RIB Group magazine for the construction and process industry and infrastructure management

research projec t s

major projec t s in 5d

iT WO in SMEs

is sue 37

int egrat ed solu tions

Feature

Researching the virtual construction site


transparent I contents

editorial 3  5D-Initiative Realisation of innovative technology

iTWO in medium-sized companies 20  Model for the entire construction process

 research 4  M efisto project

5D as new standard at WOLFF & MÜLLER

New potential for the combined use of planning and controlling information

10  M efisto project Magic of a vision

industry promotes 5d 24  Quality, cost certainty and adherence to schedule Engineering firm Pinkert: ”There’s no avoiding 5D”

5d major project 14  Max Bögl: company-wide switch to iTWO Multifunction hall ratiopharm arena Ulm

integrated solutions 26  b.i.m.m. GmbH is the construction manager of the virtual model Total construction process simulated

innovative 5d features 18  Fully up-to-date on economic conditions ATP: largest project developer and

Page 16

on PC

single user plans digital 30  W hy 2D planning is a waste of time

integral planner in Europe decides

With iTWO Detlev Kraneis saves 50%

in favour of RIB

in time

When building the ratiopharm arena in Ulm Max Bögl used a 5D-ERP solution based on three-dimensional construction models (BIM). Photo: Duckek, company group Max Bögl

Page 26

With the help of the 5D constrcution model b.i.m.m. GmbH can precisely forecast how the process on the construction site will work. Here a visualisation for a hospital project. Animation: Martin Taurer

2

transparent 37/2012


transparent I editorial

Editorial

Published by

Dear Reader,

RIB Limited Suite 1207, 12/F, ICBC Tower 3 Garden Road Hong Kong China

The process-oriented 5D simulation technology creates new and innovative basic conditions and opportunities for the construction industry. In the 5D work method common building information modeling (BIM) procedures are supplemented with central information on the construction process and information from all life phases of a construction project. The technology, which has already been successfully introduced into other industrial sectors, is now being used increasingly in the construction industry. The goal is to create a continuous digital chain from planning and construction to the operation of construction works. In this way different action alternatives can already be quickly evaluated in the early project phases with regard to their effects on costs, dates and quality.

RIB Software AG Vaihinger Straße 151 70567 Stuttgart Germany

www.rib-software.com info@rib-software.com Managing Editor Verena Mikeleit Manager Corporate Communications Realisation VERDURE www.verdure.de Photos: Title: WED Wiener Entwicklungsgesellschaft für den Donauraum AG Circulation: 2.500

The 5D initiative is a consortium of five leading European and Arabian construction companies that work to a great extent with digital 5D construction models. The 5D initiative was established by the construction companies MAX BÖGL, ZÜBLIN / STRABAG, CCC, BAM and BALLAST NEDAM. Our goal is to create general construction industry requirements for the realisation of innovative technology by hardware and software companies. The potential of 5D technology will be brought to the attention of practitioners in the construction industry at the first international 5D conference in Constance on 21 and 22 May. This event of the Constance University of Applied Sciences will assemble renowned construction industry representatives from around the world, who will demonstrate their practical experience in this context. We will support this event together with the sponsors PERI GmbH, RIB Software AG and Trimble Ltd.

Online: www.rib-software.com/en/transparent transparent is the magazine of RIB Software AG and its subsidiaries. Its aim is to showcase software solutions for remarkable design, engineering and construction projects around the world as well as providing practical ideas for software users. Information: If you would like to feature your project in transparent, or require further information on any of our featured projects or articles, contact Verena Mikeleit on +49 711 7873-369 or via mail: transparent@rib-software.com. No part of this magazine may be reproduced in whole or part without permission from the publishers.

We hope you enjoy your reading

Konstantinos Kessoudis Chair of the 5D Initiative

transparent 37/2012

3


mefisto-project I research

M.Sc. Sven-Eric Schapke, Institut für Bauinformatik, Technische Universität Dresden Dr.-Ing. Christoph Pflug, Max Bögl

Multi-models: New potentials for the combined use of planning and controlling information Mefisto is a lead project in the research program ”IKT 2020 – software systems and knowledge technologies” of the German Federal Ministry of Education and Research (BMBF). The goal of the project is the development of a Management Information System for partnering-based, process-driven and risk-controlled construction planning and management. The project presents software solutions to combine current planning and controlling information in so-called multi-models. These multi-models allow for the transparent representation of the necessary construction tasks, for more holistic analyses of the project performance and risks as well as for a better management of the collaboration processes on a construction project.

Mefisto: Combining design, engineering and management models across boundaries of corporations, AEC/FM disciplines and organisational hierarchies.

n Starting point for the developments in Mefisto are

as well as to simulate and analyse the consequences of

the design, engineering and management models

design and management decisions.

used in construction planning and management today.

4

Combining these models across the boundaries of

By contrast with the building-centric integration

corporations, AEC/FM disciplines and organisational

approaches of ”Building Information Modeling,” in

hierarchies allows for the flexible integration of project

Mefisto the different application models such as 3D

information to better evaluate the current project plans

building models, bills of quantities, time schedules

transparent 37/2012


mefisto-project I research

Utilisation of application models in hierarchic organisations of owners and contractors.

and quantity models are regarded as equivalent.

• Information logistics: the Mefisto platform defines a

Furthermore, it is assumed that for a long time these

standard business logic for the use of multi-models

application models will be created separately with

to manage the collaboration processes for creating

specialised software applications and stored locally

and utilising application models as well as the

with the different project partners. Consequently, the

corresponding access rights.

developments of the Mefisto project concentrate on Combining engineering and management models

mediating technologies in three areas:

The basic idea of a multi-model is to combine containers:

selected engineering and management models in a

multi-models consist of multiple interlinked application

single information resource. Within the resource the

models that can be compiled and evaluated with

application models are bound together by link-models

specialised nD-software applications and that can be

that explicitly specify the interdependencies among

exchanged using multi-model containers.

the models interlinking associated model elements.

• Multi-models

and

multi-model

The result is a consistent multi-model that reflects a • Mefisto platform: on the Mefisto platform the

certain project status and view on the overall project

software applications of the project participants

information. It provides a sound basis to evaluate the

are connected via Web Service interfaces and the

current project situation as well as to further elaborate,

coordinated exchange of the multi-model containers

simulate and analyse new design and construction

is supported by central platform services.

alternatives.

transparent 37/2012

5


mefisto-project I research

Data exchange using Multi-Model Containers For the exchange of multi-models among different project participants and software applications a new exchange format named the multi-model container was developed. The container only defines a superstructure to encapsulate different kinds of application models and corresponding link models. Within the container the application models are treated as independent information resources with their own application domain, data schema and data formalisation. This way, the multi-model container allows for the flexible utilisation of established file formats, such as the IFC* standard for 3D building models and GAEB** DA XML for specification models using bills of quantities. In addition, in Mefisto a series of supplements to existing data standards and several new data schemas were specified to allow for the exchange of e.g. construction site models, cost models, organisation models and risk

Bidding documents in a multi-model container.

models. A multi-model for preparing a bid proposal may for example comprise: (1) a 3D building model and (2) calculated quantities deduced from its elements. These can be interlinked with the items in (3) a bill of quantities and (4) a corresponding cost calculation as well as with (5) the activities of a time schedule. With such a multi-model different aspects of the required construction tasks and supporting measures can be represented

more

transparently.

