Page 102

Appendix 5.7-1

Traffic Analysis Data

HCM Signalized Intersection Capacity Analysis 25: Cll Jose Fidalgo Diaz & Ave Ponce De Leon

Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS

11/11/2011

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

0 1900

20 1900 5.0 1.00 1.00 1.00 1863 1.00 1863 0.92 22 0 22 NA 4

0 1900

100 1900

235 1900

352 1900 5.0 1.00 1.00 1.00 1863 1.00 1863 0.92 383 0 383 NA 2

0 1900

0.92 109 0 0 Perm

89 1900 5.0 1.00 1.00 0.95 1770 0.24 441 0.92 97 0 97 Perm

0 1900

0.92 0 0 0

829 1900 5.0 0.95 0.97 1.00 3417 0.92 3168 0.92 901 0 1265 NA 8

0.92 0 0 0

0.92 0 0 0

493 1900 5.0 1.00 1.00 1.00 1863 1.00 1863 0.92 536 0 536 NA 6

205 1900 5.0 1.00 0.85 1.00 1583 1.00 1583 0.92 223 0 223 Perm

0.92 0 0 0

Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group

Tren Liviano EIS 2011 Existing AM Peak Hour Consultant: Antonio Di Mambro, P.C. Subconsultant: Epsilon Associates, Inc.

8

27.2 27.2 0.46 5.0 3.0 856 0.01

0.92 255 0 0

27.2 27.2 0.46 5.0 3.0 1456 c0.40 0.87 14.4 1.00 5.8 20.2 C 20.2 C

0.03 8.8 1.00 0.0 8.8 A 8.8 A 20.6 0.83 59.2 80.0% 15

HCM Level of Service Sum of lost time (s) ICU Level of Service

2 22.0 22.0 0.37 5.0 3.0 164 0.22 0.59 15.0 1.00 14.7 29.7 C

22.0 22.0 0.37 5.0 3.0 692 0.21

22.0 22.0 0.37 5.0 3.0 692 c0.29

0.55 14.7 1.00 3.2 17.9 B 20.3 C

0.77 16.4 1.00 8.3 24.7 C 22.0 C

6 22.0 22.0 0.37 5.0 3.0 588 0.14 0.38 13.6 1.00 1.9 15.5 B

C 10.0 D

Synchro 8 Report Page 8 Municipality of San Juan

Profile for Publicidad Tere Suarez

Appendix Vol 1 Part I.pdf  

Tren Liviano - Declaracion Impacto Ambiental

Appendix Vol 1 Part I.pdf  

Tren Liviano - Declaracion Impacto Ambiental

Advertisement