Page 1

WEEKLY NEWSLETTER

May 23, 2012

Volume 18 Issue 21

CAL Green 2012 Q & A with Michael Nearman, By Bob Graves CALGreen has been in effect since January having the green building code applied to them 2011. How would you describe its reception for enforcement. with local governments and the building industry? The City of Los Angeles’ Building and Safety Division commented during one of our early develThe Building Standards Commission, local build- opment meetings that we’re missing the largest ing officials and the building industry put a lot stock of buildings out there and that’s existing of effort into the development of CALGreen as it buildings, alterations and additions. Their repwent through the rulemaking process managed resentative pointed out that about 90 percent by the Commission. We had some insight into of the impact for green construction is going to its reception when we released the 2008 green be realized in existing buildings through remodbuilding standards code, the initial CALGreen els, additions and alterations. Having the initial version published as a 100 per cent voluntary codes applied only to new commercial construccode. A number of jurisdictions voluntarily went tion didn’t really give full force to the code. So, ahead and enforced the standards. Based on this, we are hoping by including additions and alterawe were hopeful that the 2010 mandatory code tions we will take a much larger step toward our would be well received by local government and greenhouse gas emissions reduction goal. the building industry. We’re delighted to see the reception and the open arms it’s received. It was The City of Los Angeles included existing comdefinitely a pleasure for me to see that happen. mercial buildings in their local amendments to the 2010 CALGreen code. Was their experience A CALGreen code update is slated for July 1st, sufficiently positive to expand the scope to the 2012. What are the its most significant ele- entire state? ments? Why were these changes incorporated? Yes, the information we saw and the experiences they brought to the table, really encourI think of all the changes, the most significant is aged such a move. We felt it was a logical step to a new division that has been added to the 2010 take. The evidence showed it was well received CALGreen code. This intervening cycle added and was successfully working for them. With Division 5.7, which covers additions and altera- that support we really looked to the City of Los tions to existing nonresidential buildings. The in- Angeles to assist us in the development of these tent was to include a large portion of the state’s provisions. In doing so we also put in triggers to existing building stock that would benefit from assist its implementation.

We protect the people who build California. Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work.

Together, we’ll help keep California working. www.statefundca.com Ask for SBCA Group #821

One was a threshold limit of 2,000 square feet. Another was a $500,000 cost allowance for alterations. Only buildings above those levels have to meet CALGreen code requirements. Without those two triggers some of the smaller projects might get confused about the newer standards. The idea was to try to clarify the scope of the remodels and additions standard and to start out with these levels. A few of the other items I’ll just touch on briefly. They don’t have quite as big an impact, but they will help people use the provisions in the initial mandatory 2010 code. One of them is the waste management plan. There is new information provided to help with waste stream reduction. This was to align with the HCD [Housing and Community Development] requirements that are in the code and makes it easier for local jurisdictions and builders to comply with the provisions. Another item is light pollution reduction. It was a voluntary provision initially and has become a mandatory provision now. It has been rearranged to be more measureable and quantifiable so it can be actually be enforced and managed at the local level. We’re pleased with these provisions. There was also a 20 percent water reduction reviContinued on page 14

In This Issue CAL Green Q & A 2012 Calendar Highlights Tailgate Safety Topic Kalb’s Q & A for Contractors SBCA Online Planroom Report SB City Building Permits South County Building Permits North County Building Permits SBCA Ad Rates for 2012

Santa Barbara Contractors Association Celebrating Over 60 Years of Service to the Community

Page 1 Page 2 Page 7 Page 14 Page 18 Page 29 Page 33 Page 45 Page 55


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Calendar Highlights MAY 2012 SBCA Board of Directors Meeting May 1, 2012 from 5:00pm to 7:00pm Location: SBCA, 914 A Santa Barbara Street SBCA Online Planroom Training May 2, 2012 from 10:00am to 11:00am Location: SBCA, 914 A Santa Barbara Street Built Green Orientation May 3, 2012 from 9:00am to 10:00am Location: Built Green Resource Center, 914 A Santa Barbara Street SBCA Golf Tournament May 14, 2012 Shot Gun Start 9:00am Location: Glen Annie Golf Club, 405 Glen Annie Rd, Goleta Builder of the Year Entry Packet Due May 21, 2012 at 12:00 noon Location: SBCA, 914 A Santa Barbara Street Green Building Education Series Presented by Paul Poirier, USGBC C4 May 21, 2012 from 12:00pm to 1:30pm Location: Built Green Resource Center, 914 A Santa Barbara Street emPowerSBC Homeowner Workshop Contractors come and meet homeowners! May 21, 2012 from 5:30 tp 7:30pm Location: SBCA, 914 A Santa Barbara Street

SBCA Online Planroom Training June 6, 2012 from 10:00am to 11:00am Location: SBCA, 914 A Santa Barbara Street Built Green Orientation June 6, 2012 from 9:00am to 10:00am Location: Built Green Resource Center, 914 A Santa Barbara Street Green Building Education Series Presented by Paul Poirier, USGBC C4 June 11, 2012 from 12:00pm to 1:30pm Location: Built Green Resource Center, 914 A Santa Barbara Street 1st Aid CPR Training & Certification Instructor, Justin Haagen, Safety Matters June 26, 2012 from 8:30am to 1:30pm Location: SBCA, 914 A Santa Barbara Street Quickbooks Training for Contractors Instructor Monica Dittrich-Summers June 27, 2012 from 10:00am to 11:00am Location: SBCA, 914 A Santa Barbara Street

SBCA Board of Directors Meeting July 10, 2012 from 5:00pm to 7:00pm Location: SBCA, 914 A Santa Barbara Street SBCA Online Planroom Training July 11, 2012 from 10:00am to 11:00am Location: SBCA, 914 A Santa Barbara Street Built Green Orientation July 12 2012 from 9:00am to 10:00am Location: Built Green Resource Center, 914 A Santa Barbara Street EPA Lead Paint RRP Training Presented by Criterion Environmental July 17 2012 from 7:30am to 5:00pm Location: SBCA, 914 A Santa Barbara Street Construction Contracts Seminar Presented by Chris Haskell of Price, Postel, & Parma July 24 2012 from 9:00am to 11:30am Location: SBCA, 914 A Santa Barbara Street SBCA Builder of the Year Awards Banquet July 30, 2012 from 6:00pm to 9:00pm Location: Fess Parkers Doubletree Resort, 633 East Cabrillo Blvd., Santa Barbara

JULY 2012 SBCA Office Closed Fourth of July Holiday July 4, 2012

Mechanics Lien Seminar Presented by Mark Coffin, Hardin & Coffin LLP May 22, 2012 from 9:00am to 11:00am Location: SBCA, 914 A Santa Barbara Street SBCA Office Closed Memorial Day Holiday May 28, 2012

JUNE 2012 Green Building Education Series Presented by Paul Poirier, USGBC C4 June 4, 2012 from 12:00pm to 1:30pm Location: Built Green Resource Center, 914 A Santa Barbara Street SBCA Board of Directors Meeting June 5, 2012 from 5:00pm to 7:00pm Location: SBCA, 914 A Santa Barbara Street

2

Need to find out what’s going on? Visit us online for a complete list of events, classes, trainings at www.sbcontractors.org


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Santa Barbara Contractors Association QuickBooks Troubleshooting Class June 27 , 2012 from 10:00am to 11:00am Presented by: Monica Dittrich-Summers, QuickBooks for Contractors Consultant Location: SBCA Office, 914 A Santa Barbara Street

Popular Troubleshooting Topics t Payroll items set up and use - aligning with estimates & costs t Workers comp set up/use to include in labor burden & easy workers comp insurance reporting t Using purchase orders for tracking subcontracts - workaround for current QuickBooks issues t Handling joint checks t Entry of advance deposits received (before work has commenced) t Q & A Session QuickBooks Premier for Contractors Edition - 2012 Bring your laptops & questions Worksheet & additional resources will be supplied To register, please visit www.sbcontractors.org and go to Events Calendar. Pre-registration is required. Limited seating. SBCA Member - $35 per person - Online registration fee SBCA Member - $55 per person - Registration fee via email, fax, phone Non-Member - $75 per person - Registration fee Attendees MUST pay in advance to reserve their space(s). All registration is on a 1st come 1st serve basis until the seminar is full. Late cancellation fees will be billed at 50% of the seminar price. No shows will be billed full seminar price. To avoid being billed you must cancel no later than 5 business days prior to training by 5:00PM. LATE CANCELLATIONS = NO REFUNDS ~ NO CREDITS ~ NO ROLLING FORWARD ~ NO EXCEPTIONS. The SBCA reserves the right to cancel the class due to low enrollment. Santa Barbara Contractors Association P.O. Box 23409, Santa Barbara, CA 93121 805.884.1100 phone 805.884.1108 fax www.sbcontractors.org info@sbcontractors.org

Please register by 5pm on June 25, 2012 3


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

4


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

!"#$%&#'"%(')*+,))%$*-.%/01%-"2*+*+3! 4+5&%67889%:6;<=>8%?25',@!

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

!!!%A4BCDE%FGHED%I%J4AGH14KD! %!

L2&%;7M;>%%%%%%%%%%%%%%%N'+,%OMP! %%%%%%%%%%%%Q,+-'"2%%%%%%%%%%%%%%D2+-2%/2"(2"2! %%%%

! DR2S,%*)%5*T*-,U%)#%?*)*-%')%#+5*+,%2-% $$$V,TR#$,")(SV#"3W(R*%-#%",3*)-,"V% ! <*'!1*'4!6$8*'1#=*$!9*$%#9%!B.354,!P#%O6$.!#%!! QMRNRSQNTRUK!*'!#2#%O6$.V9*;.#$%#N(#'(#'#;9#;+.! !

5


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

HAYWARD SO YOU CAN BUILD. . Architectural Mouldings . Bathroom Cabinets . Door Hardware . Doors & Windows . Kitchen Cabinets . Lumber . FSC-Certified Trusses First Impressions Are Priceless! www.haywardlumber.com

Hayward Design Center 606 Olive Street Santa Barbara, CA 93101 (805) 965-7772 Goleta, CA 93117 (805) 964-7711

We protect the people who build California. Will my supplies be here on time? Am I going to get this bid? We understand those on the job in California have more on their mind than workers’ compensation insurance. So let us put your mind at ease: you can count on the strength and stability of State Fund. We’ve never pulled out of the market due to an economic downturn, and we never will. Visit statefundca.com today to learn about the 6% discount on premiums we offer eligible GSBE members. Your individual business may be eligible for even more discounts. Thanks for reading…we’ll let you get back to work.