Particularly,

the

interactive visualisation of information from different application models in combination with the 3D building allows for the user to more intuitively access, understand and evaluate the contained project information. To support the combination and interlinking of

Principle structure of a multi-model container.

application models in consistent multi-models, the software applications on the Mefisto platform are

On the Mefisto platform the multi-model container is

supplemented

modeling,

realised by a collection of data files that are exchanged

visualisation and analyses technologies. The developed

within a compressed archive file. In addition to the

components first allow the user to systematically

application models and link models, the container

inspect the interdependent applications models within

comprises a XML-based description of the container

a multi-model from different discipline perspectives

content. It provides metadata on the subjects, detailing

and on different levels of detail. Second, they provide

and data format as well as the contributors for each of

for the navigation of the overall information space

the contained models. On the one hand, this metadata

of interdependent application models within the

supports the administration, retrieval and utilisation of

multi-models on a construction project. Furthermore,

the application models throughout the project. On the

rule-based methods are applied: on the one hand to

other hand, they can also be used to define multi-model

automatically interlink and complement application

templates that prescribe the requirements regarding

models and on the other hand to filter interrelated

content and formalisations of application and link

project information from a multi-model to be

models yet to be produced.

with

newly

developed

translated, aggregated or otherwise transformed for further use in adjacent areas of construction planning

Project collaboration with multi-models

and management.

In their entirety the multi-models on a construction project open up a multi-dimensional information space of interdependent application models that can be

6

transparent 37/2012


mefisto-project I research

independently processed by the project participants.

multi-model-based

collaboration

processes.

The

Each participant has the opportunity to produce new

business logic of the Mefisto-Platform is first of all

application models on his/her own responsibility and

defined by general business process models, called

interlink them with existing models. Depending on

Reference Process Modules. Integrating multi-model

the situation these newly created multi-models can be

templates, these process models formally specify the

maintained locally or published project-wide as a basis

requirements for the different planning and controlling

for further planning and controlling tasks. In comparison

models to be produced. On a particular construction

to the often pursued integration of project information

project these reference processes can be customised

in central project databases or product model servers,

and interlinked with project schedules as well as

this approach distributed model-based collaboration

reused for the instantiation of respective workflows.

represents a paradigm shift.

Furthermore, the multi-model container is also used for workflow coordination: on the one hand planning

In the Mefisto project various software components

and controlling tasks can be assigned to the participants

(MM plug-ins) have been developed for the local

using multi-model templates and on the other hand the

creation and analysis of the multi-models: on the one

tasks results can be delivered in a corresponding result

hand for existing specialised software applications

container.

such as iTWO (RIB Software AG), GRANID (gibGreiner GmbH) and SolidWorks (SolidWorks GmbH) and

Potentials for the application of multi-models

on the other hand for new analytical tools like the

Overall the research project Mefisto elaborates a variety

SiteSimEditor (Ruhr-Universit채t Bochum) and the

of collaboration methods and technical solutions

M2A2 Multi-Model Assembly and Analysing Platform

for multi-model-based construction planning and

(Technische Universit채t Dresden).

management. Their potential applications and benefits are investigated in several demonstrations scenarios by the contractors and the project management company on the project.

Software systems on the Mefisto-Platform.

For the project-wide use of multi-models the Mefisto platform provides central platform services for the

Filtering model views and systems from a building model.

coordination of collaboration processes (information logistics) as well as for the filtering and transformation the multi-models (multi-model management). The information logistics of the Mefisto-Platform is realised by a set of platform services for managing platform users and multi-models. Via these services, project

participants

can

publish

and

retrieve

multi-model containers from their local software applications. Moreover, a central workflow service allows for assigning planning and controlling tasks to the different project participants as well as for delivering the respective results. Various process management technologies are applied to support the planning and coordination of the

transparent 37/2012

Interlinking coarse-grained and fine-grained project schedules, M2A2 Multi-Model Assembly and Analysing Platform.   (TU Dresden)

7


mefisto-project I research

The methods and tools developed for the interlinking and the combined processing of application models first of all provide for managing the interdependencies among disparate application models. Of particular significance for the identification and maintenance of these interdependencies are filtering methods to extract discipline- or tasks-specific sub-models as well as visualisation methods to interactively inspect and navigate the combined application models. New

potentials

for

the

effective

utilisation

of

model-based project information are also offered by the procedures and tools to build supplementary

Business Process Model: Construction bidding with multi足model containers.

simulation and analyses models. Based on the

8

interlinked application models simulation models of

Finally,

the construction processes and the project risks can

management offer the basis for realising (multi-)model

be generated much more efficiently. Furthermore, the

based collaboration in construction practice. Prerequisite

multi-models can also be used to conduct geometrical

for the effective application of multi-models are

and kinematic analyses of the production processes on

harmonised collaboration processes and detailed

the construction site as demonstrated in the following

agreements on their content and form. In Mefisto

article by Thomas Hauber.

detailed multi-model templates and reference process

the

procedures

and

tools

for

process

transparent 37/2012


mefisto-project I research

Multi-model container of Mefisto-High-Rise, M2A2 Multi-Model Assembly and Analysing Platform. 

(TU Dresden)

Multi-model container of Mefisto-High-Rise, GRANID  (gibGreiner GmbH)

Multi-model container of Mefisto-High-Rise, iTWO  (RIB Software AG)

modules are first of all developed for the collaboration

*IFC (Industry Foundation Classes) is a standard

processes between owners and contractors, e.g.

conceived and certified by buildingSMART e.V. for the

for construction bidding and construction progress

exchange of building information models (BIM). Further

reporting as well as for change management. The

information can be found at: www.buildingsmart.de.

elaborated demonstration scenarios have shown that these reference processes provide a good basis to

**GAEB stands for Joint Committee for Electronics in

plan and coordinate the technical and organisational

Construction. The GAEB promotes the application of

interfaces of a project as well as for realising the

electronic data processing in construction based on a

corresponding software systems.

common language of all stakeholders involved.

Acknowledgement

GAEB DA XML is intended to establish a common

The research described in this paper was enabled by the

standard for construction information exchanged

financial support of the German Ministry of Education

during construction bidding, contracting and invoicing

and Research, Department of ICT under contract

as well as during construction execution. Further

no. 01|A09001A, which is gratefully acknowledged.

information can be found at: www.gaeb.de.

n

Moreover, the authors would like point out that the results presented have been developed in collaboration with ten additional project partners from research, the software industry and the construction industry. Further information can be found at: www.mefisto-bau.de.

transparent 37/2012

9


mefisto-project I research

Dipl.-Ing. (FH) Thomas Hauber, Max Bögl

The magic of a new vision The team of the Mefisto research project researches the virtual construction site

Virtual construction site with cranes, concrete distributor, wind and fall protection.

n The further development of all instruments for

transparency to the construction site geometry and

construction site planning is decisive

construction processes.

