Issuu on Google+

Rui Han Registered Architect, LEED AP (BD+C) ruihan78@gmail.com • (480)518-0643 9018 Twin Trails Ct. San Diego, CA 92129 SKILLS AND QUALIFICATIONS • • • • • • • •

9 years’ (2 years overseas) comprehensive experience in cultural and educational projects on various scales Ability to assist or run all phases of a project from Feasibility Study to Construction Administration Great knowledge of building codes and regulations Strong Revit, AutoCAD experience; Proficiency in SketchUp, MS Office and Adobe Creative Suite Excellent written and verbal communication skills in both English and Chinese Ability to develop collaborative relationships across the firm, with clients and other key constituents Excellent analytical and problem solving skill and ability to multi-task Self-starter, motivated, takes initiative and is proactive in management of process and has strong work ethic

PROFESSIONAL CERTIFICATES

• Registered Architect in State of California and State of New York • LEED Professional Accreditation (BD+C)

EDUCATION Arizona State University (ASU) – Tempe, Arizona Master of Architecture (Final project won thesis award)

May 2005

Beijing Polytechnic University – Beijing, P.R.China Bachelor of Architecture

May 2001

EXPERIENCE Project Designer, HMC Architects - Sand Diego, CA •

Dec 2013-Mar 2014

Santa Fe Christian Schools Modernization and Improvement Plan – Solana Beach, CA (BIM project) − Project Designer in Schematic Design and Design Development phase − Design concepts development, Permit set production and Project scheduling − Coordination with client, general contractor and consultant teams

Project Architect, GKKWORKS - Sand Diego, CA

Feb 2013-Dec 2013

Mesa College Fitness Center – San Diego, CA (Design-Build BIM project under DSA review) − Project Architect/Designer in Construction Documents phase − Construction documents details/drawings production, Project scheduling and Cost control − Coordination with client, general contractor, consultant teams and trade partners • Pacific Ridge High School Middle School/Arts Building – Carlsbad, CA (Design-Assist BIM project) − Project Architect/Designer in Design Development phase − Design concepts development, Project scheduling and Cost control − Coordination with client, general contractor and consultant teams

Architect, Pfeiffer Partners Architects, Inc. - Los Angeles, CA/New York, NY

July 2005-Jan 2013

Theater/Concert Hall/Auditorium: • Chapman University Center for the Arts - Orange, CA (BIM project under construction) 2010-2012 − Project architect of the theater in Design Development and Construction Documentation phases − Developed theater design solutions by hand sketching, physical modeling and digital modeling − Produced presentation renderings/drawings and architectural documentation drawings for the theater − Coordinated with consultant teams; Selected building materials; Analyzed building codes − Worked on Feasibility Study including site analysis, regulation analysis and programming study


RUI HAN (480)518-0643 • SUNY Potsdam Performing Arts Building - Potsdam, NY (BIM project under construction) 2009-2010 − Project architect of the theater in Design Development and Construction Documentation phases − Developed theater design solutions by hand sketching, physical modeling and digital modeling − Produced presentation renderings/drawings and architectural documentation drawings for the theater − Coordinated with consultant teams; Selected building materials; Analyzed building codes − Assisted in Construction Administration phase for theater on answering RFIs • Cal Poly H.P. Davidson Music Center Renovation & Expansion - San Luis Obispo, CA 2006 − Worked on Feasibility Study including site analysis, regulation analysis and programming study − Produced presentation drawings and Feasibility and Programing Study Report Library/Education: • Seattle University Lemieux Library & Learning Commons - Seattle, WA (Completed 2010) 2008-2009 Library Journal: 2012 New Landmark Academic Library − Job Captain in Design Development and Construction Documentation phases − Developed building mass, building façade and interior space concept and details − Produced presentation renderings/drawings and architectural documentation drawings − Advised and coordinated sustainable design strategies − Assisted in Construction Administration phase inside of the building shell • Los Angeles Valley College Library & Academic Center - Valley Glen, CA (Completed 2012) 2005-2006 − Worked on Schematic Design, Design Development and Construction Document phases − Developed ceiling concept by hand sketching, physical modeling and digital modeling Historical: • Duke University Baldwin Auditorium Renovation & Expansion - Durham, NC (Under construction) 2009 − Worked on Feasibility Study including site analysis, regulation analysis and programming study − Developed auditorium renovation concept by hand sketching, physical modeling and digital modeling − Produced presentation drawings and Feasibility and Programing Study Report Student Housing: • UCLA Northwest Campus Housing Infill - Los Angeles, CA (BIM project completed 2012) 2011 − Assisted in Construction Administration phase on documenting RFIs/bulletins − Worked on punch list and back checks in field Master Plan: • Yale Univ.-National Univ. of Singapore New Liberal Arts Campus Master Plan – Singapore 2011 − Worked on cultural and environmental research − Worked on site analysis, regulation analysis and programming study Intern Architect, RTKL Associates Inc. Los Angeles, CA Summer 2004 • Renovation and Expansion of China National Museum International Competition - Beijing, China

• Venetian Hotel - Macau, China Architectural Designer, China Architecture Design & Research Group – Beijing, China • Fukang Master Plan and New City Center Area Planning - Xinjiang, China

2001-2003

• Huang Guoshu Resort Master Plan – Huang Guoshu, China

REFERENCE: Bill Murray,

Principal, Pfeiffer Partners bmurray@pfeifferpartners.com 213.624.2775 James Krueger, Associate Principal, HMC james.krueger@hmcarchitects.com 858.877.1746


Ruihan resume