Together, we’ll help keep California working. statefundca.com

Member of Golden State Builders Exchanges

State Compensation Insurance Fund is not a branch of the State of California.

6


Tailgate Safety Topic

P.O. Box 23409 Santa Barbara, CAASSOCIATION 93121 SANTA BARBARA CONTRACTORS 805-884-1100 phone WEEKLY NEWSLETTER May 23, 2012 805-884-1108 fax www.sbcontractors.org info@sbcontractors.org

ELECTRIC EQUIPMENT GUARDING AND WORKSPACES Electrical current is found in power lines, transformers, breaker boxes, and power outlets and switches. Exposure to electric current can cause shock, injury and electrocution. Workers that service electrical sources need to get training on electrical safety, assume electrical equipment and lines are live, and use lock out/tag out procedures. Proper guarding and clearance around electrical equipment can prevent accidental worker exposure to electrical currents. A shock can occur when a workerâ&#x20AC;&#x2122;s body becomes part of the flow of an electrical circuit. The severity of injury depends on the voltage and time that the electrical current passes through the body. Low voltage causes pain and slight burns, a large voltage can cause severe burns and stop the heart. A minor shock may cause a large injury if a surprised worker takes a fall. To avoid the risk of accidental shock, live electrical components operating at 50 volts or more must be guarded with covers or other permanent barriers to prevent accidental contact by workers and their tools. Equipment can also be locked behind an enclosure, in a room, or at an elevated height. These areas should have restricted access and warnings against unauthorized entry. Permanent markings on electrical equipment with the voltage, current or wattage provide power output information for workers. Electrical boxes and equipment are best stored in areas free from moisture, chemicals, and excessive temperatures. Electric cabinets with ventilation holes need to remain clear to allow air circulation. Electric parts that ordinarily spark or arc require covers and isolation from combustion sources. Equipment should be securely mounted to the surface that it rests on. There should be adequate working space to allow workers to safely maneuver around electrical equipment. Electrical equipment with a voltage of 0-150 requires 36 inches of clearance. A voltage of 150-600, where there are energized parts on one side, also needs 36 inches of clearance. Equipment with a voltage of 150-600 and exposed energized and grounded parts on either side requires 42 inches clearance; equipment with exposed energized parts on both sides must have 48 inches clearance. The clearance workspace around electrical equipment is not intended for storage. The area should be kept clear to allow safe movement and to prevent a fire hazard. Electric equipment workspaces require adequate lighting for safe work; light operating switches should not be near live electrical feeds. Enclosures need at least one entrance and enough headroom to work safely. With adequate clearance and guarding around electrical equipment, workers can avoid accidental exposure to electric shock.

Courtesy of the State Compensation Insurance Fund Visit www.statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members. Your individual business may be eligible for even more discounts. Ask for Santa Barbara Contractors Association Group 821. For more tailgate, and other safety topics please visit us online. The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations or standards.

7


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Here to Assist with Your Surety Bond Needs Expanding Our Office On the Central Coast

Philip E. Vega, President of Contractors & Developers Bonding is proud to announce the appointment of Myrna Smith, as Associate Vice President. She will be joining Jadon Smith, Vice President, and Manager of the new office in Pismo Beach. Contractors & Developers Bonding specializes in providing surety bonds to contractors and other surety clients. The largest independently owned, surety only broker in the western states, C&D bonding has over 80 years combined surety experience. Let us know how we can assist with your surety bond needs

Now in Pismo Beach!

Jadon Smith, Vice President

Myrna Smith, Associate Vice President

575 Price Street, #207 Pismo Beach, CA 93449 805-343-7434 www.cndbonding.com

Law Offices of Barton C. Merrill Trial Attorney and Counselor at Law _______________________________________________________________

Specializing in Construction Law __________________________________________

Construction Litigation, including Mechanic’s Liens & Stop Notices Administrative Hearings before CalOSHA and the CSLB Corporation & Partnership Agreements Contract Drafting & Review _______________________________________________________________

Since 1989 Barton Merrill has represented contractors & design professionals in the Tri-Counties with all phases of construction. _______________________________________________________________

225 E. Carrillo St., Suite 305 Santa Barbara, CA, 93101 (805) 750-0910 – Tel. (805) 564-8281 – FAX bartlaw123@yahoo.com FREE INITIAL CONSULTATION FOR SBCA MEMBERS 8


P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone SANTA BARBARA CONTRACTORS ASSOCIATION 805-884-1108 fax WEEKLY NEWSLETTER May 23, 2012 www.sbcontractors.org info@sbcontractors.org

PROTECTORES DE EQUIPO ELÉCTRICO Y LOS LUGARES DE TRABAJO La corriente eléctrica se encuentra en los cables de alta tensión, las cajas de cortacircuitos y los tomacorrientes e interruptores eléctricos. La exposición a la corriente eléctrica puede causar descargas eléctricas, lesiones y electrocución. Los trabajadores que realizan el mantenimiento de las fuentes eléctricas necesitan recibir adiestramiento en la seguridad eléctrica, deben suponer que los equipos y cables eléctricos tienen corriente, y usar los procedimientos de trabado y etiquetado. La protección y el espacio libre adecuados alrededor del equipo eléctrico pueden evitar la exposición accidental del trabajador a las corrientes eléctricas. Las descargas eléctricas pueden ocurrir cuando el cuerpo de un trabajador se convierte en parte del flujo del circuito eléctrico. La gravedad de la lesión depende del voltaje y del tiempo que la corriente eléctrica pase a través del cuerpo. El voltaje bajo causa quemaduras leves y dolor. El voltaje alto puede causar quemaduras graves y detener el corazón. Una descarga menor puede causar una lesión importante si el trabajador se cae. Para evitar el riesgo de una descarga eléctrica accidental, los componentes eléctricos con corriente que funcionen con 50 voltios o más deben estar protegidos con cubiertas u otras barreras permanentes para prevenir el contacto accidental con los trabajadores y sus herramientas. El equipo también puede encerrarse tras una caja o armario, en una habitación, o a una altura elevada. Estas áreas deben tener acceso restringido y advertencias contra la entrada sin autorización. Los letreros permanentes en el equipo eléctrico que indican el voltaje, la corriente o la potencia en vatios proporcionan información sobre la generación de electricidad a los trabajadores. Es mejor que las cajas y el equipo eléctrico se almacenen en áreas sin humedad, sustancias químicas ni temperaturas excesivas. Los gabinetes eléctricos con agujeros de ventilación necesitan permanecer libres para permitir la circulación del aire. Las partes eléctricas que normalmente lanzan chispas o arcos requieren tener cubiertas y aislamiento de las fuentes de combustión. El equipo debe estar montado de manera segura a la superficie sobre la que esté colocado. Debe existir un espacio de trabajo adecuado para permitir a los trabajadores maniobrar con seguridad alrededor del equipo eléctrico. El equipo eléctrico con voltaje de 0-150 requiere 36 pulgadas de espacio libre. Un voltaje de 150-600, en donde existen partes energizadas en un lado, también necesita un espacio libre de 36 pulgadas. El equipo con un voltaje de 150-600 y partes expuestas que están energizadas y conectadas a tierra en cualquiera de los lados requiere un espacio libre de 42 pulgadas; el equipo con partes energizadas expuestas en ambos lados debe tener un espacio libre de 48 pulgadas. El espacio libre del área de trabajo alrededor del equipo eléctrico no es para que se use como área de almacenamiento. El área debe estar libre para permitir el movimiento seguro y para evitar el peligro de incendio. Los espacios de trabajo de equipo eléctrico requieren una iluminación adecuada para poder trabajar de manera segura; los interruptores de luz no deben estar cerca de las fuentes eléctricas con corriente. Los recintos cerrados necesitan tener por lo menos una entrada y suficiente espacio por encima de la cabeza para poder trabajar con seguridad. Con el espacio libre y la protección adecuados alrededor del equipo eléctrico, los trabajadores pueden evitar la exposición accidental a las descargas eléctricas.

Courtesy of the State Compensation Insurance Fund Visit www.statefundca.com today to learn about the 6% discount on premiums we offer eligible SBCA members. Your individual business may be eligible for even more discounts. Ask for Santa Barbara Contractors Association Group 821. For more tailgate, and other safety topics please visit us online. The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that your workplace is safe or healthful or that it complies with all laws, regulations or standards.

9


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

PRICE, POSTEL & PARMA LLP Counselors at Law A Tradition of Service and Excellence Since 1852

_____________________________________________________________ Santa Barbara's Full Service Law Firm Specializing in All Aspects of Construction and Surety Law, Public and Private Work, Contract and Project Planning, Pre-Litigation Planning and Resolution of Construction Disputes, Mechanic Liens, Stop Notices and Bond Claims, Labor and Employment Law, Incorporations and Partnerships, Business and Tax Law, Real Estate, Land Use and Environmental, Insurance Disputes SPECIAL RATES FOR SBCA MEMBERS

_________________________________________ J. Terry Schwartz, Esq. (jts@ppplaw.com); Christopher E. Haskell, Esq. (ceh@ppplaw.com) 200 East Carrillo Street, Suite 400, Santa Barbara, CA 93101; (805) 962-0011; Fax (805) 965-3978 www.ppplaw.com

Ca l l t o day ! 962.2525

Ta k e a p r i v a t e t o u r o f t h e n e w H o m e A u t o m a t i o n S y s t e m s b y H i F i C l u b , a t t h e B u i l t G r e e n R e s o u r c e Ce n t e r. Fo r c o n t r a c t o r s , a r c h i t e c t s , d e s i g n e r s a n d t h e i r c l i e n t s .

p u r v ey o rs of eff o r t l ess a cce s s t o ev e r y t h i n g a m a z i n g . . .

Ho m e T h ea te rs Med ia Ro o m s

Mu l t i - Ro o m Music Sys te m s Au d i o p h i l e L i s te n i n g Ro o m s W i re l e s s Co n t r o l s

www. h i f ic l u b. n e t 5 1 9 Ga rden S t reet S a nta Ba rba ra , CA 93101 l i c. # 7 9 0 9 4 2

10


P.O. Box 23409 Santa Barbara, CA 93121 805-884-1100 phone SANTA BARBARA CONTRACTORS ASSOCIATION 805-884-1108 fax WEEKLY NEWSLETTER May 23, 2012 www.sbcontractors.org info@sbcontractors.org Original: Job Office, Oficina Del Departamento

REPORT OF SAFETY MEETING

INFORME SOBRE LAS REUNION DE ASUNTOS DE SEGURIDAD Employer/Patron Job Location/Ubicacion Del Trabajo - Department/Departamento

Date/Fecha

Accidents Reviewed/Accidentes Analizados

Employee's Name/Signature Empleado/Firma

Nombre Del

1. 2. 3. 4. Subjects Discussed/Temas Discutidos

5. 6. 7. 8. 9. 10. 11. 12.