All of the partners involved in a construction project are confronted by a steady increase in complex problems.

The solution: supplement of the construction model

The problem solution is in addition complicated by

with construction machinery models

unclear connections on the construction site. To keep

The virtual construction site is the consistent further

pace with these problems, the consistent further

development of the ”BIM” and was expedited with

development of all instruments for construction site

passion and determination. The decisive step on the

planning and controlling are of decisive importance.

way to a construction site model is supplementing the construction model with models of the construction

10

The goal: realistic models of the construction site for

machinery required and infrastructure facilities. On the

meaningful investigations

basis of the multimodel system, the construction site

After the use of building information models had

can be described by various interdependent specialist

become established in many areas, it appeared in

models that are independent of each other. Individual

principle possible to expand the models of the building

elements of the construction site were reproduced

with a virtual construction site environment. Our

from particular perspectives. In the centre is first the

idea of a virtual construction site environment was

construction plot, supplemented by the infrastructure

intended to be modeled as realistically as possible on

of the construction site and equipment with its

the future construction site to introduce comprehensive

dimensions, movement possibilities, performance and

transparent 37/2012


mefisto-project I research

cost key data. Ideally, information from other specialist models, such as process models and bills of quantities, can also be included. Depending on what aspects are focused on, various models can be linked as a suitable multimodel. As a whole the investigations have shown that the virtual construction site is perfectly suitable for the construction site planning. Modeling process - overview All general components of the construction site planning were selected from the newly created

construction

machinery

library

and the construction site layout planned in the CAD development environment SolidWorks. The customary application area of SolidWorks is mechanical engineering. Consequently, numerous adaptations were

Virtual construction site of a tower block with work platforms and construction machinery.

required. The design of the construction site model was then exported via the newly developed CPIXML interface in RIB iTWO. The publication and calculation of the configured construction site model occurred on the project and information platform RIB iTWO. The data exchange between the project partners occurred via standardised multimodel containers. Modeling procedure - example In the example of the tower block a wind and fall protection installation is used as the central safety module. The individual components of the wind and fall protection installation were selected from the newly created construction machinery library. The

Representation and calculation of construction site and construction machinery in RIB iTWO.

selected elemental model is equipped with all important information, such as the weight, materials used, the recommended assembly process and the valid assembly tolerances. Fast adaptation of the model geometry to the specific use conditions is possible via the configuration rules. Realistic movement processes of the construction machinery are ensured via the kinematic constraints. If one considers the cranes, the estimate of the range required and the lifting load capacity

transparent 37/2012

Publication for all project partners – RIB iTWO as project platform.

11


mefisto-project I research

needed produce the crane types possible. The hook height intended reveals the number of tower pieces required. Together with the suspension or base anchoring, all components are adopted from the library and the crane assembled and configured. Finally the construction model is consistently supplemented with all cranes, scaffolding and concrete pumps needed. This process adheres to defined rules, which evaluate the location and height coordinates and provide the basic construction site layout as a result. Investigations on the construction site model: visualisation and testing of construction viability The

three

dimensionally

visualised

constrcution site model offers a good idea of the planned construction task and the planned construction site installation. The configuration of the extremely demanding formwork systems, like an automated lifting raise platform, is in general possible. The number of climbing machines, the lifting process and spatial conditions on the �production island� can be subjected to a conceptual check. Collision check and movement analysis As a result of a considered visualisation of the construction site and emphasis of potential collisions, the decisive overview can be obtained. All crane models used have the specific movement potential of the reproduced originals. In this way investigations on lifting, turning and trolley movement of the service loads can be carried out. Determination of the equipment performance Although every construction project is unique,

many

production

processes

are similar: the virtual construction site can

describe

the

special

production

process through the interaction between construction elements, the construction machinery

used

and

the

workforce

involved. The investigation of the material flows required serves the improvement of the supply security. For example, the consideration of the stationary concrete pump is significant: the pump performance Construction process analysis

12

of the concrete pump in this case does not

Analysis of pump output: pressure head and pipeline length.

transparent 37/2012


mefisto-project I research

correspond to the standard performance,

Analysis of construction processes

since the concrete has to be pumped to the

The analysis of a construction process as

top floors of the tower block. The pump

interaction between construction work,

performance is reduced by the hydrostatic

people, material and equipment provides

pressure head and by the internal friction

significant data on the effort involved

of

in the production processes, suitable for

The

the

unusually

construction

long site

delivery

model

line.

provides

subsequent simulations.

information on the planned concrete pump, the standard pump performance, the exact

Conclusion

length of the delivery line with the number

The virtual construction site describes our

of pipe elbows and the actual hydrostatic

idea of an effective instrument for modern

pressure head. With this information the

construction site planning. Our vision of

pump performance to be expected can be

the new tool is a realistic multimodel of the

determined under real construction site

entire planned construction site with all of

conditions. The pump output determines

its components and properties: a virtual,

the specific manufacturing duration for

three-dimensional construction site model.

the proper processing of the concrete

To allow this vision to be realised all conditions

transported. (see following page).

which characterise the construction site should be recorded as precisely as necessary and the tried-and-tested traditions and

Investigation of transport processes the

methods in the construction site planning

implementation of the formwork across all

taken up and further developed. The

deployment locations. For this purpose it

virtual construction site will only become a

is necessary to concentrate the formwork

meaningful tool for supporting and securing

as transport units. The path from stripping

strategic decisions through a meaningful

the formwork via cleaning to the next use

analysis of geometry, crane movements and

is reproduced with typified transport units.

production processes in the hands of creative

This results in a geometric check of the

engineers. Conceived in this manner, we

transport routes and crane conveyance.

expect a noticeable increase in planning

An analysis of the scheduling produces all

security. 

Another

example:

ensuring

n

components that are to be produced in a particular period. In this example the analysis of the quantities was carried out based on a model on the project platform RIB iTWO.

Geometric check of the transport routes of a floor formwork system.

transparent 37/2012

1. Rotary tower crane in RIB iTWO 2. Construction process analysis 3. Material flows in RIB iTWO 4. Hoisting and assembly process 5. Vision of construction site planning

13


5d major project I max bögl

Starting Out Into the Future Max Bögl Builds Multi-Purpose Hall Using 5D Construction Models

When building the ratiopharm arena in Ulm Max Bögl used a 5D-ERP solution based on three-dimensional construction

n One of the 5D projects of Max Bögl Group is the

after

multi-purpose hall rationpharm arena in Ulm. The

ratiopharm, which sponsors the Ulm basketball team

the

Ulm-based

pharmaceutical

company

PPP project is one of many construction projects for

of the same name. The hall was developed via a

which the Neumarkt-based construction company

reception area on the ground floor with access to the

used the 5D ERP solution iTWO from RIB based on

upper floor. This is also where the boxes are situated,

three-dimensional construction models (BIM). The

which can be used as separate venues. An adjacent

company strives to be a step ahead of the competition

250-space multi-storey car park and a parking lot

in the area of innovative construction. This demands

for another 750 cars completed the project. The hall

active rethinking, exact process analysis and, most of

was realised as a PPP project by the cities of Neu-Ulm

all, a high level of commitment of the staff. According

and Ulm in cooperation with the Max Bögl Group.

