SPURTAN® SUREPLAY

SPURTAN® SUREPLAY

SAFETY SURFACE FOR CHILDREN PLAYGROUNDS

SAFETY SURFACE FOR CHILDREN PLAYGROUNDS

The ideal safety surface for children playgrounds with creative play, exercise play and climbing combinations. Spurtan ® Sureplay is a two layered in-situ sandwich system with a mimimum of 40 mm base of shock absorbing SBR rubber granule bound with elastic polyurethane Qualipur binder and a resilient surface layer of EPDM granule bound with premium, UV stabilized polyurethane.

APPLICATION GUIDE Advanced Polymer Technology Corporation has prepared this application guide to assist applicators in the construction of the permeable sandwich system for children playgrounds Spurtan ® Sureplay. Any references to consumptions are approximate values, which may vary due to particular site conditions and application techniques. The applicator should study all technical data of the required Qualipur ® products

Tested acc. to ASTM F 1292-04, EN 1177:2008.

and the particular installation procedures before starting any work.

Adjustable composition from 40 - 110 mm. Waterpermeable. Free drainage.

1. MIXING OF MATERIALS

UV stable and lightfast.

The Qualipur® products for the construction of Spurtan® Sureplay are 1 component.

Absorbs impacts from critical heights > 3,40 m. 2. POT LIFE The pot life of Qualipur® products is set at a temperature of 20 °C (68 °F). Pot life is dependent on temperature:

EPDM BOUND WITH UV STABILIZED PU BINDER QP 3480

Qualipur® 1030, 1230, 3939, 3480 > 2 hours SBR RUBBER BOUND WITH PU BINDER QP 3939

3. ASPHALT AND CONCRETE PREPARATION Prior to the synthetic surface application, the applicator must make sure that the substrate (asphalt or concrete) is perfectly dry, clean and free of any oil stains, grease

PU PRIMER QP 1030 OR 1230

or other bond inhibiting contaminants. Spalls, delamination, pot-holes, scaling, popouts and other defects in the sub-base must be repaired and any irregularity must be

ASPHALT OR CONCRETE

levelled. Asphalt, respectively concrete, pavement should be at least 28 days old and free of

120

sheeting with the duct tape. Leave the sheeting for approximately 30 minutes on the surface and check for condensation subsequently. Repeat the test until the sheeting remains dry. It is the responsibility of the asphalt/concrete contractor to provide a substrate that meets the requirements set forth for asphalt/concrete substrates for sports surfaces. Asphalt should be compacted to 95% or greater.

America

Europe / Africa / Middle East

Australia

Asia

Advanced Polymer Technology Corp. World Headquarters 109 Conica Lane PO Box 160 Harmony PA 16037 USA

APT Chemieprodukte GmbH Hansestrasse 73 38112 Braunschweig Germany

Advanced Polymer Technology Australasia Pty Ltd Factory 3 Dunlopillo Drive Dandenong Victoria 3175 Australia

APT Australasia Suite 504 5F Chinachem Leighton Plaza 29 Leighton Road Causeway Bay Hong Kong

Tel +1 724 452 1330 Fax +1 724 452 1703

Tel +49 531 2317 280 Fax +49 531 2317 2823

Tel +61 3 8792 8000 Fax +61 3 8792 8001

Tel +852 2882 3054 Fax +852 2882 3825

americas@advpolytech.com www.advpolytech.com

europe@advpolytech.com www.advpolytech.com

australia@advpolytech.com www.advpolytech.com

asia@advpolytech.com www.advpolytech.com

ADVANCED POLYMER TECHNOLOGY

clear sheeting on the ground with duct tape. Make sure to seal all of the edges of the

SPORT SURFACE SYSTEMS

ADVANCED POLYMER TECHNOLOGY

SPORT SURFACE SYSTEMS

any residual moisture. Excessive moisture levels can be determined by taping 1m² of

121


SPURTAN® SUREPLAY

5. COVERAGES Actual coverage rates are dependent on a variety of factors relative to the field application. The installer must assess the conditions prior to ordering material. Allowances must

SAFETY SURFACE FOR CHILDREN PLAYGROUNDS

be made for waste in mixing, pouring, and field conditions. 6. LIMITATIONS

APPLICATION GUIDE

Do not apply over damp or wet substrates. Do not apply to surfaces during the out-gassing of vapor.

4. INSTALLATION OF THE SYNTHETIC SURFACE

Minimum application and curing temperature 5°C.

A. PRIMER

Maximum substrate temperature 40°C.

All asphalt or concrete work has to be primed with the appropriate polyurethane

Minimum cure time for asphalt or concrete is 28 days.

primer, using a solvent-resistant fur roller or spray machine. Asphalt has to be primed

Maximum moisture content of substrate is 4%.

with Qualipur 1030, whereas concrete work needs to be primed with Qualipur 1230.

Substrate temperature must show a minimum of 4°C above the dew point.

The consumption rate is in either case approximately 0.15 – 0.2 kg/m². In case of

Do not apply during inclement weather or when it is anticipated.

®

®

retopping the existing synthetic surface needs to be primed with Qualipur 1230 at ®

approx. 0.08 kg/m². Prime only the area to be covered within a working day, in order

REMARKS

to ensure a good bond to the base. The primed area should be coated within 24 hours.

For more details, please refer to the technical data sheets of the particular products

Refer to Qualipur 1030 and 1230 technical data sheet for more details.

and/or contact our technical service.

®

B. BASE LAYER The base layer is composed of 1 - 4 mm recycled rubber granules (SBR) bound with Qualipur® 3939 polyurethane binder. The materials have to be mixed with a mixing machine or hand stirrer until the SBR is uniformly covered with polyurethane. Mixing ratio is:

Qualipur® 3939

10 %

SBR Rubber Granules

90 %

The prepared rubber and polyurethane mixture should be installed at approximately 35,75 kg/m² for a minimum 50 mm thickness, using a appropriate paving equipment for the installation of children playgrounds. Curing time is dependent on temperature and relative humidity. Use only APT recommended SBR. Refer to QUALIPUR 3939

122

The top layer is composed of 1 – 3 mm EPDM rubber granules bound with Qualipur® 3480 polyurethane binder. The materials have to be mixed with a mixing machine or hand stirrer until the EPDM is uniformly covered with polyurethane. Mixing ratio is:

Qualipur® 3480

20 %

EPDM Rubber Granules

80 %

The prepared rubber and polyurethane mixture should be installed at approximately 9.25 kg/m² for a minimum 8 mm thickness, using appropriate machinery for the installation of children playgrounds. Curing time is dependent on temperature and relative humidity. Use only APT recommended EPDM. Refer to Qualipur ® 3939 technical data sheet for more details.

ADVANCED POLYMER TECHNOLOGY

C. TOP LAYER

SPORT SURFACE SYSTEMS

ADVANCED POLYMER TECHNOLOGY

SPORT SURFACE SYSTEMS

technical data sheet for more details.

123


Application Guide