Suggestions/Sugerencias - Recommendations/Recomendaciones

13. 14. 15. 16. 17. 18. 19.

Action Taken/Supervisor's Comments Medidas Tomadas/Comentarious Del Supervisor

20. 21. 22. 23. 24.

Supervisor's Name/Nombre Del Supervisor - Signature/Firma SCIF 17653 (Rev. 5-92)

STATE COMPENSATION INSURANCE FUND

11


LAW SPECIALISTS

SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

HARDIN & COFFIN, LLP

Ź Lawsuits, Arbitrations, Mediation Ź Construction Defect Claims Ź Contract, Business, and Nonpayment Disputes Ź Construction Contract Consultation Ź Mechanic’s Liens, Stop Notices, Attachment HARDIN & COFFIN, LLP Ź Payment & Performance Bonds Ź Jobsite Accidents / Personal Injury Claims Ź Insurance Coverage Analysis

H&C H&C

CONSTRUCTION IONCONSTRUCTION LAW CONSTRUCTION LAW SPECIALISTS LAWHARDIN & COFFIN,SPECIALISTS LLP HARDIN & COFFIN, LLP S SPECIALISTS

H&C

Ź Lawsuits, Arbitrations, Mediation itrations, Mediation Construction Defect ClaimsFor an appointment, please contact us at: Ź Lawsuits, Arbitrations,ŹMediation Defect Claims Ź Contract, Business, and Nonpayment Disputes Ź Construction Defect Claims iness, and Nonpayment Disputes ŹNonpayment ConstructionDisputes Contract Consultation Ź Contract, Business, and Contract Consultation Mechanic’s Liens, Stop Notices, Attachment Ź Construction ContractŹ Consultation iens, Stop Notices,Ź Attachment Ź Payment & Performance Bonds for initial consultation to SBCA members Mechanic’s Liens, Stop Notices, Attachment No charge erformance BondsŹ Payment & Performance Ź Jobsite Accidents / Personal Injury Claims Bonds ents / Personal Injury Claims Ź Insurance Coverage Analysis Ź Jobsite Accidents / Personal Injury Claims verage Analysis Ź Insurance Coverage Analysis

805-963-3301

HARDIN & COFFIN, LLP

ATTORNEYS AT LAW For an appointment, please contact us at: ent, please contact usappointment, at: For an please contact us at:

963-3301

805-963-3301 805-963-3301

www.hardincoffin.com

FAX: 805-963-7372 EMAIL: info@hardincoffin.com 1531 Chapala, Suite 1 No charge for initial consultation to SBCASanta members Barbara, CA 93101 onsultation to SBCA No charge formembers initial consultation to SBCA members PLEASE CONTACT: Rick Hardin or Mark Coffin

HARDIN & COFFIN, LLP & COFFIN, LLP HARDIN & COFFIN, LLP AT LAWExpert in Leak Repairs ATTORNEYS

NEYS AT LAW ATTORNEYS AT LAW

Reroof Specialists Tile / Slate www.hardincoffin.com ardincoffin.com Composition Shingles www.hardincoffin.com FAX: 805-963-7372 805-963-7372 EMAIL: info@hardincoffin.com FAX: 805-963-7372 Single Ply (PVC) o@hardincoffin.com EMAIL: info@hardincoffin.com 1531 Chapala, Suite 1 Full Maintenance Department Chapala, Suite 1 1531 Chapala, Suite 1 Santa Barbara, CA 93101 arbara, CA 93101 Aluminum / Copper Gutters PLEASE CONTACT: Rick Hardin or Mark Coffin Santa Barbara, CA 93101 : Rick Hardin or Mark Coffin 5“ Ogee Seamless and PLEASE CONTACT: Rick Hardin or Mark Coffin 6” Half Round Seamless

AND RAIN GUTTERS

“We think of Quality and Service first.” Owned and Operated for 25 Years by Jack Martin

FREE ESTIMATE AND EVALUATION LIABILITY INSURED Lic. 674-048

12


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

First Aid CPR Training & Certification Instructor Justin Haagen, Safety Matters Certified Training This course will cover adult, child and infant basic CPR and First Aid training for the home, workplace and the general community. 2 year Certification, Digital Student Guide & Free SmartPhone App. • • • • • • •

Emergency Action Steps CPR Skills Adult/Child/Infant AED Training Sudden Cardiac Arrest Adult/Child/Infant Choking Heart Attack Recovery Positions

• • • • • •

Bleeding Control Diabetic Emergencies Stroke Deformed Limb Managing Shock Seizure & More

Date: June 26, 2012 Time: 8:00am to 2:00pm 30 Min. Lunch Break (Lunch not provided) Location: SBCA Classroom 914 A Santa Barbara Street Santa Barbara Cost: $15 SBCA Member in State Fund Group $75 SBCA Member $150 Non-Member Minimum 10 attendees per class Maximum 20 attendees per class

PAYMENT

REGISTRATION Company Attendee Name(s)

Enclosed is my check for

$

Visa/MasterCard/AmEx

$

(payable to SBCA)

Name on Card

$15 SBCA Member in State Fund Group

Card Number

Exp Date

Email

Phone

Sec Code

$75 SBCA Member $150 Non-Member

Card Holders Signature

REMITTANCE OR QUESTIONS - Payment must accompany form Santa Barbara Contractors Association P.O. Box 23409, Santa Barbara, CA 93121 805.884.1100 phone 805.884.1108 fax www.sbcontractors.org info@sbcontractors.org

13


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Kalb’s Q & A for Contractors By David Kalb, Capitol Services, Inc.

In the global economy sometimes business comes calling with a ‘foreign’ accent. Some of the legal requirements for becoming a licensed contractor in California are uniquely American and may be ‘lost in translation’… Q: Our company has been selected to provide a product as part of a building project in Southern California. The General contractor has asked that we look into getting a California contractors’ license to install the product and suggested we speak with you. We’re a foreign manufacturer that has worked in the US but has not registered in California. Based on some research, it appears we might have a problem. We do not have a State tax number in California nor personnel with a Social Security number. Will we still be able to apply for a California Contractors License?

Building, “C-54” Tile, and “C-20” HVAC. I have been doing this work for over 20 years. The CSLB rejected my application due to the fact that I was However, all out-of-state corporations are re- applying for multiple classifications. Being that quired (at a minimum) to list a President (or CEO) (from what I hear) it takes them several months and the Qualifying individual who will sit for the to process applications, it could be a year long exams (this can be the same person). Since the process to obtain these three licenses! Is there fingerprint/Social Security requirement took ef- any way around this? fect in 2005, foreign companies have either had their President apply for a US SSN (which can be A: Unfortunately, you are only permitted to apa lengthy process) or appointed someone with a ply for one classification at a time if you are testSSN to that office. The Social Security number is ing for each of these classifications. Your first application for an Original License may take up an absolute requirement. to three months from start to finish. However, at I wish I could give you more positive information; this time, the CSLB is processing Additional Class but a company cannot secure a CA Contractors applications much more quickly. These remainlicense unless all listed personnel have a United ing two will likely take 6-7 weeks each. In other words, while not a yearlong process, it could take States SSN. a total of 6 months. An alternative would be to only act as a manufacturer/supplier, which does not require a con- While knowledge is power, knowing where to go for tractor’s license. However, you could not sign a the answers is half the battle. Get expert assistance imcontract to INSTALL your product. Registration mediately when you call 866-443-0657, email info@ with the CA Secretary of State is still necessary. cutredtape.com, or write us at Capitol Services, Inc., I hope this information helps. Please get back 1225 8th St. Ste. 580, Sacramento, CA 95814. Research past columns at www.cutredtape.com. with us if you have any further questions. tax ID. This should not be a problem and can be handled by Capitol Services.

A: This is an issue that has impacted a number of foreign contractors. The question of how to get a license when no one with the company has a US Social Security number (SSN) is one we’re often asked. Prior to addressing this, let me say that the CA Contractors Board requires all corporate contractors to register with the CA Secretary Q: I recently submitted an application for a new of State, which results in being assigned a CA contractor’s license. I applied for a “B” General

CAL Green 2012 Continued from page 1 sion. The modification assists calculations using an occupant load Table A factor out of the Uniform Plumbing Code. By incorporating this, the indoor water use 20 percent reduction calculation is easier to make.

As we move forward we are making more and more information available online via the Building Standards Commission website www.bsc. ca.gov/. It has a number of locations that may be of interest to visitors. I would first direct them to the “Publications” tab along the top of our The last one that may have some impact is for homepage and then under the “Guidebooks consumers of large quantities of indoor water. and Other Resources” section. There are proviThere was some sub-metering added to pick sions there that will give you more information up the sub-systems that buildings have, such as regarding some of the standards. cooling towers, evaporative coolers, hot water boilers and steam boilers. Those types of devices There are also codes online. When you go to the weren’t clearly identified before. codes tab and go to the publisher’s information, you’ll be able to link to the supplements and erIf I understand this correctly, residential hous- rata insertions for the codes. Additionally, under ing does not include CALGreen application to the Education and Outreach, Calendar of Events existing buildings, remodels and additions? location on the website there are PowerPoint presentations that we’ve done recently that also That’s correct. I believe the Housing and Com- include point by point comparisons between the munity Development Department is on a slight- current 2010 code and what the supplements ly different track in relation to this section and modify. This is a real concise view of the changes we may see something coming from them in the to the green code. near future. The Energy Commission, California Air ReWhere can our readers find out more about the sources Board, and the California Public Utilispecifics of these changes? ties Commission have adopted the policy goal to achieve zero net energy, or ZNE building 14

standards by 2020 for residential buildings and 2030 for commercial buildings. Will future versions of CALGreen be tied to this standard? If so, how do you see its evolution occurring? The Air Resources Board and these other groups were involved in the whole development of standards that initiated CALGreen in the first place. For instance, they’re heavily involved in the air quality standards that are in the code. So they’ll have significant ongoing input to CALGreen. I expect future editions will be tied to this standard in order to reach these goals. If the energy codes are ramped up in their efficiency standards they will be included by reference within CALGreen. Right? Yes, that’s correct. We’ve had discussions with the Energy Commission regarding the percentages of increase in the Tiers, where there are optional higher level standards available for local adoption, within the code. Tier 1 is typically a 15 percent increase over the baseline and then Tier 2 is 30 percent higher. With the Energy CommisContinued on page 16


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Santa Barbara office: 211 Anacapa Street, Santa Barbara, CA 93101 805-966-3233 www.ventanadoor.com

15


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

CAL Green 2012 Continued from page 14

sion ramping up their requirements for energy compliance, those 15 and 30 percent reaches are going to be much more difficult to obtain. So I think through our discussions there may be proposed modifications to the Tiers to adjust those numbers down to be more aligned with an attainable compliance.