to Max Bögl, the key to success is company-wide

Gerhard Hupfer, Manager of Building Construction

process transparency.

at Max Bögl, shook hands formally with the Lord Mayors of the two cities as well as the manager of the

New Arena for Ulm’s Basketball Team

sponsor ratiopharm at the groundbreaking ceremony

National league basketball matches, live concerts,

in July 2010.

shows and cultural events: The Swabian cathedral

14

city of Ulm partnered with the city of Neu-Ulm in

5D Software System

Bavaria in January 2010 to commission the building

All in all, modern technology played a key role in this

of a new multi-purpose hall on the Volksfestplatz

project. Since 2011, the Neumarkt Group Max Bögl has

in Neu-Ulm. Max Bögl, Germany’s largest privately

productively worked with RIB‘s model-based project

owned construction company, was responsible for the

management solution iTWO. As one of the founding

planning, construction and operation. This prestigious

members of the 5D Initiative , Max Bögl is regarded

new building, which seats 9,000 spectators, costed

as one of the most innovative representatives of

the two cities around 28 million euros. It was named

the European construction industry and already

transparent 37/2012


5d major project I max bögl

models (BIM).

Animation: ColorPoint ®

has several years of intensive experience in digital

three-dimensional

engineering

The

modern engineering and construction methods have

RIB solution proved its practical relevance in the

already been tested for the carcassing work of the DC

realisation of the ratiopharm arena in Ulm.

Tower in Vienna – a high-rise building with 61 floors

and

construction

processes.

construction

model.

These

and a four-storey underground car park. The future Group-wide Changeover

potential of this new work method, a preliminary

This project is one of several selected large-scale

end-to-end simulation of construction time, cost and

5D projects for which the Neumarkt construction

a collision check of design data with BIM information

company used the new quantity surveying method,

from the structural plans and the mechanical

which bases processes and cost estimation on a

electrical plumbing, is already being thoroughly analysed. On the whole, Germany’s largest privately owned construction company has gradually been managing more and more projects with the aid of construction models in recent years. 5D Project Management as Basis for Innovation The Upper Palatinate company is aiming to be the quality and innovation leader throughout Europe. True to its corporate claim ”Progress is built on ideas”, the company intends to set the tone in the construction industry. These ideas are not only

Digital planning and construction was also used in the shell of the Viennese DC Towers.  Screenshot: Max Bögl

transparent 37/2012

permeating the IT department. The company has also added products to its service portfolio that are to complement its traditional construction services.

15


5d major project I max bögl

As Max Bögl is one of Europe’s largest manufacturers of prefabricated components, this field offers considerable potential. For example, the company used its own know-how of prefab parts to realise the ”slab track Bögl” that has already

been

successfully

built on German high-speed routes and also in China. Other concepts that have been put into practice are HIPERCON®

prefabricated

components,

used,

for

instance in machine tools. And of course, the technical feasibility of such innovations ultimately

depends

information

on

technology,

according to the company. These products are based on interactive, three-dimensional models. Company-wide Information Portal – the Intramax All processes at Max Bögl are based on an intelligent and transparent IT infrastructure. RIB’s iTWO system, the company’s SAP system, the Autodesk Revit construction modelling software, the Microsoft Project scheduling software and other software used in the company are all fully integrated via a central web-based information portal called the Intramax. The construction company uses this portal to handle analysis, risk management and in-house communication. Holistic Mapping of Corporate Processes This portal is a key component of the company’s innovative strategy. After all, innovation is always associated with change processes within a company. Transparent communication is a must. Taking the example of RIB’s new 5D technology, it soon becomes clear that the Neumarkt company had to make obvious changes in many areas to ultimately reach the target set by corporate management. And this target is ambitious. The managers of the Neumarkt construction company are aiming at cost savings of up to 20%. The company makes clear that iTWO is a strategic investment: ”Of course, it will take a few years to pay off and demand a lot of time and personal commitment from every single member of our staff on all levels of the corporate hierarchy.” Working Modern technology played a decisive role in this construction project on the Neu Ulm Volksfestplatz.  Photos: Duckek, company group Max Bögl

16

with the 3D construction model in connection with iTWO brings a significant advantage, particularly for

transparent 37/2012


5d major project I max bögl

The construction company Max Bögl is convinced that it took the right path with the 5D technology.  Animation: ColorPoint®

changes to plans. However, not all projects

The strategy of Max Bögl is crystal clear.

at Max Bögl are being fully managed with

The construction company is positive it has

the new iTWO 5D technology yet. For

taken the right direction by embracing 5D

some projects it is decided that it is better

software technology.

n

to use a purely alphanumeric handling method with RIB iTWO. An Industry in Transition It is believed at Max Bögl Group that the trend towards digital engineering and construction is unstoppable. More and more companies are opting for the new work method. Yet the transition has only just begun. For this reason, the company is committed to exercising its powers of persuasion,

particularly

in

connection

with the contracting of its own planning services, which are usually done with the conventional 2D method. The savings of up to 20% of total construction costs are only possible if the complete planning sector is involved as early on as possible and most importantly, they are convinced of the benefits they will derive from making active use of the new 5D technology. That’s why the focus of Max Bögl Group’s commitment, besides

This project is one of several selected 5D major projects in which the company from Neumarkt tested the new work method for quantity determination, processes and calculation based on a three-dimensional construction model.  Screenshots: Max Bögl Max Bögl, one of the biggest prefabricated component manufacturers in Europe, is striving to be the leader in quality and innovation. www.5d-initiative.eu

the ongoing inspection and revision of in-house processes, is on the planning side.

transparent 37/2012

17


leading position in europe with iTWO I ATP

Integral Planning in Five Dimensions with iTWO RIB’s New Customer ATP the Largest Company in Austria’s Planning Sector

Equipped with the 5D technology ATP will be able to consolidate and build on their leading position in Europe.

n RIB Software AG Stuttgart has won ATP Architekten

architectural tasks with structural engineering measures

und Ingenieure, Austria’s largest project developer

and technical facility equipment. Additionally, the

and at the same time the largest integral planner

client is always intensively involved to ensure that the

in Europe, as another new customer for its digital

completed project entirely meets the desired planning

construction software solution iTWO. The main reason

quality. The company’s recipe for success is based on the

why RIB was awarded the contract were the innovative

extensive exchange of experience among planners from

5D features offered by the software. No vendor in

different areas of specialism, who all speak a standard

Austria was able to offer a comparable IT system, so the

language.

decision was made in favour of RIB, who fully supports all the country-specific characteristics. According to

”iTWO Business Suite is the ideal solution for us,”

Gerald Hulka, Member of the Board: ”The innovative

comments Gerald Hulka, Member of the Board.

combination of 3D geometry, time and cost in one

Besides allowing us to show customers a picture of the

solution makes iTWO Business Suite the only product of

finished construction with all the details from the very

its kind all over the world.”

beginning, the innovative 5D technology additionally provides them with all the relevant cost and time

