Page 1

RABIADILARA CELIK-ARCHI TECTURAL DE SIGN-PORTFO LIO-2011/18


2018

DEGLI ESPOSTI ARCHITETTI -Architectural Intern -Office

Degli Esposti Architetti -Lorenzo Degli Esposti


1

4


1

5


1

6


1

BAYRAMPASA LOFT

THE EXISTING FACTORY LOCATED ON THE PROJECT AREA. THE FINISHINGS AND

DETAILS

ONLY THE

OF THE STRUCTURE WILL BE

EXTRACTED.

THE COMMUNAL L FE MASSES WIL BE ATTACHED TO THE STRUCTURAL COLUMNS AND BEAMS CREATING A FLOW INSIDE THE BUILDING.

AN

STRUCTURAL ELEMENTS WILL BE KEPT SUCH AS COLUMNS AND BEAMS.

THE VERTICALLY ALIGNED WOODEN PANELS WILL BE PLACED TO CREATE URBAN PATTERN INSIDE THE PROJECT AREA.

THE LAYER OF THE PROJECT LINED CONSECUTEVLY AS

THE LANDSCAPE WILL BE ARANGED ACCORDING THE MAIN AND SECONDARY STRUCTURES.

TO THESE PATTERNS AND CARRY ON INSIDE

STRUCTURAL SYSTEM, COMMUNAL LIFE MASS, WOODEN DECKS AND THE LANDSCAPE REGULAT ONS.

7


1

8


1

9


2

10


2

11


2 +18.00 SCALE:1/1000 STUDY HALL ARCHIVE

+15.00 SCALE:1/1000 MANAGEMENT OFFICES, AUDITORIUM STUDY HALL

+12.00

SCALE:1/1000 RESTAURANT PERFORMANCE HALLS

+9.00 SCALE:1/1000 TEMPORARY EXHIBITION HALLS 2 X 600 4 X 300

+6.00 SCALE:1/1000 PERMANENT EXHIBITION HALL, GUEST HOUSES, COMMUNAL GARDEN

+3.00 SCALE:1/1000 ENTRANCE, RECEPTION, CLOAKROOM, GIFT SHOP, OFFICES, PERMANENT EXHIBITION HALL, WORKSHOPS

12


2 the total area needed for the fırst floor ıs 3200 m2, but the floor plan and the mass wıll be large. to solve thıs area problem, the suıtable part of the plan scheme wıll rıse up one more floor as an ınterstage. the total area needed for the fırst floor ıs 2500m2 but the floor plan does not have enough area to fıt ın thetemporary exhıbıtıon halls,cafe and the performance stage, as a solutıon thıs sectıon wıll be two storey heıght reachıng 6m wıth and ınterstage. the gıven area for the second floor ıs 2700m2 but the floor plan does not have area for the audıtorıum, foyer and archıve. as applıed on the other floors, here wıll also have an ınterstage to cover the needed areas.

13


2

14


2

15


2

16


2

17


2

18


2

19


3

20


3

21


3

22


3

23


3

24


3

25


3

26


3

27


3

28


3

29


3

30


3

31


4

32


4

33


4

34


4

35


4

36


4

37


5

38


MATERIALS:

POLITECNICO DI MILANO

5

SCHOOL OF ARCHITECTURE URBAN PLANNING CONSTRUCTION ENGINEERING

-BALLOON FRAME WOOD STRUCTURE

A.Y. 2017 / 2018

-STRAWBALE PANELS

A

-BAMBOO SUN SHIELDS

ARCHITECTURAL DESIGN IN DEVELOPING COUNTRIES

-hempcrete panels -green roof -concrete base

Professors Le�zia Ca�ani Paolo De’ Angelis Colleague Monica Moscatelli EDUCATIONAL CENTER IN GAZA STRIP -glass panels -wood frame 2cm

CELIK DILARA 869052 CETIN ILKE

868844

TOTAL AREA : 25.000 m SCHOOL COMPLEX: -KINDERGARTEN -PRIMARY & SECONDARY SCHOOLS -HIGHSCHOOL -ALLIGNED WITH THE BOYS SCHOOLS WITH THE SAME USAGE TYPE