It’s hard to predict the future. The IgCC is a well developed code, and a vast amount of resource was available during its development process. Seeing the value in that process I think we can certainly learn from it. It’s interesting to note that the initial versions of the IgCC were born from the concepts in CALGreen, so there’s an interrelationship that all green standards will have.

modification decisions based on how things worked for the local jurisdictions and the building industry.

Source: Green Technology is a non-profit initiative designed to inform government efforts toward sustainability, providing a forum in which government officials can communicate with those in the private sector who are developing and distributing green This, of course, will all be addressed through the adoption process that includes our ongoing ef- You can assume there will be some interaction. technologies. Visit www.green-technology.org for forts to encourage participation. We put out If we will go with the IgCC and adopt it as CAL- more information and upcoming events. notices electronically and post meeting times Green, I couldn’t predict whether that will hapon our website to get as many people engaged pen or not. But any development we do with Article from http://www.green-technology.org/ as possible. The process the Building Standards CALGreen will certainly include groups like the green_technology_magazine/calgreen-in-2012Commission administers is important to state International Code Council, because the depth a-wider-shade-of-green-q-and-a-with-michaelgovernment and the citizens of the state. Giving of their research and development is an asset to nea/ everyone a voice and a chance to have input and everyone. We try to tap into those sources wherimpact on the provisions before they’re mandat- ever we can. ed is an important role in getting a well vetted, well developed code. All the steps are important Anything you’d like to add before we conas opposed to developing something in a void clude? and mandating enforcement. We’re getting ready to start the development of Looking again into the future, the Interna- the 2013 update of Title 24, which will include all tional Code Council’s International Green the codes. Included in that, of course, would be Construction Code (IgCC) is slated for release the CALGreen code. I don’t anticipate significant in its fully approved version this month. What modifications. We want the code to rest for a will be its influence on future versions of CAL- while and allow it to be used in its current form. We’ll see how things go and then make the next Green?

New Member Bio New members, or members who have never utilized this service are welcome to send us a 150 word New Member Bio to be published free of charge in an upcoming issue of our Weekly Newsletter! Please contact the SBCA Office for more information at 805-884-1100. Have you introduced your company to the SBCA Membership??

16


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

REDUCE YOUR WORKERS’ COMP INSURANCE COSTS The SBCA and 25 Builder’s Exchanges in California have joined to form the Golden State Builders Exchange (GSBE). Participation in this group insurance program may significantly reduce the cost of your workers’ compensation premiums over a State Compensation Insurance Fund individual policy. Qualifying SBCA members are eligible for a 6% discount. Ask to be placed into the SBCA Group 821. Please call the SBCA office for more information and conversion form. If you are already with State Fund, please call us or your broker to see if you qualify for this group program.

www.statefundca.com

VISIT The Built Green Resource Center offers information, programs and classes on green building practices and materials. It showcases energy independence, water savings, and other sustainable building practices. The Resource Center is open to the public by appointment only. Please call 805-884-1100 to schedule your visit. www.builtgreensb.org 805.884.1100

MEMBER BENEFITS • Referrals • Online Planroom • Safety Program • Networking Events • Group Insurance • Weekly Newsletter • Government Affairs • Get Industry Updates • Educational Seminars • Annual Golf Tournament • Online Membership Listing • Annual Membership Directory • Advertise Directly to Construction Industry in Weekly Newsletter • New Member Bio - Introduce Your Business in the Newsletter • Built Green Santa Barbara

805.884.1100 info@sbcontractors.org www.sbcontractors.org

17


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012 5/23/2012

Weekly Bulletin sbca online planroom report Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the SBCA is not responsible or liable for errors, omissions or inaccuracies.

Projects Out to Bid

Santa Barbara Contractors Association

5/23/2012

Wednesday, May 23, 2012 11-383 Torrance Roofing - Remove Existing Built-Up and install new PVC roofing system

Torrance

Department of Motor Vehicles - Cindy Huynh 2415 First Avenue MS E-112, Sacramento, CA 95818 Fax#: 916-657-2387 Bid Date:

5/23/2012

Project Description: Prebid Conference:

2:30 PM

Ref #

Project Type: Public

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - Telli Foster Facilities Management, Building 370, Santa Barbara, CA 93106 893-4493 5/23/2012

Project Description:

Prebid Conference:

2:30 PM

FM120434S/ Project Type: Public Est: 136-05 Contractor is responsible for providing all labor and material necessary for the demolition of existing lighting fixtures, conduit, cabling, controls, drywall and al necessary finishes for the installation of new lighting fixtures. Contractor is to install all new specified lighting fixtures and modify/install all associate controls as indentified within the contract drawings and specifications. Estimated Construction Cost: $325,000.00 MAND May 3 @ 1:30pm

City of Oxnard - Public Works, Oxnard, CA Cyber Copy, CA 805-642-3292 5/23/2012

Project Description: Prebid Conference:

805-893-2661 x 2408, Fax#: 805-

Ref #

Blackstock South Neighborhood Resurfacing, Alley Improvement South of Colonia Road & Gloria Court Street Improvement

Bid Date:

Est:

Removal of the existing built-up roof system and installation of a new single-ply polyvinyl-chloride (PVC) roof system at the Torrence DMV Field Office. MAND May 1 @ 8am Addenda: 0

South Hall Lighting Upgrade, Bldg 528

Bid Date:

916-657-6972,

2:00 PM

Addenda:

0

Oxnard

805-385-7821

Spec No. Project Type: Public Est: PW12-02 The project consists of resurfacing Blackstock South Neighborhood streets; installation of 8 inch recycled water line in Justin Way; alley improvement south of Colonia Road; and street improvements of Gloria Court May 2 @ 9:30am Addenda: 0 Ref #

= New Plans Entered This Week 18


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Interested in a career in the building trades? There is a critical shortage of construction workers. Over 1 million new jobs will be created nationally in the next seven years, with 2,500 of them in Santa Barbara and Ventura in the next three years. California construction workers earn an average of $24 an hour and journey-level workers earn $70,000-plus a year!

Santa Barbara City College

Summer School 2012 CT 113 Roof Framing T/Th 6:00-9:00pm (8 weeks) Wake Center (Located by Turnpike/101) (Beg. 6/19/12)

CT 153 Electrical Mathematics W: 5:30-9:30pm Rod Bond Training Center, Buellton (Beg. 5/21/12)

19


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Projects Out to Bid

Santa Barbara Contractors Association

5/23/2012

Thursday, May 24, 2012 11-398 - Remove Existing Built-Up and install new PVC roofing system

Culiver City

Department of Motor Vehicles - Cindy Huynh 2415 First Avenue MS E-112, Sacramento, CA 95818 Fax#: 916-657-2387 Bid Date:

5/24/2012

Project Description:

Prebid Conference:

2:30 PM

Ref #

Project Type: Public

Simi Valley Department of Public Works, Simi Valley, CA 5/24/2012

Project Description:

Prebid Conference:

Est:

The Contractor agrees to provide to the Department of Motor Vehicles (DMV) all labor, tools, materials, and equipment necessary to remove the existing asbestos containing foam roof over a built-up roof system and install a new single-ply polyvinyl-chloride (PVC) roof system at the Culiver City DMV field office for the term of this agreement. The Contractor is responsible for field verifying all dimensions and existing site conditions pertinent to this agreement. MAND May 3 @ 8am Addenda: 0

FY2011-12 Major Street Rehabilitation Program: Cochran Street from Erringer Road to Sycamore Drive Bid Date:

916-657-6972,

3:30 PM

Ref #

Simi Valley

805-563-6891 Project Type: Public

Est:

The proposed improvements consist of placing asphalt concrete overlay of approximately 4,066 tons of asphalt rubber hotmix and 263 tons of asphalt base course. The work further includes cold milling 342,100 square feet of existing ashalt concrete paving, removal, and replacement of curb and gutter, sidewalk, traffic signing, and all appurtenant work. Addenda: 0

Construction of the 2011-2012 County Wide Preventative Maintenance Application of Scrub Seal and Micro-Surfacing

Santa Barbara

County of Santa Barbara - Transportation Engineering Dept 123 East Anapamu Street, Santa Barbara, CA 93101 568-3000 Bid Date:

5/24/2012

Project Description: Prebid Conference:

2:00 PM

805-

County Project Type: Public Est: Project No.: 820625 Repair of failed asphalt pavement plus application of scrub seal and micro-surfacing as part of annual surface treatment program. Addenda: 0 Ref #

Tuesday, May 29, 2012 Santa Ynez Apartments 200's Refurbishment

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - George Levinthal Facilities Management, Building 370, Santa Barbara, CA 93106 805-893-4493 Bid Date:

5/29/2012

Project Description:

Prebid Conference:

2:30 PM

805-893-2661 x 2205, Fax#:

FM120186L/ Project Type: Public Est: 986365 The Santa Ynez Apartments 200's consists of a total of 55, 1 and 2 bedroom apartment units, in 5 buildings with a total assignable square footage of 43,732 SF. The scope of work includes the demolition and removal of all furniture, floor coverings, kitchen and bathroom cabinets and fixtures, all kitchen appliances, and light fixtures in the kitchens and dining areas. New work will consist of new plumbing fixtures in the kitchens and bathrooms, new cabinets and countertops, new kitchen appliances, new floor coverings (carpeting to be furnished by Housing), new light fixtures, and painting. New furniture (furnished & installed by Housing) MAND May 14 @ 1:30pm Addenda: 0 Ref #

Harold Frank Hall Corridor Flooring Replacement, Building 556

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - Jennifer Hernandez, Santa Barbara, CA 805-893-2661 x 2214, Fax#: 805-893-4493 Bid Date:

5/29/2012

Project Description: Prebid Conference:

2:30 PM

FM120339S/ Project Type: Public Est: 211-35 1. Demolition and disposal of existing corridor/lobby flooring and base on all five building levels. Ref #

2. Furnish and install rolled linoleum goods with 6" base on all five building levels. MAND May 22 @ 1:30pm

Addenda:

1

5/23/2012

= New Plans Entered This Week 20


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Federal and California Certified Small Business

GEOTECHNICAL SERVICES

Soils Engineering Reports, Slope Stability Foundation Forensics, Liquefaction Analysis

ENVIRONMENTAL SERVICES Percolation Testing, Septic Fields Environmental Site Assessment

GEOLOGIC SERVICES

Engineering Geology Reports Fault and Landslide Investigation, Bluff Setback

SPECIAL INSPECTION

Welding, High Strength Bolt, Fireproofing Epoxy, Concrete, Masonry, URM Retrofit

CONSTRUCTION INSPECTION

         

Grading and Testing Observation, CalTrans Certified Footing and Foundation Observation

LABORATORY AND DRILLING SERVICES In-House Laboratory Testing, and Tract-Mounted CME Drill Rig

(805) 683-1848 Fax: 805.964.6653

precision-welding.net preweld@cox.net Lic. #559076

General Contractor CM-at-Risk Construction Management Frank Schipper Construction Co.