18

ATP Architekten und Ingenieure sees integral planning as

information. So they are always fully up-to-date on

a prerequisite for outstanding achievements. By integral

the economic conditions of their project. This gives us

planning, the company understands the connection of

value added for our business.” Gerald Hulka continues:

transparent 37/2012


leading position in europe with iTWO I ATP

Animations: ATP

”Equipped with the 5D technology we are able to consolidate and build on our leading position in Europe.” Integrated solutions for complex building construction projects – ATP Architekten und Ingenieure, headquartered in Innsbruck in Tirol, is regarded as the largest integral planning company in Europe. The company can look back on a long tradition of success. Founded in the fifties as a one-man office, ATP Architekten und Ingenieure now has a workforce of about 450 employees at seven sites – in addition to Austria in Germany, in Switzerland, in Croatia, and in Hungary.

transparent 37/2012

n

19


iTWO among medium-sized companies I WOLFF & MÜLLER

Carcassing Quantity Takeoff Time Halved by Digital Engineering and Construction Processes The medium-sized construction company WOLFF & MÜLLER ranks as a pioneer in digital construction. Using the new iTWO software from RIB, it has significantly improved construction processes already, accelerating quantity takeoff for carcassing work by up to 50 per cent. The Stuttgart-based family enterprise implemented iTWO software in 2011 and is convinced that the innovative method of working with 5D construction models will establish itself as the new standard in future.

The construction project, a B&B hotel in Heilbronn, served as a comprehensive illustration of the advantages of digital planning and construction with iTWO for the employees. Animation: WOLFF & MÜLLER

20

n Quality, reliability and innovation strength. These

institutes. They also take on particularly challenging

three keywords have always been the motto of the

power station and civil engineering projects. Their

WOLFF & MÜLLER Group. The medium-sized Swabian

wide-ranging portfolio of services in the classic

family enterprise is one of Germany’s leading

construction market is rounded off by road and

privately owned construction companies. WOLFF &

underground construction work and infrastructure

MÜLLER handle projects all over Germany from new

management projects. Besides actual construction

or modernised buildings for trade and industry or

work, the company also produces construction

the public sector to hotels, office blocks and research

materials, offers a comprehensive concept for

transparent 37/2012


iTWO among medium-sized companies I WOLFF & MÜLLER

The company accelerated the quantity determination for the shell by up to 50% with iTWO.  Models: WOLFF & MÜLLER

investment, property and procurement management, supports and advises industrial companies on buying energy, besides offering insurance for all aspects of construction. The key to the company’s success is the nationwide exchange of information and an active knowledge management covering all fields of expertise. Process Transparency an Essential Prerequisite The targets that Organisation Consultant Andreas Salzer and Helmuth Pfeiffer, Head of Organisation and Data Processing have set themselves for the future are ambitious. To extend the company’s lead, they intend to achieve a significant reduction of project throughput times. With the aim of enhancing profitability and competitiveness, the company plans an end-to-end optimisation of construction processes. This is to be based on a uniform IT landscape linking up all tasks from quantity takeoff through the compilation of work specifications all the way to cost estimation and control. manufacturer to combine 3D geometry with tendering Model-based Engineering and Construction

and award of construction contracts, did not lead to

The company subjected many different software

the expected improvements. In practice, staff had

programs to thorough testing in the search for the

to pool their competences in totally different areas,

optimal tool for integrated, model-based project

i.e. design and cost estimation. However, the desired

management.

increase in efficiency can only be attained when these areas of competence work in parallel, which

WOLFF & MÜLLER thus evaluated various systems

was unfortunately not the case with this and other

of reputed software vendors. One of the first tools

software.

available on the software market, claimed by the

transparent 37/2012

21


iTWO among medium-sized companies I WOLFF & MÜLLER In 2009, the Stuttgart company RIB

method, we have accelerated the quantity

Software AG launched iTWO that also

takeoff process for carcassing work by

promised end-to-end handling of all

roughly 50 per cent.”

construction processes in a 3D model. However, there was a crucial difference

Digitisation of the Construction Industry

between iTWO and all the other products

Gaining Ground

WOLFF & MÜLLER had tested. Helmuth

The

Pfeiffer: ”With this system, the model

amount of value added to the model-based

is

company

attributes

an

immense

entire

method. The staff therefore produce the

construction process. The model-based

3D models themselves to make sure the

processing

the

in-house quality expectations are always

compilation of the work specifications.

met. At first, this step may appear to involve

This was a vitally important aspect for the

extra work and expense, but it pays off by

requirements of our company. Another

the time the quotation is made. Helmuth

consideration was that we had already

Pfeiffer and Andreas Salzer are convinced

worked successfully with RIB software in

that the cooperation with the engineering

the past. So with iTWO we were confident

side will soon change, too. This will depend

that we had found the right solution.”

on having a model-based design, which is

available

throughout

does

not

end

the

with

bound to happen in future, according to The company then implemented the new

the experts.

iTWO 5D software solution from RIB. To create the 3D models, WOLFF & MÜLLER

To demonstrate the full benefits of digital

chose the Revit Architecture CAD system

engineering

from Autodesk. In addition, an optimised

staff, a construction project was taken

content was required for iTWO and Revit

as an example of all the advantages of

Architecture to give the staff an easier

5D processing. At the time, a B&B hotel

start to working with the model-based

in Heilbronn was at the project planning

work method. WOLFF & MÜLLER obtained

stage. Being a medium-sized venture, this

the appropriate software for this from the

was a typical project for the Zuffenhausen

Berlin company htG hartmann technologies

company. The resulting quantities were

GmbH.

absolutely precise. As well as this, iTWO

and

construction

to

the

introduced modern digital construction

B&B hotel in Heilbronn. Typical project for WOLFF & MÜLLER. Classic SME-oriented construction project.  Photos: WOLFF & MÜLLER

22

Improved Economic Efficiency With iTWO

approaches to the sample project such as

”Using iTWO, we reduced our project lead

3D laser scanning. Another project goal

times very quickly, so that we are noticing

was to simulate the construction process.

the first signs of success already,” reports

This was done by dovetailing the iTWO

Salzer. ”By adopting the digital work

software with an additional IT system, the

The work with iTWO permitted guaranteeing very high transparency at very early project phases.  Screenshot: WOLFF & MÜLLER

transparent 37/2012


iTWO among medium-sized companies I WOLFF & MÜLLER

Organisational consultant Andreas Salzer

WOLFF & MÜLLER save time and costs with shortened project run times.  Animation: WOLFF & MÜLLER

ASTA Powerproject project management

in the project. Details are important and

software used at WOLFF & MÜLLER.

variants play a key role. Some customers,

Helmuth Pfeiffer, head of organisation and data processing, ”The clients of WOLFF & MÜLLER also benefit from the transparent construction processes, as a result of which their investment security increases.” Photos: private

especially in the manufacturing sector, Migration Completed in the First Half

even take it for granted that a simulation of

of 2011

the construction process will be provided,”

”Our staff were quick to embrace the

he reports. And, with redevelopment

model-based

recalls

becoming increasingly topical, clients need

Pfeiffer. Those already actively working

to know exactly the quantities that will be

with iTWO 5D are delighted with the new

required to refurbish a building. ”Using

possibilities.”

