Page 25

...NaRQ recovers narcotics through an automated recovery cycle – a 3 step process which takes 20 minutes from start to finish with no manual input required.

The separation unit contains the sewage system and drain, hot air fans and collection chamber.

equipments is operated via pre-programmed software and is ready for use 3-4 hours after installation.

For safety purpose, a clear window is located at the top of the separation chamber, allowing staff and the suspects’ representatives to observe the recovery cycle. The separation unit connected to video camera with hand-held screen ensuring that the entire process can be monitored.

The equipment should be serviced once a year or after 200 uses. Trained technicians are available on call to visit installations for regular inspections.

NaRQ can be installed easily in one, or two directly adjacent rooms with very little space required. Entailing none or very little refurbishment to existing facilities, the narcotics recovery

For further information about the NaRQ product, please visit www.narq.com or email enquiries to info@narq.com.

Security industry E-mag - March 2014  

Security industry E-mag - March 2014

Security industry E-mag - March 2014  

Security industry E-mag - March 2014

Advertisement