LiLicense ce n s e NNo. o. 7788005 88005

SBCA SBCABest BestHardscape Hardscape & & Landscape Landscape International Landscape Designer theYear Year- 2009 - 2009 International Landscape Designer ofofthe

Phone Phone (805) (805) 687-3569 687-3569 | gracedesignassociates.com gracedesignassociates.com

SERVING THE TRI-COUNTY AREA FOR 30 YEARS 610 E COTA STREET, SANTA BARBARA, CA 93103 T (805) 963-4359 â&#x20AC;˘ F (805) 963-1270 Lic# 436175 EMAIL: info@schipperconstruction.com www.schipperconstruction.com

21


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Projects Out to Bid

Santa Barbara Contractors Association

West Los Angeles Avenue Widening from Easy Street to the City's Public Services Center (PSC) Simi Valley Department of Public Works, Simi Valley, CA Bid Date:

5/29/2012

Project Description:

3:30 PM

Ref #

Spec No. SV12-18

5/23/2012

Simi Valley

805-563-6891 Project Type: Public

Est:

Schedule 1 (Roadway Widening) The proposed improvements consist of widening of West Los Angeles Avenue from Easy Street to the City's Public Services Center (PSC) 10 feet north and south of existing edge of pavement, including 117,328 s.f. of cold milling, grading, earthwork, installation of 305 l.f. of storm drain pipes, four catch basins, 6'x6' box culvert extension, 1,454 c.y. of pavement removal and unclassified excavation and 8,000 tons of asphalt concrete for base reconstruction and paving. The work also includes the construction of 9,500 s.f. of sidewalks, 3,250 l.f. of curb and gutter, tree removals and planting, adjustment of manhole and utility covers, replacement of traffic striping and singing and all appurtenant work. Schedule II (Fiber Optic Communication Line) The work will primarily consist of furnishing and installing equipment and materials for a complete and operational fiber optic communication system in a new conduit on West Los Angeles Avenue from Easy Street ot the City Maintenance Yard entrance, located at 500 West Los Angeles Avenue. Schedule III (Recycled Water Pipeline)

Prebid Conference:

The Recycled Water Pipeline work shall consist of furnishing and installing approximately 1,425 linear feet of pipeline including valves and fittings, trenching, concrete pavement removal, bedding, backfilling, testing and all necessary appurtenances to complete the work in accordance with Standard Plans, Specification, the Plans and Special Provisions. Addenda: 0

Wednesday, May 30, 2012 Wide Area Emergency Communication System Main Campus

Santa Barbara

UCSB - Telli Foster Facilities Management, Building 370, Santa Barbara, CA 93106 893-4493 Bid Date:

5/30/2012

Project Description: Prebid Conference:

2:30 PM

805-893-2661 x 2408, Fax#: 805-

FM120450S/ Project Type: Public Est: 987776 Provide expansion of Main Campus area emergency communication system including: additional control panels, "giant voice" speakers, rooftop supporting devices, interconnection with existing building fire alarm panels, new local emergency communication panels and interconnecting wiring. MAND May 15 @ 1:30pm Addenda: 0 Ref #

Thursday, May 31, 2012 Tactical Unmanned Air Systems (TUAS) Bid Date:

5/31/2012

Project Description:

Prebid Conference:

2:00 PM

Camp Roberts Ref #

Project Type: Public

Est:

Project Description: The project consist of constructing a new Tactical Unmanned Air Systems Facility at Camp Roberts, CA. The following divisions of work are part of this project: Div 3 â&#x20AC;&#x201C; Concrete, Div 4-Masonry, Div 5-Structural Steel Framing, Steel Decking, Cold-Formed Metal Framing, Metal Fabrication, Div 6-Rough Carpentry, Cabinets, Div 7-Water Repellents, Thermal Insulation, Foamed-in Place Masonry Wall Insulation, Metal Roof Panels, Insulated-Core Metal Wall Panels, Sheet Metal Flashing and Trim, Joint Sealants, Div 8-Hollow Metal Doors and Frames, Overhead Coiling Doors, Sound Control Door Assemblies, Aluminum Framed Entrances and Storefronts, Aluminum Windows, Door Hardware, Glazing, Div 9-Non-Structural Metal Framing, Gypsum Board, Tiling, Acoustical Ceiling, Resilient Base and Accessories, Tile Carpeting, Presentation Dry Erase Wallcovering, Exterior Painting, Interior Painting, High Performance Coatings, Div 10Signage, Toilet Compartments, Operable Partitions, Wall and Door protection, Toilet, Bath, Laundry Accessories, Fire Extinguisher Cabinets, Lockers, Div 12- Blinds, Entrance Floor Mats and Frames, Div 13 Metal Building System, Div 21 Portable Foam-Water Systems, Div 22- Plumbing. Div 23-Mechanical, Div 26-Electrical, Div 27Communication, Div 28-Fire Alarm, Div 31-Earthwork, Div 31- Concrete Paving, Chain Link Fence, Landscape, Div 33-Site Utilities Addenda: 0

= New Plans Entered This Week 22


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

PHONE (805) 965-1926

FAX (805) 963-6071

OSWALD J. DA ROS, INC. â&#x20AC;˘ MASONRY CONTRACTORS â&#x20AC;˘ Lic# 216916 MARBLE â&#x20AC;˘ GRANITE â&#x20AC;˘ STONES

PETER A DA ROS

976 Carrillo Road Santa Barbara, CA 93103

805-498-8350 â&#x20AC;&#x153;Waterproofing at itâ&#x20AC;&#x2122;s best, quality above the rest!â&#x20AC;?

P.O. Box 517 Santa Barbara, CA 93102 Phone 805-618-8648 Email tradart@cox.net www.tradartfoundation.org

Residential & Commercial Repairs, Re-Roofing and New Construction â&#x20AC;˘ â&#x20AC;˘ â&#x20AC;˘ â&#x20AC;˘ â&#x20AC;˘

Workers Comp Insurance General Liability Insurance All work done by company experts Locally owned and operated Free Estimates

www.augustroofing.com

CA Lic. B & C-39 786740

Serving Southern Santa Barbara County Appliances â&#x201D;&#x201A; Doors â&#x201D;&#x201A; Windows â&#x201D;&#x201A; Lighting â&#x201D;&#x201A; Tile â&#x201D;&#x201A; Cabinetsâ&#x201D;&#x201A; Hardware

Donate used build materials to the Habitat ReStore All proceeds go directly back to Habitat for Humanity 1RUWK1RSDO6W32%R[6DQWD%DUEDUD&$ 3KRQH  )$;  (PDLOLQIR#VDQWDEDUEDUDVWRQHFRP

Goleta ReStore 6725 Hollister Avenue, Goleta (between Los Carneros & Storke)

Tues. - Fri.: 12 pm - 5 pm Saturday: 9 am - 5 pm Phone: (805) 692-2226 www.sbhabitat.org

SBCA Member Since 1995

BROOK s SINCE 1975

QUALITY COATINGS

WaterProof Deck Coating Systems Concrete Restoration Resurfacing Restoration of integral colors & exposed aggregrate

966-5020

Visit us at brooksqc.com CSL 496582

23


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Projects Out to Bid

Santa Barbara Contractors Association

Buchanan Hall Room 1910 Lighting Renewal Project Bldg 573

5/23/2012

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - George Levinthal Facilities Management, Building 370, Santa Barbara, CA 93106 805-893-4493 Bid Date:

5/31/2012

Project Description:

Prebid Conference:

2:30 PM

FM120194S/ Project Type: Public Est: 101-83 The project consists of new lighting, lighting controls and slotted steel support system mounted below the existing ceiling of Room 1910. Perform selected demolition and abatement necessary to accomplish the work, and remove existing lighting fixtures. Ref #

Estimated Construction Cost: $140,000.00 MAND May 17 @ 1:30pm

Addenda:

Engineering Reserch Center Restoration Project, Building 997 Tri-County Blueprinting & Supply, CA Bid Date:

5/31/2012

Project Description: Prebid Conference:

805-893-2661 x 2205, Fax#:

2:30 PM

0

Santa Barbara

805-966-1701, Fax#: 805-966-9484

FM120313X/ 211-77 Estimated Construction Cost: $190,000.00 MAND May 17 @ 1:30 PM Ref #

Project Type: Public

New Emergency Generator, San Rafael Hall, Building 586

Est:

Addenda:

0

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - Roger Monte, Santa Barbara, CA 93106 805-893-2947 Bid Date:

5/31/2012

Project Description:

2:30 PM

FM120144S/ Project Type: Public Est: 293-44 Clear Site. Construct new chain-link fence with perimeter concrete curb and aggregate base, new concrete foundation pad, new emergency generator with fuel tank, and landscape irrigation. Demolish existing generator and associated piping and conduit. Ref #

Estimated Construction Cost: $158,334.00 Prebid Conference:

Addenda:

HSSB Exterior Painting, EIFS Repair and Caulking, Bldg 515

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - Joe Van Thyne Facilities Management, Building 439, Santa Barbara, CA 93106 Bid Date:

5/31/2012

Project Description:

2:30 PM

0

805-893-6137

FM120501S/ Project Type: Public Est: 980835 The exterior of the HSSB building to be cleaned, related EIFS repair completed, caulking removal and replacement where indicated and painting of complete exterior including handrails and associated accessories per the drawings and specifications. This work to be completed in phases to reduce the impact of the occupants of the building. Ref #

Estimated Construction Cost: $980,000.00 Prebid Conference:

Addenda:

Construction Of The El Embarcadero Enhancement Project Phase 2

0

Santa Barbara

County of Santa Barbara - Transportation Engineering Dept 123 East Anapamu Street, Santa Barbara, CA 93101 568-3000 Bid Date:

5/31/2012

Project Description:

Prebid Conference:

2:00 PM

805-

County Project Type: Public Est: Project No.: 310312R General Work Description: Removal and reconstruction of existing curb, gutter spandrel, cross gutter and sidewalks. Removal and reconstruction of roadway structural section, overlay, installation of concrete crosswalks and paint pavement striping and markings. Installation of conduits, pull boxes, and related items necessary for the installation of street lights. Removal and reconstruction of an existing storm drain system. Furnish and install King Palms and plant establishment. Addenda: 0 Ref #

= New Plans Entered This Week 24


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Douglas A. Harlow Agency Owner HARLOW INSURANCE AGENCY

Allstate Insurance Company 1215 De La Vina St, Suite A Santa Barbara, CA 93101

24-Hour Customer Service

Phone 800-350-3470 Phone 805-963-3470 ext 801 harlow@allstate.com CA Insurance License #0680121

www.allstateagencies.com/harlow

If you are an employer who wishes to obtain assistance from Cal/OSHA Consultation, or want to learn more about what services are available, you can do so by calling the toll-free assistance number.

1(800) 963-9424 If you want to arrange an on-site visit or obtain technical information, you can contact the Cal/OSHA Consultation area office nearest your workplace or you can email us at InfoCons@dir.ca.gov.

TILE TECHNIQUES, INC. J. SCOTT QUITTNER OWNER, LIC# 610873C-54

MAKE SURE YOU ARE IN COMPLAINCE wwwdir.ca.gov

PH/FX (805) 965.5331 DAYTIME CELL ( 8 0 5 ) 3 3 1 . 2 2 3 7 SANTA BARBARA,CA T 2 TIL E T E C H N I Q U E S@ C OX. NET

� � T 2 TI L ETEC HNI QU ES.CO M

25


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Projects Out to Bid

Santa Barbara Contractors Association

5/23/2012

Friday, June 01, 2012 Howard Residence - Dorie 805-377-0891

Santa Barbara

Dorie Pellegrin, CA 805-377-0891 Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 Bid Date:

6/1/2012

Project Description:

12:00 PM

805-962-9155

Project Type: Public

Ref #

Est:

New 9000 sq. ft. custom home, new detached garage, and new 1976 SF guest house on 5 acres. Project Contact: Dorie Pellegrin (805) 377-0891 e-mail doriepellegrin@gmail.com

Prebid Conference:

Addenda:

0

Tuesday, June 05, 2012 El Dorado Apartments Refurbishment, Bldg. 945

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - George Levinthal Facilities Management, Building 370, Santa Barbara, CA 93106 805-893-4493 Bid Date:

6/5/2012

Project Description:

Prebid Conference:

2:30 PM

805-893-2661 x 2205, Fax#:

FM120303L/ Project Type: Public Est: 986335 Interior refurbishment consisting of selective demolition, including limited asbestos abatement, new framing, doors, wallboard, painting, millwork, cabinets, sinks, countertops, ceramic tile, resilient flooring, toilet/bathroom accessories, shower pans, shower enclosures, kitchen appliances, ADA accessible upgrades, electrical, light fixtures, mechanical, plumbing, additional Sewer cleanouts and installation of University supplied carpet, and coordination of University provided furniture and window treatment in 50 apartment units in building 945 Ref #

Estimated Construction Cost: $1,725,000.00 MAND May 23 @ 1:30pm

Addenda:

0

Thursday, June 07, 2012 IFB 11-347 Reroofing project for Inglewood DMV Department of Motor Vehicles - Heidi Turpen, CA Bid Date:

6/7/2012

Project Description:

Prebid Conference:

2:00 PM

Inlewood 916-657-9807

Ref #

Project Type: Public

Est:

The Contractor agrees to provide to the Department of Motor Vehicles (DMV) all labor tools, materials, and equipment necessary to remove the existing foam roof system and install a new single-ply polyvinyl-chloride (pvc) roof system at Inglewood DMV field office for the term of this agreement. The Contractor is responsible for field verifying all dimensions and existing site conditions pertinent to this agreement. MAND May 17 @ 8am Addenda: 0

Friday, June 08, 2012 Events Center Locker Rooms Remodel, Bldg. 505

Santa Barbara

Tri-County Blueprinting & Supply, CA 805-966-1701, Fax#: 805-966-9484 UCSB - Deedee Ciancola UCSB - Design & Construction Services, Santa Barbara, CA 93160 Fax#: 805-893-4493 Bid Date:

6/8/2012

Project Description:

Prebid Conference:

2:30 PM

805-893-2661 x 2209,

FM120423S/ Project Type: Public Est: 077-84 Remodeling of the men's and women's locker rooms in the Events Center. The work will include demolition of the existing locker rooms, toilet and shower rooms, removal of debris and the reconstruction of the locker, toilet and shower rooms. Work will include architectural, electrical, plumbing and mechanical disciplines. Ref #

Estimated Construction Cost: $452,000.00 MAND May 29@ 1:30pm

Addenda:

0

= New Plans Entered This Week 26


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Projects Out to Bid

Santa Barbara Contractors Association

5/23/2012

Thursday, June 28, 2012 Betteravia Administration Building "D" Addition

Santa Maria

County of Santa Barbara, CA 805-568-2663 County of Santa Barbara - John Green, Santa Barbara, CA Bid Date:

6/28/2012

Project Description:

12:00 PM

805-934-6229

Project 8676 Project Type: Public Est: PH2 The Betteravia Administration Building “D” Addition project will construct a single story approximately 2,000 SF addition to the existing County Administration Building on the Betteravia Government Center Campus in Santa Maria, CA. Additionally, existing Board of Supervisors Hearing Room and Administration Building “D” will receive some minor tenant improvement efforts and site improvements. The project has an estimated construction value of $800,000.00 and estimated construction duration of 7 months. The project schedule will be extremely critical as this project utilizes federal RZEDB funding which includes a firm expiration date. The Contractor will be expected to maintain the project schedule and delivery dates as defined within the contract documents. Ref #

The new addition and renovation will include the following elements: • New lobby/ reception area, public restrooms, staff office and facilities support space. • The existing Building “D” renovation work consists of wall reconfiguration, entry reconfiguration, ceiling improvements, lighting improvements, and various room finishes including flooring. • Site Improvements including, concrete walkways, landscaped areas, ADA improvements to paved parking lot, utilities re-routing to support the new addition. • Additive Alternates including tenant improvement options and material upgrades.

Prebid Conference:

The County of Santa Barbara has determined that all General Contractors wishing to bid on the Betteravia Administration Building “D” Addition must be prequalified prior to submitting a bid on the project. The County’s competitive selection process will proceed in two steps: Step 1: The construction General Contractor pre-qualification phase. Step 2: Submittal of bids according to the requirements of the bid documents. Only those successfully qualified in step 1 will be allowed to participate in step 2. MAND June 7 Addenda: 0

Prebid Dhaliwal Residence - Bid Set

Camarillo

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 Ref # Project Description: Prebid Conference:

Est:

NEW ±18,000 S.F. HABITABLE RESIDENCE WITH TWO 4 CAR Addenda:

TISH NON VILLAGE COMMUNITY CENTER

0

Loleta Ref #

Project Description: Prebid Conference:

805-962-9155

Project Type: Public

Project Type: Public

Est:

31,167 sq. ft., 2 stories on 230,176 sq.ft. site Addenda:

1020 Placido

0

Santa Barbara

Housing Authority of the City of Santa Barbara - Hector Torres 808 Laguna Street, Santa Barbara, CA 93101 1060 Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 805-962-9155 Ref # Project Description:

Prebid Conference:

Project Type: Public

805-897-

Est:

Remodel of an (e) single family residence for a (n) detox facility with maximun 12 clients and on site staff. Exterior improvements: (n) accessible ramp and stairs, (n) van H/C parking space, (n) deck w/ associates ramps and stairs. (n) exterior wall finishes, (n) windows and doors. Interior improvements: remodel ground floor for H/C access, remodel restroom for accessiility, remodel den to create accessible bedroom, remodel kitchen for accessibility. Remodel for exiting and fire rated conditions due to change of occupancy. Addenda: 0

= New Plans Entered This Week 27


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

Projects Out to Bid

Santa Barbara Contractors Association Greyhound

Santa Barbara

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 Ref # Project Description:

5/23/2012

805-962-9155

Project Type: Public

Est:

FORMER USE: BICYCLE SALES SHOP. PROPOSED USE: SMALL MARKET THAT WILL ALSO SELL GREYHOUND TICKETS. PROPERTY OWNER: Redevelopment Agency of the City of Santa Barbara A.P.N.‘s: 033-010-11,-13,-14,-15; 033-041-12,-13; 033-042-1,-2,-3,-4,-12, -14,-15,-16,-17,-19; 033-075-12,-14. ADDRESS: 224 Chapala St. ZONING: HRC-2/SD-3 BLD: BLD2010-01798 LOT AREA: 2.21 acres GENERAL PLAN NEIGHBORHOOD: Downtown/Waterfront Lower State HIGH FIRE: No FLOOD ZONE: AH Zone AVG. SLOPE: 1% MAX BLDG. HEIGHT ALLOWED: 45’, 3-STORIES MAX BLDG HEIGHT: 20’, 1-STORY YARD REQUIREMENTS: FRONT YARD SETBACK: 10 FT < 15’ Bldg Hght, 20’ all others INTER. YARD SETBACK: 10 FT or 1/2 Bldg Hght (whichever greater) PARKING Parking Required:104 Spaces Parking Provided (existing): 158 (151 Spaces & 7 HC Spaces) Bicycle Parking (existing): 15 City Standard Posts

Prebid Conference:

Addenda:

Harper Residence

Thousand Oaks

Coast Reprographics 220 West Canon Perdido Street, Santa Barbara, CA 93101 Ref # Project Description: Prebid Conference:

0

805-962-9155

Project Type: Public

Est:

New Construction of House & Pool House Addenda:

0

= New Plans Entered This Week 28


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

City of Santa Barbara

Building & Safety Division CONSTRUCTION MONITOR'S REPORT for permits issued between:

PERMIT #

ADDRESS

BLD2009-01925 336 ANACAPA ST SANCHEZ FAMILY EXEMPTION TRUST 2/19 1133

ALAMEDA PADRE SERR

SANTA BARBARA CA 93103

5/7/2012

and

5/18/2012

ROLE

VAL. $

DATE ISSUED C/A-ENF

400,000

OWNER

5/8/2012

BALTADANO CONSTRUCTION INC 3003 CALLE NOGUERA SANTA BARBARA CA 93105

CON

805-687-2945

ENG

682-3887

ENG

899-3775

ARC

805-570-7056

GARY FROLENKO 23 HITCHCOCK WAY #104 SANTA BARBARA CA

JOHN MALONEY 156 W. ALAMAR AVE. #B SANTA BARBARA CA 93105

JOSE LUIS ESPARZA 232 ANACAPA ST SUITE 2C SANTA BARBARA CA 93101

BLD2010-02060 PAUL HERNADI

3757 STATE ST

3720 HITCHCOCK RANCH RD

SANTA BARBARA CA 93105

508,200

OWNER

C/A-ALTERATION

5/18/2012

CEARNAL ANDRULAITIS 521 1/2 STATE ST SANTA BARBARA CA 93101

ARC

ja@cearnal.com

ENG

805-687-3660

CON

963-6787

ENG

805-966-2877

STUDIO ENGINEERS, INC 103 VIA TUSA SANTA BARBARA CA 93105

YOUNG BROTHERS CONSTRUCTION* 9 ASHLEY AVENUE SANTA BARBARA CA 93103

BRIAN SMITH ENGINEERING 920 DE LA VINA ST. SANTA BARBARA CA 93101

BLD2011-02471 JOE RUTION

602 E SOLA ST

610 E VICTORIA ST

SANTA BARBARA CA 93103

250,000

OWNER

R/B-ALTERATION

5/8/2012

THOM HUME CONSULTING ENGINEERS

ENG

1336 ELLA ST SAN LUIS OBISPO CA 93401

BLD2011-02497 2215 CARLTON WAY TOWNSEND, CONSTANCE SOROS 2215

CARLTON WAY

SANTA BARBARA CA 93109

OWNER

thomhume@thengineers.com 75,000

R/B-ALTERATION

5/16/2012

29


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

PERMIT #

ADDRESS

ROLE

VAL. $

DATE ISSUED

AMY VON PROTZ, DESIGNER

DES

217 SAN NAPOLI DR. GOLETA CA 93117

BLD2012-00174 203 LADERA ST 203 LADERA STREET, LLC 720 SANTA BARBARA ST

SANTA BARBARA CA 93101

722-0381 35,000

OWNER

C/A-ALTERATION

5/10/2012

LITBEL CONSTRUCTION

CON

16426 KITTRIDGE ST APT 9 VAN NUYS CA 91406

BLD2012-00217 ESJ CENTERS 200

819 STATE ST A

E CARRILLO #200

SANTA BARBARA CA 93101

310-502-1177 68,000

OWNER

C/A-ALTERATION

5/7/2012

BRAUN & ASSOCIATES PO BOX 2004 BUELLTON CA 93427

ENG

688-5429

CON

963-4359

ARC

805-966-4034

FRANK SCHIPPER CONSTRUCTION 610 E. COTA ST SANTA BARBARA CA 93101

JAMES LECRON 109 OLIVER ROAD SANTA BARBARA CA 93109

BLD2012-00236 118 MOHAWK RD BRIDLEY FAMILY TRUST 118

MOHAWK RD

SANTA BARBARA CA 93109

50,000

OWNER

R/B-ADDITION

5/17/2012

D L GEORGE CONSTRUCTION** 3224 VISTA ARROYO SANTA BARBARA CA 93109

CON

563-9996

ENG

685-2506

KEVIN L VANDERVORT 147 CASTILIAN DR. #3 GOLETA CA 93117

BLD2012-00259 1001 CIMA LINDA LN VANACORE TRUST 5/5/03 25736

OAK MEADOW DR

VALENCIA CA 91355

200,000

OWNER

R/B-ALTERATION

5/17/2012

NELSON DANIELS 520 S SEPULVEDA BLVD STE 300 LOS ANGELES CA 90049

CON

(310) 476-8520

OWN

661-644-2232

VANACORE TRUST 5/5/03 25736

OAK MEADOW DR VALENCIA CA 91355

BLD2012-00266 1131 LOS PUEBLOS RD SCHEEFF, RICHARD W & VERA J FAMILY 5860

COMPASS DR

LOS ANGELES CA 90045

250,000

OWNER

R/C-ALTERATION

KIFER CONSTRUCTION *** 101 ARNOLD PLACE #C GOLETA CA 93117

CON

805-683-7745

ARC

805-569-0759

MURPHY & ASSOCIATES ARCHITECTS 3040 STATE ST SUITE C SANTA BARBARA CA 93105

30

5/9/2012


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

PERMIT #

ADDRESS

BLD2012-00424 1011 SAN ROQUE RD BORGATELLO DAVID J/LOUISE M TRUSTEE 1011

SAN ROQUE RD

SANTA BARBARA CA 93105

ROLE

VAL. $ 50,000

OWNER

DATE ISSUED R/B-ADDITION

5/8/2012

HOLEHOUSE CONST. & DESIGN 33 W. MICHELTORENA SANTA BARBARA CA 93101

CON

805-966-9662

ARC

569-1039

ENG

thomhume@thengineers.com

JAMES ZIMMERMAN 16 W MISSION ST STE H SANTA BARBARA CA 93101

THOM HUME CONSULTING ENGINEERS 1336 ELLA ST SAN LUIS OBISPO CA 93401

BLD2012-00431 MAYER, GARY L 655

2465 CALLE ALMONTE

S MENTOR AVE

PASADENA CA 91106

150,000

OWNER

R/B-ADDITION

5/14/2012

BRAUN & ASSOCIATES PO BOX 2004 BUELLTON CA 93427

ENG

688-7239

OWN

626-796-6937

CON

570-2528

ARC

805.687-2783

ENG

966-2259

MAYER, GARY & ELIZABETH 655 S. MENTOR AVE PASADENA CA 91106

NELSON CONSTRUCTION 248 OLIVER SANTA BARBARA CA 93109

BRYAN POLLARD 229 WEST MISSION ST SANTA BARBARA CA 93101

MIKE GONES 1518 BATH STREET SANTA BARBARA CA 93101

BLD2012-00463 243 COLEMAN AVE RONALD C HYATT & PATRICIA A HYATT R 243

COLEMAN AVE

SANTA BARBARA CA 93109

100,000

OWNER

R/B-ALTERATION

5/8/2012

AMY VON PONTZ

DES

217 SAN NAPOLI DR. GOLETA CA 93117

BLD2012-00545 819 CHAPALA ST PACIFIC TEL AND TEL COMPANY 104

NEW MONTGOMERY

SAN FRANCISCO CA 94105

805-685-9513 45,000

OWNER

C/B-ALTERATION

5/17/2012

ANGUS ASPHALT, INC 9959 PROSPECT AVE SANTEE CA 92071

CON

619-921-2952

OWN

(214) 464-5591

A T & T CALIFORNIA 2600 CAMINO RAMON ROOM 3E000 SAN RAMON CA 95483

BLD2012-00572 3647 SUNSET DR ADLER-KASSNER, LINDA 3647

SUNSET DR

SANTA BARBARA CA 93105

60,000

OWNER

R/B-ALTERATION

5/17/2012

LOREN SOLIN 5205 BARWICK ROAD SANTA BARBARA CA 93111

APL

966-1612

31


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

PERMIT #

ADDRESS

BLD2012-00629 510 N SALSIPUEDES ST CLAVERIA, BERTHA FAM TR 4/5/96 1106

COAST VILLAGE RD

SANTA BARBARA CA 93108

ROLE

VAL. $

50,000

OWNER

DATE ISSUED

R/A-SITE WORK

5/14/2012

TRAK ENVIRONMENTAL

CON

3637 B ARUNDELL CIRCLE VENTURA CA 93003

BLD2012-00769 21 CALLE CAPISTRANO JOHNSON, DOROTHEA M TRUST 1/8/03 21

CALLE CAPISTRANO

SANTA BARBARA CA 93105

650-5333 50,000

OWNER

R/A-ADDITION

5/9/2012

ERIC SWENUMSON

ARC

5521 SAN ARDO WAY S.B. CA 93111

BLD2012-00856 LONGO, DANA F 513

4119 SAN MARTIN WAY

E PEDREGOSA ST

SANTA BARBARA CA 93103

967-5507 R/A-PV

26,000

OWNER

5/16/2012

LUCERNE PACIFIC INC.

CON

12601 FLETCHER DR GARDEN GROVE CA 92840

BLD2012-00879 2550 TREASURE DR COVENANT RETIREMENT COMMUNITIES WES 2550

TREASURE DR

SANTA BARBARA CA 93105

714-715-3189 26,000

OWNER

C/OTC-SITE WORK

5/10/2012

ALLIED FENCE CO.