iTWO, we can visualise these quantities and

work

method,”

measure the involved cost and duration of As they naturally want to stay ahead of

the construction process more accurately,”

the competition in future, too, they are

he sums up.

considering the integration of further example,

Helmuth Pfeiffer concludes: ”Model-based

structural engineering and dimensioning

engineering and construction with iTWO

are to be meshed with the system in the

offers us a large number of options

near future. There is also discussion on

for enhancing our competitiveness. By

linking up building services to derive

shortening our project throughput times

active

Clash

we save time and money. Our clients

Detection feature and thereby speed up

benefit from transparent construction

the planning stage even further. A link

processes, which improve the security

with civil engineering project accounting

of their investment. We are therefore

and the integration of special software

convinced that our investment in the

for sustainable building are also being

integrated software solution will pay off

considered.

very soon.”

processes

with

benefit

iTWO.

from

For

iTWO’s

n

Andreas Salzer (photo above: left, photo below: second from left) explains the model-based work method to colleagues with iTWO. Photos: WOLFF & MÜLLER

Enhanced Competitiveness Andreas Salzer is convinced that iTWO software will establish itself as the standard in the construction industry just as ARRIBA did: ”Clients’ specifications have changed,” he says. ”Nowadays, our customers expect a high degree of transparency very early on

transparent 37/2012

23


industry promotes 5d I engineering firm pinkert

The Future of the Construction Industry is Based on 5D Construction Models Large-scale Industry Sets New Course for the Entire Construction Industry

The model-based work method is intended to make a 15 per cent cost saving in construction implementation possible in the event of stringent material purchase and supply management. For developers 20 to 25 per cent are possible.

n The future belongs to digital engineering and

provide a basis for delivering the demanded quality. As

construction – this is the philosophy of engineering

Pinkert says, ”There is a continuous and massive increase

company Pinkert in Sandersdorf, which was established

in customer expectations.”

in 1990. Its founder and manager, construction engineer Dieter Pinkert, says that the specialty of the company is its

Large-scale Industry Demands Five-Dimensional

holistic approach to construction project management.

Planning

This is reflected in the company’s range of services,

Located in Sachsen-Anhalt, the engineering company

which covers the entire planning chain from tendering

works for major industrial enterprises, i.e. the classic

and site management all the way through to full project

manufacturing industries. One of the core competences

management. The portfolio also includes structural

of Dieter Pinkert’s team is the service phase 5 of the

engineering and technical design as well as supervision

HOAI (Fee Scales for German Architects and Engineers),

and management of planning and construction costs.

which mainly covers implementation planning and

State-of-the-art work methods are applied to keep

cost management. ”Perspective planning in this line

pace with ever-growing customer requirements. To be

of business, for instance in the automotive sector, the

able to carefully examine the opportunities and risks of

solar industry or power plant engineering, is oriented to

their customers’ ideas in the preliminary planning phase

construction management,” says Pinkert. ”The basis for

already, Dieter Pinkert and his team of ten engineers

this is the 5D construction model,” he continues.

rely on model-based processes. In 2010, they introduced

24

Autodesk Revit Architecture and iTWO from RIB, an

The

Sandersdorf

engineers

are

convinced

that

integrated software solution for digital engineering

traditional software for tendering and contracting

and construction in five dimensions. Dieter Pinkert and

construction services is no longer adequate for coping

his colleague Thomas Kunte are convinced that this

with the standards of quality, cost accuracy and

high-tech-software system will equip them to address

delivery reliability demanded in large-scale industry

customer requirements even more specifically and

nowadays. For example, customers of the Pinkert

transparent 37/2012


industry promotes 5d I engineering firm pinkert

company already expect not only extremely

the initial phase,” explains Thomas Kunte. ”It

structured planning but also especially

is extremely difficult to be done without a

accurate realisation of their construction

special affinity with high-tech applications,”

projects. The execution phase is a particular

adds company boss Pinkert, ”and as a

challenge for materials procurement and

company you naturally have to invest a great

project accounting staff; all the data must

deal of time at the beginning to be able to

always be transparent for the customer.

use the new solution efficiently.” Looking at

”Our work in the planning sector comprises

the planning time for this project however,

project control activities, the exact planning

which has a total volume of approximately

of technological processes and, above

40 million euros, the fast payback period of

all, end-to-end management of all costs

the 5D solution is immediately apparent. The

incurred in a project,” adds Dieter Pinkert.

project has reached the execution stage in the same year in which the Pinkert company

The company meets these demands of

made the changeover.

industry with the integrated software solution consisting of iTWO from RIB

Basis for Smooth Construction Workflow

and Autodesk Revit Architecture. The 3D

According to the experience of the staff, the

geometry ensures the desired quality, iTWO

group most hesitant to use the new planning

Business Suite focuses on cost accuracy for

methods is that of the technical building

the customer and the scheduling system

equipment engineers. ”If these people didn’t

MS Project, which can easily be linked up to

shy away from the expenditure involved in

the system solution, helps to guarantee the

changing the system, it would be possible

deadline reliability expected by the client.

to integrate all aspects into an end-to-end model that could be used as a basis for a

Strategic Switchover

smooth construction workflow,” comments

In 2010, the company, which has meanwhile

Pinkert. After all, the technical ERP solution

used RIB software for 20 years, switched

from RIB already incorporates integrated

from the predecessor system ARRIBA to

clash detection for such structured planning.

the new iTWO solution. This was a strategic decision, as ”engineering and construction

High Savings Potential on Both Sides

with 5D construction models will establish

The company founder sees tremendous

itself as standard practice,” as Dieter

savings potential from the use of 5D.

Pinkert emphasises. The Industry has clearly

Contractors can save about 15 percent

indicated that the construction business is

provided they apply stringent materials

expected to adopt this technology. Pinkert

purchasing

estimates that roughly 50 percent of all

According to Dieter Pinkert, engineering

Germany’s engineering and construction

companies can save even more, as ”more

capacities will have implemented the new

planning accuracy means less deviation from

work method within the next five years.

the actual construction. We can save 20 to 25

and

process

management.

percent of planning and engineering costs At the moment, however, the picture is

using the model-based method,” Pinkert

rather different. Four members of staff

sums up. ”This savings potential alone shows

use the integrated software solution at the

why the future belongs to 5D and why there

Pinkert company, producing 3D models

is no alternative.” 

on the basis of dwg files in Autodesk Revit Architecture and transferring them to the RIB iTWO technical ERP software. In a power plant construction project, the specialist engineers from Sandersdorf planned a conglomerate of factories consisting of 15

n

The 3D geometry guarantees the quality the client desires. iTWO Business Suite focuses on cost security. Dieter Pinkert estimates that in about five years around 50 per cent of the entire planning and realisation capacity in Germany will make active use of the new work method based on the 5D construction model.

separate buildings on the basis of pdf files. ”The processing of the models involves a

 

Models: engineering firm Pinkert

tremendous amount of work, particularly in

transparent 37/2012

25


integrated solutions I b.i.m.m. gmbh

The Site Manager of the Virtual Model ”Predict 1:1 How the Process Will Work on the Construction Site”

Improved cooperation and project communication in all phases of planning with model-oriented project processing.