-balloon frame wood structure -bamboo sun shades -formed by 2 parts

GENERAL PLAN SCHEME:

A

B

PARTIAL DETAILED PLAN

-ENTRANCE -MEETING ROOMS -TEACHERS OFFICE -CLASSROOMS -CAFETERIA -LABORATORIES -TOILETS -MAINTANENCE ROOMS

SCALE : 1/200

Vegeta on Soil

B ELEVATION

SCALE : 1/200

Protec on membrane Drainage Protec on membrane Waterproofing Steel shee ng Vapor barrier Support panel Wood Beam 150mm Plaster

LE

ION EXAMP

CONNECT

Wood Column 150mm Plaster

SECTION DETAIL SCALE : 1/20

A-A SECTION

SCALE : 1/200

39


5

40


5

41


5

42


5

43


5

44


5

45


6

ALEPPO | RECONSTRUCTION OF THE DEMOLISHED NEIGHBORHOODS & CONNECTION TO THE GREENBELT (ONGOING PROJECT)

46


6 5 ALEPPO DISTRICTS SOCIAL PROBLEMS

Insecurity Poverty

ALEPPO DISTRICTS SERVICE PROBLEMS

Lack of Educa�on Centers Lack of Health Centers

47


5 6

48


6 5

49


5 6

50


5 6

51


6

52


6

53


6

54


6

55


6

56


6

57


6 E F

D

PLAN 1/50

Finishing ceramic tile 10mm Adhesive 2mm Waterproof membrane 10mm Screed (%1-2 slope) Thermal insulation 100mm R.C. Slab 30mm Plaster/finishing

C

DETAIL C ROOF DETAILED SECTION 1/20

Finishing ceramic tile 10mm Adhesive 2mm Screed with pipes 100mm R.C. Slab (with ventilation cavity) Gravel Vapour retarder 5mm Soil

B

Exterior finishing natural stone Adhesive 3mm Thermal insulation 50mm Waterproof insulation 5mm CMU Concrete blocks 215mm Plaster 10mm

A

PARTIAL SECTION 1/50

FOUNDATION DETAILED SECTION 1/20

DETAIL B

DETAIL A

Finishing ceramic tile 10mm Adhesive 2mm Screed with pipes 100mm Acoustic membrane 10mm R.C. Slab 30mm Plaster/finishing

FLOOR DETAILED SECTION 1/20

, 1/20

EXTERIOR WALL PLAN 1/10 DETAIL D

INTERNAL WALL PLAN 1/10 DETAIL E

WATER SUPPLY PLAN 1/50

ENERGY PERFORMANCE MATERIALS d(mm) (from interior natural stone 30mm adhesive 3mm thermal insulation 50mm waterproof 5mm concrete block 215mm gypsum plaster 10mm interior finish (paint) 0mm

Thermal Conductivity (λ) (W/Mk) 1,83 1,40 0,022 0,045 0,088 1,40 -

2

R(W/m K) 0,079 0,32 2,04 0,16 2,18 0,32 -

PARTIAL ELEVATION WITH SHADOWS 1/50

58

DOOR CONNECTION PLAN 1/10 DETAIL F


6 +0.00

STRUCTURAL STUDY

POLITECNICO DI MILANO SCHOOL OF ARCHITECTURE URBAN PLANNING CONSTRUCTION ENGINEERING A.Y. 2017 / 2018

TUTORS:

ARCHITECTURAL DESIGN STUDIO 2 ALEPPO / REVITALISING THE CITY

Proff. A.Del Bo M.V. Carddnale C. Sanggorgg, T. Zambettt Tutors : Proff C.Fumagalll S.Perego A

STUDENTS:

CELIK DILARA 869052 CETIN ILKE 868844

STRUCTURAL STUDY

SCALE : 1 / 50

59


Dilara Celik | Architectural Design | Portfolio  

Selected studio works between 2011-2018

Dilara Celik | Architectural Design | Portfolio  

Selected studio works between 2011-2018

Advertisement