK REQUIRED TO CORRECT DEFICIENT CONDITIONS INCLUDING BUT NOT LIMITED TO, ADDITIONAL GYPSUM BOARD TO ACHIEVE REQUIRED RATINGS.

6.

MAINTAIN THE ARCHITECTURAL, STRUCTURAL AND FIRE RATING INTEGRITY OF THE DEMISING WALLS, FLOOR SLAB, BEAMS, COLUMNS, ROOF DECK, ETC.

7.

ALL WALL FRAMING NOT BRACED TO DEMISING WALLS SHALL BE SECURED OR DIAGONALLY BRACED AT MINIMUM 4'-0" O.C.. REFER TO PARTITION TYPES AND CONSTRUCTION DETAILS.

8.

MINIMUM DIMENSION FROM ANY CORNER OR WALL TO FRAMING STUD AT DOOR JAMB OPENING SHALL BE 4" (UNLESS OTHERWISE NOTED).

9.

DIMENSIONS ARE FROM FACE OF GYPSUM WALL BOARD OR CENTERLINE OF COLUMN (UNLESS OTHERWISE NOTED).

10. PROVIDE METAL OR FIRE RETARDANT TREATED WOOD BLOCKING FOR ALL SIGNS, HOOKS, TOILET ROOM ACCESSORIES AND ANY OTHER WALL OR CEILING MOUNTED EQUIPMENT. COORDINATE ALL BLOCKING REQUIREMENTS NECESSARY FOR ALL WORK WITH TENANT REPRESENTATIVE. 11. ALL FRAMING LUMBER, PLYWOOD AND CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED. 12. COORDINATE WORK OF VARIOUS TRADES IN INSTALLATION OF INTERRELATED WORK. BEFORE INSTALLATION OR WORK BY ANY TRADE, INCLUDING TENANT'S VENDORS BEGINS, MAKE PROPER PROVISIONS TO AVOID INTERFERENCES. 13. ADJUST FLOOR CONDITION AT LEASE LINE TO ELIMINATE ANY TRIPPING HAZARD. 14. COORDINATE ANY REQUIRED SLAB AND/OR STRUCTURAL AND/OR EXIST'G BUILDING MODIFICATIONS WITH LANDLORD PRIOR TO COMMENCEMENT OF WORK. REFER TO MEP SHEETS FOR ADDITIONAL INFORMATION. 15. PROVIDE WATERPROOFING FOR WET AREAS UNDER SPECIFIED FLOORING. THE MEMBRANE SHALL CONTINUE UP WALLS A MINIMUM OF 4". 16. ALL WOOD FINISHES, FURNITURE AND FIXTURES SHOULD BE TREATED WITH FIRE RETARDANT. 17. ALL FINISHED SHOULD BE SUBMITTED TO ARCHITECT FOR APPROVAL.

LEGENDS : 00

DOOR SCHEDULE TAG

#

00

FINISH SCHEDULE TAG

W0

1 A203

WALL PARTITION TAG WALL FINISH TAG

ELEVATION TAG

WALL FINISHES : WALL FINISH LIST: W1

1 A-100

PRC NO:

ARCHITECT

VALID UNTIL: IAPOA: 5/F PGA TECH BLDG., #85 KAMUNING ROAD, QUEZON CITY, PHILIPPINES 1103 Phone: (02) 332-2657 Fax: (02) 928-6627 Website : www.lizacrespo.com

LIZA MORALES-CRESPO PROJECT ARCHITECT / DESIGNER

UAP, LEED AP, AIA

PTR NO: DATE: ISSUED AT: TIN:

0012877 APRIL 28, 2021 08321 224984 070318 5520494 C JANUARY 3, 2018 QUEZON CITY 152-808-664-000

RA 9266, Sec. 33

Drawings and specifications, duly signed, stamped or sealed as instruments of service are the properties and documents of the Architect, whether the object for which they are made is executed or not. It shall be unlawful for any person, without the written consent of the Architect or author of said documents to duplicate or to make copies of said documents for use in the repetition of and for other projects or building, whether executed partly or in whole.

PROJECT TITLE:

PATRICIA SANTOS ATELIER

NO.

PATRICIA SANTOS

1 2

SHEET NAME:

DATE MAY 2018 JUNE 2018

3

JULY 2018

4

AUGUST 2018

Unit 1601 High Street South Corporate Plaza Tower 1, Bonifacio Global City, Taguig

5

PAINT FINISH FABRIC WALL PANELS

W4

PORCELAIN TILES

W5

MIRROR

1:50 M

SCALE :

ISSUES:

LOCATION:

PD No. 49

" Protection of Intellectual Property" November 14, 1972. Works of art, architecture, models and designs are creative works and considered as part of the intellectual property of the author duly protected under PD 49.