CON

549 N. 8TH ST. LOMPOC CA 93436

BLD2012-00893 2819 STATE STREET PERRY, RICHARD T LIVING TRUST PO BOX 3037

SANTA BARBARA CA 93130

966-3680 40,000

OWNER

C/OTC-REROOF

5/15/2012

AMES ROOFING

CON

1825 OLIVE DR. SANTA MARIA CA 93455

BLD2012-00912 2510 LAS POSITAS RD MCDERMOTT DONALD RAY 2510

LAS POSITAS RD

SANTA BARBARA CA 93105

260-4669 80,200

OWNER

R/A-PV

SUN PACIFIC SOLAR ELECTRIC ** 809 BOND AVE. #B S.B. CA 93103

32

CON

805-965-9292

5/16/2012


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

          

         

 



                 



 

   



    

                

          



   

   

   



                                                     

    

 

   



    

                 

        



 

  

   

 



   

33


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                                               

   



    

                  

            



  

   



    

                   

        



  

  

   



                                                               

   



    

                

                  

   

 

34



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

          

            

        



 



    

   

   



    

                      

            



   

   



    

                         

         



   

   

   



    

                

       



  

    

   



     

 

   

35


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

          

                 

        





 

   

   



          

             

       





  

  

   



    

                  

                     



  

   



    

              



               



  

   

 

36



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

          

                 

       



 

    

   



                                             

     

    



   

   



    

                     



          



  



 

   



                                               

   

 



   

37


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

          

                       

              



  



 

   



                                               

   



    

                    

      



  



   



         

               

        





  

   

   



       

 

38

   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

            

         

         



 



     

  

   



    

                         

        

       

 

  

   



                                                                    

   



    

                   

               



  

   



          

 

   

39


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

               

            

       



  



  

 



  

   



                                                                     

   



                                                                                            

   



             

            

 



               



  

   

 

40



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

             

            

 



               



  

   



    

                         

       

   

               



                                      

     

  

   



                                                        

      

   

   

 



   

41


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                                                      

   



                                               

      

  

   



                                        

    





   



                                                                                      

   

 

42



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

             

                  

       

    



   



     

   



    

                        

         



  



   



                                              

   



    

                        

       



  

  

   

 



   

43


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                           

    

       

     

   



                                                   

     

  

   

                        

    

       



    

  

   



                

                

         



 



      

  

   

 

44



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

          

                             

        



   

   



                                     

     

   



  

   



                                            

     

  

   



                                                            

 

 



   

45


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                                

     

   

   



                                        

     

   

   



  

              

 

        



  



   

   



                                

    

   

 

46



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                         

     

   



  

   



          

                  

      



    

   



          

                

       





 

  

   



    

                  

      



  



  

 

   



       

   

47


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                        

     

   



  

   



                                        

     

   



   

   



                                       

    





   



                                  

     

   



   

   

 

48



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                         

     

   



   

   



    

     



                          

    

   



         

           

 



       



   

   



                                        

    

   

 



   

49


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

         

       

                      

 



                      

 



                      

 



 



                     



   



    

       

   



    

       

   



    

                                    

   



    

       

   

 

50



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

         

                     



       

   



    

                     



       

   



    

                     



       

   



            

              

      





  



   



                                                              

   

 



   

51


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                                                        

 



                                     

    





   



               

                                            





  

   



                                          

    

   



        

 

52

   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

             

                 

      



  



   



                                            

    

   



    

           

        



 



 

  

   



                                   

     

  

   

 



   

53


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

  

                    

                                                                 



    

   



    

             

        



  

   



                                                                               



    

   



                                                                        

    

 

     



  

   

 

54



   


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

2012 ADVERTISING RATE SHEET 2012 Web Banner Advertising SIZE SBCA Website - 468 x 60 pixels SBCA Online Planroom - Level 1 - 234 x 60 pixels SBCA Online Planroom - Level 2 - 234 x 60 pixels SBCA Online Planroom - Level 3 - 468 x 60 pixels SBCA Online Planroom - Level 4 - 468 x 60 pixels SBCA Online Planroom - Level 5 - 221 x 26 pixels SBCA Online Planroom - Level 6 - 468 x 60 pixels SBCA Online Planroom - Level 7 - 221 x 125 pixels

BIANNUALLY $850  $425  $425  $600  $600  $600  $850  $850 

ANNUALLY $1500 $ 750 $ 750 $1000 $1000 $1000 $1500 $1500

       

RUN TIME - The Santa Barbara Contractors Association web site www.sbcontractors.org, had more than 2.7 million visitors in the year 2011. Ads run for 12 seconds each on every page of the site. All banner ads can link to your company website. The online planroom site runs per click in each zone, and a biannual report of ad views and ad clicks can and provided upon request. Levels are as follows: Level 1 - Planrooms, Bidding Projects, CSI Projects, Keyword Search Results, View & Print Project Docs, Level 2 - Planrooms, Bidding Projects, CSI Projects, Project Info Search, Install Software, Level 3 - Login Page, Level 4 - Login Page, Level 5 - Project Details, Level 6 - My Desk, CSI Code Setup, Keyword Spec Search, Daily Project Email Setup, Support Center, View Activity, Add to Bidders and Search Spec Book, Level 7 - Project Details.

2012 Newsletter Advertising SIZE Business Card - 3.5” x 2” 1/4 Page - 3.5” x 4.75” 1/2 Page - 7.375” x 4.75” Full Page - 7.375 x 10.25” Full Page - 7.375 x 10.25” - 1 Issue Special Insert

13 ISSUES $125 $175 $350 $500 $300

    

52 ISSUES $ 400 $ 650 $1200 $1750 (please provide run date)

   

DISTRIBUTION - The Santa Barbara Contractors Association Newsletter is distributed 52 times a year to over 600 subscribers. Copies are delivered electronically on Wednesdays. The Newsletter is provided free to association members. DEADLINES - Artwork must be received by Wednesday at noon for the following Wednesday’s publication. FORMAT OF ARTWORK - Artwork must be submitted in a digital format. Web Banner Ads can not be larger than 15KB. Artwork must be exact size. We accept PDF, TIFF, JPEG, GIF; InDesign & Illustrator files save as EPS & have fonts turned to outlines. SUBMISSION OF ARTWORK - Please deliver your artwork along with your payment to the SBCA. Send emails to info@sbcontractors.org or mail a CD to P.O. Box 23409, Santa Barbara, CA 93121 or deliver to the SBCA office at 914 A Santa Barbara Street, Santa Barbara, CA 93101. ARTWORK QUALITY - The SBCA is not responsible for the quality of ads that do not meet the above criteria. Advertisers must be current members of the SBCA. All advertisements are subject to approval by the SBCA Board of Directors. PAYMENT -

The SBCA accepts

Check

Visa

Master Card

American Express

Company Name

Contact Name

Signature

Date

Credit Card Number

Expiration Date

Security Code

Authorized Charge $

Santa Barbara Contractors Association P.O. Box 23409, Santa Barbara, CA 93121 805-884-1100 phone 805-884-1108 fax www.sbcontractors.org info@sbcontractors.org

55


SANTA BARBARA CONTRACTORS ASSOCIATION WEEKLY NEWSLETTER May 23, 2012

CONTRACTORS STATE ���������� ���� ���LICENSE BOARD DE PART M E NT O F C O N S U M E R A F FA I R S

ADVERTISING

Include your license number in anything that might be considered advertising. Donâ&#x20AC;&#x2122;t use false or misleading advertising, or advertise a price you donâ&#x20AC;&#x2122;t intend to honor. Donâ&#x20AC;&#x2122;t advertise to do work youâ&#x20AC;&#x2122;re not licensed to perform. Donâ&#x20AC;&#x2122;t advertise about bonding. When advertising asbestos removal services, be sure to include your asbestos certification and

ADVERTISING your business name. GUIDELINES Notify CSLB whenever you see registration numbers along with

��� ����������� advertising for an unlicensed contractor.

ď?Łď?Żď?Žď?´ď?˛ď?Ąď?Łď?´ď?Żď?˛ ď?´ď?Šď?°ď?ł ď?Śď?Żď?˛ Unlicensed Operators Like legitimate contractors, unlicensed operators sometimes use advertising to find new clients. Ads without license numbers or with numbers that are not issued by the CSLB are frequently used by the Board to identify sting targets. Include your license number in The CSLB and other enforcement agencies use two sections anything that7027.1 might considered of the lawâ&#x20AC;&#x201D;B&P Sections andbe7099. 10â&#x20AC;&#x201D;to take legal action against unlicensed contractors and, on advertising. occasion, against licensed contractors who advertise illegally. Donâ&#x20AC;&#x2122;toperator use false or misleading If an unlicensed advertises as a contractor in a

ADVERTISING

telephoneadvertising, directory, and iforanadvertise investigationadetermines price the entity doing the advertising is unlicensed, under B&P Section you intend to honor. 7099.10 (a), thedonâ&#x20AC;&#x2122;t Registrar can issue a citation for a fine or other civil penalty assessment. The citation will also include Donâ&#x20AC;&#x2122;t advertise to do work youâ&#x20AC;&#x2122;re an order of correction that requires: not licensed to perform. s 4HEVIOLATORTOCEASETHEUNLAWFULADVERTISINGAND s 4HETELEPHONECOMPANYTODISCONNECTSERVICETO Donâ&#x20AC;&#x2122;t advertise about bonding. any phone number in the unlawful ad and to not refer subsequent to any new number obtained by Whencalls advertising asbestos that person. If the order of correction isnâ&#x20AC;&#x2122;t made, the removal services, be sure to include Registrar can have the Public Utilities Commission disconnect phone service. yourthe asbestos certification and If you believe that an unlicensed contractor actively registration numbers alongis with working on a construction project, contact the CSLB your business at 1-800-321-CSLB (2752) or name. fill out a â&#x20AC;&#x153;SWIFT Lead Referralâ&#x20AC;? form, which is available on the CSLB Web Notify CSLB whenever you see site, www.cslb.ca.gov. advertising for an unlicensed contractor.

CONTRACTORS STATE LICENSE BOARD P.O. Box 26000 Sacramento, CA 95826-0026 1-800-321-CSLB (2752) www.cslb.ca.gov DEPARTMENT OF CONSUMER AFFAIRS 07/08

56


Board of Directors John Holehouse President Jack Martin 1st Vice President Paulo Sitolini 2nd Vice President Dan George Treasurer Peter Novak Parliamentarian Patrick Foster David James Brian Larkowski William Mace Mark Magid Aaron McKean Rodney Utt

Executive Director Karin Perissinotto karin@sbcontractors.org Administrative Assistant April Ford april@sbcontractors.org

Santa Barbara Contractors Association 914 A Santa Barbara Street P. O. Box 23409 Santa Barbara, CA 93121 805.884.1100 Phone 805.884.1108 Fax info@sbcontractors.org www.sbcontractors.org www.builtgreensb.org

The Santa Barbara Contractors Association Newsletter is published weekly by the Santa Barbara Contractors Association, Inc. Editorial and advertising offices are located at 914 A Santa Barbara Street, P.O. Box 23409, Santa Barbara, CA 93121. Office 805-8841100, Fax 805-884-1108, Email info@sbcontractors.org. A subscription is included in the annual membership dues. The newsletter is distributed to more than 600 local businesses and agencies. Articles appearing in this newsletter are presented as a public service and may not reflect the opinion of the publisher, its board of directors or its members. Please send comments regarding the newsletter to info@sbcontractors.org.

SBCA Weekly Newsletter 05/23/12  

SBCA Weekly Newsletter 05/23/12

Read more
Read more
Similar to
Popular now
Just for you