SCHEMATIC DESIGN
1
PRE DESIGN
2
20%
OWNER
PROJECT EVALUATION • • • • • •
Provide project information Program Site Budget Schedule Project ideas / images / photos / examples / likes and dislikes • Sign contract
CONCEPTUAL DESIGN • • • • •
Provide site survey Respond to design proposals Research / homework Budget review Meet regularly
STEP 1
SITE
CLIENT INPUT
• Select materials / finishes / shopping • Select cabinets / kitchen style • Select equipment / appliances
V1
SITE ENGINEERING
V2
CLIENT INPUT
SITE
V1
V2
STRUCTURE
MATERIALS
QUESTIONNAIRE REVIEW RPA PROJECT PROPOSAL
SIGN OFF
V3
RPA PROJECT EVALUATION
STEP 2
MATERIALS & FINISHES
SITE
PRE-DESIGN QUESTIONNAIRE
STEP 3
20%
SIGN OFF
SIGN OFF PROJECT EVALUATION FORM
DESIGN DEVELOPMENT
V3
V3
PROPOSAL REVIEW
INTERIORS
WINDOWS
FINISHES
MEP
FINAL CONTRACT
ARCHITECT
SIGN CONTRACT
• • • • •
Provide project evaluation Provide project questionaire Provide project proposal Review project / project analysis Initial meetings
• • • • • • • • • • •
Site analysis (maybe breakdown of parts) Conceptual design Bubble diagram Site planning Preparing 3d design models for meeting review Revising design and review Sharing results Providing priliminary cost estimate Reviewing energy goals Finialing priliminary design Code compliance and zoning review
• Introducing construction systems • Floor, wall, roof assemblies • Providing window specifications / preliminary window quote • Engaging consultants included : septic, site engineer, structural engineer, energy, prefab, PHIUS • Distributation of design drawings to builders for comments and preliminary cost estimating. • Creatingowner selection information including : finishes, materials, kitchen, equipment, appliances, plumbing • Revise preliminary cost estimate
4-6 WEEKS
4-6 WEEKS
SCHEDULE & BUDGET 2-4 WEEKS
PRELIMINARY BUDGET
DESIGN BUDGET REVIEW
ESTIMATING PRELIMINARY COST ESTIMATE AND BUILDERS VALUE ENGINEERING
DESIGN PROCESS