Seero Engineering Consulting L.L.C.
PLAN. DESIGN. SUSTAIN. Latest Projects October, 2013
www.seeroeng.com
PROJECTS
PROJECTS
01
We have worked in various transportation engineering and planning projects such as:
Traffic Impact Study for J.W Marriot Hotel - Qatar Business Trading Company has assigned Seero to complete the full traffic impact study for the new JW Marriot Hotel in Qatar to satisfy MMUP requirements. The TIS of the development will require traffic demand distributions, traffic analysis, site development review plans, and the final traffic impact report. The development is located in the towers zone at the diplomatic street in Doha. 397600
397550
397500
A
4
3
SLOPE
UP
SLOPE
397450
B
B
SLOPE SLOPE
SLOPE
SLOPE
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
SLOPE
2
A
232000
231950
231900
231850
231800
Consultant:
231750
Owner:
231700
397400
Status: Ongoing LOCATION PLAN
R Q
P O
N
M L
R
Q
P
A
A"
A
B
C
PLOT LIMIT
7
O
D
E
F
G
H
N
H' M
L K
J
O
7 P
8
A P
G N I K R A P
6
K DROP OFF AREA
SLOPE
14
10.70m Landscape /
Water feature EX
IT
DN TO B1
EN
TR
Y
PLO PLO TT LIMI LIMI TT
7 VIP
ING
STA IR-
08
Scale:1:300 R
8
SHAFTS (OPEN BELOW)
SHAFTS (OPEN BELOW)
PLOT LIMIT
A
2
Q
IT
OUT
PLOT LIMIT
A"
A
B
A"
A
B
C
ACCESS TO TX
C
D
E
F
G
H
H'
E
F
G
H
H'
T LIMI
T
I
J
P
O
N M L
K
A
D
PLO
IN
IN
OUT
PLOT LIMIT
2
OT
SHAFTS (OPEN BELOW)
LANDSCAPE / GREEN AREA
IN
PL
OUT
SITE PLAN
1 LI
SHAFTS (OPEN BELOW) RETURN AIR VENTS
PARK
SHAFTS (OPEN BELOW) AIR VENTS RETURN
M
CK
7.50m
SETBA
8
8.95m
PLO T LIMI T
LIMITLIMIT PLOTPLOT
ASSEMBLY AREA
2.70m
7
GROUND FLOOR LEVEL Nos. of Parking: 78 NOS.
G N
S I
IT M
IT M PL
G N
S I R
B
K
U
B LI M IT
ABOVE LIMIT SLAB
5
APARTMEN
7.50m
SETBAC
6 6
G
5
N
RY
I
13
3
ENT
K
3
T
12
G
EXI
N
4
I
B
SLOPE
K
G
SLOPE
SLOPE
11
Landscape / Water feature
R
N
4
SLOPE
TOWER ROOF APEX LINE
B 4
(3B+G+51)
PIN NO. 61070120 WEST BAY, DOHA, QATAR HEIGHT: 0+215.30 M. A
I
SLOPE
A
B
JW MARRIOT HOTEL TOWER R
G
K
9.0m
4
12
IT
P
N
R
3
A
I
A
DROP OFF AREA
SLOPE
M
10
P
K
P
C
DN
GOV'T. OWNED PLOT 4464.97 M²
THIS DRAWING IS THE PROPERTY OF M.Z. & PARTNERS AND SHALL NOT BE COPIED OR REPRODUCED IN ANY MANNER WITHOUT THE WRITTEN CONSENT OF MZ & PARTNERS.
