Page 101

Appendix 5.7-1

Traffic Analysis Data

HCM Signalized Intersection Capacity Analysis 24: Cll Jose Fidalgo Diaz & Fernandez Juncos

Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS

11/11/2011

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

436 1900

483 1900 5.0 0.95 1.00 0.98 3443 0.82 2880 0.92 525 0 1032 NA 4

30 1900

0 1900

0 1900

0 1900

0 1900

0 1900

0.92 0 0 0

0.92 0 0 0

0.92 0 0 0

0.92 0 0 0

0.92 0 0 0

410 1900 5.0 1.00 1.00 0.95 1770 0.95 1770 0.92 446 0 446 Perm

79 1900 5.0 1.00 1.00 1.00 1863 1.00 1863 0.92 86 0 86 NA 6

0 1900

0.92 33 0 0

8 1900 5.0 1.00 1.00 1.00 1863 1.00 1863 0.92 9 0 9 NA 8

0.92 474 0 0 Perm 4

Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group

Tren Liviano EIS 2011 Existing AM Peak Hour Consultant: Antonio Di Mambro, P.C. Subconsultant: Epsilon Associates, Inc.

25.2 25.2 0.43 5.0 3.0 1245

6 23.1 23.1 0.40 5.0 3.0 701

25.2 25.2 0.43 5.0 3.0 805 0.00

c0.36 0.83 14.6 1.00 4.7 19.3 B 19.3 B

0.01 9.4 1.00 0.0 9.4 A 9.4 A 18.6 0.74 58.3 61.9% 15

HCM Level of Service Sum of lost time (s) ICU Level of Service

c0.25 0.64 14.2 1.00 4.4 18.6 B

0.0 A

0.92 0 0 0

23.1 23.1 0.40 5.0 3.0 738 0.05 0.12 11.1 1.00 0.3 11.5 B 17.4 B

B 10.0 B

Synchro 8 Report Page 7 Municipality of San Juan

Profile for Publicidad Tere Suarez

Appendix Vol 1 Part I.pdf  

Tren Liviano - Declaracion Impacto Ambiental

Appendix Vol 1 Part I.pdf  

Tren Liviano - Declaracion Impacto Ambiental

Advertisement