Page 127

Appendix 5.7-1

Traffic Analysis Data

HCM Signalized Intersection Capacity Analysis 3: Cll Matias Ledesma & Ave Ponce De Leon

Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS

11/11/2011

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

0 1900

1375 1900 4.0 0.95 1.00 1.00 3538 1.00 3538 0.92 1495 0 1498 NA 4

3 1900

0 1900

0 1900

0 1900

53 1900

0.92 0 0 0

0.92 0 0 0

0.92 28 0 0

0.92 58 0 0 Perm

6 1900 4.0 1.00 1.00 0.96 1783 0.79 1471 0.92 7 0 65 NA 6

0 1900

0.92 0 0 0

0 1900 4.0 1.00 0.86 1.00 1611 1.00 1611 0.92 0 15 13 NA 2

26 1900

0.92 3 0 0

13 1900 4.0 1.00 1.00 1.00 1863 1.00 1863 0.92 14 0 14 NA 8

0.92 0 0 0 Perm 4

Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group

Tren Liviano EIS 2011 Existing PM Peak Hour Consultant: Antonio Di Mambro, P.C. Subconsultant: Epsilon Associates, Inc.

25.3 25.3 0.51 4.0 3.0 1816 c0.42

25.3 25.3 0.51 4.0 3.0 956 0.01

16.0 16.0 0.32 4.0 3.0 523 0.01

0.82 10.1 1.00 3.2 13.3 B 13.3 B

0.01 5.9 1.00 0.0 5.9 A 5.9 A

0.03 11.3 1.00 0.1 11.4 B 11.4 B

13.2 0.56 49.3 54.7% 15

6

0.92 0 0 0

16.0 16.0 0.32 4.0 3.0 477 c0.04 0.14 11.8 1.00 0.6 12.4 B 12.4 B

HCM Level of Service

B

Sum of lost time (s) ICU Level of Service

8.0 A

Synchro 8 Report Page 33 Municipality of San Juan

Profile for Publicidad Tere Suarez

Appendix Vol 1 Part I.pdf  

Tren Liviano - Declaracion Impacto Ambiental

Appendix Vol 1 Part I.pdf  

Tren Liviano - Declaracion Impacto Ambiental

Advertisement