PROJECT OWNER:

FLOOR PLAN

WALLPAPER FINISH

W2 W3

SHEET NO:

DESCRIPTION ISSUE FOR PERMIT ISSUE FOR BID ISSUE FOR CONSTRUCTION ISSUE FOR REVISIONS ISSUE FOR REVISIONS

FLOOR PLAN

A-100


RETAIL

5

JB MUSIC & SPORTS BACOOR, CAVITE, PHILIPPINES Phase: Completed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post process Responsibilities: Design Floorplans, Construction drawings, Design Development, 3D model, 3D renderings, source out materials, contact with Client and contractor, RFIs and RFQs, & Site Visits.


RETAIL

6

4x5 BIG ASS FANS GLASS SHOWROOM Makati City, Philippines Phase: Proposed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post process Responsibilities: Design Development, Floorplans, 3D model, & 3D renderings


RESTAURANTS

7

SOUV! BY CYMA The Podium Mall, Mandaluyong, Philippines Phase: Completed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post processing Responsibilities: Floorplans, Construction drawings, 3D model, 3D renderings, source out materials, contact with Client and contractor, RFIs and RFQs, & Site Visits.


Photo by Albert Dumlao

For Liza Crespo Ecotecture

Photo by Albert Dumlao


RESTAURANTS

8

CYMA - GREEK TAVERNA Quezon City, Philippines

Phase: Proposed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post process Responsibilities: Design Development, Floorplans, 3D model, & 3D renderings


1

3

2

5

4

6

7

8

2 A300

NON-POTABLE WATER TANK (40,000 L)

4450

2790

69071

8960

GARBAGE ROOM

124

SE-1

123

122

120

119

118

110

WOMEN'S LOCKER ROOM

UP

114

109

112

STORAGE ROOM

109

126

SAUNA

U101

113

UP

PUMP ROOM ELEV. +700

115 114

121

T101

MALE T&B ELEV. +50

P109

113 UP RAMP

118

B102

T103

P106

KITCHEN ELEV. +150

T103

N

B101

P101

P105

117 120

P102

P107 T101

123

118

114

B103

HALLWAY

119

117

15653

P104

ELEV.+100

MEN'S LOCKER ROOM

122 115

119

SAUNA

125

P108

T102

116

3000

FIRE WALL

FEMALE T&B ELEV. +50 T104

116

116 MASSAGE ROOM

122

119

MASSAGE ROOM

ELEV. +100

1 A733

117

122

9126

P110 T102

121

FE-1

115

U102

8500

1 A770

ELECT'L / AUXILIARY ROOM

110

U103

PUMP ROOM

925

113

LANDING

3003

1975

111

6018

1697

C

925

4 A751

PLANT BOX

4950 2628

B

2475

111

U105

U104

3475

A

2999

FIRE WATER RESERVE TANK (40,000 L)

2783

7291

9

2 A201

1 A301

KIDDIE SHOWER

124

D

PLANT BOX

GENSET ROOM

7507

1 MVA GENSET

4 A771

U100

ADULT POOL

POOL SUNKEN BAR

P103

P104

112

39.44 sq.m. CYCLING AREA

127

P102

KIDDIE POOL

5000

PLANT BOX

E

1 A300

ELEV. -750

GYM AREA 128

111

106

1 A300 ELEV. -450

BOXING AREA

F

WADING POOL

P101

129

19350

1 A730

K

PE-2

133 134

2350

UP

BAR AREA

6632

COFFEE SHOP 76.98 sq.m.

102

101

141

LEGENDS:

102

103

1 A000

A301 1

ARCADIA SPORTS COMPLEX PRC NO:

12877

VALID UNTIL: 04-28-2018

SEAL:

RA 9266, Sec. 33

Drawings and specifications, duly signed, stamped or sealed as instruments of service are the properties and documents of the Architect, whether the object for which they are made is executed or not. It shall be unlawful for any person, without the written consent of the Architect or author of said documents to duplicate or to make copies of said documents for use in the repetition of and for other projects or building, whether executed partly or in whole.

Davao City, Philippines

UAP, LEED AP, AIA

WINDOW TAG - SEE WINDOW SCHEDULE LOUVER TAG - SEE LOUVER SCHEDULE CALL OUT DETAIL

(SLOPE @ 7.37%)

PTR NO:

5520494C

DATE:

01-03-2018

ISSUED AT:

QUEZON CITY

TIN:

152-808-664-000

IAPOA:

08321 193545 070317

PROJECT TITLE:

PROPOSED 3-STOREY ARCADIA SPORTS & FITNESS BUILDING

1 A-100

ISSUES:

PROJECT OWNER:

A

B

D

C

ESCANDOR DEVELOPMENT CORPORATION Glen Y. Escandor

PD No. 49

" Protection of Intellectual Property" November 14, 1972. Works of art, architecture, models and designs are creative works and considered as part of the intellectual property of the author duly protected under PD 49.