LI
I
ING
C
DATE
X
R
I
SLOPE
C
3
DESCRIPTION
8.16 m²
GF-ST-07
A
A
X
PARK
11
REV
9
OT
STAIR-07
T
P
A
VIP
SL A
10
Landscape / Water feature
T
1
2
PL
JULY2012 JUNE2012 MAY 2012
LI
GOV'T. OWNED PLOT 4464.97 M²
PERGOLA
2
LI
PERGOLA
OT
PERGOLA
1
RE- ISSUED FOR DC-1 RE- ISSUED FOR DC-1 ISSUED FOR DC-1
OT
ASSEMBLY A
Landscape / Water feature 02 01 00
PL
7
U
IT
IR-0
K
LIM
STA
B
9
OT
Landscape / Water feature
R
PL
1a
F PERGOLA ABOVE
A
GAS TANK BELOW
5.35m
SWIMMING POOL @ 33RD FLOOR DECK
GAS TANK BELOW
P
D
8
ARCHITECTURAL STRUCTURAL MECHANICAL ELECTRICAL SUPERVISION
WLL
TEL:44 363813-4 , 44 360764-5
G
G
FAX:44 363812
N
N
I
I
K
K
13
R
R
P.O.B: 5785-QATAR
A
LEVEL 33 FLOOR LINE
3.50m
1a
A
P
1.90m 4.85
SETBAC
CANOPY BELOW
P
DC-1 APRIL 2012 17 APRIL 2013 NSG/PBJ/MER/AVB JSP/SMA NJ AS SHOWN A-1
Issue Purpose Date Started Date Issued Drawn Checked Approved Scale Format
14
EX
IT
EN
TR
Y
SITE PLAN VIP
PARK
ING
STAIR-08 12.21 m²
GF-ST-08
GUARD HOUSE
SHAFTS
(OPEN BELOW) AIR VENTS RETURN
PROJECT NO
PHASE
STAGE
DC-1
1
DISCIPLINE, AREA CODE & SHEET NUMBER
IN
A-0001
REVISION NUMBER
03
R
OUT
PLO
T LIM
IN
O
N L
K
P
IT
M
J
Q
M IT
IN
PLOT LIMIT
G
N
LI
H'
I
O T
H
PLOT LIMIT
SHAFTS (OPEN BELOW) RETURN AIR VENTS
10.0mK
SHAFTS (OPEN BELOW) SUPPLY AIR VENTS
DN TO B1
G
5.95m
PLO PLO TT LIMI LIMI TT
F
SETBAC
7.60 m
E
A
7.50mK
LANDSCAPE / GREEN AREA
D
K
PL
C
LIMIT PLOT PLOT LIMIT
B
R
GROUND FLOOR LEVEL Nos. of Parking: 72 NOS.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
A PLO T LIM IT
A
A
OUT
A"
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
I
R
PLOT LIMIT
PROJECTS 02
Traffic Impact Study for J.W Marriot HotelBahrain Seero has also been assigned to conduct the full traffic impact study for the new JW Marriot Hotel in Bahrain in order to satisfy Urban Planning Affairs requirements in MMA. The TIS of the development will require traffic demand distributions, traffic analysis, site development review plans, and the final traffic impact report. The development is located in the plot F02.1 Bahrain Bay in Manama.
Owner: Khalij Capita BSC
Consultant:
Yousif Daoud Al Sayegh & Associates
Status: Ongoing
PROJECTS 03
Traffic Impact Study for Lexus Showroom & Offices By following MMUP guidelines and procedures of transport studies, Seero team will improve the circulation of ground and basement areas, improve the pedestrians and cyclist facilities within the project development area, and improve the geometry of the surrounding road network considering the trips generated by the project. Owner: Abdullah AbdulGhani& Bros. Co.
Consultant:
Status: Ongoing
Traffic Impact Study for Um Ghwilina Commercial and Residential Buildings Seero has been commissioned to undertake a limited Traffic Impact Study (TIS) for Um-Ghawilina residential and commercial buildings (B+G+7, &B+G+4 respectively). Seero team worked on the analysis and improvements of the parking design,circulation, and building accesses. Owner: Sh. A. A. A.
Consultant:
Status: Submitted
PROJECTS 04
Traffic Impact Study for a Commercial Building (B+G+2) on Salwa Expressway
Owner:
Consultant:
Status: Completed
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
MMUP requires for all new development in Qatar that include any vehicle or traffic interaction to be checked and designed as per their transport guidelines issued May 2011. This project is around 5000 sq.m. on Salwa road and it is required to improve parking design and road connection to the service road in Salwa international expressway.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
This limited TIS is mainly required by MMUP to check and modify the site developments plans in order to improve traffic circulation, parking design, vulnerable road users. This includes some traffic challenges to improve the swept path analysis for service trucks and their interaction with passengers cars. This type of limited TIS is very helpful for improving the performance of the building future operation. Consultant:
Status: Completed PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Owner:
05
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Traffic Impact Study for Al-Wakra Commercial Building (B+G+1)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PROJECTS
PROJECTS 06
Traffic Impact Study for College of Engineering and College of Pharmacy in Qatar University This traffic impact study of this project is a study which requires the review of the proposed development drawings for consistency with driveway and access management standards along with the safety analysis for pedestrians and cyclist within the project location. All this analysis are implemented according to the guidelines and procedures for transport studies by MMUP, date May 2011. It includes methodology report, and site development plans and report. New College of Engineering,
Owner:
Consultant:
Status: Completed
New College of Pharmacy
PROJECTS 07
For any enquiries, please contact: Mr. Haytham Sadeq, BSc. (Hons.), MASc. General Manager | Transportation Engineer haytham.sadeq@seeroeng.com Mob: +974 5582 0688 Tel: +974 4486 6821 Fax: +974 4486 6410
Tel
Fax
Mobile
P.O.Box
C.R.
+974 44866821
+974 44866410
+974 55820688
201257 Doha, Qatar
info@seeroeng.com
57385
www.seeroeng.com Address: Office no. 5, Al Hedab street 787, Al Garrafa (51) Doha, Qatar
Published on Oct 1, 2013
This a summary of our latest projects that we have worked in.