Page 1

TheFusi on

2

Meteorologi calSt ati onandServi ceOperati ons Di egoRami rezI slands,Chi le Desi gnI ntent Conservethesi te,engagenaturalenergyandcelebratesthepowerofdesi gni nharmonywi thnature. I tsapproachi scollaborati veandi tmeetsthehi ghestrecogni zedst andardsofameteorologi calst ati on.

6 10

Proj ectDescri pti on ThestudentDesi gncompeti ti on’ sgui deli nesprovi deenoughbackgroundi nformati ontoenabletheteams todesi gnorselecttheHVAC systemforthegi venbui ldi ngortodesi gnasust ai nablebui ldi ngi mplementi ng ani ntegratedbui ldi ngdesi gnprocess( thearchi tecturalandbui ldi ngdesi gnforsust ai nabi li tyandi ts supporti ngmechani calandelectri calsystems)forthegi venprogram.

5

11 4 11 8

•I ntegrateandhi dethebui ldi ngi nthelandscape • Createtransi ti onalspaceswi ththeuseoflandscape • Blendthebui ldi ngwi thnaturalelementsthatarefoundi nsi te

1

• Createci rculati oncongruenttotopographycontourli nes •I mprovethefaçadearea • Allow forplentyofdayli ghti ntothei ndoorspace

9

12 11

8

Si tePlanKey 1.WaterDrai nage

7.Veget ati on

2.Sunori ent ati on

8.Parki ng

3.

9.Vehi cular/Pedestri anAccess

Fi reExi ts

4.GeoThermalHeati ng

10.GreenRoof

5.Bui ldi ngI ntegrati ngPV’ s

11.WaterCollector

6.Topography

12.Retenti onPond

13.Retenti onWall

7

9 1

13


Design Studio VI - Capstone  

Meteorological Stations and Operation Systems II Location: Diego Ramirez Islands, Chile II SCAD - Savannah College of Art and Design

Design Studio VI - Capstone  

Meteorological Stations and Operation Systems II Location: Diego Ramirez Islands, Chile II SCAD - Savannah College of Art and Design

Advertisement