Republic of the Philippines

City of Koronadal Water District Block I, Casa Subdivision, Zone III, City of Koronadal Tel. No. (083) 520-0674/ (083)228-4049

December 27, 2012 Mr. Rey J. Vargas General Manager City of Koronadal Water District Block I, Casa Subdivision, Zone III, City of Koronadal

Annual Accomplishment Report 2012 – Production Section This serves as Production Section summary of all activities/events occurred in the entire year of 2012.

January: ü ü ü ü

Restoration of Estember Reservoir Perimeter Lights San Isidro PS in-house power meter reconnected Start of installation of 3-phase powerline at Agreville P3 well Cleaning of Estember Reservoir Concrete Tank

01/11 01/19 01/24 01/11 (every 6 months)

February: ü ü ü ü

Installation of Hypochlorinator @ Estember Reservoir Installation of Agreville P3 motor control Completion of 3-phase primary powerline @ Agreville P3 (Hotline) Conduct Pumping Test of 6 Pumping Stations w/ LWUA Engr. Elefan

02/02 02/19 02/23 02/28

March: ü ü ü ü

Adjust operation of Victory Homes pumping (23hrs & 50min RUN,10min OFF) Replacement of Forro PS Genset oil and fan belt Rehabilitation of San Antonio P1 PS perimeter lights Replacement of Sta. Cruz PS outlet pressure gauge

Production Section Annual Accomplishment Report 2012

03/01 03/22 03/26 03/30


April: ü ü ü ü

Rehabilitation of Forro PS perimeter lights Replacement of Bo.2 PS Genset oil / oil pressure warning Replacement of San Isidro PS Genset oil Replacement of San Isidro PS motor control push button & selector switches

04/02 04/17 04/19 04/26

May: ü Meeting: Mr. Piabol - genset/chlorinator/control (weekly) Mr. Rosal - chlorine residual (daily) ü Memo: Conduct of Flushing Maintenance personnel

05/15 05/16

June: ü Road clearing of Victory Homes PS ü Installation of MTS at Sta. Cruz PS ü Commissioning of 51kVA Genset at Sta. Cruz PS

06/06 06/25

July: ü ü ü ü

07/04 07/09 07/12

Conduct well inspection at San Isidro PS Drain fuel of Genset @ Bo.2 PS (presence of water) Reinstallation of temp. electrical connection @ Agreville P3 (on process..) Replacement of Submersible Pump at San Isidro PS / Camera Logging

August: ü Cleaning of Estember Reservoir Concrete Tank ü Installation of service entrance at Agreville P3 PS ü Start of well drilling at Victory Homes

Production Section Annual Accomplishment Report 2012

06/26

07/31

08/02 (every 6 months) 08/10 08/13


September: ü Installation of electromechanical components @ Agreville P3 PS ü Pumping test at Agreville P3 PS ü Pilot hole logging at Labiste well ü Pilot hole logging at Victory Homes new well

October: ü Replacement of defective chlorinator @ Sta. Cruz PS ü Improvement of Agreville P3 PS discharge line ü Conduct well inspection at Morales PS ü Replacement of AVR and battery for Base Station @ Estember Reservoir ü Shutting down operation of San Antonio P1 Ps ü Utilization of Agreville P3 PS

09/13 09/14 09/15 09/16

10/02 10/05 10/10 10/12 10/31 10/31

November: ü Motor control trouble at San Isidro PS ü Conduct flushing at San Antonio P1 (high presence of iron/manganese residue) ü Constant monitoring of well drilling (PDN Chief)

December: ü Prepare documents for ECC/CNC applications (PDN Chief) ü Transfer of electromechanical components to new well Victory Homes PS ü Reinstallation of Sta. Cruz PS ü Installation of Cut-out Assembly @ Sta. Cruz PS

Production Section Annual Accomplishment Report 2012

11/05 11/20

12/11 12/08 12/13


Production Personnel Composition: 1. 2. 3. 4. 5.

Production Chief (OIC) ENGR. DIONISIO B. DURAGOS JR. Water Quality Officer ROGER M. ROSAL Control Technician RONIE P. PIABOL Reservoir Watchman RENE E. ESTORNINOS Pump Operators (19 heads): ASEN, JEREMIAS FRANKLIN R. BADERA, ALVIN B. BORRA, LUDOVICO JR. T. CERNA, ELY ANTHONY A. DAMGO, LERMO H. FELONGCO, RONNIE M. HURTADA, BRAULIO D. LLAMELO, JOSE BOBBY T. OBOGON, JUN S. OLINOY, JODIE PALAD, JOEWE M. PANES, JOHNNY A. PANO, ARNOLD PARRENO, RAMON A. POSADAS, RANDY MANUEL T. SULIT, RONALD TAÑEDO, ABCEDE G. UNICO, SUANSO VILLAREAL, RAYMUND R.

CKWD Production Facilities: 1. Pumping Facilities (7 locations)

2. Reservoir (1 location)

Bo. 2 Pumping Station Forro Pumping Station Morales Pumping Station Sta. Cruz Pumping Station San Isidro Pumping Station Agreville P3 Pumping Station Victory Homes Pumping Station Estember Heights Reservoir

Capacity: 26.10 lps Capacity: 19.00 lps Capacity: 18.50 lps Capacity: 17.50 lps Capacity: 17.10 lps Capacity: 18.20 lps Capacity: 1.80 lps Capacity: 800 m3

Production Section Operation Overview: “Production section primary function is to ensure ample amount of clean and potable water is available to our concessionaires at any given time of the day. To cope up with the daily water demand, constant monitoring is observed in all production facilities and its parameters. Proper disinfection procedure on pumping stations is observed before releasing water to the system. To ensure water quality compliance in Department of Health standards, monthly bacteriological test are conducted in random points of the system including pumping stations. And cleaning of reservoir/tank is conducted semi-annually to further improve water quality. In addition, weekly flushing on critical points of the system is practiced as part of water quality improvement measures.”

Prepared by:

Engr. Dionisio B. Duragos Jr. Production Chief (OIC) Plant Electrician C (SG 8) Cc: Admin Acct’g OGM

Production Section Annual Accomplishment Report 2012