26

n Simulating the Construction Process on the PC

located, companies involved in a project are to be given

Anton Gasteiger sees himself as a pioneer of new

easy access to the information via the world wide web.

work processes in construction engineering. In 2010,

The international team of specialists working for the

he achieved a vision by founding b.i.m.m. GmbH

Kufstein-based b.i.m.m. GmbH is propagating improved

together with the architect and engineer Martin

cooperation and communication of everyone involved in

Taurer and software specialists Jochen Reichert and

the planning stage in all phases. In the model, quantities

Shenqiang Wu. The company name b.i.m.m. stands

and all components of a project are displayed in three

for building information model management, i.e.

dimensions. The model-based quantity takeoff paves

the management of building information using a

the way for transparent cost information via a detailed

three-dimensional model. The challenge for these

list of work including all price data. Beyond this, the

international experts is the efficient networking of all

model also contains information on construction time.

stakeholders in the planning stage of a construction

”The aim is to avoid delays in the construction schedule

project – be they designers or structural or mechanical

right from the beginning,” comments Anton Gasteiger.

engineers. According to founder Anton Gasteiger, this

Using the model, the entire construction process

entails providing everyone involved in the planning

can be simulated on the PC. And Anton Gasteiger,

stage, i.e. architects or engineers, with the information

founder of the AGA-BAU GmbH company in Tirol,

they need on any construction component, for

is convinced that the PC can be an indispensable tool

instance a supporting member. ”This is done with the

for efficient processes on a real construction site, too.

three-dimensional model,” he adds. Wherever they are

Most importantly, it allows risks to be detected even

transparent 37/2012


integrated solutions I b.i.m.m. gmbh

”Each planner or specialist planner has access to the information decisive for his concerns on each construction element.” Engineer and architect Anton Gasteiger



before they arise. He is certainly not short of

Animation: Martin Taurer.

lists, etc., and then calculated. 

practical experience in this field.

Modell: b.i.m.m. GmbH

Integrated Solutions Virtual Reality as a Preliminary Stage

Nowadays, of course, software technology

To date, AGA-BAU has completed roughly

has reached the level of sophistication

400 projects. For about four years, they have

required for the comprehensive method

all been realised using the new b.i.m.m work

that

method – not only in Austria. All the projects

Besides standard Autodesk software such

are planned virtually on a computer first as

as Autodesk REVIT Architecture for the

prototypes.

architectural

b.i.m.m.

intends

design,

to

implement.

Autodesk

REVIT

Structure for the structural engineering and The Kufstein engineer and architect was

Autodesk REVIT MEP for the mechanical

successfully working on 3D design as early

engineering,

as the end of the eighties. The service

use various developments of their own,

portfolio of the AGA-BAU GmbH already

the so-called b.i.m.m tools. The parameter

covered joinery calculations for roofs, all of

tool enables simultaneous editing of all

which Gasteiger designed on the computer

parameters. A special floor tool produces

as 3D models, including all joints and special

a realistic view of flooring for an entire

designs along with the structural analysis,

storey including all layers, doorsills and

transparent 37/2012

the

b.i.m.m.

professionals

b.i.m.m. GmbH from Kufstein, Tyrol (Austria) sees its role both as general planner as well as ”support provider” in introducing BIM in the planning process. About ten to 20 per cent of the overall planning costs on average can already be saved with a model-based work method. If one in addition considers the savings on the part of the construction company and conducts comprehensive controlling, overall cost savings of up to 30 per cent are also possible.

27


integrated solutions I b.i.m.m. gmbh

iTWO from RIB above all covers the tasks of the company carrying out the construction. 

Animation: Martin Taurer.

masonry niches. The service portolio of b.i.m.m

sees itself as so-called site manager of the virtual model

GmbH also comprises customised software geared to

with the main task of providing all project participants

project-specific requirements in order to enable even

with the information they need. ”The 5D construction

more efficient use of the systems available on the

model enables us to predict 1:1 how the process will

market - Anton Gasteiger and his constantly growing

work on the construction site,” says Gasteiger. On the

team at b.i.m.m. rely on integrated solutions to be

basis of the tender preparation plans, construction

able to keep optimising the practical relevance of their

companies can see an exact breakdown of project costs.

complete portfolio.

With this modern method, Anton Gasteiger is able to precisely determine the economic efficiency not only

b.i.m.m GmbH regards itself both as leading company

of structural components, but also of materials, such as

and ”support provider” for the introduction of BIM in

different grades of concrete. His detailed models also

the planning process.

contain the necessary resources, for example cranes and construction machinery. ”Our 5D representation of

New Basis for Cost Estimation

construction site activity is so transparent that the price

Unlike several well-established engineering software

calculation for the construction company is realistic,”

products in the b.i.m.m. portfolio, iTWO from RIB

he continues. ”That means a totally new type of cost

also covers the construction side of a project. The 3D

estimation basis for the contractor.”

model, therefore, is primarily intended to help project

28

participants in the construction process itself. Besides

Transparency: Two Sides of a Coin

the three-dimensional geometry, iTWO comprises

According to the motto: No construction site is too

resource

construction

small and none too large to justify efficient planning,

materials, machines or construction site workers,

the company also approaches clients on the subject and

time and process components. Its manufacturer,

encourages them to demand it. ”These are the people

RIB, calls it a 5D construction model. The integration

who are most likely to notice the overall cost benefits,

between Autodesk REVIT and iTWO enables the

not to mention those of avoided errors,” comments

three-dimensional model to be transferred to the

Anton Gasteiger. The engineer is convinced that clients

RIB solution. This step also includes the checking and

will play a key role in the gradual change in work

editing of all structural components. The objective of

processes throughout the construction industry. Some

b.i.m.m. GmbH is to pass the construction model to

of Austria’s construction companies are still reluctant

the contractors in a form that enables them to realise

to embrace the new methods. The comprehensive

all kinds of processes of their construction projects,

data transparency offered by working with the 5D

ranging from material ordering to cost control. b.i.m.m.

construction model is a two-sided coin, says the expert.

information,

i.e.

data

on

transparent 37/2012


integrated solutions I b.i.m.m. gmbh

This is due in part to the sensationalist

­Bau-PLANUNGS GmbH. The company plans

coverage of the subject of data protection

to directly provide all companies involved

by the media. Transparent information

in a project with the 3D models in a virtual

processes are usually presented in the

forum on the Internet. In future, all parties,

clichéd ”Big Brother is Watching You” style.