1:100 M

SCALE :

SHEET NAME:

NO.

DATE

1

SEPT 29, 2016

E

DESCRIPTIONF

G

H

I

J

K

L

M

ISSUE FOR PERMIT

2

OCT 24, 2016

ISSUE FOR BID

3

NOV 11, 2016

ISSUE FOR CONSTRUCTION

LOCATION:

ADDRESS:

4

DEC. 11, 2017

ISSUE FOR REVISIONS

MATINA GOLF DRIVE, MATINA, DAVAO CITY

ESCANDOR BUILDING, CORNER SUAZO & JUAN LUNA STREETS, DAVAO CITY, 8000 DAVAO DEL SUR

5

MARCH 06, 2018

ISSUE FOR REVISIONS

GROUND FLOOR PLAN

10405

1000

4500 350 1000

4500 5500 1750 350 1200 750 220 1000 980 1550

INDOOR BASKETBALL COURT

WOMEN'S LOCKER / SHOWER ROOM

STORAGE ROOM

MEN'S TOILET ROOM

MTG RM FUNCTION ROOM 2

RESTAURANT

MEN'S LOCKER ROOM

HALLWAY

FITNESS GYM

LOBBY MALE

SPORTS APPAREL

1100

+ 4500 SECOND FLOOR

400 1000

750 800 1200

+ 9000 THIRD FLOOR

4500

Phase: Completed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post process

5905

OPEN CEILING (SEE STRUCT'L DWGS)

+ 13500 ROOF DECK

2950

9

Phone: (02) 332-2657 Fax: (02) 928-6627 Website : www.lizacrespo.com

WALL PARTITION TAG - SEE WALL PARTITION SCHEDULE DOOR TAG - SEE DOOR SCHEDULE

SIDEWALK

1 A200

A300 2

5/F PGA TECH BLDG., #85 KAMUNING ROAD, QUEZON CITY, PHILIPPINES 1103

ROOM TAG - SEE FINISH SCHEDULE

00

SIDEWALK

LIZA MORALES - CRESPO

ELEVATION TAG

000

000

OPEN PLAYGROUND

(SLOPE @ 7.37%)

ARCHITECT

1 A000

000

120

101

101

PEDESTRIAN ACCESS TO FUTURE DEVELOPMENT

119

PARKING AREA

PROPERTY LINE

1018

14644

6994

140

PARKING ENTRANCE

101

DINING AREA

139

106

DISPLAY REF

LOBBY

136

138

107

106

COVERED ENTRY

FE-2

125

105

2 A200

108

102

103

135

137

104

104

L KITCHEN

105

103

PE-1

SECURITY OFFICE

MEN'S TOILET RM

+/- 0 GROUND FLOOR

Responsibilities: Design interior 3D Renderings of office, assisted in revising floorplans, sections and elevations

3150 5500

132

WOMEN'S TOILET RM

104

107 108

P100

105

1 A-301

SCALE :

2000 3500

2125

6 A770

1225

PARKING AREA

900

I J

131

CARETAKER'S SHED

109 PWD

SPORTS APPAREL

2650

130

119

RECEPTION

2 A751

PROPERTY LINE

125

108

H

M

110

0

G

5100

1 A201

1:100 M


RESIDENTIAL

10

ALFONSO CAVITE VACATION HOUSE CAVITE, PHILIPPINES

Phase: Proposed Software used: Autocad for floorplans; Sketchup Vray and Photoshop for renders and post process Responsibilities: Render proposal for bedrooms, Assisted in floorplans, 3D model, & 3D renderings


11

RESIDENTIAL EKODORM

MANILA, PHILIPPINES Phase: Proposed Software used: Autocad for floorplans; Lumion 5 and Photoshop for renders and post process Responsibilities: Render proposal for bedrooms, Assisted in floorplans, 3D model, & 3D renderings


UNDERGRADUATE AND INTERNSHIP WORKS


GRAPHIC DESIGN / DIGITAL WORKS


Profile for Seldon May Tagao (Stee)

Seldon May Tagao Portfolio  

A team player with high exposure to a diverse range of projects, which include residental developments, hospitality, retail, commercial & he...

Seldon May Tagao Portfolio  

A team player with high exposure to a diverse range of projects, which include residental developments, hospitality, retail, commercial & he...

Advertisement