Anton Gasteiger says, are to be enabled to

In addition, many of Austria’s construction

process or retrieve all the project information

companies work with country-specific cost

in real time.

estimation and cost management software. Switching to the German RIB system would

5D on the Advance with iTWO

involve a fundamental change in the initial

Despite the rather low current prevalence

phase.

of RIB software systems on the Austrian market, Gasteiger is convinced that iTWO

On the Way to Cost Reduction

will take the whole country by storm. ”When

Clients, on the other hand, are extremely

I heard of the new 5D solution, I knew

keen to increase cost transparency. According

right away that I wanted to add it to my

to Anton Gasteiger, an average of ten to 20

product portfolio,” he says. ”I have always

per cent of total planning costs can already

felt that working with the most modern

be saved by using a model-based working

and innovative IT solutions the market

method. ”If you also look at the savings

has to offer is a sound basis for success in

made by the construction companies and

the construction industry. RIB’s new iTWO

implement end-to-end cost control, you can

software system is definitely in this league.

even attain total savings of thirty per cent,

The career I have had so far proves that my

which is what has already been achieved

intuition was correct,” he concludes.

n

in the automobile and manufacturing industries with the aid of the digital factory,” says Gasteiger. ”Cost changes that have been caused by changes to the plans can be shown the very same day using the model-based method,” Gasteiger reports. For this reason, b.im.m. GmbH is currently concentrating

www.bim-management.at www.bim-management.com

on the client side of the business. ”If clients expect a model-based working method, contractors will have no other option,” the expert is confident. However, because ”The Journey is the Goal” applies to clients just as it does to all other project participants, b.i.m.m. GmbH supports each company for at least six months. This is the only way to ensure long-term success with the new project management methods. The

production

of

three-dimensional

b.i.m.m models is gradually becoming more and more of an interesting proposition for architects, too, although Gasteiger expects the trend to take a while to catch on completely in this group of professionals. Virtual Forums b.i.m.m. GmbH characterises the corporate philosophy of actively supporting Austria’s largest

architecture

and

engineering

company – ATP – as well as the country’s smallest lead planning company – AGA-

transparent 37/2012

29


individual user plans digitally I kraneis bauingenieure

Model-Based Engineering and Construction Processes Efficiently Implemented in Real Estate Projects ”Better to plan in the office than on the construction site with an excavator shovel” Continuous optimisation ”As an engineer, you have to move forward at least every two years,” he explains. ”Only then do you derive a practical benefit from competitive advantages.” He also stresses the importance of ongoing further training. He has based his planning on three-dimensional geometry models ever since the nineties. At that time, Kraneis explored projects in mechanical engineering and the process industry, where the switchover to digital engineering and construction took place much sooner than in the construction industry. ‘Drawing in 2D is a waste of time‘ Until 2009, Detlev Kraneis waited for a similar, mature system for the construction industry. In his opinion, the 2D drawing customary in the planning environment is not only a joyless task, but a waste of time. Defining the construction sequence in the planning stage ”When I plan an object in 3D, I can get detailed results in a very short time without a great effort,” he reports. 3D planning saves him the work of processing views, Construction engineer Detlev Kraneis had already introduced the new 5D software solution iTWO from RIB.

sections or details separately. Detlev Kraneis edits the three-dimensional models with Autodesk Revit. Just one mouse click gives him all the quantities plus the

n Dipl.-Eng. Detlev Kraneis, a construction engineer

detailed costs within iTWO Business Suite. If there are

from Leverkusen, sees himself as a partner in project

any changes to the plans, the impact on the costs can

planning, site management and supervision, besides

be seen immediately. This makes it easier for him to

working as an appraiser and advising clients on buying

communicate with all his project partners. Tradesmen

or building their own properties. To offer his customers

can see from the model what the job they are working

a top-quality, modern service, one of his main concerns

on is supposed to look like, as the construction sequence

is energy- efficient construction and energy consultancy.

is already fixed in the plan. The cooperation with the

Using thermographs, he detects sources of heat loss in

client gains transparency, as he can see the impact of any

buildings and manufacturing defects. Throughout his

changes in detail. The engineer also plans to implement

career he has always been quick to embrace business

resource management and a scheduling system into

trends, enlarging his portfolio of services accordingly.

the overall system in the near future in order to benefit

This is also reflected in the way he integrates the latest

from the full scope of the 5D functionalities.

information technology in his daily work. End-to-end

30

construction process and project management based

”By reducing the workload in costing and quantity

on a 5D construction model helps him work particularly

takeoff, compilation of works specifications, invoicing,

efficiently. In 2009, Detlev Kraneis introduced RIB’s new

and

5D software solution iTWO, which is becoming more

consisting of RIB iTWO and Autodesk Revit saves about

and more popular among Europe’s leading construction

50% of my time,” he says. And time is money in the

companies as well.

construction industry, as everybody knows.

preparing

tenders,

the

integrated

solution

transparent 37/2012


individual user plans digitally I kraneis bauingenieure

However, switching from 2D plans to the

site using a Tablet PC. He also intends to

integrated

thorough

log defects on site – naturally in 3D. Apart

routine in 3D modelling, because the fast

from this, he is currently defining various

processing of variants, which is what saves all

configuration options with construction

the time later on, can only be optimally done

materials of different quality grades that

if the models have been prepared in exact

he can use to tailor his plans to individual

detail and are always correctly defined.

customer requirements.

solution

requires

This requires comprehensive training and practice and constant further development,

The concept for success:

according to the expert.

Technology and innovation The motto of Detlev Kraneis is: ‘Better to

Customers demand more transparency

plan in the office than on the construction

But, as Detlev Kraneis explains, there

site with an excavator shovel.’ The engineer

will soon be no alternative. ”Customer

is convinced that this is only possible with a

expectations are increasing all the time,”

model-based working method. ”Successful

he reports. ”This is not only the case for

planning goes hand in hand with a high

extremely large construction projects, which

affinity for technology,” the engineer from

means that an integrated technical ERP

Leverkusen concludes. 

system like iTWO Business Suite is essential for

large

construction

companies.

My

customers in the private sector are expecting more and more transparency, too,” he adds. ”They want to see why something on the construction site is not working so that they can take appropriate action if necessary.”

n By using 3D planning the engineer obtains detailed results very quickly and without great expense. Optical changes, quantities and costs are all transparent for the customers of Kraneis Bauingenieure (Construction Engineers) and they can reach better founded decisions. 

Screenshots: Kraneis Bauingenieure

Energy consultancy: Costs at a keystroke Apart from cost estimating, Detlev Kraneis mainly uses iTWO for energy consultancy. ”When I define a new heating system with a corresponding output in Revit, iTWO shows me the exact cost at the press of a key.” If a building is thoroughly restored to meet all the current energy specifications, the engineer just has to make graphic adjustments to the model to get all the quantities and costs needed to implement the project. The customer can see all the visual changes, quantities and costs entailed by an energy-saving renovation and make more informed decisions. Other ideas the engineer plans to put into practice include the adjustment of 3D models directly on the construction

transparent 37/2012

31


WOLFF & MÜLLER Holding GmbH & Co. KG Schwieberdinger Straße 107 70435 Stuttgart Telefon +49 711 8204-0 info@wolff-mueller.de

www.wolff-mueller.de

WE HAVE BUILT THE FUTURE FOR 75 YEARS. The Future is digital, even in construction industry. For that reason we rely on state of the art software applications to link our WOLFF & MÜLLER planning and calculation units in a smart way. Thereby we are able to achieve obliging results, even if structural parameters are changed spontaneously. For guaranteed planning.